CN103601094B - Substation's hand-operated tackle - Google Patents
Substation's hand-operated tackle Download PDFInfo
- Publication number
- CN103601094B CN103601094B CN201310509665.0A CN201310509665A CN103601094B CN 103601094 B CN103601094 B CN 103601094B CN 201310509665 A CN201310509665 A CN 201310509665A CN 103601094 B CN103601094 B CN 103601094B
- Authority
- CN
- China
- Prior art keywords
- straight
- hole
- pulley
- wedge
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Package Frames And Binding Bands (AREA)
- Clamps And Clips (AREA)
Abstract
Substation's hand-operated tackle, comprise coaster support, the middle part fixed pedestal axle of coaster support, pivot shaft installs pulley, pulley is equipped with crank, the lower end of coaster support is provided with insurance gib head, through hole offered by pulley, two straight-bars are set in through hole, the two ends of each straight-bar are all outside at through hole, the lower end of straight-bar arranges sphenocephaly, the pointed end of sphenocephaly, the top of straight-bar arranges wedge, the point upward of wedge, the top of two straight-bars connects cylindricality block, bottom cylindricality block, blind hole is set, straight-bar inserts in blind hole, the hole wall of blind hole is offered wedge hole, wedge is through wedge hole, cylindricality block top connects stay cord, between two straight-bars, spring leaf is set.Adopt between stay cord with pulley and be fixedly connected with, avoid the phenomenon that stay cord and pulley skid, equipment rises steadily, stay cord uniform force, ensures the safety that stay cord uses; Different according to the equipment of transport, be convenient for changing different stay cords, easy disassembly between stay cord and pulley, increase work efficiency.
Description
Technical field
The present invention relates to a kind of substation equipment, is exactly a kind of substation hand-operated tackle.
Background technology
Power transformation is in the process of repairing, hand-operated tackle can realize laborsavingly pulling stay cord, but between stay cord and the pulley of coaster be sliding block joint, therefore in drawing process, often there is skidding between stay cord and pulley, cause the very fast decline of equipment of carrying, the pulling force of stay cord body is strengthened, the fracture causing stay cord is set, the device fall of conveying is damaged, and serious injures staff by a crashing object.Although adopt to be fixedly connected with between stay cord with pulley and can overcome above-mentioned shortcoming, according to the size and the weight that pull equipment, select different to stay cord length thickness, stay cord is changed frequent.Stay cord is by being connected with coaster in pulley surface knotting, and the method for knotting often tightly can not cause loosening because of knotting, causes a hidden trouble; Or knotting tension is not easy dismounting, affects work efficiency.
Summary of the invention
For overcoming above-mentioned deficiency of the prior art, the present invention is to provide a kind of substation hand-operated tackle.
The present invention for achieving the above object, be achieved through the following technical solutions: substation's hand-operated tackle, comprise coaster support, the middle part fixed pedestal axle of coaster support side, pivot shaft installs pulley, pulley is equipped with crank, the lower end of coaster support is provided with insurance gib head, through hole offered by pulley, two straight-bars are set in through hole, the two ends of each straight-bar are all outside at through hole, the lower end of straight-bar arranges sphenocephaly, the pointed end of sphenocephaly, the top of straight-bar arranges wedge, the point upward of wedge, the top of two straight-bars connects cylindricality block, bottom cylindricality block, blind hole is set, straight-bar inserts in blind hole, the hole wall of blind hole is offered wedge hole, wedge is through wedge hole, cylindricality block top connects stay cord, sphenocephaly on two straight-bars, the line of centers specular that wedge one cylindricality is fast, between two straight-bars, spring leaf is set, the power that spring leaf gives straight-bar one outside all the time.
In order to realize object of the present invention further, can also by the following technical solutions: described cylindricality block periphery arranges pivoted housing, and pivoted housing inwall arranges negative thread, and cylindricality block periphery arranges outside thread, and negative thread and outside thread match.Described blind via bottom arranges horizontal slide rail, and straight-bar top arranges slide block, and slide block and slide rail match.Described cylindricality block periphery arranges vertical wire casing.Described pulley bracket is provided with fixed point lock pin, fixed point lock pin is arranged on the end of the wheel body of pulley.Install assistant support between described crank and pulley, crank is arranged on one end of assistant support, and the other end of assistant support installs balance block, and fixed handle is installed on the top of coaster support.
