CN103580816B - A kind of uplink receiving method and device - Google Patents

A kind of uplink receiving method and device Download PDF

Info

Publication number
CN103580816B
CN103580816B CN201210274463.8A CN201210274463A CN103580816B CN 103580816 B CN103580816 B CN 103580816B CN 201210274463 A CN201210274463 A CN 201210274463A CN 103580816 B CN103580816 B CN 103580816B
Authority
CN
China
Prior art keywords
ack
nack
channel
pucch
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210274463.8A
Other languages
Chinese (zh)
Other versions
CN103580816A (en
Inventor
谢建红
蔡婉婕
龚红霞
王倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanechips Technology Co Ltd
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201210274463.8A priority Critical patent/CN103580816B/en
Publication of CN103580816A publication Critical patent/CN103580816A/en
Application granted granted Critical
Publication of CN103580816B publication Critical patent/CN103580816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of uplink receiving method and device, including:Uplink receiver is after data of eating dishes without rice or wine are received, each Channel Processing subsystem and signal processing subsystem is made to be in ready state, channel task and/or signal task are sent respectively to corresponding Channel Processing subsystem and/or signal processing subsystem is demodulated processing;Channel Processing subsystem and signal processing subsystem are parallel to handle received task.The uplink receiving method of the present invention can realize that the efficient parallel of uplink receives, and reduce the association of each channel in the degree of association of each channel and PUCCH in LTE uplink receiving systems, reduce system complexity, improve uplink receiving treatment effeciency.

Description

A kind of uplink receiving method and device
Technical field
The present invention relates to LTE (Long Term Evolution, Long Term Evolution), more particularly to a kind of uplink receiving method And device.
Background technology
In LTE system, physical channel/signal of uplink has SRS (Sounding Reference Signal, detection reference Signal), PUSCH (Physical Uplink Shared Channel, Physical Uplink Shared Channel), PUCCH (Physical Uplink Control channel, uplink control channel) etc..
PUCCH channels are responsible for the periodic report of the control information of uplink, and control information includes HARQ-ACK (Hybrid Automatic Repeat request-Acknowledgement, hybrid automatic repeat-request-confirmation), SR (Scheduling Request, dispatch request), CQI (Channel Quality Indication, channel quality instruction), PMI (Precoding Matrix Index, pre-coding matrix instruction), RI (Rank Indication, order instruction) etc..
PUSCH is responsible for bearer service information, while also carries control information.
SRS signal is in order to carry out the dynamic configuration of ascending resource, for estimating frequency domain momentary channel quality.
While defining channel and signal, agreement also specify related constraint, for example PUSCH and PUCCH can not possibly be at the same time In the presence of, if necessary to transmit control information, and should in TTI (Transmission Time Interval, Transmission Time Interval) UE (User Equipment, user equipment) does not have PUSCH, then control information is transmitted by PUCCH, otherwise in PUSCH On be transmitted;When PUCCH, PUSCH processing, if there is SRS, the resource reservation of SRS is come out, in these constraintss Under, there is presently no better method to realize uplink receiving efficiency highest.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of uplink receiving method and device, can reduce in uplink receiving The degree of association of each channel, improves uplink receiving treatment effeciency.
In order to solve the above technical problems, a kind of uplink receiving method of the present invention, including:
Uplink receiver makes each Channel Processing subsystem and signal processing subsystem be in just after data of eating dishes without rice or wine are received Not-ready status, corresponding Channel Processing subsystem and/or signal processing subsystem are sent respectively to by channel task and/or signal task System is demodulated processing;
The Channel Processing subsystem and signal processing subsystem are parallel to handle received task.
Further, further include:
Before uplink receiver receives data of eating dishes without rice or wine, Parameter analysis of electrochemical subsystem determines channel and signal that may be present, When definite Physical Uplink Shared Channel (PUSCH) is channel that may be present, by the ascending control information of user equipment (UE) Demodulation parameter be multiplexed on PUSCH.
Further, the demodulation parameter of the control information of user equipment is multiplexed on PUSCH, including:
When the dispatch request (SR) of UE reaches the cycle, the relevant parameter of SR is added to the ascending control information of UE (UCI) in demodulation parameter;
When the confirmation/non-acknowledgement (ACK/NACK) for receiving UE demodulates message, the ACK relevant parameters demodulated are added to In the demodulation parameter of UCI;
When channel quality instruction (CQI)/pre-coding matrix instruction (PMI)/order instruction (RI) of UE reaches report cycle, In the demodulation parameter for the UCI that the relevant parameter of CQI/PMI/RI demodulation is added;
When receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI outside removing SR is passed to PUSCH processing Subsystem;When not receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI comprising SR is passed to PUSCH processing subsystems System.
Further, further include:
After uplink receiver receives data of eating dishes without rice or wine, Parameter analysis of electrochemical subsystem carry out detection reference signal (SRS) with The detection whether PCSCH conflicts, or carry out the detection whether SRS conflicts with uplink control channel (PUCCH);
Channel task and/or signal task are sent respectively to phase by the uplink receiver according to the testing result of conflict The Channel Processing subsystem and/or signal processing subsystem answered are demodulated processing.
Further, the detection whether SRS conflicts with channel is carried out, including:
In the cycle that UE is in SRS, UCI does not include SR, and when UCI includes CQI, determines SRS and channel confliction;
The uplink receiver does not send the signal task of UE in SRS and channel confliction to SRS processing subsystems.
Further, further include:
Comprehensive decision subsystem is judging UE in the Channel Processing subsystem and signal processing subsystem after treatment There are during PUSCH and SRS, the handling result of PUSCH and SRS are reported;Judging that UE there are during PUCCH and SRS, reports PUCCH With the handling result of SRS;Judge UE there are when one of PUSCH, PUCCH and SRS, report existing PUSCH, The handling result of PUCCH or SRS.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The process of the PUCCH processing subsystems processing PUCCH includes:In PUCCH, there are multiple potential ACK/NACK During resource, the signal-to-noise ratio in each ACK/NACK resources or signal power are measured, obtain measured value;
When the measured value of all ACK/NACK resources is respectively less than thresholding, determine ACK/NACK resources for discontinuous transmission (DTX), ACK/NACK is not demodulated;
When a measured value for being higher than thresholding is only included in the measured value of all ACK/NACK resources, measured value is higher than The ACK/NACK resources of thresholding carry out ACK/NACK demodulation;
In the measured value of all ACK/NACK resources comprising it is multiple be higher than thresholding measured value when, to measured value maximum ACK/NACK resources carry out ACK/NACK demodulation.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The process of the PUCCH processing subsystems processing PUCCH includes:The detection information of SR is included in UCI, and judges SR For Positive (just) SR when, abandon the demodulation of CQI, and record the mark for detecting SR;Judging SR for Negative (negative) During SR, CQI is demodulated;When UCI does not include the detection information of SR, CQI is demodulated.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The process of the PUCCH processing subsystems processing PUCCH includes:When UCI includes the detection information of SR, SR's ACK/NACK is detected in resource, when testing result is non-DTX, record detects the mark of SR and the result of ACK/NACK; When testing result is DTX, ACK/NACK is demodulated again in ACK/NACK resources;When UCI does not include the detection information of SR, ACK/NACK is demodulated in the resource of ACK/NACK.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The process of the PUCCH processing subsystems processing PUCCH includes:It can not be total in high level configuration CQI and ACK/NACK During biography, ACK/NACK is detected in the resource of ACK/NACK, when testing result is DTX, CQI is detected in the resource of CQI; When testing result is non-DTX, the result of ACK/NACK is recorded;When high level configuration CQI and ACK/NACK can be passed altogether, provided in CQI CQI and ACK/NACK is detected on source.
