CN103572769B - 沉井下沉中倾斜度监控方法 - Google Patents

沉井下沉中倾斜度监控方法 Download PDF

Info

Publication number
CN103572769B
CN103572769B CN201210262787.XA CN201210262787A CN103572769B CN 103572769 B CN103572769 B CN 103572769B CN 201210262787 A CN201210262787 A CN 201210262787A CN 103572769 B CN103572769 B CN 103572769B
Authority
CN
China
Prior art keywords
open caisson
point
total powerstation
steel ruler
crosshair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210262787.XA
Other languages
English (en)
Other versions
CN103572769A (zh
Inventor
赵建立
秦宏海
李胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201210262787.XA priority Critical patent/CN103572769B/zh
Publication of CN103572769A publication Critical patent/CN103572769A/zh
Application granted granted Critical
Publication of CN103572769B publication Critical patent/CN103572769B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及沉井下沉施工。一种沉井下沉中倾斜度监控方法,包括:在沉井同一井壁上标出分别位于沉井顶部和距离地面1.4-1.7m位置、且在同一铅锤线上的两测点;使全站仪目镜中十字丝的竖线处于上述两测点所在井壁的平面上;将钢尺置于沉井下方的测点上钢尺刻度朝向全站仪;使沉井顶部的测点位于全站仪目镜中十字丝交点;调整物镜至目镜十字丝水平线与钢尺刻度线重合;读取十字丝竖线与钢尺交点到井壁的距离;用该距离和上述两测点间的竖向距离,即得井壁的倾斜角度;沉井根据倾斜角度纠偏后下沉,沉井下方的点逐渐被地面掩埋,在沉井下方点正上方1.5m处,引出另一侧点,重复至完成。本发明的方法可确保沉井下沉施工安全顺利的进行。

Description

沉井下沉中倾斜度监控方法
技术领域
本发明涉及岩土工程施工,尤其涉及沉井下沉施工。
背景技术
沉井是一种井筒状的结构物,以井内挖土,依靠自身重力克服井壁摩阻力下沉到设计标高后,再经过混凝土封底、填塞井孔,最终成为结构物的基础。在沉井下沉过程中,井体会由于挖土不均、地质情况复杂等原因产生倾斜。为保证沉井施工质量,必须及时监测井体倾斜程度,通过各种措施进行纠偏。
经对现有技术文献检索发现,通常采用在井体内部悬挂铅球的方法监测沉井下沉的倾斜度,但这种方法存在易受井内挖土施工影响、获取数据困难等缺点,对于施工现场相对宽敞的情况,上述方法更显繁琐。
发明内容
本发明旨在解决上述缺陷,提供沉井下沉中倾斜度监控方法。本发明的方法可确保沉井下沉施工安全顺利的进行。
为解决上述问题,一种沉井下沉中倾斜度监控方法,它包括全站仪和钢直尺,并包括下列步骤:
步骤一,在沉井同一井壁上标出两个测点,两测点分别位于沉井顶部和距离地面1.4-1.7m位置,且在同一铅锤线上;
步骤二,架设、调整全站仪位置,使全站仪目镜中十字丝的竖线处于上述两测点所在井壁的平面上;
步骤三,一个操作人员将钢尺置于沉井下方的测点上,并保持不动,钢尺刻度朝向全站仪;
步骤四,用全站仪瞄准沉井顶部的点,使该点位于全站仪目镜中十字丝交点;旋转全站仪物镜,直至目镜中出现钢尺,且十字丝水平线与钢尺刻度线接近重合;读取此时目镜中十字丝竖线与钢尺交点到井壁的距离;
步骤五,用步骤四获得的距离除以上述两点间的竖向距离,即得上述两点所在井壁2的倾斜角度;
步骤六,沉井根据倾斜角度纠偏后下沉,沉井下方的点逐渐被地面掩埋,此时,可在沉井下方点正上方1.5m位置处,引出另一侧点,并重复步骤三至五,求得新倾斜角度,沉井纠偏后继续下沉,如此重复直至完成沉井下沉。
本发明利用全站仪和钢尺组成监测沉井下沉倾斜度的装置,通过简单计算量化倾斜度数据,确保沉井下沉施工安全顺利的进行。
附图说明
下面结合附图对本发明作进一步的说明:
图1为步骤一示意图;
图2为全站仪目镜读数示意图。
具体实施方式
本实发明主要包括全站仪和钢尺1等部件。
第一步,如图1所示,在沉井2同一井壁上标出A、B两点,其中A点位于沉井顶部,B点距离地面约1.5m位置,便于放置钢尺。A、B两点在同一铅锤线上。
第二步,将全站仪架设好,使目镜中十字丝的竖线处于A、B两点所在井壁的平面上。
第三步,操作人员将钢尺水平置于沉井B点,并保持不动,钢尺刻度朝向全站仪。
第四步,用全站仪瞄准A点,使A点位于全站仪目镜中十字丝交点。
第五步,如图2,旋转全站仪物镜,直至目镜中出现钢尺1,且目镜十字丝水平线3与钢尺刻度线接近重合。
第六步,如图2,读取目镜4中十字丝竖线与钢尺交点到井壁的距离d,A、B两点间的距离可以通过计算或用卷尺测得为l。则A、B两点所在井壁与铅锤线的夹角α正弦可通过公式sinα≈d/l计算得到。当α较小时,有α=sinα,故α≈d/l,即沉井倾斜角度。
第七步,随沉井下沉,B点逐渐被地面掩埋。此时,可在B点正上方1.5m位置处,引出另一点,并以此点作为后续的监测点,完成沉井倾斜的监测。

Claims (1)

1.一种沉井下沉中倾斜度监控方法,其特征在于,它包括全站仪和钢直尺,并包括下列步骤:
步骤一,在沉井同一井壁上标出两个测点,两测点分别位于沉井顶部和距离地面1.4-1.7m位置,且在同一铅锤线上;
步骤二,架设、调整全站仪位置,使全站仪目镜中十字丝的竖线处于上述两测点所在井壁的平面上;
步骤三,一个操作人员将钢尺置于沉井下方的测点上,并保持不动,钢尺刻度朝向全站仪;
步骤四,用全站仪瞄准沉井顶部的点,使该点位于全站仪目镜中十字丝交点;旋转全站仪物镜,直至目镜中出现钢尺,且十字丝水平线与钢尺刻度线接近重合;读取此时目镜中十字丝竖线与钢尺交点到井壁的距离;
步骤五,用步骤四获得的距离除以上述两点间的竖向距离,即得上述两点所在井壁的倾斜角度;
步骤六,沉井根据倾斜角度纠偏后下沉,沉井下方的点逐渐被地面掩埋,此时,可在沉井下方点正上方1.5m位置处,引出另一测点,并重复步骤三至五,求得新倾斜角度,沉井纠偏后继续下沉,如此重复直至完成沉井下沉。
CN201210262787.XA 2012-07-27 2012-07-27 沉井下沉中倾斜度监控方法 Active CN103572769B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210262787.XA CN103572769B (zh) 2012-07-27 2012-07-27 沉井下沉中倾斜度监控方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210262787.XA CN103572769B (zh) 2012-07-27 2012-07-27 沉井下沉中倾斜度监控方法

Publications (2)

Publication Number Publication Date
CN103572769A CN103572769A (zh) 2014-02-12
CN103572769B true CN103572769B (zh) 2016-03-30

Family

ID=50045426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210262787.XA Active CN103572769B (zh) 2012-07-27 2012-07-27 沉井下沉中倾斜度监控方法

Country Status (1)

Country Link
CN (1) CN103572769B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489455A (zh) * 2018-03-25 2018-09-04 姚燕明 污水沉井内部结构的辅助测量装置及测量方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109855611B (zh) * 2019-03-27 2022-03-15 中南大学 一种基于全站仪的pc墙体快速测量校准方法
CN112902934B (zh) * 2021-01-22 2022-03-01 中铁大桥科学研究院有限公司 一种基于gps-eja的沉井几何姿态测试方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2105664U (zh) * 1991-10-12 1992-05-27 王锦军 多用工程检测尺
CN2193995Y (zh) * 1994-05-07 1995-04-05 牡丹江市万达仪器仪表厂 直井单摄点测斜仪
CN1110753A (zh) * 1994-07-30 1995-10-25 海勃湾矿务局基本建设第一工程处 一种斜井沉井方法
KR20030022536A (ko) * 2001-09-11 2003-03-17 주식회사유신코퍼레이션 공기 분사구를 갖는 우물통 슈 및 그를 이용한 침하공법
CN101787712A (zh) * 2009-12-25 2010-07-28 中国水电顾问集团中南勘测设计研究院 一种沉井倾斜测量装置及测量方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2105664U (zh) * 1991-10-12 1992-05-27 王锦军 多用工程检测尺
CN2193995Y (zh) * 1994-05-07 1995-04-05 牡丹江市万达仪器仪表厂 直井单摄点测斜仪
CN1110753A (zh) * 1994-07-30 1995-10-25 海勃湾矿务局基本建设第一工程处 一种斜井沉井方法
KR20030022536A (ko) * 2001-09-11 2003-03-17 주식회사유신코퍼레이션 공기 분사구를 갖는 우물통 슈 및 그를 이용한 침하공법
CN101787712A (zh) * 2009-12-25 2010-07-28 中国水电顾问集团中南勘测设计研究院 一种沉井倾斜测量装置及测量方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"挤压车间淬火井沉井下沉施工控制";陈华等;《山西建筑》;20110630;第37卷(第16期);第206-207页 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489455A (zh) * 2018-03-25 2018-09-04 姚燕明 污水沉井内部结构的辅助测量装置及测量方法
CN108489455B (zh) * 2018-03-25 2020-05-01 姚燕明 污水沉井内部结构的测量方法

Also Published As

Publication number Publication date
CN103572769A (zh) 2014-02-12

Similar Documents

Publication Publication Date Title
CN205532581U (zh) 一种沉井定位自动测量装置
CN106123776B (zh) 一种顶管智能顶进测量系统以及测量方法
CN104563171B (zh) 一种钢管桩锤击沉桩的贯入度检测装置及检测方法
CN101798918B (zh) 一种确定邻井平行段的相对空间位置的方法
RU2015117646A (ru) Угловая ориентация на опорном интервале для операций обработки данных с координатной привязкой и/или с перекрытием
CN104120656B (zh) 桥梁高墩施工垂直度自动控制方法
CN104251688A (zh) 顶管工程中利用激光直线定向测量工法
CN104153391A (zh) 一种基于差分gps的沉井几何形态监控方法
CN103572769B (zh) 沉井下沉中倾斜度监控方法
CN105628000A (zh) 一种矿山竖井坐标传递测量方法
CN106813589B (zh) 在用外浮顶储罐实时变形监测方法
CN109238254A (zh) 一种洞桩投点方法
CN105649080A (zh) 一种单桩沉桩的方法
CN105509710B (zh) 一种地表沉降的检测方法
CN103741726B (zh) 一种沉井沉降量测量方法
CN206223091U (zh) 一种顶管智能顶进测量系统
CN103410135B (zh) 一种基于网格钎探的河床标高测量方法
CN102817605A (zh) 一种地下钻探中准确测量钻探点高程的方法
CN214308640U (zh) 一种钻孔桩垂直度测量装置
CN1232719C (zh) 隧道微型顶管土压平衡的施工方法
CN104153353A (zh) 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN107816933A (zh) Gnss参考站位移检校方法和检校装置
CN203891086U (zh) 一套用于直线重置法监测深基坑水平位移的测读工具
CN207228180U (zh) 一种基于视准线法的水平位移测量系统
CN107423525B (zh) 一种灌注桩循环钻成孔桩长计算替代判岩方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right