Beneficial effect of the present invention is: adopt between stay cord with pulley and be fixedly connected with, avoid the phenomenon that stay cord and pulley skid, and equipment rises steadily, stay cord uniform force, ensures the safety that stay cord uses, transportation safety and stability; Different according to the equipment of transport, be convenient for changing different stay cords, easy disassembly between stay cord and pulley, increase work efficiency.The present invention also has advantage compact, cheap for manufacturing cost and easy to use simple for structure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention; Fig. 2 is the I partial enlargement structural representation of Fig. 1; Fig. 3 is the II partial enlargement structural representation of Fig. 2.
Reference numeral: 1 crank 2 assistant support 3 pivot shaft 4 balance block 5 stay cord 6 fixed handle 7 lock pin 8 pulley 9 coaster support 10 of fixing a point insures gib head 11 wire casing 12 pivoted housing 13 spring leaf 14 wedge 15 blind hole 16 through hole 17 straight-bar 18 sphenocephaly 19 cylindricality block 20 slide block 21 slide rail 22 wedge hole.
Detailed description of the invention
Substation's hand-operated tackle, as shown in Figure 1, comprises coaster support 9, the middle part fixed pedestal axle 3 of coaster support 9 side, pivot shaft 3 is installed pulley 8, pulley 8 is equipped with crank 1, the lower end of coaster support 9 is provided with insurance gib head 10, pulley 8 is offered through hole 16, arrange two straight-bars 17 in through hole 16, application force is evenly distributed on two straight-bars 17, and two straight-bars 17 interact, the width of the straight-bar 17 after closing up is corresponding with through hole 16 internal diameter, keeps compact.The two ends of each straight-bar 17 are all outside at through hole 16, the lower end of straight-bar 17 arranges sphenocephaly 18, the pointed end of sphenocephaly 18, sphenocephaly 18 conveniently has direction as shown to enter in through hole 16 from top to bottom, can coordinate fast clamp from through hole 16 lower end after stretching out with the edge of through hole 16.The top of straight-bar 17 arranges wedge 14, the point upward of wedge 14, the top of two straight-bars 17 connects cylindricality block 19, and arrange blind hole 15 bottom cylindricality block 19, straight-bar 17 inserts in blind hole 15, the hole wall of blind hole 15 is offered wedge hole 22, wedge 14 is through wedge hole 22, and cylindricality block 19 top connects stay cord 5, when wedge 14 is pushed wedge hole 22, from up to down slide and press, namely change the position of holding cylindricality block 19 and just can complete coordinating between straight-bar 17 with pulley 8.The line of centers specular of the sphenocephaly 18 on two straight-bars 17, wedge 14 1 cylindricality fast 19, arranges spring leaf 13 between two straight-bars 17, the power that spring leaf 13 gives straight-bar 17 1 outside all the time.Adopt between stay cord 5 with pulley 8 and be fixedly connected with, avoid the phenomenon that stay cord 5 and pulley skid, equipment rises steadily, stay cord 5 uniform force, ensures the safety that stay cord 5 uses, transportation safety and stability; Different according to the equipment of transport, be convenient for changing different stay cords, easy disassembly between stay cord 5 and pulley 8, increase work efficiency.
Working process is: first will insure gib head, and 10 hang on fixed object, is then inserted in the through hole 16 of pulley 8 by the end of stay cord 5, and the other end of stay cord hangs weight, and weight can be mentioned by shake crank 1.When stay cord 5 and pulley 8 are fixed, two straight-bars 17 are inserted in through hole 16, sphenocephaly 18 through after through hole 16 under the effect of spring leaf 13, separately, sphenocephaly 18 is stuck in the edge of through hole 16 to two straight-bars 18, plays fixation; When with when changing stay cord, inwardly press from up to down and pinch wedge 14, two straight-bars 17 come closer, and sphenocephaly 18 is separated with the edge of through hole 16, thus are extracted out by straight-bar 17, realize the object of dismounting, then are connected by new stay cord.
When stay cord is too tightened, sphenocephaly 18 coordinates too tension with the edge of through hole 16, in order to reach the object of dismounting, described cylindricality block 19 periphery arranges pivoted housing 12, pivoted housing 12 inwall arranges negative thread, and cylindricality block 19 periphery arranges outside thread, and negative thread and outside thread match.By rotating pivoted housing 12, pivoted housing 12 moves downward, and is inwardly extruded by wedge 14, thus is moved inward by two straight-bars 17, thus reaches the object of fast power-saving dismounting.
In order to keep the horizontal motion of straight-bar 17, arrange horizontal slide rail 21 bottom described blind hole 15, straight-bar 17 top arranges slide block 20, and slide block 20 and slide rail 21 match.Straight-bar 17 is parallel motion, reduces distance when straight-bar 17 closes up, and the distance of two sphenocephalies 18 is nearer, and the maximum width of two sphenocephalies 18 is less, is convenient to, in unloading process, the sphenocephaly 18 of straight-bar 17 end is passed through hole 16.
The conveniently winding of stay cord 5, described cylindricality block 19 periphery arranges vertical wire casing 11, the first lap that stay cord 5 is wound around can coordinate with wire casing 11, stay cord 5 can through the centre of two straight-bars 17, prevent two straight-bars 17 from closing up, avoid use procedure medium pulling rope 5 to be separated with pulley 8, thus improve the safety used in process of the present invention.
Described pulley bracket 9 is provided with fixed point lock pin 7, fixed point lock pin 7 is arranged on the end of the wheel body of pulley 8, if allow weight stop in certain position, as long as inserted in the hole of pulley 8 side by fixed point lock pin 7.
In order to not allow coaster rock, install assistant support 2 between described crank 1 and pulley 8, crank 1 is arranged on one end of assistant support 2, and the other end of assistant support 2 installs balance block 4, and fixed handle 6 is installed on the top of coaster support 9.One of operator is hand to shake 1, another hand steered fixed handle 6, crank balance block 4 allows crank 1 keep a state of equilibrium all the time.
The technical solution of the utility model is not restricted in the scope of embodiment described in the utility model.The technology contents of the not detailed description of the utility model is known technology.
Claims (6)
1. substation's hand-operated tackle, it is characterized in that: comprise coaster support (9), middle part fixed pedestal axle (3) of coaster support (9) side, pivot shaft (3) is installed pulley (8), crank (1) pulley (8) is equipped with, the lower end of coaster support (9) is provided with insurance gib head (10), pulley (8) is offered through hole (16), two straight-bars (17) are set in through hole (16), the two ends of each straight-bar (17) are all outside at through hole (16), the lower end of straight-bar (17) arranges sphenocephaly (18), the pointed end of sphenocephaly (18), the top of straight-bar (17) arranges wedge (14), the point upward of wedge (14), the top of two straight-bars (17) connects cylindricality block (19), cylindricality block (19) bottom arranges blind hole (15), straight-bar (17) inserts in blind hole (15), the hole wall of blind hole (15) is offered wedge hole (22), wedge (14) is through wedge hole (22), cylindricality block (19) top connects stay cord (5), sphenocephaly (18) on two straight-bars (17), the line of centers specular of wedge (14) cylindricality block (19), between two straight-bars (17), spring leaf (13) is set, spring leaf (13) gives straight-bar (17) outside power all the time.
2. substation according to claim 1 hand-operated tackle, is characterized in that: described cylindricality block (19) periphery arranges pivoted housing (12), and pivoted housing (12) inwall arranges negative thread, and cylindricality block (19) periphery arranges outside thread, and negative thread and outside thread match.
3. substation according to claim 1 hand-operated tackle, is characterized in that: described blind hole (15) bottom arranges horizontal slide rail (21), and straight-bar (17) top arranges slide block (20), and slide block (20) and slide rail (21) match.
4. substation according to claim 1 hand-operated tackle, is characterized in that: described cylindricality block (19) periphery arranges vertical wire casing (11).
5. substation according to claim 1 hand-operated tackle, is characterized in that: described pulley bracket (9) is provided with fixed point lock pin (7), and fixed point lock pin (7) is arranged on the end of the wheel body of pulley (8).
6. substation according to claim 1 hand-operated tackle, it is characterized in that: between described crank (1) and pulley (8), assistant support (2) is installed, crank (1) is arranged on one end of assistant support (2), the other end of assistant support (2) installs balance block (4), and fixed handle (6) is installed on the top of coaster support (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310509665.0A CN103601094B (en) | 2013-10-25 | 2013-10-25 | Substation's hand-operated tackle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310509665.0A CN103601094B (en) | 2013-10-25 | 2013-10-25 | Substation's hand-operated tackle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103601094A CN103601094A (en) | 2014-02-26 |
CN103601094B true CN103601094B (en) | 2015-09-23 |
Family
ID=50119384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310509665.0A Expired - Fee Related CN103601094B (en) | 2013-10-25 | 2013-10-25 | Substation's hand-operated tackle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103601094B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103991346B (en) * | 2014-05-30 | 2016-03-23 | 宁波天益齿轴齿轮有限公司 | A kind of tractor from traction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3231240A (en) * | 1963-02-28 | 1966-01-25 | Naito Ichinosuke | Rope drawing apparatus |
CN2238241Y (en) * | 1995-10-27 | 1996-10-23 | 重庆五金机具厂 | Rope type hand-operated hoist |
CN2697387Y (en) * | 2004-04-06 | 2005-05-04 | 玉环双友机械工具有限公司 | Rope positioning structure for tractor |
CN101704484A (en) * | 2009-11-20 | 2010-05-12 | 江苏省电力公司徐州供电公司 | Hand-operated tackle |
CN203545561U (en) * | 2013-10-25 | 2014-04-16 | 国家电网公司 | Hand-operated pulley block for transformer substation |
-
2013
- 2013-10-25 CN CN201310509665.0A patent/CN103601094B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3231240A (en) * | 1963-02-28 | 1966-01-25 | Naito Ichinosuke | Rope drawing apparatus |
CN2238241Y (en) * | 1995-10-27 | 1996-10-23 | 重庆五金机具厂 | Rope type hand-operated hoist |
CN2697387Y (en) * | 2004-04-06 | 2005-05-04 | 玉环双友机械工具有限公司 | Rope positioning structure for tractor |
CN101704484A (en) * | 2009-11-20 | 2010-05-12 | 江苏省电力公司徐州供电公司 | Hand-operated tackle |
CN203545561U (en) * | 2013-10-25 | 2014-04-16 | 国家电网公司 | Hand-operated pulley block for transformer substation |
Also Published As
Publication number | Publication date |
---|---|
CN103601094A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203402757U (en) | Geological twisting-preventing wire winder capable of arranging wires evenly | |
CN210457308U (en) | Natural gas long distance pipeline conveying device | |
CN204416793U (en) | Backspring device | |
CN203660415U (en) | Wire lifting device | |
CN205397673U (en) | Cable -placing device | |
CN103601094B (en) | Substation's hand-operated tackle | |
CN203545561U (en) | Hand-operated pulley block for transformer substation | |
CN107284500A (en) | A kind of firm type carrier | |
CN203959494U (en) | A kind of ground wire gathering-device that is applicable to many specifications earth bar | |
CN203284039U (en) | Cable reel lifting appliance | |
CN204243620U (en) | A kind of pre-twisting type overhang installation wire lifting device | |
CN203319515U (en) | Hoisting clamping device | |
CN204110823U (en) | Portable wrap-up | |
CN208485446U (en) | A kind of drawing cable line apparatus | |
CN207997215U (en) | A kind of part derusting mechanism being integrally formed knitting machine | |
CN208261530U (en) | A kind of battery pole piece rolling mill roll loading-unloading vehicle | |
CN205873499U (en) | A admission machine for cable braider | |
CN202344102U (en) | Novel welding machine | |
CN203920816U (en) | On a kind of optical fiber proof-tester, coil go-cart | |
CN204038854U (en) | A kind of lifting hook for cable tray suspension bracket | |
CN205862890U (en) | A kind of cable copper cash wire twisting machine structure being easy to thread-changing wiring | |
CN202953745U (en) | Transportation loading and unloading machine | |
CN204938574U (en) | A kind of weaving Winder | |
CN216472087U (en) | Small-size storage crane with goods discernment and transportation function | |
CN204038853U (en) | A kind of cable drum overhead hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 |
|
CF01 | Termination of patent right due to non-payment of annual fee |