Further, a kind of uplink receiving device, including:Uplink receiver, Channel Processing subsystem and signal processing System, wherein:
The uplink receiver, for after data of eating dishes without rice or wine are received, making each Channel Processing subsystem and signal processing System is in ready state, and channel task and/or signal task are sent respectively to corresponding Channel Processing subsystem and/or letter Number processing subsystem is demodulated processing;
The Channel Processing subsystem and signal processing subsystem, are handled received task for parallel.
Further, Parameter analysis of electrochemical subsystem is further included, wherein:
The Parameter analysis of electrochemical subsystem, for before uplink receiver receives data of eating dishes without rice or wine, determining letter that may be present Road and signal, when definite Physical Uplink Shared Channel (PUSCH) is channel that may be present, by the uplink of user equipment (UE) The demodulation parameter of control information is multiplexed on PUSCH.
Further, the Parameter analysis of electrochemical subsystem, specifically for when the dispatch request (SR) of UE reaches the cycle, by SR Relevant parameter be added in the demodulation parameter of ascending control information (UCI) of UE;Receiving confirmation/non-acknowledgement of UE (ACK/NACK) when demodulating message, the ACK relevant parameters demodulated are added in the demodulation parameter of UCI;In the channel quality of UE When instruction (CQI)/pre-coding matrix instruction (PMI)/order instruction (RI) reaches report cycle, by the correlation of CQI/PMI/RI demodulation In the demodulation parameter for the UCI that parameter adds;When receiving the PUSCH demodulation parameters of UE, by the demodulation of the UCI outside removing SR Parameter is passed to PUSCH processing subsystems;When not receiving the PUSCH demodulation parameters of UE, by the demodulation parameter of the UCI comprising SR Incoming PUSCH processing subsystems.
Further, Parameter analysis of electrochemical subsystem is further included, wherein:
The Parameter analysis of electrochemical subsystem, for after uplink receiver receives data of eating dishes without rice or wine, carrying out detection reference signal (SRS) detection whether to conflict with PCSCH, or carry out the detection whether SRS conflicts with uplink control channel (PUCCH);
The uplink receiver, specifically for the testing result according to conflict, channel task and/or signal task are distinguished It is sent to corresponding Channel Processing subsystem and/or signal processing subsystem and is demodulated processing.
Further, the Parameter analysis of electrochemical subsystem, specifically in the cycle that UE is in SRS, UCI does not include SR, And when UCI includes CQI, determine SRS and channel confliction;
The uplink receiver, specifically in SRS and channel confliction, the letter of UE is not sent to SRS processing subsystems Number task.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The PUCCH processing subsystems, in PUCCH there are during multiple potential ACK/NACK resources, to each ACK/ Signal-to-noise ratio or signal power in NACK resources measure, and obtain measured value;
When the measured value of all ACK/NACK resources is respectively less than thresholding, determine ACK/NACK resources for discontinuous transmission (DTX), ACK/NACK is not demodulated;
When a measured value for being higher than thresholding is only included in the measured value of all ACK/NACK resources, measured value is higher than The ACK/NACK resources of thresholding carry out ACK/NACK demodulation;
In the measured value of all ACK/NACK resources comprising it is multiple be higher than thresholding measured value when, to measured value maximum ACK/NACK resources carry out ACK/NACK demodulation.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The PUCCH processing subsystems, for including the detection information of SR in UCI, and judge SR for Positive (just) During SR, the demodulation of CQI is abandoned, and record the mark for detecting SR;When judging SR for Negative (negative) SR, CQI is carried out Demodulation;When UCI does not include the detection information of SR, CQI is demodulated.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The PUCCH processing subsystems, for UCI include SR detection information when, detect ACK/ in the resource of SR NACK, when testing result is non-DTX, record detects the mark of SR and the result of ACK/NACK;It is DTX in testing result When, ACK/NACK is demodulated again in ACK/NACK resources;When UCI does not include the detection information of SR, in the money of ACK/NACK ACK/NACK is demodulated on source.
Further, the Channel Processing subsystem includes PUCCH processing subsystems, wherein:
The PUCCH processing subsystems, for when high level configuration CQI and ACK/NACK can not be passed altogether, in ACK/NACK Resource on detect ACK/NACK, when testing result is DTX, CQI is detected in the resource of CQI;It is non-DTX in testing result When, record the result of ACK/NACK;When high level configuration CQI and ACK/NACK can be passed altogether, detected in CQI resources CQI and ACK/NACK。
In conclusion the uplink receiving method of the present invention can realize that the efficient parallel of uplink receives, LTE uplinks are reduced In reception system in the degree of association of each channel and PUCCH each channel association, reduce system complexity, improve at uplink receiving Efficiency is managed, and is also had the advantages that:
(1):Propose that there are the Conflict solving and treatment mechanism during a plurality of channel as UE, there is provided a kind of preliminary ruling+ The processing structure of intermediate treatment+synthesis judgement, saves and the process that all kinds of channel conflictions judge is inserted into process flow, optimize Flow;Intermediate treatment part is unrelated, i.e., PUCCH processing, PUSCH processing, SRS handle orthogonal, each processing subsystem Can parallel processing;The reception processing time of physical layer is saved, has been reserved more for the uplink receiving delay requirement of whole system Nargin;
(2):The Conflict solving method and process flow of various potential channels inside PUCCH are proposed, is reduced in PUCCH Hypothesis back and forth and judgement when portion is handled, improve the reception demodulation efficiency of PUCCH;
(3):Under the ACK multiplexer modes of PUCCH especially set out, the ACK/NACK demodulation sides on multiple ACK potential resources Method, it is proposed that the processing method based on thresholding and optimal selection, reduces the resource object for needing to carry out ACK demodulation;
(4):The multiclass channel parallel processing system of proposition reduces the complexity of base station equipment realization, improves system The degree of modularity, is conducive to the realization of the relevant IP of all kinds of Channel Processings, and existing part IP or mature modules can be adopted Outsourcing strategy is taken, to reduce development cost and risk, while also shortens the construction cycle.
Brief description of the drawings
Fig. 1 is the flow chart of the uplink receiving method of the present invention;
Fig. 2 is PUSCH and the flow chart of PUCCH multiplexing process in uplink receiving method of the invention;
Fig. 3 is the flow chart of the preliminary ruling that PUCCH conflicts with SRS in uplink receiving method of the invention;
Fig. 4 is PUSCH and SRS, PUCCH and the comprehensive judgement of SRS handling results in uplink receiving method of the invention Flow chart;
Fig. 5 is the flow chart of the ACK/NACK demodulation on multiple ACK resources (multiplexing) in uplink receiving method of the invention;
Fig. 6 is the flow chart of processing when SR conflicts with CQI in uplink receiving method of the invention;
Fig. 7 is the flow chart of processing when SR conflicts with ACK in uplink receiving method of the invention;
Fig. 8 is the flow chart of processing when ACK conflicts with CQI in uplink receiving method of the invention;
Fig. 9 is the Organization Chart of the uplink receiving device of the present invention.
Embodiment
Present embodiment is started with from whole LTE physical layers uplink receiving, devises a kind of efficient parallel reception system, energy It is effective to solve to conflict caused by multichannel configuration, arbitration and the separation mechanism of conflict are realized, at the place of specific every channel During reason, it can not have to be concerned about the channel to conflict therewith, this mode improves the efficiency of each Channel Processing, also allows for each A channel realizes separation, and the realization of subsystem parallel processing.Meanwhile for the processing of the complex PUCCH of uplink, by Conflict and multiplying question of the portion there is also various control information in the inner, the prioritization scheme of present embodiment reduce its internal prison The detour of survey, it is possible to increase the detection efficiency and disposal ability of PUCCH.
In addition, present embodiment uses the related letters of PUSCH or PUCCH to channel confliction except solving SRS processing procedures The problem of breath, multichannel comprehensive descision link is pushed into by related question, and the treatment effeciency of SRS is improved from realistic meaning, drop The low coupling of multiple Channel Processing subsystems, realizes parallel processing, overcomes serial process and caused by detour judges The problems such as inefficiency.Moreover the multiple resource detection object of PUCCH inter-process determine in the optimization solution based on thresholding Detection efficiency is improved, possesses a degree of adaptivity.
Present embodiments provide for a kind of parallel LTE uplink receiving method and apparatus, LTE upstream physical layer phases are reduced The association such as channel or signal such as PUCCH, PUSCH, SRS and influence of the coupling to reception system are closed, improves physical layer process The speed of response, so as to improve the process performance of physical layer in the case where saving resource, reserved more processing times To high-rise relevant scheduling or other processing.
As shown in Figure 1, the uplink receiving method of present embodiment, including:
Step 101:Parameter analysis of electrochemical subsystem shift to an earlier date N number of subframe to it is received by high level issue physical layer modulation message, Cell-level relevant information and UE grades of relevant informations etc. carry out parameter calculating, determine channel and signal that may be present, and may The physical layer process parameter of existing channel and signal;
UE grades of relevant informations are used for the parameter for determining which channel and signal and channel and signal.
The layer sequential distribution each with system of the value of N and function division are related, are usually 2.
Step 102:When definite PUSCH is channel that may be present, the processing of PUSCH and PUCCH multiplexings is carried out;
In a step 101 if according to the physical layer modulation message received, the UE is judged there are PUSCH, and have except SR Outer control message needs to demodulate (whether there are PUCCH), then by the demodulation parameter (bag of the ascending control information of the UE It is contained in physical layer parameter) it is multiplexed on PUSCH;If it is determined that the s UE are there are PUCCH, there is no PUSCH, then determining should The control information of UE is in PUCCH channels.
As shown in Fig. 2, on the PUSCH of the demodulation parameter multiplexing of the above-mentioned ascending control information by UE, including:
Step 201:Judge whether the dispatch request (SR) of UE reaches the cycle, if reached, perform step 202;Otherwise, Perform step 203;
Step 202:The relevant parameter of SR is added in the demodulation parameter of UCI (ascending control information);
Step 203:Judge whether that the ACK/NACK for having been received by UE demodulates message, if received, perform step 204; Otherwise, step 205 is performed;
Step 204:The ACK relevant parameters demodulated are added in the demodulation parameter of UCI;
Step 205:Judge whether the CQI/PMI/RI of UE reaches report cycle, if reached, perform step 206;It is no Then, step 207 is performed;
Step 206:The CQI/PMI/RI relevant parameters demodulated are added in the demodulation parameter of UCI;
Step 207:Judge whether to receive the PUSCH demodulation parameters of UE, if received, perform step 208;It is no Then, step 209 is performed;
Step 208:The demodulation parameter of UCI outside removing SR is passed to PUSCH processing subsystems;
Step 209:The demodulation parameter of UCI comprising SR is passed to PUSCH processing subsystems.
Step 103:When determining may be simultaneously present SRS and PUSCH, the preliminary inspection whether SRS conflicts with PCSCH is carried out Survey, when determining may be simultaneously present SRS and PUCCH, carry out the Preliminary detection whether SRS conflicts with PUCCH;
As shown in figure 3, the Preliminary detection that SRS conflicts with PUSCH or progress SRS with PUCCH is carried out, including:
Step 301:Judge whether UE is in the cycle of SRS, if it is, performing step 302;Otherwise, it determines do not send out Raw conflict;
It can learn whether UE is in the cycle of SRS according to the parameter of UE.
Step 302:Judge whether include the detection information of SR in UCI, if do not included, perform step 303;Otherwise, Determine not clash;
Step 303:Judge whether to include the detection information of CQI in UCI, if included, perform step 304;Otherwise, really It is fixed not clash;
Step 304:Abandon the processing information of SRS, it is believed that UE does not send SRS.
In UE there is no SR (when the reason for judging SR is that CQI conflicts with positive SR, it will abandon CQI), but there are CQI When (ACK/NACK whether there is it is not intended that), it may appear that SRS conflicts with PUCCHFormat2/2a/2b's or PUSCH, UE meetings Abandon SRS, the processing such as corresponding base station uplink receiving system also avoids the need for measuring the SRS of UE, otherwise carry out SRS's Processing.
Step 104:After uplink receiver, which receives, eats dishes without rice or wine data, it is respectively started at each Channel Processing subsystem and signal Subsystem is managed, makes to be in ready state, includes PUCCH processing subsystems, PUSCH processing subsystems and SRS processing subsystems, root Channel task and/or signal task are sent at corresponding Channel Processing subsystem and/or signal according to the testing result of conflict Reason subsystem is handled;
Each Channel Processing subsystem and signal processing subsystem are Concurrent Subsystem, and need not interact letter between each other Breath.
Multiple subsystems can be completed by multiple CPU or Core or IP.
Same UE may be simultaneously present SRS and PUSCH, or there are SRS and PUCCH at the same time, i.e. may be same for a UE When by SRS and PUSCH, or SRS and PUCCH are sent into two subsystems and handled, exist conflict when, it is preliminary by conflicting After detection for a UE be in the case of more a moment only to SRS, PUSCH and PUCCH one of them at Reason..
Step 105:Subsystems after treatment, comprehensive decision subsystem carry out comprehensive descision to demodulation result, really The demodulation result reported is needed calmly, and reports demodulation result to high level.
As shown in figure 4, carrying out integrating judgement to demodulation result, determine to need the demodulation result reported, including:
Step 401:Judge that UE whether there is PUSCH, if it is present performing step 402;Otherwise, step 405 is performed;
Step 402:Judge that UE whether there is SRS, if it is present performing step 403;Otherwise, step 404 is performed;
Step 403:Determine to report the demodulation result of PUSCH and SRS, and reported;
Step 404:Determine to report the demodulation result of PUSCH, and reported;
Step 405:Judge that UE whether there is SRS, if it is present performing step 406;Otherwise, step 409 is performed;
Step 406:Judge that UE whether there is PUCCH, if it is present performing step 407;Otherwise, step 408 is performed;
Step 407:Determine to report the demodulation result of PUCCH and SRS, and reported;
Step 408:Determine to report the demodulation result of SRS, and reported;
Step 409:Judge that UE whether there is PUCCH, if it is present performing step 410;Otherwise, terminate, without appointing What demodulation result reports;
Step 410:Determine to report the demodulation result of PUCCH, and reported.
PUCCH not only needs the detection for being conflicted and being multiplexed, the various control letter that PUCCH is included with PUSCH and SRS Breath is equally also required to detection and the multiplexing process to conflict, specific processing is realized described below there is also conflict and multiplexing.
As shown in figure 5, the ACK/NACK of multiple ACK resources on PUCCH is demodulated, including:
Step 501:Signal-to-noise ratio (SNR) in potential ACK/NACK resources a to M (M >=1) existing for PUCCH inside or Signal power measures, and obtains signal-to-noise ratio or the measured value of signal power;
Step 502:By obtained measured value and thresholding PCfgIt is compared, judges whether that measured value is more than thresholding PCfg Resource, if it does not exist, then perform step 503;If it is present perform step 504;
Inside PUCCH there are the potential ACK/NACK resources of M in the case of, M is up to 4 (TDD multiplexings), at this time, elder generation SNR in each ACK/NACK resources is measured, measured value PSNR, and by the measured value of signal-to-noise ratio and thresholding PCfgThan Compared with.For the sake of simplicity, and based on the bottom of signal make an uproar difference it is little the fact, the measurement to SNR can be weakened as to signal power Measurement, the measured value of signal power is PSignal, by the measured value P of signal powerSignalWith thresholding PCfgCompare.
Step 503:If PSignal, k< PCfg, (k=0,1...M-1), i.e., there is no measured value to be more than thresholding PCfgMoney Source, then the testing result judgement in ACK/NACK resources is DTX (Discontinuous Transmission, discontinuous biography It is defeated), i.e., UE does not send ACK/NACK;
Step 504:The resource of measured value maximum is selected, ACK/NACK solutions are carried out to the resource of the measured value maximum of selection Adjust;
If Sum (Countif (PSignal, k> PCfg))=1, (k=0,1...M-1), the condition in Countif is true When, the value of Countif is 1, is otherwise 0, i.e., there was only one in measurement result is higher than thresholding, then selected as measured value is higher than door Limit PCfgResource carry out ACK/NACK demodulation;
If Sum (Countif (PSignal, k> PCfg)) > 1, i.e., there are multiple measurement results be higher than thresholding resource, that The demodulation of ACK/NACK is carried out to the highest resource of measured value.
Step 505:Processing is demodulated to other resources of PUCCH.
The detection carried out in present embodiment to ACK/NACK resources and demodulation process, can be no longer required for physical layer Layer issues the exact demodulation resources of ACK, improves the efficiency of channel demodulation.
The optimization that can be realized to the method for ACK/NACK detection thresholds, is taken using the method based on average and variance The gate method of generation reality, i.e., be more than a certain proportion of situation of average (this ratio usually relatively appearance in signal if there is variance Easily choose), you can the corresponding resource of maximum variance is chosen to be demodulation object, if do not occurred, then it is assumed that be not reaching to thresholding Resource, the demodulation result of ACK/NACK is regarded as DTX.
As shown in fig. 6, for CQI existing for PUCCH inside and Positive SR (positive dispatch request) in the case of conflicting Detection, including:
Step 601:Judge whether UCI includes the detection information of SR, if including execution step 602;Otherwise, perform Step 605;
Step 602:Whether detection SR sends, that is, it is Negative (negative) SR or PositiveSR to detect SR;
Step 603:Judge whether SR is Positive SR, if it is, performing step 604;Otherwise, step is performed 605;
Step 604:Determine that UE can abandon CQI, then the demodulation of CQI is also abandoned in base station, and records the mark for detecting SR;
Step 605:If SR is Negative SR, the demodulation module for starting CQI is handled in the resource of CQI.
As shown in fig. 7, the detection for SR in the case ofs conflicting with ACK existing for PUCCH inside, including:
Step 701:Judge whether UCI includes the detection information of SR, if including execution step 702;Otherwise, perform Step 705;
Step 702:ACK/NACK is detected in the resource of SR;
Step 703:Judge whether testing result is DTX, if it is not, then performing step 704;Otherwise, step is performed 705;
Step 704:Record detects the mark of SR and the result of ACK/NACK;
Step 705:ACK/NACK is demodulated again in the resource of ACK/NACK.
There is a situation where that ACK/NACK conflicts with Positive SR for PUCCH inside, can first be carried out in the resource of SR The demodulation of ACK/NACK, then determines the need for further re-starting in ACK/NACK resources further according to testing result ACK/NACK is demodulated.If the ACK/NACK results detected in SR resources are DTX, i.e. signal power is not up to detection threshold, It is considered that SR is Negative, ACK/NACK channels are demodulated again in the resource of ACK/NACK.
As shown in figure 8, (it is primarily referred to as high level to match somebody with somebody in the case of conflict with CQI for ACK/NACK existing for PUCCH inside It is the situation that ACK/NACK and CQI cannot be passed altogether to put UE) detection, including:
Step 801:Judge that the high-rise CQI and ACK/NACK that whether configures can be passed altogether, if configuration can pass altogether, perform step 802;If configuration can not pass altogether, step 803 is performed;
Step 802:CQI and ACK/NACK is detected in CQI resources;
Step 803:ACK/NACK is detected in the resource of ACK/NACK;
Step 804:Judge whether testing result is DTX, if it is not, then performing step 805;Otherwise, step is performed 806;
Step 805:Record the result of ACK/NACK;
Step 806:CQI is detected in the resource of CQI.
ACK/NACK can be first individually detected with the situation about conflicting of CQI in ACK/NACK resources, be such as DTX, then CQI resources are detected again, otherwise abandon the demodulation of CQI channels.In the case of high level configuration can be with simultaneous transmission, directly The demodulation of CQI and ACK/NACK is carried out in CQI resources.
As shown in figure 9, present embodiment additionally provides a kind of uplink receiving device, including:Uplink receiver, Channel Processing Subsystem and signal processing subsystem, wherein:
Uplink receiver, for after data of eating dishes without rice or wine are received, making each Channel Processing subsystem and signal processing subsystem In ready state, channel task and/or signal task are sent respectively at corresponding Channel Processing subsystem and/or signal Reason subsystem is demodulated processing;
Channel Processing subsystem and signal processing subsystem, are handled received task for parallel.
The device further includes Parameter analysis of electrochemical subsystem, wherein:
Parameter analysis of electrochemical subsystem, for before uplink receiver receives data of eating dishes without rice or wine, determine channel that may be present and Signal, when definite Physical Uplink Shared Channel (PUSCH) is channel that may be present, by the upload control of user equipment (UE) The demodulation parameter of information is multiplexed on PUSCH.
Parameter analysis of electrochemical subsystem, specifically for when the dispatch request (SR) of UE reaches the cycle, the relevant parameter of SR is added Enter into the demodulation parameter of the ascending control information (UCI) of UE;Demodulate and disappear in the confirmation/non-acknowledgement (ACK/NACK) for receiving UE During breath, the ACK relevant parameters demodulated are added in the demodulation parameter of UCI;(CQI)/precoding is indicated in the channel quality of UE When matrix instruction (PMI)/order instruction (RI) reaches report cycle, by the UCI's of the relevant parameter addition of CQI/PMI/RI demodulation In demodulation parameter;When receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI outside removing SR is passed at PUSCH Manage subsystem;When not receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI comprising SR is passed to PUSCH processing System.
Parameter analysis of electrochemical subsystem, for after uplink receiver receives data of eating dishes without rice or wine, carrying out detection reference signal (SRS) The detection whether to conflict with PCSCH, or carry out the detection whether SRS conflicts with uplink control channel (PUCCH);
Uplink receiver, specifically for the testing result according to conflict, channel task and/or signal task are sent respectively Processing is demodulated to corresponding Channel Processing subsystem and/or signal processing subsystem.
Parameter analysis of electrochemical subsystem, specifically in the cycle that UE is in SRS, UCI does not include SR, and UCI includes CQI When, determine SRS and channel confliction;
Uplink receiver, specifically in SRS and channel confliction, the signal that UE is not sent to SRS processing subsystems is appointed Business.
Channel Processing subsystem includes PUCCH processing subsystems, wherein:
PUCCH processing subsystems, in PUCCH there are during multiple potential ACK/NACK resources, to each ACK/NACK Signal-to-noise ratio or signal power in resource measure, and obtain measured value;
When the measured value of all ACK/NACK resources is respectively less than thresholding, determine ACK/NACK resources for discontinuous transmission (DTX), ACK/NACK is not demodulated;
When a measured value for being higher than thresholding is only included in the measured value of all ACK/NACK resources, measured value is higher than The ACK/NACK resources of thresholding carry out ACK/NACK demodulation;
In the measured value of all ACK/NACK resources comprising it is multiple be higher than thresholding measured value when, to measured value maximum ACK/NACK resources carry out ACK/NACK demodulation.
PUCCH processing subsystems, for including the detection information of SR in UCI, and when judging SR for Positive (just) SR, The demodulation of CQI is abandoned, and records the mark for detecting SR;When judging SR for Negative (negative) SR, CQI is demodulated; When UCI does not include the detection information of SR, CQI is demodulated.
PUCCH processing subsystems, for UCI include SR detection information when, detect ACK/NACK in the resource of SR, When testing result is non-DTX, record detects the mark of SR and the result of ACK/NACK;When testing result is DTX, ACK/NACK is demodulated again in ACK/NACK resources;When UCI does not include the detection information of SR, solved in the resource of ACK/NACK Adjust ACK/NACK.
PUCCH processing subsystems, for when high level configuration CQI and ACK/NACK can not be passed altogether, in the money of ACK/NACK ACK/NACK is detected on source, when testing result is DTX, CQI is detected in the resource of CQI;When testing result is non-DTX, Record the result of ACK/NACK;When high level configuration CQI and ACK/NACK can be passed altogether, CQI and ACK/ is detected in CQI resources NACK。
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and formed Network on, alternatively, they can be realized with the program code that computing device can perform, so as to be stored in Performed in storage device by computing device, they are either fabricated to each integrated circuit modules respectively or by them Multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the present invention be not restricted to it is any specific hard Part and software combine.
This is merely a preferred embodiment of the present invention above, is not intended to limit the invention, for the technology of this area For personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (16)

  1. A kind of 1. uplink receiving method, it is characterised in that including:
    Uplink receiver makes each Channel Processing subsystem and signal processing subsystem be in ready shape after data of eating dishes without rice or wine are received State, is sent respectively to corresponding Channel Processing subsystem by channel task and is demodulated processing;And/or signal task is distinguished It is sent to corresponding signal processing subsystem and is demodulated processing;
    The Channel Processing subsystem and signal processing subsystem are parallel to handle received task;
    Further include:
    Comprehensive decision subsystem is judging UE presence in the Channel Processing subsystem and signal processing subsystem after treatment During PUSCH and SRS, the handling result of PUSCH and SRS are reported;Judging that UE there are during PUCCH and SRS, reports PUCCH and SRS Handling result;Judge UE there are when one of PUSCH, PUCCH and SRS, report existing PUSCH, PUCCH or The handling result of SRS;
    After uplink receiver receives data of eating dishes without rice or wine, Parameter analysis of electrochemical subsystem carries out detection reference signal (SRS) is with PUSCH The detection of no conflict, or carry out the detection whether SRS conflicts with uplink control channel (PUCCH);
    Channel task is sent respectively to corresponding Channel Processing subsystem by the uplink receiver according to the testing result of conflict It is demodulated processing;And/or signal task is sent respectively to corresponding signal processing subsystem and is demodulated processing.
  2. 2. the method as described in claim 1, it is characterised in that further include:
    Before uplink receiver receives data of eating dishes without rice or wine, Parameter analysis of electrochemical subsystem determines channel and signal that may be present, true When to determine Physical Uplink Shared Channel (PUSCH) be channel that may be present, by the solution of the ascending control information of user equipment (UE) Parameter is adjusted to be multiplexed on PUSCH.
  3. 3. the method as shown in claim 2, it is characterised in that be multiplexed into the demodulation parameter of the control information of user equipment On PUSCH, including:
    When the dispatch request (SR) of UE reaches the cycle, the relevant parameter of SR is added to the ascending control information (UCI) of UE In demodulation parameter;
    When the confirmation/non-acknowledgement (ACK/NACK) for receiving UE demodulates message, the ACK relevant parameters demodulated are added to UCI Demodulation parameter in;
    , will when channel quality instruction (CQI)/pre-coding matrix instruction (PMI)/order instruction (RI) of UE reaches report cycle In the demodulation parameter for the UCI that the relevant parameter of CQI/PMI/RI demodulation adds;
    When receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI outside removing SR is passed to PUSCH processing subsystems System;When not receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI comprising SR is passed to PUSCH processing subsystems.
  4. 4. the method as shown in claim 1, it is characterised in that the detection whether SRS conflicts with channel is carried out, including:
    In the cycle that UE is in SRS, UCI does not include SR, and when UCI includes CQI, determines SRS and channel confliction;
    The uplink receiver does not send the signal task of UE in SRS and channel confliction to SRS processing subsystems.
  5. 5. the method as described in claim 1, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems, Wherein:
    The process of the PUCCH processing subsystems processing PUCCH includes:In PUCCH, there are multiple potential ACK/NACK resources When, the signal-to-noise ratio in each ACK/NACK resources or signal power are measured, obtain measured value;
    When the measured value of all ACK/NACK resources is respectively less than thresholding, ACK/NACK resources are determined as discontinuous transmission (DTX), ACK/NACK is not demodulated;
    When a measured value for being higher than thresholding is only included in the measured value of all ACK/NACK resources, thresholding is higher than to measured value ACK/NACK resources carry out ACK/NACK demodulation;
    When in the measured value of all ACK/NACK resources comprising multiple measured values higher than thresholding, to the ACK/ of measured value maximum NACK resources carry out ACK/NACK demodulation.
  6. 6. the method as described in claim 1, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems, Wherein:
    The process of the PUCCH processing subsystems processing PUCCH includes:The detection information of SR is included in UCI, and judges that SR is During Positive (just) SR, the demodulation of CQI is abandoned, and record the mark for detecting SR;Judging SR for Negative (negative) SR When, CQI is demodulated;When UCI does not include the detection information of SR, CQI is demodulated.
  7. 7. the method as described in claim 1, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems, Wherein:
    The process of the PUCCH processing subsystems processing PUCCH includes:When UCI includes the detection information of SR, in the resource of SR Upper detection ACK/NACK, when testing result is non-DTX, record detects the mark of SR and the result of ACK/NACK;Detecting When being as a result DTX, ACK/NACK is demodulated again in ACK/NACK resources;When UCI does not include the detection information of SR, in ACK/ ACK/NACK is demodulated in the resource of NACK.
  8. 8. the method as described in claim 1, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems, Wherein:
    The process of the PUCCH processing subsystems processing PUCCH includes:When high level configuration CQI and ACK/NACK can not be passed altogether, ACK/NACK is detected in the resource of ACK/NACK, when testing result is DTX, CQI is detected in the resource of CQI;Detecting When being as a result non-DTX, the result of ACK/NACK is recorded;When high level configuration CQI and ACK/NACK can be passed altogether, in CQI resources Detect CQI and ACK/NACK.
  9. A kind of 9. uplink receiving device, it is characterised in that including:Uplink receiver, Channel Processing subsystem and signal processing System, wherein:
    The uplink receiver, for after data of eating dishes without rice or wine are received, making each Channel Processing subsystem and signal processing subsystem In ready state, channel task is sent respectively to corresponding Channel Processing subsystem and is demodulated processing;And/or it will believe Number task is sent respectively to corresponding signal processing subsystem and is demodulated processing;
    The Channel Processing subsystem and signal processing subsystem, are handled received task for parallel;
    Further include:
    Comprehensive decision subsystem, in the Channel Processing subsystem and signal processing subsystem after treatment, judging UE reports the handling result of PUSCH and SRS there are during PUSCH and SRS;Judging that UE there are during PUCCH and SRS, reports The handling result of PUCCH and SRS;Judging that UE is existing there are when one of PUSCH, PUCCH and SRS, reporting The handling result of PUSCH, PUCCH or SRS;
    Parameter analysis of electrochemical subsystem is further included, wherein:
    The Parameter analysis of electrochemical subsystem, for after uplink receiver receives data of eating dishes without rice or wine, carrying out detection reference signal (SRS) The detection whether to conflict with PUSCH, or carry out the detection whether SRS conflicts with uplink control channel (PUCCH);
    The uplink receiver, specifically for the testing result according to conflict, corresponding channel is sent respectively to by channel task Processing subsystem is demodulated processing;And/or signal task is sent respectively to corresponding signal processing subsystem and is demodulated Processing.
  10. 10. device as claimed in claim 9, it is characterised in that Parameter analysis of electrochemical subsystem is further included, wherein:
    The Parameter analysis of electrochemical subsystem, for before uplink receiver receives data of eating dishes without rice or wine, determine channel that may be present and Signal, when definite Physical Uplink Shared Channel (PUSCH) is channel that may be present, by the upload control of user equipment (UE) The demodulation parameter of information is multiplexed on PUSCH.
  11. 11. device as claimed in claim 10, it is characterised in that:
    The Parameter analysis of electrochemical subsystem, specifically for when the dispatch request (SR) of UE reaches the cycle, the relevant parameter of SR is added Enter into the demodulation parameter of the ascending control information (UCI) of UE;Demodulate and disappear in the confirmation/non-acknowledgement (ACK/NACK) for receiving UE During breath, the ACK relevant parameters demodulated are added in the demodulation parameter of UCI;(CQI)/precoding is indicated in the channel quality of UE When matrix instruction (PMI)/order instruction (RI) reaches report cycle, by the UCI's of the relevant parameter addition of CQI/PMI/RI demodulation In demodulation parameter;When receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI outside removing SR is passed at PUSCH Manage subsystem;When not receiving the PUSCH demodulation parameters of UE, the demodulation parameter of the UCI comprising SR is passed to PUSCH processing System.
  12. 12. device as claimed in claim 9, it is characterised in that:
    The Parameter analysis of electrochemical subsystem, specifically in the cycle that UE is in SRS, UCI does not include SR, and UCI includes CQI When, determine SRS and channel confliction;
    The uplink receiver, specifically in SRS and channel confliction, the signal that UE is not sent to SRS processing subsystems is appointed Business.
  13. 13. device as claimed in claim 9, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems System, wherein:
    The PUCCH processing subsystems, in PUCCH there are during multiple potential ACK/NACK resources, to each ACK/NACK Signal-to-noise ratio or signal power in resource measure, and obtain measured value;
    When the measured value of all ACK/NACK resources is respectively less than thresholding, ACK/NACK resources are determined as discontinuous transmission (DTX), ACK/NACK is not demodulated;
    When a measured value for being higher than thresholding is only included in the measured value of all ACK/NACK resources, thresholding is higher than to measured value ACK/NACK resources carry out ACK/NACK demodulation;
    When in the measured value of all ACK/NACK resources comprising multiple measured values higher than thresholding, to the ACK/ of measured value maximum NACK resources carry out ACK/NACK demodulation.
  14. 14. device as claimed in claim 9, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems System, wherein:
    The PUCCH processing subsystems, for including the detection information of SR in UCI, and when judging SR for Positive (just) SR, The demodulation of CQI is abandoned, and records the mark for detecting SR;When judging SR for Negative (negative) SR, CQI is demodulated; When UCI does not include the detection information of SR, CQI is demodulated.
  15. 15. device as claimed in claim 9, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems System, wherein:
    The PUCCH processing subsystems, for UCI include SR detection information when, detect ACK/NACK in the resource of SR, When testing result is non-DTX, record detects the mark of SR and the result of ACK/NACK;When testing result is DTX, ACK/NACK is demodulated again in ACK/NACK resources;When UCI does not include the detection information of SR, solved in the resource of ACK/NACK Adjust ACK/NACK.
  16. 16. device as claimed in claim 9, it is characterised in that the Channel Processing subsystem includes PUCCH processing subsystems System, wherein:
    The PUCCH processing subsystems, for when high level configuration CQI and ACK/NACK can not be passed altogether, in the money of ACK/NACK ACK/NACK is detected on source, when testing result is DTX, CQI is detected in the resource of CQI;When testing result is non-DTX, Record the result of ACK/NACK;When high level configuration CQI and ACK/NACK can be passed altogether, CQI and ACK/ is detected in CQI resources NACK。
CN201210274463.8A 2012-08-03 2012-08-03 A kind of uplink receiving method and device Active CN103580816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210274463.8A CN103580816B (en) 2012-08-03 2012-08-03 A kind of uplink receiving method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210274463.8A CN103580816B (en) 2012-08-03 2012-08-03 A kind of uplink receiving method and device

Publications (2)

Publication Number Publication Date
CN103580816A CN103580816A (en) 2014-02-12
CN103580816B true CN103580816B (en) 2018-05-15

Family

ID=50051829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210274463.8A Active CN103580816B (en) 2012-08-03 2012-08-03 A kind of uplink receiving method and device

Country Status (1)

Country Link
CN (1) CN103580816B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104393955B (en) * 2014-11-25 2018-04-27 北京北方烽火科技有限公司 Ack/nack signal detection method and device
JP6725516B2 (en) * 2015-08-07 2020-07-22 シャープ株式会社 Terminal device and communication method
CN109495927B (en) * 2017-09-11 2022-01-28 维沃移动通信有限公司 Information transmission method, terminal and network side equipment
CN109962759B (en) * 2017-12-25 2021-09-28 普天信息技术有限公司 Uplink service PUSCH detection method and system
CN109995464B (en) * 2017-12-29 2021-10-26 普天信息技术有限公司 Detection processing method and device, electronic equipment and storage medium
CN110149726B (en) * 2018-02-12 2021-03-30 电信科学技术研究院有限公司 Information transmission method and terminal
EP4300858A3 (en) * 2018-04-28 2024-02-28 Beijing Xiaomi Mobile Software Co., Ltd. Uplink transmission method and apparatus
CN111294936B (en) 2018-12-06 2023-04-14 大唐移动通信设备有限公司 Transmission method and terminal
WO2020113997A1 (en) * 2018-12-06 2020-06-11 电信科学技术研究院有限公司 Transmission method and terminal
CN111835479B (en) * 2019-07-02 2021-09-24 维沃移动通信有限公司 Information transmission and receiving method, terminal and network side equipment
WO2021088072A1 (en) * 2019-11-08 2021-05-14 Oppo广东移动通信有限公司 Information transmission method and apparatus, terminal, and storage medium
WO2021159381A1 (en) * 2020-02-13 2021-08-19 富士通株式会社 Uplink signal processing method and apparatus, and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1647429A (en) * 2002-04-15 2005-07-27 美商内数位科技公司 Software parameterizable control blocks for use in physical layer processing
CN101394209A (en) * 2007-09-21 2009-03-25 华为技术有限公司 Macrodiversity incorporating method, system and equipment
CN101583195A (en) * 2009-06-12 2009-11-18 华为技术有限公司 Data transmitting method, device and system
CN102301801A (en) * 2009-01-29 2011-12-28 Lg电子株式会社 Method for controlling signal transmission power and device for same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1647429A (en) * 2002-04-15 2005-07-27 美商内数位科技公司 Software parameterizable control blocks for use in physical layer processing
CN101394209A (en) * 2007-09-21 2009-03-25 华为技术有限公司 Macrodiversity incorporating method, system and equipment
CN102301801A (en) * 2009-01-29 2011-12-28 Lg电子株式会社 Method for controlling signal transmission power and device for same
CN101583195A (en) * 2009-06-12 2009-11-18 华为技术有限公司 Data transmitting method, device and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《LTE系统空中接口开销分析》;张新程;《2009年信息通信网络技术委员会年会征文》;20091231;全文 *

Also Published As

Publication number Publication date
CN103580816A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103580816B (en) A kind of uplink receiving method and device
US12114343B2 (en) Method for transmitting signaling information, and communication node and storage medium
US11863482B2 (en) Method and apparatus for signaling aperiodic channel state indication reference signals for LTE operation
CN102368697B (en) Interferometry signals, interferometry and feedback method and its device
CN103812602B (en) The method and apparatus of blind examination public search space and the specific search space UE
EP2490495B1 (en) Method for transmitting physical downlink control channel (pdcch) information, method for determining pdcch search space and devices thereof
CN106452691B (en) Communication method and device for carrier aggregation system
CN103493556B (en) Dynamic uplink/downlink configuration for time division duplexing
CN103369582B (en) The Physical Downlink Control Channel qualitative forecasting method of long evolving system and device
CN110035544B (en) Uplink control information transmission method and device
US20120230266A1 (en) Method and System for Resource Distribution, Blind Detection Method, Base Station, User Equipment
US20180220433A1 (en) Multi-user data transmission method and device
US20130010746A1 (en) Dynamic allocation of communication resources in a wireless system
KR20170102292A (en) Method and apparatus for signaling aperiodic channel status indication reference signals for LTE operation
CN102781095B (en) The method of transfer of data, base station, subscriber equipment and system
CN103716888A (en) Control channel resource allocation method and base station
CN107040342A (en) A kind of method and apparatus of transmitting uplink control information
CN105991209B (en) A kind of PUCCH method and apparatus in the CA of enhancing
CN103716828A (en) Interference measuring, control and scheduling methods, user equipment and base station
CN110138523A (en) A kind of feedback code book determines method and device
CN106471763A (en) The method and apparatus realizing the self-adapting detecting to dispatch request
US20220295507A1 (en) Data transmission method, data transmission device, non-transitory computer readable medium, and chip
CN106961742A (en) A kind of up LAA communication means and device
CN103595501B (en) Instruction method for sending information and method of reseptance, base station and subscriber equipment
CN103152835A (en) Method and system for estimating uplink sub-frame PUSCH (Physical Uplink Shared Channel) usable resource in LTE (Long Term Evolution) system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: 518055 Zhongxing Industrial Park, Liuxian Avenue, Xili street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: SANECHIPS TECHNOLOGY Co.,Ltd.

Address before: 518057 Ministry of justice, Zhongxing building, South Science and technology road, Nanshan District hi tech Industrial Park, Shenzhen, Guangdong

Patentee before: ZTE Corp.

TR01 Transfer of patent right