CN103577563B - 一种变电站模型迁移方法 - Google Patents
一种变电站模型迁移方法 Download PDFInfo
- Publication number
- CN103577563B CN103577563B CN201310511261.5A CN201310511261A CN103577563B CN 103577563 B CN103577563 B CN 103577563B CN 201310511261 A CN201310511261 A CN 201310511261A CN 103577563 B CN103577563 B CN 103577563B
- Authority
- CN
- China
- Prior art keywords
- model
- transformer station
- iec
- cim
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 230000005477 standard model Effects 0.000 claims abstract description 6
- 238000005259 measurement Methods 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 238000012795 verification Methods 0.000 abstract description 8
- 230000005012 migration Effects 0.000 abstract description 6
- 238000013508 migration Methods 0.000 abstract description 6
- 238000012423 maintenance Methods 0.000 abstract description 4
- 238000004891 communication Methods 0.000 description 7
- 238000006243 chemical reaction Methods 0.000 description 4
- 241001269238 Data Species 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000013499 data model Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/214—Database migration support
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511261.5A CN103577563B (zh) | 2013-10-24 | 2013-10-24 | 一种变电站模型迁移方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511261.5A CN103577563B (zh) | 2013-10-24 | 2013-10-24 | 一种变电站模型迁移方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103577563A CN103577563A (zh) | 2014-02-12 |
CN103577563B true CN103577563B (zh) | 2017-01-04 |
Family
ID=50049339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310511261.5A Active CN103577563B (zh) | 2013-10-24 | 2013-10-24 | 一种变电站模型迁移方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103577563B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104331839A (zh) * | 2014-10-22 | 2015-02-04 | 国家电网公司 | 一种采用高速io技术的cim本体建模校验系统及方法 |
CN111221794A (zh) * | 2020-02-17 | 2020-06-02 | 湖南工学院 | 配电网广域量测控制系统多源数据融合方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006017944A1 (en) * | 2004-08-16 | 2006-02-23 | Abb Research Ltd | Method and system for bi-directional data conversion between iec 61970 and iec 61850 |
CN101710735A (zh) * | 2009-12-11 | 2010-05-19 | 江西省电力科学研究院 | 智能变电站和主站共享建模方法 |
CN102611710B (zh) * | 2012-03-31 | 2015-03-18 | 广东电网公司电力科学研究院 | 基于mms的调度主站与变电站的数据交互方法及系统 |
CN102647027A (zh) * | 2012-04-25 | 2012-08-22 | 河北省电力研究院 | 一种实现建立电能质量数据交换接口的方法 |
-
2013
- 2013-10-24 CN CN201310511261.5A patent/CN103577563B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103577563A (zh) | 2014-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102521398B (zh) | 变电站-调度中心两级分布式电网的建模方法 | |
CN103970887B (zh) | 一种基于gis配电网图形上的信息流显示系统及方法 | |
CN104133953B (zh) | 智能变电站二次设计系统 | |
CN102929911B (zh) | 变电站与调度主站一体化建模方法 | |
CN102880792B (zh) | 一种基于iec标准的常规变电站的动态建模方法 | |
CN105095600B (zh) | 一种智能变电站和调控中心协调建模方法 | |
CN102957205B (zh) | 一种建立配电网模型的方法及系统 | |
CN103077212B (zh) | 变电站配置文件管控方法和系统 | |
CN105589886B (zh) | 电网公共信息模型构建方法及装置 | |
CN102779156B (zh) | 数字化变电站中通信装置的数据库配置方法 | |
CN102663094A (zh) | Iec61970cim模型校验方法 | |
CN102184280A (zh) | 图模一体可视化集成设计方法 | |
CN104123271A (zh) | 基于Excel的智能变电站二次设计系统 | |
CN105302954A (zh) | 多人在线的智能变电站设计系统 | |
CN103914307A (zh) | 一种基于可复用库的交互界面快速实现方法 | |
CN103294568A (zh) | 基于e语言的配网模型增量入库方法 | |
CN102270261A (zh) | 基于cad图模一体化的智能变电站模型设计方法 | |
CN104866613A (zh) | 一种电网设备设施三维组件化模型数据库的建立方法 | |
CN102609520A (zh) | 变电站模型数据过滤处理的导出方法 | |
CN107067161B (zh) | 一种智能电网中信息点表的自动化校核实现系统及方法 | |
Suleiman et al. | Inter-domain analysis of smart grid domain dependencies using domain-link matrices | |
CN107071013A (zh) | 一种智能变电站接入调控主站的服务响应方法及服务系统 | |
CN111199091A (zh) | 一种基于增强虚拟现实的电力系统交互仿真方法 | |
CN101275978A (zh) | 虚拟电能表及其制作方法 | |
CN109272248A (zh) | 一种基于元数据的综合能源一体化e-CIM模型设计方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Xiao Yanwei Inventor after: Liu Pei Inventor after: Yang Jian Inventor after: Jiang Zhengwei Inventor after: Du Qiwei Inventor after: Zhang Lizong Inventor after: Liu Dong Inventor after: Luo Shaojie Inventor after: Peng Baoyong Inventor after: Zhu Chuanbai Inventor after: Li Ying Inventor before: Jiang Zhengwei Inventor before: Du Qiwei Inventor before: Zhang Lizong Inventor before: Xiao Yanwei Inventor before: Liu Dong Inventor before: Luo Shaojie Inventor before: Zhu Chuanbai Inventor before: Liu Pei Inventor before: Yang Jian |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161130 Address after: 310007 Huanglong Road, Zhejiang, Hangzhou, No. 8 Applicant after: State Grid Zhejiang Electric Power Company Applicant after: State Grid Corporation of China Applicant after: Shaoxing Power Supply Company of State Grid Zhejiang Electric Power Company Applicant after: Hangzhou Zhi Guangyichuan Science and Technology Ltd. Address before: 310007 Huanglong Road, Zhejiang, Hangzhou, No. 8 Applicant before: State Grid Zhejiang Electric Power Company Applicant before: Shaoxing Power Supply Company of State Grid Zhejiang Electric Power Company Applicant before: Hangzhou Zhi Guangyichuan Science and Technology Ltd. Applicant before: State Grid Corporation of China |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |