CN103576037A - 基于水轮发电机微机保护装置智能测试平台的测试方法 - Google Patents
基于水轮发电机微机保护装置智能测试平台的测试方法 Download PDFInfo
- Publication number
- CN103576037A CN103576037A CN201310603053.8A CN201310603053A CN103576037A CN 103576037 A CN103576037 A CN 103576037A CN 201310603053 A CN201310603053 A CN 201310603053A CN 103576037 A CN103576037 A CN 103576037A
- Authority
- CN
- China
- Prior art keywords
- test
- cover
- protection
- hydrogenerator
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Control Of Eletrric Generators (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
本发明涉及一种基于水轮发电机微机保护装置智能测试平台的测试方法。水轮发电机微机保护装置包含保护A套和保护B套,保护A套和保护B套的电流输入及电压输入连接至测试仪设备的交流信号输出端,保护A套和保护B套的COM口通过485通信总线连接至微机保护智能测试平台,测试仪设备与微机保护智能测试平台相互连接,测试仪设备的开出和开入端还分别与保护A套和保护B套连接;所述测试方法为通过双套水轮发电机微机保护装置定检试验数据包及测试计划进行双套保护装置的复归、暂停试验、单步试验、手动试验、保存状态序列以及递变试验功能测试。本发明满足了通用化、自动化、可视化以及智能化的设计理念,提高了现场检修工作的效率。
Description
技术领域
本发明涉及电气二次设备测试领域,特别是一种基于水轮发电机微机保护装置智能测试平台的测试方法。
背景技术
为保证系统稳定、满足设备安全要求并且提高供电可靠性,水口电厂发电机微机继电保护采取双重化配置原则,在传统微机继电保护测试系统的设计理念上进行改进升级,研究并开发出了新一代水轮发电机微机保护装置智能测试平台,实现了同步进行双套保护装置自动测试的功能。国内外测试仪厂家配带的测试软件大多采用开环控制试验模式,目前国内出现了整个试验过程采取控制信号正向通路和反馈通路构成的闭环控制模式,但是均为“一对一”试验模式,而且不具备试验进程人工调节功能,本发明中的第二代继电保护通用测试平台具有“一对多”的试验功能,而且能够根据各次保护装置动作输出的信息来进行自适应判断,即通过比较保护动作行为与期望行为之间的偏差,采取智能判别与人工干预相结合的策略,调整试验数据重新进行本次试验项目,最终实现逐项精确校验装置的功能,满足规程对微机继电保护调试的要求。
发明内容
本发明的目的在于一种通用化、自动化、可视化以及智能化的水轮发电机微机保护装置智能测试平台的测试方法。
为实现上述目的,本发明的技术方案是:一种基于水轮发电机微机保护装置智能测试平台的测试方法,所述水轮发电机微机保护装置包含保护A套和保护B套,所述保护A套和保护B套的电流输入及电压输入连接至测试仪设备的交流信号输出端,所述保护A套和保护B套的COM口通过485通信总线连接至微机保护智能测试平台,所述测试仪设备与微机保护智能测试平台相互连接,所述测试仪设备的开出和开入端还分别与保护A套和保护B套连接;其特征在于:所述测试方法包括以下步骤,
步骤S01:试验对象及试验类型选择模块:微机保护智能测试平台由保护A套和保护B套的COM口采集信息,选择试验水轮发电机组、保护的水轮发电机的厂家和装置类型以及保护试验类型;
步骤S02:水电厂生继定值单载入模块:通过485通信总线,载入双套水轮发电机微机保护装置定值单,即载入保护A套定值单和保护B套定值单;
步骤S03:试验数据生成模块:根据步骤S01和步骤S02,生成双套水轮发电机微机保护装置定检试验数据包;
步骤S04:载入试验计划模块:载入步骤S03生成的双套水轮发电机微机保护装置定检试验数据包;
步骤S05:进行通讯设置并建立起可靠通讯链路:建立双套保护装置与智能测试平台之间的通讯链路、测试仪与智能测试平台之间的通讯链路,该通讯链接线程同时具备链路状态监视功能;
步骤S06:执行测试计划模块:根据步骤S04载入的双套水轮发电机微机保护装置定检试验数据包,执行双套保护装置的测试计划,即双套保护装置复归、暂停试验、单步试验、手动试验、保存状态序列以及递变试验功能;
步骤S07:试验结论确认模块:包含动作信号灯指示反馈、故障报文读取和保存功能;
步骤S08:定检试验报告生成模块:完成所有测试计划,一键生成试验报告。
在本发明实施例中,所述步骤S03的双套水轮发电机微机保护装置定检试验数据包包含保护A套保护状态序列和保护B套保护状态序列。
在本发明实施例中,所述步骤S06至步骤S08的具体过程如下,
步骤S11:选择试验项目,并执行试验项目;
步骤S12:判断试验仪器保护装置是否正常,即判断保护A套和保护B套是否处于正常运行状态,若不正常,返回步骤S11,若正常,执行下一步骤;
步骤S13:执行双套保护装置的测试计划,并对测试的试验结果输出进行采集;
步骤S14:判断步骤S13的试验结果是否正确,若不正确,若不正确进行试验数据的矫正,并返回步骤S11,若正确,保存试验结果,并生成试验报告。
相较于现有技术,本发明具有以下有益效果:
1、本发明调试过程中试验步骤不间断,测试平台与双套保护之间同步通信无冲突;
2、同步解析动作报文进程效率高,试验报告格式规范化;
3、在调试进程中可充分采用人机对话功能,以自动测试为主,人工干预为辅的试验模式。
附图说明
图1是本发明中水轮发电机微机保护装置智能平台最大化测试试验的电路和通信链路框图。
图2是本发明基于水轮发电机微机保护装置智能测试平台的测试方法的流程图。
图3是本发明试验测试计划执行流程图。
具体实施方式
下面结合附图,对本发明的技术方案进行具体说明。
如图1所示,本发明的一种基于水轮发电机微机保护装置智能测试平台的测试方法,所述水轮发电机微机保护装置包含保护A套和保护B套,所述保护A套和保护B套的电流输入及电压输入连接至测试仪设备的交流信号输出端,所述保护A套和保护B套的COM口通过485通信总线连接至微机保护智能测试平台,所述测试仪设备与微机保护智能测试平台相互连接,所述测试仪设备的开出和开入端还分别与保护A套和保护B套连接;
如图2所示,所述测试方法包括以下步骤,
步骤S01:试验对象及试验类型选择模块:微机保护智能测试平台由保护A套和保护B套的COM口采集信息,选择试验水轮发电机组、保护的水轮发电机的厂家和装置类型以及保护试验类型;
步骤S02:水电厂生继定值单载入模块:通过485通信总线,载入双套水轮发电机微机保护装置定值单,即载入保护A套定值单和保护B套定值单;
步骤S03:试验数据生成模块:根据步骤S01和步骤S02,生成双套水轮发电机微机保护装置定检试验数据包;
步骤S04:载入试验计划模块:载入步骤S03生成的双套水轮发电机微机保护装置定检试验数据包;
步骤S05:进行通讯设置并建立起可靠通讯链路:建立双套保护装置与智能测试平台之间的通讯链路、测试仪与智能测试平台之间的通讯链路,该通讯链接线程同时具备链路状态监视功能;
步骤S06:执行测试计划模块:根据步骤S04载入的双套水轮发电机微机保护装置定检试验数据包,执行双套保护装置的测试计划,即双套保护装置复归、暂停试验、单步试验、手动试验、保存状态序列以及递变试验功能;
步骤S07:试验结论确认模块:包含动作信号灯指示反馈、故障报文读取和保存功能;
步骤S08:定检试验报告生成模块:完成所有测试计划,一键生成试验报告。
在本实施例中,所述步骤S03的双套水轮发电机微机保护装置定检试验数据包包含保护A套保护状态序列和保护B套保护状态序列。
在本实施例中,所述步骤S06至步骤S08的具体过程如下,
步骤S11:选择试验项目,并执行试验项目;
步骤S12:判断试验仪器保护装置是否正常,即判断保护A套和保护B套是否处于正常运行状态,若不正常,返回步骤S11,若正常,执行下一步骤;
步骤S13:执行双套保护装置的测试计划,并对测试的试验结果输出进行采集;
步骤S14:判断步骤S13的试验结果是否正确,若不正确,若不正确进行试验数据的矫正,并返回步骤S11,若正确,保存试验结果,并生成试验报告。
以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。
Claims (3)
1.一种基于水轮发电机微机保护装置智能测试平台的测试方法,所述水轮发电机微机保护装置包含保护A套和保护B套,所述保护A套和保护B套的电流输入及电压输入连接至测试仪设备的交流信号输出端,所述保护A套和保护B套的COM口通过485通信总线连接至微机保护智能测试平台,所述测试仪设备与微机保护智能测试平台相互连接,所述测试仪设备的开出和开入端还分别与保护A套和保护B套连接;其特征在于:所述测试方法包括以下步骤,
步骤S01:试验对象及试验类型选择模块:微机保护智能测试平台由保护A套和保护B套的COM口采集信息,选择试验水轮发电机组、保护的水轮发电机的厂家和装置类型以及保护试验类型;
步骤S02:水电厂生继定值单载入模块:通过485通信总线,载入双套水轮发电机微机保护装置定值单,即载入保护A套定值单和保护B套定值单;
步骤S03:试验数据生成模块:根据步骤S01和步骤S02,生成双套水轮发电机微机保护装置定检试验数据包;
步骤S04:载入试验计划模块:载入步骤S03生成的双套水轮发电机微机保护装置定检试验数据包;
步骤S05:进行通讯设置并建立起可靠通讯链路:建立双套保护装置与智能测试平台之间的通讯链路、测试仪与智能测试平台之间的通讯链路,该通讯链接线程同时具备链路状态监视功能;
步骤S06:执行测试计划模块:根据步骤S04载入的双套水轮发电机微机保护装置定检试验数据包,执行双套保护装置的测试计划,即双套保护装置复归、暂停试验、单步试验、手动试验、保存状态序列以及递变试验功能;
步骤S07:试验结论确认模块:包含动作信号灯指示反馈、故障报文读取和保存功能;
步骤S08:定检试验报告生成模块:完成所有测试计划,一键生成试验报告。
2.根据权利要求1所述的基于水轮发电机微机保护装置智能测试平台的测试方法,其特征在于:所述步骤S03的双套水轮发电机微机保护装置定检试验数据包包含保护A套保护状态序列和保护B套保护状态序列。
3.根据权利要求1所述的基于水轮发电机微机保护装置智能测试平台的测试方法,其特征在于:所述步骤S06至步骤S08的具体过程如下,
步骤S11:选择试验项目,并执行试验项目;
步骤S12:判断试验仪器保护装置是否正常,即判断保护A套和保护B套是否处于正常运行状态,若不正常,返回步骤S11,若正常,执行下一步骤;
步骤S13:执行双套保护装置的测试计划,并对测试的试验结果输出进行采集;
步骤S14:判断步骤S13的试验结果是否正确,若不正确,若不正确进行试验数据的矫正,并返回步骤S11,若正确,保存试验结果,并生成试验报告。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310603053.8A CN103576037B (zh) | 2013-11-26 | 2013-11-26 | 基于水轮发电机微机保护装置智能测试平台的测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310603053.8A CN103576037B (zh) | 2013-11-26 | 2013-11-26 | 基于水轮发电机微机保护装置智能测试平台的测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103576037A true CN103576037A (zh) | 2014-02-12 |
CN103576037B CN103576037B (zh) | 2016-05-04 |
Family
ID=50048236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310603053.8A Active CN103576037B (zh) | 2013-11-26 | 2013-11-26 | 基于水轮发电机微机保护装置智能测试平台的测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103576037B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112147434A (zh) * | 2020-09-01 | 2020-12-29 | 浙江浙能兰溪发电有限责任公司 | 一种缩短双重化配置的继电保护装置调试时间方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050030693A1 (en) * | 2004-06-23 | 2005-02-10 | Bela Deak | Protective relay test device |
CN1920721A (zh) * | 2006-09-15 | 2007-02-28 | 四川东风电机厂有限公司 | 水电站微机监控保护系统调试方法 |
JP2009171722A (ja) * | 2008-01-16 | 2009-07-30 | Chugoku Electric Power Co Inc:The | デジタル保護継電装置およびその試験方法 |
CN102323499A (zh) * | 2011-06-15 | 2012-01-18 | 北京四方继保自动化股份有限公司 | 一种继电保护设备实现自动化测试的方法 |
CN102608464A (zh) * | 2012-03-21 | 2012-07-25 | 山东电力集团公司济南供电公司 | 继电保护装置模块化自动测试组件系统及测试方法 |
-
2013
- 2013-11-26 CN CN201310603053.8A patent/CN103576037B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050030693A1 (en) * | 2004-06-23 | 2005-02-10 | Bela Deak | Protective relay test device |
CN1920721A (zh) * | 2006-09-15 | 2007-02-28 | 四川东风电机厂有限公司 | 水电站微机监控保护系统调试方法 |
JP2009171722A (ja) * | 2008-01-16 | 2009-07-30 | Chugoku Electric Power Co Inc:The | デジタル保護継電装置およびその試験方法 |
CN102323499A (zh) * | 2011-06-15 | 2012-01-18 | 北京四方继保自动化股份有限公司 | 一种继电保护设备实现自动化测试的方法 |
CN102608464A (zh) * | 2012-03-21 | 2012-07-25 | 山东电力集团公司济南供电公司 | 继电保护装置模块化自动测试组件系统及测试方法 |
Non-Patent Citations (6)
Title |
---|
ANDREW C.WEBB 等: "Automated testing of power system protection relays", 《POWER ENGINEERING JOURNAL》, 30 November 1988 (1988-11-30), pages 291 - 296 * |
CRISTIAN PADURARU: "Automated testing of protective relays using Advanced Visual Test Software", 《PROCEEDINGS OF THE 2002 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING》, 31 December 2002 (2002-12-31), pages 143 - 146 * |
胡红兵 等: "继电保护装置自动化测试系统的设计与实现", 《江苏电机工程》, vol. 32, no. 2, 31 March 2013 (2013-03-31), pages 54 - 56 * |
赖擎 等: "通用继电保护自动测试系统软件的研究", 《电力系统保护与控制》, vol. 38, no. 3, 1 February 2010 (2010-02-01), pages 90 - 94 * |
邰能灵 等: "大型水轮发电机组微机保护装置的总体设计", 《继电器》, vol. 29, no. 8, 31 August 2001 (2001-08-31), pages 28 - 32 * |
郑新才 等: "基于测试模板的继电保护装置自动测试技术研究与实现", 《电力系统保护与控制》, vol. 38, no. 12, 16 June 2010 (2010-06-16) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112147434A (zh) * | 2020-09-01 | 2020-12-29 | 浙江浙能兰溪发电有限责任公司 | 一种缩短双重化配置的继电保护装置调试时间方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103576037B (zh) | 2016-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101980418B (zh) | 变电站继电保护系统二次接线在线检测系统 | |
CN104269809B (zh) | 一种地区电网继电保护定值在线校核的方法 | |
CN102195291B (zh) | 基于运行方式自动识别的主变过载联切负荷控制方法 | |
CN109582004B (zh) | 智能检测平台 | |
CN111830846A (zh) | 一种基于仿真测试平台的配电网故障测试方法及系统 | |
CN107086664B (zh) | 一种变电站出口压板状态监测装置及方法 | |
CN103197271B (zh) | 一种mmc拓扑柔性直流输电试验平台的检验方法 | |
CN104020761A (zh) | 一种无须联网的馈线自动化测试系统 | |
CN103986238A (zh) | 基于概率加权二分图法的智能变电站故障诊断方法 | |
CN105334417A (zh) | 一种便携式备自投校验装置 | |
Wan et al. | Multi‐agent application of substation protection coordination with distributed generators | |
CN109149534B (zh) | 基于dts虚拟开关的快速诊断电网模型拓扑故障的方法 | |
CN104198926A (zh) | 一种断路器防跳回路测试装置及其控制方法 | |
CN107102633B (zh) | 一种配电终端故障自诊断方法及系统 | |
CN102624099A (zh) | 监测智能电网网络连接状态的设备 | |
CN103576037A (zh) | 基于水轮发电机微机保护装置智能测试平台的测试方法 | |
CN104142472A (zh) | 支持iec61850规约的智能高压开关联锁逻辑检验方法 | |
CN102928688B (zh) | 多点同步测试馈线故障自动隔离的方法 | |
Wu et al. | A new adaptive matrix algorithm for fault location in distribution network with distributed generation | |
CN102520303A (zh) | 风电机组交流回路检测器及检测方法 | |
CN105301396A (zh) | 一种继电保护校验装置 | |
CN104682359A (zh) | 一种供电线路继电保护的方法 | |
CN207301792U (zh) | 一种直流控制系统和稳控系统之间的接口测试系统 | |
CN104348153B (zh) | 地区电网主设备故障自动转供电控制执行方法 | |
CN114441896A (zh) | 一种配网自动化仿真平台及ftu检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |