CN103559350A - Load file processing method and device of vehicle - Google Patents

Load file processing method and device of vehicle Download PDF

Info

Publication number
CN103559350A
CN103559350A CN201310531774.2A CN201310531774A CN103559350A CN 103559350 A CN103559350 A CN 103559350A CN 201310531774 A CN201310531774 A CN 201310531774A CN 103559350 A CN103559350 A CN 103559350A
Authority
CN
China
Prior art keywords
load
file
pending
operational parameter
parameter control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310531774.2A
Other languages
Chinese (zh)
Inventor
宋峰
李晓晨
李志强
王瑞锋
崔浩
江培东
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Wall Motor Co Ltd
Original Assignee
Great Wall Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Motor Co Ltd filed Critical Great Wall Motor Co Ltd
Priority to CN201310531774.2A priority Critical patent/CN103559350A/en
Publication of CN103559350A publication Critical patent/CN103559350A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a load file processing method and a load file processing device of a vehicle. The method comprises the steps of setting running control parameters and output control parameters; importing a to-be-processed load file according to the running control parameters; judging whether the running control parameters are matched with attribute parameters of the to-be-processed load file or not; if the running control parameters are judged to be matched with the attribute parameters of the to-be-processed load file, extracting load data according to the running control parameters; processing and exporting the extracted load data. By adopting the method disclosed by the embodiment of the invention, the working efficiency is improved, and the working intensity of workers is reduced; when errors occur, an error report is generated and is automatically modified and processed, so that the subjective fault of the workers is avoided, the working quality is improved, and further excellent quality guarantee is provided for the later-period vehicle performance design.

Description

Load document handling method and the device of vehicle
Technical field
The present invention relates to vehicle and CAE(Computer Aided Engineering, computer-aided engineering) technical field, particularly a kind of load document handling method and device of vehicle.
Background technology
In the properties of vehicle, endurance quality is the important index of fundamental sum comparatively, is the important content of vehicle performance design.Wherein, CAE simulation analysis is the important step of vehicle endurance quality design, mainly comprises intensity and the analysis of Fatigue-life of main member under specific operation such as vehicle body, chassis, and wherein intensive analysis is basic, the most the most frequently used analytical approach.
When a certain member of vehicle being carried out to Strength Simulation analysis, conventionally first utilize relatively simple many body methods to carry out modeling, build individual system or the whole vehicle models such as vehicle body, chassis, then solve a certain member under needed specific operation in the load being subject to other member mounting points place, and derive the load file of text formatting, afterwards according to being loaded in finite element analysis software after the load file processing of text formatting, for the Strength Simulation analysis of member; In addition, according to the load file generated loadmeter lattice file of text formatting, as quoting and reference of other simulation analysis of later stage and other work.Load is write after finite element model, and recycling inertia method for releasing solves the parameters such as component stress, strain, and whether the intensity that judgement builds meets designing requirement.At present, write the process of load form and the process being loaded in finite element model after load processing is all completed by manual operations, mainly there is following problem: the data volume of (1) load file is huge, and process hand-manipulated is loaded down with trivial details, causes inefficiency; (2) manual operations easily makes mistakes, thereby affects the design of later stage vehicle performance.
Summary of the invention
Object of the present invention is intended to solve at least to a certain extent above-mentioned technological deficiency.
For this reason, first object of the present invention is to propose a kind of load document handling method of vehicle, according to the method, can work out corresponding computer program, according to controlling parameter, pending load file is carried out to robotization processing derivation, can effectively increase work efficiency, promote work quality, reduce staff's working strength.
Second object of the present invention is to propose a kind of load document handling apparatus of vehicle.
For achieving the above object, the load document handling method of the vehicle that first aspect present invention embodiment proposes, comprises the following steps: operational parameter control and output control parameter are set; According to described operational parameter control, import pending load file; Judge whether described operational parameter control mates with the property parameters of described pending load file; If judge that described operational parameter control mates with the property parameters of described pending load file, according to operational parameter control, extract load data; And the described load data extracting is processed and derived.
The load document handling method of the vehicle of the embodiment of the present invention, at least has following beneficial effect: increase work efficiency (1), reduces staff's working strength; (2) avoid staff's subjectivity error, promote work quality, thereby provide good quality assurance for later stage vehicle performance design.
In one embodiment of the invention, also comprise: if judge that described operational parameter control does not mate with described pending data file, generation error report; According to operational parameter control described in described error reporting correction; And described step S2 is carried out in continuation.
In one embodiment of the invention, described operational parameter control comprises the title of described pending load file, the path of described pending load file, operating mode sum, load applying point sum, solution procedure sum, the property parameters of described pending load file comprises total line number of described pending load file, total columns of pending load file, the character sum of load title, total number of load data, described step S3 specifically comprises: the product that judges described load applying point sum and described operating mode sum, total columns of described pending load file, between the character sum three of described load title, whether meet first and determine relation, and judge the ratio of total number of described load data and the character sum of described load title, described solution procedure sum, between total line number three of described pending load file, whether meet second and determine relation.
In one embodiment of the invention, described step S4 specifically comprises: according to described operational parameter control, obtain the Data Position of load data described in described pending load file, and extract described load data according to described Data Position.
In one embodiment of the invention, described step S5 specifically comprises: according to described operational parameter control and described output, control the load load format template that parameter generates loadmeter grid template and application program; And described load data is carried out to pre-service, and respectively described load data inserted to the load load format template of described loadmeter grid template and described application and derived.
For achieving the above object, the load document handling apparatus of the vehicle that second aspect present invention embodiment proposes, comprising: parameter arranges module, for operational parameter control and output control parameter are set; Pending load file acquisition module, for importing pending load file according to described operational parameter control; Judge module, for judging whether described operational parameter control mates with the property parameters of described pending load file; Load data extraction module, if for judging that described operational parameter control mates with the property parameters of described pending load file, extracts load data according to operational parameter control; And load data processing module, for the described load data extracting is processed and is derived.
The load document handling apparatus of the vehicle of the embodiment of the present invention, at least has following beneficial effect: increase work efficiency (1), reduces staff's working strength; (2) avoid staff's subjectivity error, promote work quality, thereby provide good quality assurance for later stage vehicle performance design.
In one embodiment of the invention, also comprise: error reporting generation module, if for judging that described operational parameter control does not mate with described pending data file, generation error report; Control parameter correcting module, for according to operational parameter control described in described error reporting correction.
In one embodiment of the invention, described operational parameter control comprises the title of described pending load file, the path of described pending load file, operating mode sum, load applying point sum, solution procedure sum, the property parameters of described pending load file comprises total line number of described pending load file, total columns of pending load file, the character sum of load title, total number of load data, described judge module also for: judge the character sum of described load title and the product of operating mode sum, total columns of pending load file, between the character sum three of load title, whether meet first and determine relation, and judge the ratio of total number of described load data and the character sum of described load title, described solution procedure sum, between total line number three of described pending load file, whether meet second and determine relation.
In one embodiment of the invention, described load data extraction module also for: according to described operational parameter control, obtain the Data Position of load data described in described pending load file, and extract described load data according to described Data Position.
In one embodiment of the invention, described load data processing module comprises: template generation unit, for controlling according to described operational parameter control and described output the load load format template that parameter generates loadmeter grid template and application program; And content inserts unit, for described load data is carried out to pre-service, and respectively described load data inserted to the load load format template of described loadmeter grid template and described application program and derived.
The aspect that the present invention is additional and advantage in the following description part provide, and part will become obviously from the following description, or recognize by practice of the present invention.
Accompanying drawing explanation
Above-mentioned and/or the additional aspect of the present invention and advantage will become from the following description of the accompanying drawings of embodiments and obviously and easily understand, wherein:
Fig. 1 is the process flow diagram of the load document handling method of vehicle according to an embodiment of the invention;
Fig. 2 is the form schematic diagram of the load file of ADAMS/Car multi-simulation software output;
Fig. 3 is the process flow diagram of the load document handling method of vehicle in accordance with another embodiment of the present invention;
Fig. 4 is loadmeter lattice file schematic diagram according to an embodiment of the invention;
Fig. 5 is Nastran(NASA Structural Analysis according to an embodiment of the invention) the load load format schematic diagram of finite element analysis software;
Fig. 6 is the structural representation of the load document handling apparatus of vehicle according to an embodiment of the invention;
Fig. 7 is the structural representation of the load document handling apparatus of vehicle in accordance with another embodiment of the present invention.
Embodiment
Describe embodiments of the invention below in detail, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has the element of identical or similar functions from start to finish.Below by the embodiment being described with reference to the drawings, be exemplary, only for explaining the present invention, and can not be interpreted as limitation of the present invention.
Disclosing below provides many different embodiment or example to be used for realizing different structure of the present invention.Of the present invention open in order to simplify, hereinafter the parts of specific examples and setting are described.Certainly, they are only example, and object does not lie in restriction the present invention.In addition, the present invention can be in different examples repeat reference numerals and/or letter.This repetition is in order to simplify and object clearly, itself do not indicate the relation between discussed various embodiment and/or setting.In addition, the various specific technique the invention provides and the example of material, but those of ordinary skills can recognize the property of can be applicable to of other techniques and/or the use of other materials.In addition, First Characteristic described below Second Characteristic it " on " structure can comprise that the first and second Characteristics creations are for the direct embodiment of contact, also can comprise the embodiment of other Characteristics creation between the first and second features, such the first and second features may not be direct contacts.
In description of the invention, it should be noted that, unless otherwise prescribed and limit, term " installation ", " being connected ", " connection " should be interpreted broadly, for example, can be mechanical connection or electrical connection, also can be the connection of two element internals, can be to be directly connected, and also can indirectly be connected by intermediary, for the ordinary skill in the art, can understand as the case may be the concrete meaning of above-mentioned term.
With reference to description and accompanying drawing below, these and other aspects of embodiments of the invention will be known.These describe and accompanying drawing in, specifically disclose some particular implementation in embodiments of the invention, represent to implement some modes of the principle of embodiments of the invention, still should be appreciated that the scope of embodiments of the invention is not limited.On the contrary, embodiments of the invention comprise spirit and all changes within the scope of intension, modification and the equivalent that falls into additional claims.
Load document handling method and device according to the vehicle of the embodiment of the present invention are described with reference to the accompanying drawings.
Fig. 1 is the process flow diagram of the load document handling method of vehicle according to an embodiment of the invention.
As shown in Figure 1, the load document handling method of vehicle comprises the following steps:
Step S101, arranges operational parameter control and parameter is controlled in output.
In one embodiment of the invention, operational parameter control comprise pending load file title, path, operating mode sum, load applying point is total, solution procedure is total or other operational parameter control.At this, the kind of operational parameter control, quantity are not limited.Wherein, operational parameter control can be used for calculating the position of needed load data in pending load file, if operational parameter control arranges mistake, the position of so needed load data can be by miscount.
In one embodiment of the invention, output is controlled parameter and can be guaranteed that the load data after subsequent treatment is correct, reliable.For example, output control parameter comprises operating mode, load applying point, reference frame numbering or other output control parameter.At this, kind, the quantity of output control parameter are not limited.In addition, parameter is controlled in set output also needs the parameter that will analyze in the analysis software with the later stage to be consistent.For example, the analysis software using when the later stage is Nastran(NASA Structural Analysis) during finite element analysis software, set output is controlled parameter and need to be consistent with the parameter that will analyze in Nastran finite element analysis software.
In addition, in one embodiment of the invention, except operational parameter control and output control parameter are set, according to actual conditions, other control parameter can also be set.For example, in order to meet the needs of vehicle endurance quality design effort or staff's special requirement, other can also be set and control parameter, for example, when export is the form of form, the parameters such as gauge outfit title of export can be set.
Step S102, imports pending load file according to operational parameter control.
Particularly, for example, can import pending load file according to title, the path of the pending load file in operational parameter control.If cannot find pending load file according to operational parameter control, point out error message, now need staff to proofread and revise.
For instance, ADAMS/Car(Automatic Dynamic Analysis of Mechanical Systems/Car, machinery system dynamics automatic analysis/car module) the load file (being pending load file) of multi-simulation software output as shown in Figure 2.ADAMS/Car multi-simulation software is just described for example for convenient, at this, multi-simulation software and pending load file is not limited.
Step S103, judges that whether operational parameter control mates with the property parameters of pending load file.
Particularly, after importing pending load file, whether correct in order to verify the load file of multi-simulation software output, and avoid causing follow-up to the failure of load file processing because staff arranges mistake by operational parameter control, so before processing load file, need to judge that whether operational parameter control mates with the property parameters of pending load file.
More specifically, the property parameters of load file and operational parameter control have definite relation, and for example both may have equal, linear relationship, nonlinear relationship or other relation.Because the load file of different multi-simulation software output is different, at this, the relation between the property parameters of load file and operational parameter control is not limited.Definite relation for property parameters and the operational parameter control of load file will describe in detail in subsequent embodiment.
Step S104, if judgement operational parameter control mates with the property parameters of pending load file, according to operational parameter control extraction load data.
Particularly, if operational parameter control mates with the property parameters of pending load file, according to operational parameter control, extract load data.For example, according to operational parameter control, can calculate the position of needed load data in pending load file, then according to the position of calculating, needed load data be extracted.For example, pending load file as shown in Figure 2, has not only comprised load data in pending load file, has also comprised Word message, can calculate the position of needed load data in pending load file according to operational parameter control.
Step S105, processes the load data of extraction derive.
Particularly, the load data of extraction is processed and derived.For example, can modify to the precision of load data, character length or other attribute, then amended load data can be inserted in the needed format module of analysis software that the later stage need be used.Afterwards the format module file of having inserted load data after processing is derived, in the analysis software for the later stage, the intensity of vehicle component is carried out to simulation analysis, for example, for the Nastran finite element analysis software in later stage.
The load document handling method of the vehicle of the embodiment of the present invention, at least has following beneficial effect: increase work efficiency (1), reduces staff's working strength; (2) avoid staff's subjectivity error, promote work quality, thereby provide good quality assurance for later stage vehicle performance design.
Below in detail introduction how to judge that whether operational parameter control mates with the property parameters of pending load file, and the treatment step when judgement operational parameter control does not mate with the property parameters of pending load file, and introduction concrete steps that the load data of extraction is processed and derived.
Fig. 3 is the process flow diagram of load document handling method of the vehicle of another embodiment of the present invention.
As shown in Figure 3, the load document handling method of vehicle comprises the following steps:
Step S201, arranges operational parameter control and parameter is controlled in output.
Step S202, imports pending load file according to operational parameter control.
Step S203, judge the product of load applying point sum and operating mode sum, pending total columns of load file and determine relation, whether meet first between the character of load title sum three, and judge the ratio, solution procedure sum of total number of load data and the character sum of load title, whether meet second definite relation between total line number three of pending load file.
Wherein, operational parameter control comprises the title of pending load file, the path of pending load file, operating mode sum, load applying point is total, solution procedure is total, the property parameters of pending load file comprises total line number of pending load file, pending total columns of load file, the character of load title is total, total number of load data
Particularly, after importing pending load file, whether correct in order to verify the load file of multi-simulation software output, and avoid causing follow-up to the failure of load file processing because staff arranges mistake by operational parameter control, so before processing load file, need to judge that whether operational parameter control mates with the property parameters of pending load file.
More specifically, the property parameters of load file and operational parameter control have definite relation.For example, owing to comprising load title and load data in load file simultaneously, wherein, load name is called character, and load data is numeral, can utilize the quantity of character, numeral to judge.The load file of the ADAMS/Car multi-simulation software of take output is example, need to judge the product of load applying point sum and operating mode sum, pending total columns of load file and determine relation, whether meet first between the character of load title sum three, and judge the ratio, solution procedure sum of total number of load data and the character sum of load title, whether meet second definite relation between total line number three of pending load file.Wherein, first determine relation, second determine relation can be equate, linear relationship, nonlinear relationship or other relation.Because the load file of different multi-simulation software output is different, at this, to first, do not determine that relation, second definite relation limit.
Step S204, determines relation and second definite relation if judgement meets first, according to operational parameter control, obtains the Data Position of load data in pending load file, and extracts load data according to Data Position.
Particularly, if meeting first, judgement determines relation and second definite relation, can can calculate the position of needed load data in pending load file according to operational parameter control, then according to the position of calculating, needed load data be extracted.
In addition, after step S204, continue execution step S207.
Step S205, does not determine relation and second definite relation, generation error report if judgement meets first.
Particularly, if judgement meets first, determine relation and second definite relation, illustrate that pending load file does not mate with control parameter (parameter is controlled in operational parameter control and output), generation error is reported.For example, when judgement did not meet for the first definite relation, in error reporting, can show that mistake has appearred in load applying point sum and arranging of operating mode sum; When judgement did not meet for the second definite relation, in error reporting, can show that mistake appear in arranging of solution procedure sum.
Step S206, according to error reporting correction operational parameter control.
Particularly, for example, in error reporting, show that arranging of load applying point sum and operating mode sum occurs when wrong, need to check that the load applying point in operational parameter control is total, operating mode is total whether to conform to predefined programme of work, if be not inconsistent, operational parameter control is revised; When judgement did not meet for the second definite relation, in error reporting, show arranging while there is mistake of solution procedure sum, need to check that whether the solution procedure sum in operational parameter control conforms to predefined programme of work, if be not inconsistent, revises operational parameter control; If check and find that arranging of control parameter is errorless, there is mistake in the pending load file that can determine the output of multi-simulation software, need so to revise the pending load file of multi-simulation software output, such as multi-simulation software is exported pending load file again.
In addition, after step S206, continue execution step S202.
Step S207, controls according to operational parameter control and output the load load format template that parameter generates loadmeter grid template and application program.
Particularly, because the object of using the load document handling method of the vehicle of the embodiment of the present invention that pending load file is processed is the endurance quality design and analysis software for the vehicle in later stage, for example can be in finite element analysis software; Or as other simulation analysis in later stage and quoting and reference paper of other work.So, for the user demand in later stage, need to generate the template accordingly with certain format, so that the load data after processing is inserted to format module, be convenient to the use in later stage.More specifically, can control the load load format template that parameter generates loadmeter grid template and application program according to operational parameter control and output, for example, loadmeter lattice file as shown in Figure 4, the load load format of Nastran finite element analysis software as shown in Figure 5.What Fig. 4 and Fig. 5 just did for convenience of description gives an example, the load load format template of loadmeter grid template and application program can be set according to concrete need of work, at this, the load load format template of loadmeter grid template and application program is not limited.
Step S208, carries out pre-service to load data, and respectively load data is inserted to the load load format template of loadmeter grid template and application program and derived.
Particularly, load data is carried out to pre-service.For example, pre-service comprises: the processing of (1) load data precision, retains digital figure place or the quantity of significant figure as selected; (2) load data Overflow handling, during due to some application program loaded load data, the shared number of characters of load data must not be over 8, so, if the significant figure that the numerical value of load data is excessive or retain are too much, will cause data from overflow, therefore for these type of data, can force to utilize scientific notation, within being controlled at 8 characters; (3) extreme value of assumed (specified) load under all operating modes, the work such as the contrast designing for use in later stage vehicle endurance quality, summary.In addition, according to the difference of work requirements, can also to load data, carry out the pre-service of alternate manner, at this, pretreated concrete mode not limited.
More specifically, load data is being carried out after pre-service, pretreated load data is being inserted in the needed format module of analysis software that the later stage need be used.Finally, the format module file of having inserted load data is derived, in the analysis software for the later stage, the intensity of vehicle component is carried out to simulation analysis.
The load document handling method of the vehicle of the embodiment of the present invention, when pending load file does not mate with control parameter (parameter is controlled in operational parameter control and output), can report by generation error, to revise in time controlling parameter or pending load file, further increase work efficiency, further reduce staff's working strength; Load data is carried out pre-service and inserts template, improve the accuracy of load data, and make load data be more applicable for the design of later stage vehicle performance.
In order to realize above-described embodiment, the present invention also proposes a kind of load document handling apparatus of vehicle.
Fig. 6 is the structural representation of the load document handling apparatus of vehicle according to an embodiment of the invention.
As shown in Figure 6, the load document handling apparatus of vehicle comprises: parameter arranges module 100, pending load file acquisition 200, judge module 300, load data extraction module 400 and load data processing module 500.
Wherein, parameter arranges module 100 for operational parameter control and output control parameter are set.
In one embodiment of the invention, operational parameter control comprise pending load file title, path, operating mode sum, load applying point is total, solution procedure is total or other operational parameter control.At this, the kind of operational parameter control, quantity are not limited.Wherein, operational parameter control can be used for calculating the position of needed load data in pending load file, if operational parameter control arranges mistake, the position of so needed load data can be by miscount.
In one embodiment of the invention, output is controlled parameter and can be guaranteed that the load data after subsequent treatment is correct, reliable.For example, output control parameter comprises operating mode, load applying point, reference frame numbering or other output control parameter.At this, kind, the quantity of output control parameter are not limited.In addition, parameter is controlled in set output also needs the parameter that will analyze in the analysis software with the later stage to be consistent.For example, the analysis software using when the later stage is during for Nastran finite element analysis software, and set output is controlled parameter and need to be consistent with the parameter that will analyze in Nastran finite element analysis software.
In addition, in one embodiment of the invention, except operational parameter control and output control parameter are set, according to actual conditions, other control parameter can also be set.For example, in order to meet the needs of vehicle endurance quality design effort or staff's special requirement, other can also be set and control parameter, for example, when export is the form of form, the parameters such as gauge outfit title of export can be set.
Pending load file acquisition 200 is for importing pending load file according to operational parameter control.
Particularly, for example, can import pending load file according to title, the path of the pending load file in operational parameter control.If cannot find pending load file according to operational parameter control, point out error message, now need staff to proofread and revise.
For instance, the load file (being pending load file) of ADAMS/Car multi-simulation software output as shown in Figure 2.ADAMS/Car multi-simulation software is just described for example for convenient, at this, multi-simulation software and pending load file is not limited.
Whether judge module 300 mates with the property parameters of pending load file for judging operational parameter control.
Particularly, after importing pending load file, whether correct in order to verify the load file of multi-simulation software output, and avoid causing follow-up to the failure of load file processing because staff arranges mistake by operational parameter control, so before processing load file, need to judge that whether operational parameter control mates with the property parameters of pending load file.
More specifically, the property parameters of load file and operational parameter control have definite relation, and for example both may have equal, linear relationship, nonlinear relationship or other relation.Because the load file of different multi-simulation software output is different, at this, the relation between the property parameters of load file and operational parameter control is not limited.Definite relation for property parameters and the operational parameter control of load file will describe in detail in subsequent embodiment.
If load data extraction module 400 mates with the property parameters of pending load file for judgement operational parameter control, according to operational parameter control extraction load data.
Particularly, if operational parameter control mates with the property parameters of pending load file, according to operational parameter control, extract load data.For example, according to operational parameter control, can calculate the position of needed load data in pending load file, then according to the position of calculating, needed load data be extracted.For example, pending load file as shown in Figure 2, has not only comprised load data in pending load file, has also comprised Word message, can calculate the position of needed load data in pending load file according to operational parameter control.
Load data processing module 500 is for processing the load data of extraction derive.
Particularly, the load data of extraction is processed and derived.For example, can modify to the precision of load data, character length or other attribute, then amended load data can be inserted in the needed format module of analysis software that the later stage need be used.Afterwards the format module file of having inserted load data after processing is derived, in the analysis software for the later stage, the intensity of vehicle component is carried out to simulation analysis, for example, for the Nastran finite element analysis software in later stage.
The load document handling apparatus of the vehicle of the embodiment of the present invention, at least has following beneficial effect: increase work efficiency (1), reduces staff's working strength; (2) avoid staff's subjectivity error, promote work quality, thereby provide good quality assurance for later stage vehicle performance design.
Fig. 7 is the structural representation of the load document handling apparatus of vehicle in accordance with another embodiment of the present invention.
As shown in Figure 7, the load document handling apparatus of vehicle comprises: parameter arranges module 100, pending load file acquisition 200, judge module 300, load data extraction module 400 and load data processing module 500, template generation unit 510, content and inserts unit 520, error reporting generation module 600 and control parameter correcting module 700.Wherein, load data processing module 500 comprises that template generation unit 510 and content insert unit 520.
Particularly, parameter arranges module 100 for operational parameter control and output control parameter are set.
Pending load file acquisition 200 is for importing pending load file according to operational parameter control.
Judge module 300 is determined relation for judging the product of load applying point sum and operating mode sum, pending total columns of load file, whether meet first between the character of load title sum three, and judges the ratio, solution procedure sum of total number of load data and the character sum of load title, whether meet second definite relation between total line number three of pending load file.
Wherein, operational parameter control comprises the title of pending load file, the path of pending load file, operating mode sum, load applying point is total, solution procedure is total, the property parameters of pending load file comprises total line number of pending load file, pending total columns of load file, the character of load title is total, total number of load data
Particularly, after importing pending load file, whether correct in order to verify the load file of multi-simulation software output, and avoid causing follow-up to the failure of load file processing because staff arranges mistake by operational parameter control, so before processing load file, need to judge that whether operational parameter control mates with the property parameters of pending load file.
More specifically, the property parameters of load file and operational parameter control have definite relation.For example, owing to comprising load title and load data in load file simultaneously, wherein, load name is called character, and load data is numeral, can utilize the quantity of character, numeral to judge.The load file of the ADAMS/Car multi-simulation software of take output is example, need to judge the product of load applying point sum and operating mode sum, pending total columns of load file and determine relation, whether meet first between the character of load title sum three, and judge the ratio, solution procedure sum of total number of load data and the character sum of load title, whether meet second definite relation between total line number three of pending load file.Wherein, first determine relation, second determine relation can be equate, linear relationship, nonlinear relationship or other relation.Because the load file of different multi-simulation software output is different, at this, to first, do not determine that relation, second definite relation limit.
If load data extraction module 400 meets first for judgement, determine relation and second definite relation, according to operational parameter control, obtain the Data Position of load data in pending load file, and extract load data according to Data Position.
Particularly, if meeting first, judgement determines relation and second definite relation, according to operational parameter control, can calculate the position of needed load data in pending load file, then according to the position of calculating, needed load data be extracted.
Load data processing module 500 is for processing the load data of extraction derive.
Template generation unit 510 is for controlling according to operational parameter control and output the load load format template that parameter generates loadmeter grid template and application program.
Particularly, because the object of using the load document handling apparatus of the vehicle of the embodiment of the present invention that pending load file is processed is the vehicle endurance quality design and analysis software for the later stage, for example can be in finite element analysis software; Or as other simulation analysis in later stage and quoting and reference paper of other work.So, for the user demand in later stage, need to generate the template accordingly with certain format, so that the load data after processing is inserted to format module, be convenient to the use in later stage.More specifically, can control the load load format template that parameter generates loadmeter grid template and application program according to operational parameter control and output, for example, loadmeter lattice file as shown in Figure 4, the load load format of Nastran finite element analysis software as shown in Figure 5.What Fig. 4 and Fig. 5 just did for convenience of description gives an example, the load load format template of loadmeter grid template and application program can be set according to concrete need of work, at this, the load load format template of loadmeter grid template and application program is not limited.
Content is inserted unit 520 for load data is carried out to pre-service, and respectively load data is inserted to the load load format template of loadmeter grid template and application program and derived.
Particularly, content is inserted 520 pairs of unit load data and is carried out pre-service.For example, pre-service comprises: the processing of (1) load data precision, retains digital figure place or the quantity of significant figure as selected; (2) load data Overflow handling, during due to some application program loaded load data, the shared number of characters of load data must not be over 8, so, if the significant figure that the numerical value of load data is excessive or retain are too much, will cause data from overflow, therefore for these type of data, can force to utilize scientific notation, within being controlled at 8 characters; (3) extreme value of assumed (specified) load under all operating modes, the work such as the contrast designing for use in later stage vehicle endurance quality, summary.In addition, according to the difference of work requirements, can also to load data, carry out the pre-service of alternate manner, at this, pretreated concrete mode not limited.
More specifically, load data is being carried out after pre-service, pretreated load data is being inserted in the needed format module of analysis software that the later stage need be used.Finally, the format module file of having inserted load data is derived, in the analysis software for the later stage, the intensity of vehicle component is carried out to simulation analysis.
If meeting first for judgement, error reporting generation module 600 do not determine relation and second definite relation, generation error report.
Particularly, if judgement meets first, determine relation and second definite relation, illustrate that pending load file does not mate with control parameter (parameter is controlled in operational parameter control and output), generation error is reported.For example, when judgement did not meet for the first definite relation, in error reporting, can show that mistake has appearred in load applying point sum and arranging of operating mode sum; When judgement did not meet for the second definite relation, in error reporting, can show that mistake appear in arranging of solution procedure sum.
Control parameter correcting module 700 for according to error reporting correction operational parameter control.
Particularly, for example, in error reporting, show that arranging of load applying point sum and operating mode sum occurs when wrong, need to check that the load applying point in operational parameter control is total, operating mode is total whether to conform to predefined programme of work, if be not inconsistent, operational parameter control is revised; When judgement did not meet for the second definite relation, in error reporting, show arranging while there is mistake of solution procedure sum, need to check that whether the solution procedure sum in operational parameter control conforms to predefined programme of work, if be not inconsistent, revises operational parameter control; If check and find that arranging of control parameter is errorless, there is mistake in the pending load file that can determine the output of multi-simulation software, need so to revise the pending load file of multi-simulation software output, such as multi-simulation software is exported pending load file again.
The load document handling apparatus of the vehicle of the embodiment of the present invention, when pending load file does not mate with control parameter (parameter is controlled in operational parameter control and output), error reporting generation module can be reported by generation error, to revise in time controlling parameter or pending load file, further increase work efficiency, further reduce staff's working strength; Content is inserted unit load data is carried out pre-service and inserts template, improves the accuracy of load data, and makes load data be more applicable for the design of later stage vehicle performance.
In process flow diagram or any process of otherwise describing at this or method describe and can be understood to, represent to comprise that one or more is for realizing module, fragment or the part of code of executable instruction of the step of specific logical function or process, and the scope of the preferred embodiment of the present invention comprises other realization, wherein can be not according to order shown or that discuss, comprise according to related function by the mode of basic while or by contrary order, carry out function, this should be understood by embodiments of the invention person of ordinary skill in the field.
The logic and/or the step that in process flow diagram, represent or otherwise describe at this, for example, can be considered to for realizing the sequencing list of the executable instruction of logic function, may be embodied in any computer-readable medium, for instruction execution system, device or equipment (as computer based system, comprise that the system of processor or other can and carry out the system of instruction from instruction execution system, device or equipment instruction fetch), use, or use in conjunction with these instruction execution systems, device or equipment.With regard to this instructions, " computer-readable medium " can be anyly can comprise, storage, communication, propagation or transmission procedure be for instruction execution system, device or equipment or the device that uses in conjunction with these instruction execution systems, device or equipment.The example more specifically of computer-readable medium (non-exhaustive list) comprises following: the electrical connection section (electronic installation) with one or more wirings, portable computer diskette box (magnetic device), random-access memory (ram), ROM (read-only memory) (ROM), the erasable ROM (read-only memory) (EPROM or flash memory) of editing, fiber device, and portable optic disk ROM (read-only memory) (CDROM).In addition, computer-readable medium can be even paper or other the suitable medium that can print described program thereon, because can be for example by paper or other media be carried out to optical scanning, then edit, decipher or process in electronics mode and obtain described program with other suitable methods if desired, be then stored in computer memory.
Should be appreciated that each several part of the present invention can realize with hardware, software, firmware or their combination.In the above-described embodiment, a plurality of steps or method can realize with being stored in storer and by software or the firmware of suitable instruction execution system execution.For example, if realized with hardware, the same in another embodiment, can realize by any one in following technology well known in the art or their combination: have for data-signal being realized to the discrete logic of the logic gates of logic function, the special IC with suitable combinational logic gate circuit, programmable gate array (PGA), field programmable gate array (FPGA) etc.
Those skilled in the art are appreciated that realizing all or part of step that above-described embodiment method carries is to come the hardware that instruction is relevant to complete by program, described program can be stored in a kind of computer-readable recording medium, this program, when carrying out, comprises step of embodiment of the method one or a combination set of.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing module, can be also that the independent physics of unit exists, and also can be integrated in a module two or more unit.Above-mentioned integrated module both can adopt the form of hardware to realize, and also can adopt the form of software function module to realize.If described integrated module usings that the form of software function module realizes and during as production marketing independently or use, also can be stored in a computer read/write memory medium.
The above-mentioned storage medium of mentioning can be ROM (read-only memory), disk or CD etc.
In the description of this instructions, the description of reference term " embodiment ", " some embodiment ", " example ", " concrete example " or " some examples " etc. means to be contained at least one embodiment of the present invention or example in conjunction with specific features, structure, material or the feature of this embodiment or example description.In this manual, the schematic statement of above-mentioned term is not necessarily referred to identical embodiment or example.And the specific features of description, structure, material or feature can be with suitable mode combinations in any one or more embodiment or example.
Although illustrated and described embodiments of the invention, for the ordinary skill in the art, be appreciated that without departing from the principles and spirit of the present invention and can carry out multiple variation, modification, replacement and modification to these embodiment, scope of the present invention is by claims and be equal to and limit.

Claims (10)

1. a load document handling method for vehicle, is characterized in that, comprises the following steps:
S1, operational parameter control is set and parameter is controlled in output;
S2, according to described operational parameter control, import pending load file;
S3, judge whether described operational parameter control mates with the property parameters of described pending load file;
If S4 judges described operational parameter control and mates with the property parameters of described pending load file, according to described operational parameter control, extract load data; And
S5, the described load data extracting is processed and derived.
2. the load document handling method of vehicle according to claim 1, is characterized in that, also comprises:
If judge that described operational parameter control does not mate with described pending data file, generation error report;
According to operational parameter control described in described error reporting correction; And
Continue to carry out described step S2.
3. the load document handling method of vehicle according to claim 1 and 2, it is characterized in that, described operational parameter control comprises the title of described pending load file, the path of described pending load file, operating mode sum, load applying point is total, solution procedure is total, the property parameters of described pending load file comprises total line number of described pending load file, pending total columns of load file, the character of load title is total, total number of load data, and described step S3 specifically comprises:
The product, the total columns of described pending load file that judge described load applying point sum and described operating mode sum are determined relation, whether meet first between the character of described load title sum three, and judge between total line number three of total number of described load data and the ratio of the character sum of described load title, described solution procedure sum, described pending load file whether meet second definite relation.
4. the load document handling method of vehicle according to claim 1 and 2, is characterized in that, described step S4 specifically comprises:
According to described operational parameter control, obtain the Data Position of load data described in described pending load file, and extract described load data according to described Data Position.
5. the load document handling method of vehicle according to claim 1 and 2, is characterized in that, described step S5 specifically comprises:
According to described operational parameter control and described output, control the load load format template that parameter generates loadmeter grid template and application program; And
Described load data is carried out to pre-service, and respectively described load data inserted to the load load format template of described loadmeter grid template and described application and derived.
6. a load document handling apparatus for vehicle, is characterized in that, comprising:
Parameter arranges module, for operational parameter control and output control parameter are set;
Pending load file acquisition module, for importing pending load file according to described operational parameter control;
Judge module, for judging whether described operational parameter control mates with the property parameters of described pending load file;
Load data extraction module, if for judging that described operational parameter control mates with the property parameters of described pending load file, extracts load data according to described operational parameter control; And
Load data processing module, for processing the described load data extracting derive.
7. the load document handling apparatus of vehicle according to claim 6, is characterized in that, also comprises:
Error reporting generation module, if for judging that described operational parameter control does not mate with described pending data file, generation error report;
Control parameter correcting module, for according to operational parameter control described in described error reporting correction.
8. according to the load document handling apparatus of the vehicle described in claim 6 or 7, it is characterized in that, described operational parameter control comprises the title of described pending load file, the path of described pending load file, operating mode sum, load applying point is total, solution procedure is total, the property parameters of described pending load file comprises total line number of described pending load file, pending total columns of load file, the character of load title is total, total number of load data, described judge module also for:
Judge the character sum of described load title and the product of operating mode sum, pending total columns of load file and determine relation, whether meet first between the character of load title sum three, and judge between total line number three of total number of described load data and the ratio of the character sum of described load title, described solution procedure sum, described pending load file whether meet second definite relation.
9. according to the load document handling apparatus of the vehicle described in claim 6 or 7, it is characterized in that, described load data extraction module also for:
According to described operational parameter control, obtain the Data Position of load data described in described pending load file, and extract described load data according to described Data Position.
10. according to the load document handling apparatus of the vehicle described in claim 6 or 7, it is characterized in that, described load data processing module comprises:
Template generation unit, for controlling according to described operational parameter control and described output the load load format template that parameter generates loadmeter grid template and application program; And
Content is inserted unit, for described load data is carried out to pre-service, and respectively described load data is inserted to the load load format template of described loadmeter grid template and described application program and is derived.
CN201310531774.2A 2013-10-31 2013-10-31 Load file processing method and device of vehicle Pending CN103559350A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310531774.2A CN103559350A (en) 2013-10-31 2013-10-31 Load file processing method and device of vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310531774.2A CN103559350A (en) 2013-10-31 2013-10-31 Load file processing method and device of vehicle

Publications (1)

Publication Number Publication Date
CN103559350A true CN103559350A (en) 2014-02-05

Family

ID=50013596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310531774.2A Pending CN103559350A (en) 2013-10-31 2013-10-31 Load file processing method and device of vehicle

Country Status (1)

Country Link
CN (1) CN103559350A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105631060A (en) * 2014-10-29 2016-06-01 广州汽车集团股份有限公司 Static load analysis data processing method for automobile chassis suspension system
CN106960043A (en) * 2017-03-30 2017-07-18 中国航空工业集团公司西安飞机设计研究所 The processing method of initial data in a kind of Aircraft Load design
CN107038289A (en) * 2017-03-23 2017-08-11 西安飞机工业(集团)有限责任公司 The processing method of initial data in a kind of Aircraft Load design
CN113065186A (en) * 2021-04-02 2021-07-02 中国第一汽车股份有限公司 Load loading method, device, equipment and storage medium
CN113495898A (en) * 2020-04-02 2021-10-12 北京新能源汽车股份有限公司 Load data processing method, device and equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002017024A2 (en) * 2000-08-25 2002-02-28 Mazda Motor Corporation Simulation model creation method and system, and storage medium
CN101499013A (en) * 2009-03-11 2009-08-05 浙江中控软件技术有限公司 Method and apparatus for calling dynamic library
CN103049585A (en) * 2011-10-12 2013-04-17 北京汽车股份有限公司 Load extracting method and device for parts of automobile chassis and automobile body under extreme working conditions

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002017024A2 (en) * 2000-08-25 2002-02-28 Mazda Motor Corporation Simulation model creation method and system, and storage medium
CN101499013A (en) * 2009-03-11 2009-08-05 浙江中控软件技术有限公司 Method and apparatus for calling dynamic library
CN103049585A (en) * 2011-10-12 2013-04-17 北京汽车股份有限公司 Load extracting method and device for parts of automobile chassis and automobile body under extreme working conditions

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱德猛: "汽车空气悬架系统的参数化建模、分析及设计理论和方法研究", 《中国博士学位论文全文数据库》, 15 April 2006 (2006-04-15) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105631060A (en) * 2014-10-29 2016-06-01 广州汽车集团股份有限公司 Static load analysis data processing method for automobile chassis suspension system
CN107038289A (en) * 2017-03-23 2017-08-11 西安飞机工业(集团)有限责任公司 The processing method of initial data in a kind of Aircraft Load design
CN106960043A (en) * 2017-03-30 2017-07-18 中国航空工业集团公司西安飞机设计研究所 The processing method of initial data in a kind of Aircraft Load design
CN113495898A (en) * 2020-04-02 2021-10-12 北京新能源汽车股份有限公司 Load data processing method, device and equipment
CN113065186A (en) * 2021-04-02 2021-07-02 中国第一汽车股份有限公司 Load loading method, device, equipment and storage medium
CN113065186B (en) * 2021-04-02 2023-03-14 中国第一汽车股份有限公司 Load loading method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107341294B (en) Modelica language-based spacecraft information system modeling simulation method
CN103559350A (en) Load file processing method and device of vehicle
CN101859135B (en) Method and device for controlling distributed automation system
CN104462755A (en) Electronic equipment spare part configuration and calculation method based on reliability model
CN106650149B (en) Modelica model-based runtime fault injection system and method
CN104657274A (en) Method and device for testing software interface
CN104091006A (en) Self-adapting simulation and code generation control method in Simulink
CN104750887A (en) Method for generating parameterized unit in modularized mode
CN104050206A (en) Material bill rapid exporting method and system thereof
CN105022635A (en) Algorithm file generating method and apparatus based on cloud platform and cloud platform
CN108133341A (en) A kind of generation method and system of the material alternative condition based on ERP system
CN106682275B (en) Load processing method and device for industrial factory building structure modeling
CN115374676A (en) Automatic modeling method, system and storage medium for finite element grid of motor stator
CN112347723B (en) Layout-based ROM code extraction verification method and device
CN102842065A (en) Index modeling-based index data filling method
JP5907857B2 (en) Logic drawing and test table creation device
CN105354144A (en) Method and system for automatically testing consistency of business support system information models
KR101731629B1 (en) Method and device for automatic generating go code from circus
CN110728114A (en) Analysis report generation method
CN117077616B (en) Circuit generation method, device, equipment and medium based on structure guidance
CN107729617A (en) The Computer Aided Design or verification method and device of a kind of system engineering
CN116339700A (en) Automatic user demand generation method for spacecraft control system based on C codes
EP4328683A1 (en) Method and system for generating user recommendations to aid generation of an engineering project
CN107256004A (en) Product processing method and device
CN110637522B (en) Control law gain model automatic generation method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140205