CN103557003A - 一种铁矿体保安矿柱的开采方法 - Google Patents

一种铁矿体保安矿柱的开采方法 Download PDF

Info

Publication number
CN103557003A
CN103557003A CN201310341287.XA CN201310341287A CN103557003A CN 103557003 A CN103557003 A CN 103557003A CN 201310341287 A CN201310341287 A CN 201310341287A CN 103557003 A CN103557003 A CN 103557003A
Authority
CN
China
Prior art keywords
stope
filling
mineral building
ore
segmentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310341287.XA
Other languages
English (en)
Inventor
王志良
吉少杰
柴延森
李宏伟
何永进
邵鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI DACANG MINING GROUP Co Ltd
Original Assignee
ANHUI DACANG MINING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI DACANG MINING GROUP Co Ltd filed Critical ANHUI DACANG MINING GROUP Co Ltd
Priority to CN201310341287.XA priority Critical patent/CN103557003A/zh
Publication of CN103557003A publication Critical patent/CN103557003A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

本发明公开了一种铁矿体保安矿柱的开采方法,采用上向水平分层胶结充填法回采矿柱,待充填体强度达到4~5MPa后,再用上向水平分层非胶结充填法回采矿房。本发明提高了回采保安矿柱的安全性。

Description

一种铁矿体保安矿柱的开采方法
技术领域
    本发明涉及铁块采矿业领域,具体为一种铁矿体保安矿柱的开采方法。 
背景技术
保安矿柱是回风中段上部留下一部分暂不开采的矿体,一般预留30-50米厚层的矿石,用以保障地表建筑物或构筑物和采矿的安全,为了充分合理的利用矿产资源,在充分利用现有采矿设备的基础上,为了降低矿石的损失,提高回采率并切实做到安全、经济、合理的开采出此部分矿柱。目前多半采用的是分段矿房嗣后充填法回采,由于该充填法采切工程量大,采用中深孔凿岩,其回采安全难以保证。 
发明内容
本发明的目的是提供一种铁矿体保安矿柱的开采方法,以解决现有技术回采安全性差的问题。 
为了达到上述目的,本发明所采用的技术方案为: 
一种铁矿体保安矿柱的开采方法,其特征在于:采用垂直矿体走向布置采场,矿体划分为多个矿块, 每个矿块长50m、宽50m、高60m, 矿房宽度10m,每一回采循环回采高度2m,拉底巷道规格333.5m,顶柱预留厚度为5m,将矿块划分为矿房、矿柱,矿房、矿柱交替布置,第一步回采矿房,第二步回采矿柱;回采矿房时自下而上水平分层进行,随工作面向上推进,逐步充填采空区,并留出继续上采的工作空间;矿房回采到最上面分层时,进行接顶充填;待充填体强度达到4~5MPa后,再用上向水平分层全尾砂充填法回采矿柱。 
所述的一种铁矿体保安矿柱的回采方法,其特征在于:在脉外设一条采场联络巷,采场联络巷将沿脉分段联络巷与分段采场相连通,采场联络巷规格为333.5m,采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,每个矿房内自下而上分层向上回采,每个矿房内回采分层高度为2m,空顶距2m,即作业空间净高度4.5m,每个分层回采后即充填,充填高度2m。 
所述的一种铁矿体保安矿柱的回采方法,其特征在于:在每个矿房下盘运输巷中布置一条溜矿井,溜井底部由装矿平巷与主运输平巷相连,在矿房内布置一条充填井和一条行人通风天井,充填井内设充填管路和人行梯子等,是矿房的安全出口,其角度为800~900。 
所述的一种铁矿体保安矿柱的回采方法,其特征在于:采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,回采按照隔一采一进行,矿房、矿柱同宽。  
所述的一种铁矿体保安矿柱的回采方法,其特征在于:自分段沿脉巷道向水平分段采场掘进分段联络巷,分段联络巷坡度不大于18%,第一分段先在脉内开凿切割平巷与充填井相连通,再掘进人行通风天井,可借用充填井为切割天井进行切割与回采;
每个工作矿房配备1台2立方米电动铲运机出矿,配备5台YT-28凿岩机。每次爆破量320吨;
采场落矿由铲运机装运并卸入脉外矿石溜井后至阶段运输平巷,由电机车牵引侧卸式矿车运至井底车场卸入主溜井;
新鲜风流经斜坡道或行人通风天井进入到分段平巷,通过回采工作面后经采空区上到分段充填水平,再经充填井排至回风巷道。
所述的一种铁矿体保安矿柱的回采方法,其特征在于:当分段采场出矿结束后即可清理回收采场底板残留矿石;构筑加高采场进风井;架设泄水笼;构筑与采场联络巷道间的密闭墙;由充填井接入管道,并将充填管道用木质三脚架固定在适当地方,以便均匀充填;充填料采用高浓度全尾砂胶结充填,管路输送,宾汉流体的方式充入采场,接顶方式采用喷射式接顶充填,每个分段充填料经养护强度达到4~5MPa后即可进行下一个循环的开采。 
本发明的优点为: 
1、主要采准工程布置在下盘脉外,不因回采矿柱而破坏上阶段的运输、通风、充填系统,可以实现无底柱开采,有效地提高资源回收率。
2. 上向分段胶结充填法其突出优点是矿石损失率与贫化率低(矿石损失率20%,贫化率8%)有利于地压管理,安全性好。 
3. 采场布置灵活,可实现不同矿种分采。 
4.充填料采用高浓度全尾砂胶结充填,该技术的成功应用,解决了矿山充填料不足的问题,而且有效地避免了环境污染。全尾砂胶结充填的尾砂利用率达到95%以上。(特别是采用喷射式接顶充填的创新技术)。 
具体实施方式
一种铁矿体保安矿柱的开采方法,采用垂直矿体走向布置采场,矿体划分为 多个矿块,每个矿块长50m、宽50m、高60m,矿房宽度10m,每一回采循环回采高度2m,拉底巷道规格333.5m,顶柱预留厚度为5m,将矿块划分为矿房、矿柱,矿房、矿柱交替布置,第一步回采矿房,第二步回采矿柱;回采矿房时自下而上水平分层进行,随工作面向上推进,逐步充填采空区,并留出继续上采的工作空间;矿房回采到最上面分层时,进行接顶充填;待充填体强度达到4~5MPa后,再用上向水平分层全尾砂充填法回采矿柱。 
在脉外设一条采场联络巷,采场联络巷将沿脉分段联络巷与分段采场相连通,采场联络巷规格为333.5m,采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,每个矿房内自下而上分层向上回采,每个矿房内回采分层高度为2m,空顶距2m,即作业空间净高度4.5m,每个分层回采后即充填,充填高度2m。 
在每个矿房下盘运输巷中布置一条溜矿井,溜井底部由装矿平巷与主运输平巷相连,在矿房内布置一条充填井和一条行人通风天井,充填井内设充填管路和人行梯子等,是矿房的安全出口,其角度为800~900。 
采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,回采按照隔一采一进行,矿房、矿柱同宽。 
自分段沿脉巷道向水平分段采场掘进分段联络巷,分段联络巷坡度不大于18%,第一分段先在脉内开凿切割平巷与充填井相连通,再掘进人行通风天井,可借用充填井为切割天井进行切割与回采; 
每个工作矿房配备1台2立方米电动铲运机出矿,配备5台YT-28凿岩机。每次爆破量320吨;
采场落矿由铲运机装运并卸入脉外矿石溜井后至阶段运输平巷,由电机车牵引侧卸式矿车运至井底车场卸入主溜井;
新鲜风流经斜坡道或行人通风天井进入到分段平巷,通过回采工作面后经采空区上到分段充填水平,再经充填井排至回风巷道。
当分段采场出矿结束后即可清理回收采场底板残留矿石;构筑加高采场进风井;架设泄水笼;构筑与采场联络巷道间的密闭墙;由充填井接入管道,并将充填管道用木质三脚架固定在适当地方,以便均匀充填;充填料采用高浓度全尾砂胶结充填,管路输送,宾汉流体的方式充入采场,接顶方式采用喷射式接顶充填,每个分段充填料经养护强度达到4~5MPa后即可进行下一个循环的开采。 
为了较好地保护地表和上覆盖岩层不移动,必须很好的解决胶结充填接顶问题。常用的方法是人工接顶和砂浆加压接顶,但这两种方法都有缺陷。现提出“喷射式接顶充填”如下: 
将充填管道铺设在接顶空间的底板上,适当加大管道中砂浆流的残余压力,使排除的砂浆具有一定的压力和速度,以形成向上的砂浆流,使充填料填满接顶空间。

Claims (6)

1.一种铁矿体保安矿柱的开采方法,其特征在于:采用垂直矿体走向布置采场,矿体划分为多个矿块, 每个矿块长50m、宽50m、高60m, 矿房宽度10m,每一回采循环回采高度2m,拉底巷道规格333.5m,顶柱预留厚度为5m,将矿块划分为矿房、矿柱,矿房、矿柱交替布置,第一步回采矿房,第二步回采矿柱;回采矿房时自下而上水平分层进行,随工作面向上推进,逐步充填采空区,并留出继续上采的工作空间;矿房回采到最上面分层时,进行接顶充填;待充填体强度达到4~5MPa后,再用上向水平分层全尾砂充填法回采矿柱。
2.根据权利要求1所述的一种铁矿体保安矿柱的回采方法,其特征在于:在脉外设一条采场联络巷,采场联络巷将沿脉分段联络巷与分段采场相连通,采场联络巷规格为333.5m,采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,每个矿房内自下而上分层向上回采,每个矿房内回采分层高度为2m,空顶距2m,即作业空间净高度4.5m,每个分层回采后即充填,充填高度2m。
3.根据权利要求1所述的一种铁矿体保安矿柱的回采方法,其特征在于:在每个矿房下盘运输巷中布置一条溜矿井,溜井底部由装矿平巷与主运输平巷相连,在矿房内布置一条充填井和一条行人通风天井,充填井内设充填管路和人行梯子等,是矿房的安全出口,其角度为800~900
4.根据权利要求1所述的一种铁矿体保安矿柱的回采方法,其特征在于:采用上向水平分层胶结充填法回采矿房及上向水平分层全尾砂充填法回采矿柱时,回采按照隔一采一进行,矿房、矿柱同宽。
5.根据权利要求1所述的一种铁矿体保安矿柱的回采方法,其特征在于:自分段沿脉巷道向水平分段采场掘进分段联络巷,分段联络巷坡度不大于18%,第一分段先在脉内开凿切割平巷与充填井相连通,再掘进人行通风天井,可借用充填井为切割天井进行切割与回采;
每个工作矿房配备1台2立方米电动铲运机出矿,配备5台YT-28凿岩机;每次爆破量320吨;
采场落矿由铲运机装运并卸入脉外矿石溜井后至阶段运输平巷,由电机车牵引侧卸式矿车运至井底车场卸入主溜井;
新鲜风流经斜坡道或行人通风天井进入到分段平巷,通过回采工作面后经采空区上到分段充填水平,再经充填井排至回风巷道。
6.根据权利要求1所述的一种铁矿体保安矿柱的回采方法,其特征在于:当分段采场出矿结束后即可清理回收采场底板残留矿石;构筑加高采场进风井;架设泄水笼;构筑与采场联络巷道间的密闭墙;由充填井接入管道,并将充填管道用木质三脚架固定在适当地方,以便均匀充填;充填料采用高浓度全尾砂胶结充填,管路输送,宾汉流体的方式充入采场,接顶方式采用喷射式接顶充填,每个分段充填料经养护强度达到4~5MPa后即可进行下一个循环的开采。
CN201310341287.XA 2013-08-07 2013-08-07 一种铁矿体保安矿柱的开采方法 Pending CN103557003A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310341287.XA CN103557003A (zh) 2013-08-07 2013-08-07 一种铁矿体保安矿柱的开采方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310341287.XA CN103557003A (zh) 2013-08-07 2013-08-07 一种铁矿体保安矿柱的开采方法

Publications (1)

Publication Number Publication Date
CN103557003A true CN103557003A (zh) 2014-02-05

Family

ID=50011338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310341287.XA Pending CN103557003A (zh) 2013-08-07 2013-08-07 一种铁矿体保安矿柱的开采方法

Country Status (1)

Country Link
CN (1) CN103557003A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895566A (zh) * 2015-06-15 2015-09-09 武汉科技大学 一种残矿回收采矿法
CN104989408A (zh) * 2015-07-14 2015-10-21 三峡大学 一种用于山区金属矿山安全高效的采矿方法
CN105019906A (zh) * 2015-08-13 2015-11-04 中电投贵州遵义产业发展有限公司务川铝矿分公司 用于铝土矿山分区机械化连续开采的“双ii+u”型采准系统
CN105041314A (zh) * 2015-06-13 2015-11-11 招金矿业股份有限公司大尹格庄金矿 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN105863640A (zh) * 2016-04-05 2016-08-17 武汉科技大学 一种保安矿柱和同水平矿体同步开采的联合采矿法
CN110905510A (zh) * 2019-11-13 2020-03-24 铜陵有色金属集团股份有限公司 金属矿体水平矿柱的条块回采方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2398966C1 (ru) * 2009-05-12 2010-09-10 Виктор Николаевич Кулаков Способ разработки мощных крутонаклонных и крутых угольных пластов
CN102251773A (zh) * 2011-06-22 2011-11-23 大冶有色金属股份有限公司 适合于极复杂矿体开采的进路式上向水平分层充填采矿法
CN103075189A (zh) * 2013-02-19 2013-05-01 山东黄金矿业股份有限公司新城金矿 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法
CN103203124A (zh) * 2012-06-12 2013-07-17 潘明友 一种尾矿脱水工艺及装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2398966C1 (ru) * 2009-05-12 2010-09-10 Виктор Николаевич Кулаков Способ разработки мощных крутонаклонных и крутых угольных пластов
CN102251773A (zh) * 2011-06-22 2011-11-23 大冶有色金属股份有限公司 适合于极复杂矿体开采的进路式上向水平分层充填采矿法
CN103203124A (zh) * 2012-06-12 2013-07-17 潘明友 一种尾矿脱水工艺及装置
CN103075189A (zh) * 2013-02-19 2013-05-01 山东黄金矿业股份有限公司新城金矿 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
何哲祥等: "全尾砂胶结充填技术的研究与实践", 《中国有色金属学报》 *
吕辉: "矿山胶结充填技术述评与展望", 《矿业快报》 *
曹敬松: "采矿工作技术方法分析", 《黑龙江科技信息》 *
李胜辉等: "司家营铁矿平青大公路保安矿柱开采方法的研究", 《第十八届川鲁冀晋琼粤辽七省矿业学术交流会论文集》 *
许徳明等: "新城金矿尾砂胶结充填系统的优化与改造", 《冶金矿山设计与建设》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041314A (zh) * 2015-06-13 2015-11-11 招金矿业股份有限公司大尹格庄金矿 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN104895566A (zh) * 2015-06-15 2015-09-09 武汉科技大学 一种残矿回收采矿法
CN104895566B (zh) * 2015-06-15 2017-03-08 武汉科技大学 一种残矿回收采矿法
CN104989408A (zh) * 2015-07-14 2015-10-21 三峡大学 一种用于山区金属矿山安全高效的采矿方法
CN105019906A (zh) * 2015-08-13 2015-11-04 中电投贵州遵义产业发展有限公司务川铝矿分公司 用于铝土矿山分区机械化连续开采的“双ii+u”型采准系统
CN105863640A (zh) * 2016-04-05 2016-08-17 武汉科技大学 一种保安矿柱和同水平矿体同步开采的联合采矿法
CN110905510A (zh) * 2019-11-13 2020-03-24 铜陵有色金属集团股份有限公司 金属矿体水平矿柱的条块回采方法
CN110905510B (zh) * 2019-11-13 2021-06-08 铜陵有色金属集团股份有限公司 金属矿体水平矿柱的条块回采方法

Similar Documents

Publication Publication Date Title
CN106677780B (zh) 一种上下向阶段凿岩分段切底出矿嗣后充填采矿法
CN108060924B (zh) 急倾斜多层薄矿体机械化联合采矿方法
CN102562065B (zh) 一种分段空场嗣后充填采矿方法
CN101858217B (zh) 房柱变换式盘区上向分层充填采矿法
CN101818643B (zh) 深井特厚大破碎矿体盘区阶梯式无间柱连续充填采矿法
CN101871347B (zh) 采矿环境再造分层分条中深孔落矿采矿法
CN103437769B (zh) 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN106761912B (zh) 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN111828007B (zh) 一种地下矿山采空区遗留间柱的回采方法
CN104018836B (zh) 一种有不稳固假顶倾斜中厚矿体的分采方法
CN102168579A (zh) 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN103557003A (zh) 一种铁矿体保安矿柱的开采方法
CN105041314A (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN103967494B (zh) 一种浅孔留矿嗣后充填采矿方法
CN106121643A (zh) 预留护壁矿两步骤嵌套组合充填采矿法
CN104832178A (zh) 一种厚煤层分层部分充填采煤方法
CN103032070A (zh) 一种控界房柱式分段空场嗣后阶段充填采矿法
CN203452793U (zh) 近地表厚大、较倾斜矿体开采用浅孔留矿法的矿房结构
CN106499396B (zh) 一种中厚缓倾斜含废石夹层矿体房柱采矿法
CN105927226A (zh) 一种中深孔落矿连续分段水平充填采矿法
CN103104259A (zh) 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法
CN103075156A (zh) 一种棋盘式矿房预护顶上向中深孔落矿分段充填采矿法
CN111706328B (zh) 一种用于充填法处理采空区遗留间柱的开采方法
CN104100270A (zh) 一种缓倾斜矿脉无轨开采方法
CN105464700A (zh) 综采-充填混合开采工作面充填段长度确定方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ji Lichang

Inventor after: Wang Zhiliang

Inventor after: Ji Shaojie

Inventor after: Chai Yansen

Inventor after: Li Hongwei

Inventor after: He Yongjin

Inventor after: Shao Peng

Inventor before: Wang Zhiliang

Inventor before: Ji Shaojie

Inventor before: Chai Yansen

Inventor before: Li Hongwei

Inventor before: He Yongjin

Inventor before: Shao Peng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG MINGTONG WANG MINGTONG YANG XIAOJUN CENG QINGRONG LI GENGHUA CHEN SUIQIANG TO: ZHU RONGHUA WANG MINGTONG WANG MINGTONG YANG XIAOJUN CENG QINGRONG LI GENGHUA CHEN SUIQIANG

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140205