CN103578154B - Based on the implementation method of the power equipment intelligent patrol detection of PDA - Google Patents
Based on the implementation method of the power equipment intelligent patrol detection of PDA Download PDFInfo
- Publication number
- CN103578154B CN103578154B CN201310591103.5A CN201310591103A CN103578154B CN 103578154 B CN103578154 B CN 103578154B CN 201310591103 A CN201310591103 A CN 201310591103A CN 103578154 B CN103578154 B CN 103578154B
- Authority
- CN
- China
- Prior art keywords
- defect
- tour
- equipment
- inspection
- patrol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000001514 detection method Methods 0.000 title claims abstract description 11
- 238000007689 inspection Methods 0.000 claims abstract description 68
- 230000007547 defect Effects 0.000 claims description 103
- 238000007726 management method Methods 0.000 claims description 32
- 238000012545 processing Methods 0.000 claims description 16
- 230000008030 elimination Effects 0.000 claims description 10
- 238000003379 elimination reaction Methods 0.000 claims description 10
- 230000007812 deficiency Effects 0.000 claims description 4
- 230000002159 abnormal effect Effects 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000012550 audit Methods 0.000 claims description 2
- 238000012217 deletion Methods 0.000 claims description 2
- 230000037430 deletion Effects 0.000 claims description 2
- 230000005684 electric field Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000012423 maintenance Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of implementation method of the power equipment intelligent patrol detection based on PDA, be it is characterized in that: patrol officer downloads on hand-held PDA patrol task information on the PC of office, the hand-held PDA of tour of inspection apparent time is outside maked an inspection tour item by item by the equipment-patrolling item that RFID is good to predefined, and records data content; After tour task completes, result being maked an inspection tour by making an inspection tour management host, being submitted in server.What the present invention can improve electric field equipment patrols and examines quality, solves and patrols and examines not in place, undetected or patrol and examine the situations such as unpunctual.Improve the efficiency of patrolling and examining, terminate original manual situation of making a report on low, the easy leakage item of efficiency and error situation.
Description
Technical field
The present invention relates to electric device maintenance technical field, particularly a kind of implementation method of the power equipment intelligent patrol detection based on PDA.
Background technology
Patrolling and examining of equipment is the important step of electric power enterprise safety in production, the standardization of equipment routing inspection and arrival rate, can Timeliness coverage equipment defect and jeopardize safe hidden danger, eliminate defect in time to reach, reduce the loss that causes of fault.The standardization of overhaul of the equipments and standardization, can propose concrete elimination content, to ensure the operation of electricity net safety stable after making an inspection tour the standardization of equipment at ordinary times.But existing equipment Inspection is all by manual detection, not only detection efficiency is low for it, and due to equipment code standard more, artificial test often due to the error judged, and can cause the hidden danger of device security.
Summary of the invention
In view of this, the object of this invention is to provide a kind of implementation method of the power equipment intelligent patrol detection based on PDA.
The present invention adopts following scheme to realize: a kind of implementation method of the power equipment intelligent patrol detection based on PDA, be it is characterized in that: patrol officer downloads on hand-held PDA patrol task information on the PC of office, the hand-held PDA of tour of inspection apparent time is outside maked an inspection tour item by item by the equipment-patrolling item that RFID is good to predefined, and records data content; After tour task completes, result being maked an inspection tour by making an inspection tour management host, being submitted in server.
Beneficial effect of the present invention: that 1, improves electric field equipment patrols and examines quality, solves and patrols and examines not in place, undetected or patrol and examine the situations such as unpunctual.2, improve the efficiency of patrolling and examining, terminate original manual situation of making a report on low, the easy leakage item of efficiency and error situation.3, solve the situation that managerial personnel are difficult in time, understand accurately, all sidedly equipment, by three-dimensional display platform and equipment control, the defect of equipment, the disposition of defect can be grasped in time.4, the defect storehouse of standard and the idea in management of procedure, facilitates patrol officer to the qualitative and further lifting defect management level of defect.5, perform tour task: make an inspection tour personnel's hand-held tour PDA, according to content presentation such as tour path, tour project etc., to specifying inspection point provided walkaround inspection equipment, and carrying out record with tour PDA, checking the data such as facility information and historic defects.6, information analysis process: system carries out analyzing and processing to tour result, comprises the information of putting in place, defect information etc.And defect information can be sent to MIS fault management system.7, can data-interface be provided, facilitate managerial personnel to carry out the browsing of data on a local area network, inquire about and the function such as defect processing, statistics.
Accompanying drawing explanation
Fig. 1 is the system architecture schematic diagram inventing formation according to the present invention.
Fig. 2 and Fig. 3 is function demonstration figure of the present invention.
Embodiment
The embodiment of the present invention provides a kind of implementation method of the power equipment intelligent patrol detection based on PDA, be it is characterized in that: patrol officer downloads on hand-held PDA patrol task information on the PC of office, the hand-held PDA of tour of inspection apparent time is outside by RFID system equipment, obtain on-the-spot coordinate of making an inspection tour to position, make an inspection tour item by item according to the equipment-patrolling item of definition behind location, and record data content; After tour task completes, result being maked an inspection tour by making an inspection tour management host, being submitted in server.
Be noted that above-mentioned download comprises two kinds of downloading modes, a kind of electric power factory equipment being user and only can downloading to one's name responsibility according to each power plant; Another kind downloads one's own task according to task, and task comprises concrete power plant, electric power factory equipment and inspection item, reminded contents, task time, task place, task type and task definition.Described handheld terminal can according to the setup times of inspection point provided, if the time less than, do not allow the scanning carrying out next inspection point provided.
In an embodiment of the present invention, described hand-held PDA can check facility information, history makes an inspection tour non-defect elimination defect record, job instruction, make an inspection tour for scene and provide standardized directions.The flow process of concrete described tour comprises:
Step S01: the base data information checking the electric power factory equipment of power plant, whether the defect that history once occurred, the disposition of historic defects, eliminate;
Step S02: dangerous point and the Work tool of checking equipment, by patrolling and examining order, make an inspection tour one by one equipment and tour project corresponding to equipment, often maked an inspection tour an equipment, hand-held PDA records time, personnel, the coordinate of tour and the situation information that puts in place automatically;
Step S03: in tour process, hand-held PDA inquire about the facility information maked an inspection tour, and comprise the essential information of equipment, defect information, for tour work provides corresponding reference;
Step S04: patrol and examine in the course of work and record monitoring time exactly, patrol and examine place, patrol officer, patrol and examine item, defect record and elimination check and accept, patrol and examine trace information;
Step S05: in tour process, when discovering device defectiveness or abnormal conditions, carries out record by PDA, carries out the selection of defect description from defect standard storehouse, and after preserving, system records the time of patrol officer and tour automatically.Described defect record support voice, video, picture are preserved as annex, the auxiliary expression described defect.
The treatment step of described defect comprises:
Step S11: defect reports: on-the-spot discovery defect personnel are stored in hand-held PDA defect, upload to described server by wireless network or data line, also can in the manual typing defect of tour management host; Defect is given the correct time, points out the defect photo reporting personnel to upload;
Step S12: defect is authorized: the defect that patrol officer finds carries out grade judgement, different according to defect rank, system automatic-prompting defect typing personnel are sent to different flow process and audit, and auditor can describe defect and modify, and carries out deletion management to the project not being defect;
Step S13: defect processing: make an inspection tour management host and automatically generate defect processing list, and can print and derive defect processing list;
Step S14: defect processing is checked and accepted: defect processing is complete, and defect elimination personnel upgrade defect state, fills in examination suggestion, defect state change must carry out an acceptance inspection to the defect eliminated.
In addition, it is worth mentioning that, also comprise the geographic position providing basic geographical information platform to show all administration power stations, the wiring planimetric map in single power station is checked by link, show the tour path to equipment, the real time position of patrol officer, equipment deficiency situation information.Above-mentioned tour management host provides WEBSERVICE service interface, realizes managerial personnel and carries out the browsing of data on a local area network, inquires about and defect processing and statistics.
Refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 1 is the system architecture that the present invention is formed according to said method, production management system server and above-mentioned tour management host in figure, the WEBSERVICE service interface due to Operation system setting, therefore in figure, various worktable can log in and to carry out the browsing of data, inquires about and defect processing and statistics.
Refer to Fig. 2, Fig. 2 illustrates the front-end functionality of system, its by patrol and examine front end follow the tracks of patrol and examine the situation that puts in place, record make an inspection tour record, fill in defect, record logout, information inquiry etc.,
A) remind intelligently---by scanning RFID, automatic quick position is carried out to tour target device;
B) terminal data inquiry---handheld terminal checks facility information easily, history makes an inspection tour non-defect elimination defect record, job instruction etc., makes an inspection tour for scene and provides standardized directions.
C) dynamic real time data transmission---the integrated GPRS/CDMA radio communication function of terminal device, can carry out the submission with achievement of collecting of work by real-time online, dynamically updates and makes an inspection tour tour personnel real-time coordinates data, carry out the real-time location of current location.
D) content navigation and defect storehouse are maked an inspection tour in standardization---and to dissimilar tour equipment, carry out tour content navigation, minimizing is patrolled less, is leaked the situation of patrolling; Adopt curved defect to describe storehouse to the description of defect, reduce the few input of terminal record as far as possible, improve the standardization described and describe.
E) putting in place, management interval time---terminal can according to the setup times of inspection point provided, if the time less than, do not allow the scanning carrying out next inspection point provided.
F) the automatic record of terminal data---terminal system carries out automatic record to the data of the process of patrolling and examining automatically, can not revise raw data, guarantees the correctness of data; The storage of the multi-medium datas such as terminal support recording, photograph and video recording and submission.
G) automatically upgrading---terminal can identify the latest edition that background system provides automatically, automatically realizes upgrading, reduces the maintenance work that great amount of terminals equipment is upgraded one by one.
H) data syn-chronization: making an inspection tour terminal can carry out data interaction by wired USB or wireless network (WIFI, GPRS or CDMA) with server, tour task and related data are downloaded to PDA this locality, after tour completes, tour situation, defect record, RFID coordinate acquisition, make an inspection tour the data upload such as path to backstage, tour task completion rate, tour situation, defect situation, patrol officer's arrival rate are seen in time by browser in backstage.
I) task management: provide downloading mode flexibly, downloads according to each power plant during downloading task and downloads two kinds of downloading modes according to task.User only can download the electric power factory equipment of to one's name responsibility according to each power plant; Also can download one's own task according to task, task comprises concrete power plant, electric power factory equipment and inspection item, reminded contents, task time, task place, task type, task definition etc.
J) management is maked an inspection tour:
Step s01: the base data information checking the electric power factory equipment of power plant, whether the defect that history once occurred, the disposition of historic defects, eliminate.
Step s02: dangerous point and the Work tool of checking equipment, by patrolling and examining smoothly, making an inspection tour one by one equipment and tour project corresponding to equipment, often having maked an inspection tour an equipment, system automatically record tour time, personnel, coordinate, put in place the details such as situation.
Step s03: in tour process, terminal can be inquired about the facility information maked an inspection tour, and comprises the essential information of equipment, defect information etc., for tour work provides corresponding reference.
Step s04: patrol and examine in the course of work and record monitoring time exactly, patrol and examine place, patrol officer, patrol and examine item, defect record and elimination check and accept, patrol and examine the important informations such as track.
Step s05: in tour process, when discovering device defectiveness or abnormal conditions, carries out record by PDA, carries out the selection of defect description from defect standard storehouse, namely reduces manual input, ensures again the standardization that defect describes.Also can use handwriting input defect time special, after preserving, system records the time of patrol officer and tour automatically.Defect record support voice, video, picture are preserved as annex, the auxiliary expression described defect.
K) logout is recorded: the operational factor needing recording unit when tour personnel make an inspection tour equipment, such as cutter (ground wire) logout etc.Backstage provides record operational factor, bound, the unit of define equipment type, and the mode of entry values and figure are shown, enquiry of historical data function.Front end provides according to parameter definition entry values function.
L) Added Management, provides sound-recording function, and auxiliary tour personnel record field condition truly better in particular circumstances; Recorded file can be uploaded onto the server together with making an inspection tour record; Camera function is provided, when recording defect, multiple photographs can be clapped simultaneously.
M) RFID management: the positioning scenarios of RFID, by scanning the equipment automatically navigating to inspection point provided and need inspection point provided.
N) risk management: carry out backstage unified management to the history significant deficiency occurred in each equipment, accident or the easy dangerous point that security incident occurs, when PDA end scans this equipment, system automatically can be carried out safe risk and be reminded.
O) automatically upgrade: when inspection terminal redaction is issued on backstage, the latest version information on PDA terminal automatic acquisition backstage, complete the upgrade job of redaction according to prompting guide.Simplify the workload of system maintenance.
Refer to Fig. 3, Fig. 3 is the polling module function polling module of GPMS system is GPMS management system platform, by polling module management equipment information, formulate patrol plan, check patrol record, defect management, statistical study etc.Major function is composed as follows:
1) library management is maked an inspection tour in standardization---and supporting the management function to patrolling and examining object data, self-definedly can patrol and examine object type, polling period, patrol and examine project, the standardization such as drawbacks of the standard storehouse and defect type makes an inspection tour Content Management.
2) task management flexibly---patrol and examine template, to tour task can carry out craft formulate and system automatically generate, easily patrol task is distributed to patrol officer, supports the intelligent reminding to task.
3) orderly management of defect---orderly management is carried out to equipment deficiency, automatically selects auditing flow according to different hierarchical systems, support to store combinations such as defect text description, picture, videos.
4) graphics data is shown---based on dimensionally platform, mouth of a river generating plants equipment, defect information, tour path, real-time positioning system information can be shown on map.
5) the data transmission of safety---when handheld terminal and back-end data carry out exchanges data, adopt the data transmission mechanism of safety, guarantee data are in the integrality of transmitting procedure and security.
6) interface is carried out with production system---inspection tour system can carry out following data-interface with production system, realizes data sharing.Obtain from Production MIS and patrol and examine object data; Data will be patrolled and examined and output to Production MIS; With Production MIS switching equipment information, make an inspection tour and record, patrol and examine object defect and defect processing result.
7) data statistics and analysis---system records the statistics of the aspects such as data, task performance, defective data, facility information data to making an inspection tour, support many inquiry modes, field and screening conditions can be selected to carry out generating report forms, support multiple pictorial statement mode, and can the files such as EXCEL, PDF be exported to.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.
Claims (2)
1. based on an implementation method for the power equipment intelligent patrol detection of PDA, it is characterized in that: patrol officer is at the PC of office
On patrol task information is downloaded on hand-held PDA, the hand-held PDA of tour of inspection apparent time is outside maked an inspection tour item by item by the equipment-patrolling item that RFID is good to predefined, and records data content; After tour task completes, result being maked an inspection tour by making an inspection tour management host, being submitted in server;
Wherein, described download comprises two kinds of downloading modes, a kind of electric power factory equipment being user and only can downloading to one's name responsibility according to each power plant; Another kind downloads one's own task according to task, and task comprises concrete power plant, electric power factory equipment and inspection item, reminded contents, task time, task place, task type and task definition;
Wherein, described handheld terminal can according to the setup times of inspection point provided, if the time less than, do not allow the scanning carrying out next inspection point provided;
Wherein, described hand-held PDA can check facility information, history is maked an inspection tour the defect record of non-defect elimination and patrols and examines job instruction, and making an inspection tour for scene provides standardized directions;
Wherein, also comprise the geographic position providing basic geographical information platform to show all administration power stations, checked the wiring planimetric map in single power station by link, show the tour path of equipment, the real time position of patrol officer and equipment deficiency situation information;
Wherein, described tour management host provides WEBSERVICE service interface, realizes managerial personnel and carries out the browsing of data on a local area network, inquires about and defect processing and statistics.
2. the implementation method of the power equipment intelligent patrol detection based on PDA according to claim 1, is characterized in that: institute
The flow process stating tour comprises:
Step S01: the base data information checking the electric power factory equipment of power plant, historic defects, the disposition of historic defects, is
No elimination;
Step S02: dangerous point and the Work tool of checking equipment, by patrolling and examining order, make an inspection tour one by one equipment and tour project corresponding to equipment, often maked an inspection tour an equipment, hand-held PDA records time, personnel, the coordinate of tour and the situation information that puts in place automatically;
Step S03: in tour process, hand-held PDA inquire about the facility information maked an inspection tour, and comprise the essential information of equipment, defect information, for tour work provides corresponding reference;
Step S04: patrol and examine in the course of work and record monitoring time exactly, patrol and examine place, patrol officer, patrol and examine item, defect record and elimination check and accept, patrol and examine trace information;
Step S05: in tour process, when discovering device defectiveness or abnormal conditions, carries out record by hand-held PDA, carries out the selection of defect description from defect standard storehouse, and after preserving, system records the time of patrol officer and tour automatically;
Wherein, described defect record support voice, video, picture are preserved as annex, the auxiliary expression described defect;
Wherein, the treatment step of described defect comprises:
Step S11: defect reports: on-the-spot discovery defect personnel are stored in defect on hand-held PDA, by wireless network or data
Line uploads to described server, also can make an inspection tour manual typing defect on management host; Defect is given the correct time, points out the defect photo reporting personnel to upload;
Step S12: defect is authorized: patrol officer carries out grade judgement to the defect found, different according to defect rank, system automatic-prompting defect typing personnel are sent to different flow process and audit, and auditor can describe defect and modify, and carries out deletion management to the project not being defect;
Step S13: defect processing: make an inspection tour management host and automatically generate defect processing list, and can print and derive defect processing
Single;
Step S14: defect processing is checked and accepted: defect processing is complete, and defect elimination personnel upgrade defect state, fills in examination suggestion, defect state change must carry out an acceptance inspection to the defect eliminated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310591103.5A CN103578154B (en) | 2013-11-21 | 2013-11-21 | Based on the implementation method of the power equipment intelligent patrol detection of PDA |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310591103.5A CN103578154B (en) | 2013-11-21 | 2013-11-21 | Based on the implementation method of the power equipment intelligent patrol detection of PDA |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103578154A CN103578154A (en) | 2014-02-12 |
CN103578154B true CN103578154B (en) | 2016-03-30 |
Family
ID=50049870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310591103.5A Active CN103578154B (en) | 2013-11-21 | 2013-11-21 | Based on the implementation method of the power equipment intelligent patrol detection of PDA |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103578154B (en) |
Families Citing this family (50)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103700153A (en) * | 2013-12-17 | 2014-04-02 | 北京拓盛电子科技有限公司 | Routine inspection method and system |
CN103887877B (en) * | 2014-02-24 | 2016-08-17 | 西安西热控制技术有限公司 | A kind of thermal power plant's reverse prompt terminal of intelligent inspection system and method |
CN105278335B (en) * | 2014-07-01 | 2019-12-10 | 上海日趋信息技术有限公司 | Man-machine interaction method for single-person flow operation instruction and verification |
CN105572614B (en) * | 2014-10-10 | 2018-06-08 | 华立科技股份有限公司 | The long-range cruising inspection system of metering device |
CN105572620B (en) * | 2014-10-10 | 2018-06-08 | 华立科技股份有限公司 | The long-range method for inspecting of metering device |
CN104320453A (en) * | 2014-10-22 | 2015-01-28 | 山东大学 | Patrol method of intelligent patrol system on basis of Android mobile phone |
CN105095808A (en) * | 2014-11-04 | 2015-11-25 | 合肥轩明信息科技有限公司 | High-voltage power grid inspection application based on RFID |
CN104392506B (en) * | 2014-12-05 | 2017-03-29 | 华能澜沧江水电有限公司 | Data syn-chronization and data managing method are patrolled and examined in a kind of power station water conservancy project for supporting multiple terminals platform |
CN104361128A (en) * | 2014-12-05 | 2015-02-18 | 河海大学 | Data synchronization method of PC (Personnel Computer) end and mobile terminal based on hydraulic polling business |
CN104966329A (en) * | 2015-07-31 | 2015-10-07 | 上海许继电气有限公司 | System for intelligent scheduling and polling of photovoltaic power station |
CN106557986B (en) * | 2015-09-25 | 2020-06-12 | 成都鼎桥通信技术有限公司 | Photovoltaic power station equipment maintenance method |
CN106710023B (en) * | 2015-11-13 | 2019-04-05 | 山东建筑大学 | Intelligent substation enclosing method based on RFID |
CN105321051A (en) * | 2015-11-26 | 2016-02-10 | 国网安徽省电力公司检修公司 | Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof |
CN105469323A (en) * | 2015-12-15 | 2016-04-06 | 国家电网公司 | Handheld terminal for checking power supply service and method of checking power supply service |
CN106886966A (en) * | 2015-12-15 | 2017-06-23 | 天维尔信息科技股份有限公司 | Enforcement data treating method and apparatus |
CN105528683A (en) * | 2016-01-06 | 2016-04-27 | 深圳市微关注科技有限公司 | Road patrol method, hand-held terminal and cloud server |
CN105551107B (en) * | 2016-02-02 | 2018-09-07 | 深圳市中燃科技有限公司 | Inspection state display method and device based on satellite positioning collecting device |
CN105825556A (en) * | 2016-03-22 | 2016-08-03 | 杭州凯达电力建设有限公司 | Intelligent inspection system |
CN106022484A (en) * | 2016-05-04 | 2016-10-12 | 北京思特奇信息技术股份有限公司 | Trunk cable maintenance management method and system |
CN105868934A (en) * | 2016-05-09 | 2016-08-17 | 国网浙江东阳市供电公司 | Tour-inspection remote management method |
CN106022613A (en) * | 2016-05-23 | 2016-10-12 | 华电国际宁夏新能源发电有限公司 | Mobile standard maintenance system of wind generating set based on enterprise maintenance file package |
CN106056695B (en) * | 2016-07-14 | 2018-12-14 | 北京方智科技股份有限公司 | A kind of intelligent mobile inspection terminal based on Internet of Things |
CN106327603A (en) * | 2016-08-10 | 2017-01-11 | 国网浙江省电力公司金华供电公司 | Transmission equipment inspection information collection and analysis system |
CN106846529A (en) * | 2016-12-12 | 2017-06-13 | 国网北京市电力公司 | The method for inspecting and inspection device of cable |
CN108255136A (en) * | 2016-12-28 | 2018-07-06 | 博世汽车部件(苏州)有限公司 | Accident recording apparatus, apparatus for production line diagnostic method and system |
CN106952356A (en) * | 2017-03-13 | 2017-07-14 | 珠海博威电气股份有限公司 | A kind of method for carrying out electric inspection process using experts database and Internet map |
CN107798743A (en) * | 2017-10-13 | 2018-03-13 | 国网新疆电力公司阿勒泰供电公司 | Substation equipment intelligent patrol device |
CN107862395A (en) * | 2017-11-20 | 2018-03-30 | 国网山西省电力公司检修分公司 | Alarm method is checked and accepted and maked an inspection tour to intelligent substation |
CN110163988A (en) * | 2018-02-09 | 2019-08-23 | 华能澜沧江水电股份有限公司糯扎渡水电厂 | A kind of intelligent patrol detection management system |
CN108470386A (en) * | 2018-04-16 | 2018-08-31 | 国网上海市电力公司 | A kind of cable run intelligent inspection system based on GPS and cloud platform |
CN108765619A (en) * | 2018-05-17 | 2018-11-06 | 马鞍山钢铁股份有限公司 | Enterprise's patrolling and checking management system and its management method |
CN109147080A (en) * | 2018-08-21 | 2019-01-04 | 山东中烟工业有限责任公司 | Equipment point-detecting information management system and method |
CN109242066A (en) * | 2018-09-20 | 2019-01-18 | 国网福建省电力有限公司 | A kind of communicating for power information inspection method and mobile terminal based on mobile terminal |
CN109376875A (en) * | 2018-09-20 | 2019-02-22 | 国网福建省电力有限公司 | A kind of communicating for power information repair method and system based on mobile terminal |
CN109285088A (en) * | 2018-10-10 | 2019-01-29 | 中国华电科工集团有限公司 | A kind of intelligent inspection system and its method applied to power plant |
CN109886427A (en) * | 2018-11-15 | 2019-06-14 | 国网河南省电力公司郑州供电公司 | Method for inspecting is managed in power transformation lean work on the spot |
CN109710696B (en) * | 2018-12-28 | 2021-11-30 | 山东恒道信息技术有限公司 | System and method for power equipment checking and transaction moving operation |
CN109919333A (en) * | 2019-02-27 | 2019-06-21 | 上海市燃气设备计量检测中心有限公司 | A kind of gaseous-pressure pipe detection approaches to IM and its system |
CN109934950A (en) * | 2019-03-14 | 2019-06-25 | 国家电网有限公司 | APP and method are maked an inspection tour in a kind of standardization of transmission line of electricity |
CN110176085A (en) * | 2019-06-03 | 2019-08-27 | 国网黑龙江省电力有限公司牡丹江水力发电总厂 | Power station equipment cruising inspection system based on two dimensional code |
CN110246071B (en) * | 2019-06-19 | 2022-11-18 | 广东电网有限责任公司 | Tool training system |
CN110781987B (en) * | 2019-10-30 | 2023-06-20 | 云南恒协科技有限公司 | Workshop inspection management system |
CN110992512A (en) * | 2019-11-26 | 2020-04-10 | 国网辽宁省电力有限公司朝阳供电公司 | Power transmission line inspection arrival rate online monitoring system and method based on electronic tag |
CN111488999A (en) * | 2020-05-12 | 2020-08-04 | 辽宁丰沃新能源有限公司 | Be applied to wind-powered electricity generation field safety production information-based management system |
CN113077063B (en) * | 2021-03-03 | 2023-10-10 | 国网河南省电力公司郑州供电公司 | Defect management method and device for power transformation equipment based on voice and image recognition |
CN113971845A (en) * | 2021-10-27 | 2022-01-25 | 广东电网有限责任公司 | Automatic operation and maintenance patrol guiding terminal and operation and maintenance patrol guiding method |
CN115376218A (en) * | 2021-11-25 | 2022-11-22 | 广东中奥物业管理有限公司 | PDA (personal digital assistant) inspection management system and inspection method |
CN114140896A (en) * | 2021-11-30 | 2022-03-04 | 太原重工股份有限公司 | Voice broadcast panoramic intelligent inspection system |
CN114301129B (en) * | 2021-12-29 | 2023-07-04 | 安徽佑赛科技股份有限公司 | Substation inspection system and control method thereof |
CN116187984B (en) * | 2023-04-28 | 2023-07-25 | 华能济南黄台发电有限公司 | Multi-dimensional inspection method and system for power plant |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6834259B1 (en) * | 1999-10-15 | 2004-12-21 | Timekeeping Systems, Inc. | Guard tour system |
CN101763582A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Scheduled overhaul management module for EAM system of power plant |
CN201820274U (en) * | 2010-06-02 | 2011-05-04 | 南京航空航天大学 | Power transmission line polling management system based on radio frequency identification (RFID) technology |
CN102545098A (en) * | 2012-01-12 | 2012-07-04 | 航天科工深圳(集团)有限公司 | Power transmission line inspection system and implementation method thereof |
CN202353099U (en) * | 2011-12-08 | 2012-07-25 | 重庆市电力公司检修分公司 | Routing inspection and analysis integrated management system for ultra-high voltage/extra high voltage transmission line |
CN102801216A (en) * | 2012-09-06 | 2012-11-28 | 上海欣影电力科技发展有限公司 | Intelligent substation inspection system |
CN202586151U (en) * | 2012-02-20 | 2012-12-05 | 萧山供电局 | Distribution line tour-inspection system |
CN103310300A (en) * | 2013-05-27 | 2013-09-18 | 河南省电力公司鹤壁供电公司 | Mobile checking management method and system of power assets |
-
2013
- 2013-11-21 CN CN201310591103.5A patent/CN103578154B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6834259B1 (en) * | 1999-10-15 | 2004-12-21 | Timekeeping Systems, Inc. | Guard tour system |
CN101763582A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Scheduled overhaul management module for EAM system of power plant |
CN201820274U (en) * | 2010-06-02 | 2011-05-04 | 南京航空航天大学 | Power transmission line polling management system based on radio frequency identification (RFID) technology |
CN202353099U (en) * | 2011-12-08 | 2012-07-25 | 重庆市电力公司检修分公司 | Routing inspection and analysis integrated management system for ultra-high voltage/extra high voltage transmission line |
CN102545098A (en) * | 2012-01-12 | 2012-07-04 | 航天科工深圳(集团)有限公司 | Power transmission line inspection system and implementation method thereof |
CN202586151U (en) * | 2012-02-20 | 2012-12-05 | 萧山供电局 | Distribution line tour-inspection system |
CN102801216A (en) * | 2012-09-06 | 2012-11-28 | 上海欣影电力科技发展有限公司 | Intelligent substation inspection system |
CN103310300A (en) * | 2013-05-27 | 2013-09-18 | 河南省电力公司鹤壁供电公司 | Mobile checking management method and system of power assets |
Also Published As
Publication number | Publication date |
---|---|
CN103578154A (en) | 2014-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103578154B (en) | Based on the implementation method of the power equipment intelligent patrol detection of PDA | |
CN201131037Y (en) | Management system for polling base station | |
CN104157021B (en) | Intelligent inspection system and intelligent polling method | |
US20190236373A1 (en) | Data Transmission System of Safety Patrol on Construction Project Site Based on "Internet Plus" | |
CN109471142B (en) | Working track identification method based on RTK differential positioning | |
CN103927860A (en) | GPS (Global Position System)-positioned meter reading smart handheld machine and meter reading system | |
CN110163988A (en) | A kind of intelligent patrol detection management system | |
CN103325153A (en) | Inspection method and inspection system | |
CN102456238A (en) | Communication line inspection platform, system and method | |
CN111062504A (en) | AR technology-based intelligent power distribution station operation and maintenance system and method | |
CN111161445A (en) | Electric power inspection system | |
CN104992375A (en) | Hand-held transformer-substation intelligent patrol system based on XML data conversion | |
CN107516136A (en) | Power Line Inspection System | |
CN102736567A (en) | Method and system for centralized test control | |
CN110969719A (en) | Automatic inspection method, system, terminal equipment and storage medium | |
CN110503273A (en) | One kind being based on satellite dynamic two-dimension code intelligent patrol repair method and system | |
CN114298343A (en) | Management method and device for equipment inspection process, electronic equipment and storage medium | |
CN113223204A (en) | Electric power inspection system | |
CN103927620A (en) | Ship dispatch managing system for port operation | |
CN102938712A (en) | Digital operation field management and control system | |
CN102595461B (en) | Performance of mobile communication system testing apparatus, system and method for testing | |
CN110047164A (en) | Electromechanical equipment patrolling and checking management system | |
CN207882986U (en) | Electromechanical equipment patrolling and checking management system | |
CN112801432A (en) | Fan unit blade intelligent inspection system and fan unit blade inspection method | |
CN212659122U (en) | Intelligent water affair event scheduling management system based on three-dimensional visualization technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |