CN103552657B - Bearing pin pull erecting stage under water - Google Patents

Bearing pin pull erecting stage under water Download PDF

Info

Publication number
CN103552657B
CN103552657B CN201310566605.2A CN201310566605A CN103552657B CN 103552657 B CN103552657 B CN 103552657B CN 201310566605 A CN201310566605 A CN 201310566605A CN 103552657 B CN103552657 B CN 103552657B
Authority
CN
China
Prior art keywords
bearing pin
platform base
pull
mounting plate
upper mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310566605.2A
Other languages
Chinese (zh)
Other versions
CN103552657A (en
Inventor
蔡长松
魏行超
苗春生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cnooc Shenzhen Ocean Engineering Technology Service Co ltd
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD, China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
Priority to CN201310566605.2A priority Critical patent/CN103552657B/en
Publication of CN103552657A publication Critical patent/CN103552657A/en
Application granted granted Critical
Publication of CN103552657B publication Critical patent/CN103552657B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

One is bearing pin pull erecting stage under water, be provided with: a platform base, be fixed on several platform base supporting legs below platform base, be fixed on the several platform struts above platform base, be fixed on upper mounting plate above several platform strut, wherein, the center of upper mounting plate is provided with the through hole I for pull cucurbit chain, and the center of platform base is provided with a through hole II passed through for the pull end of bearing pin; The top of upper mounting plate is provided with a pull cucurbit, and the cucurbit chain of this pull cucurbit is through the through hole of upper mounting plate and the through hole of platform base.The present invention can not only make diver control bearing pin through dynamics, speed and bearing pin position in pin shaft hole process, and, substantially increase the speed that diver installs bearing pin, efficiently solve the problem of diver's operational difficulty under water.

Description

Bearing pin pull erecting stage under water
Technical field
The present invention relates to erecting stage, particularly relate to one bearing pin pull erecting stage under water.Belong to Offshore Engineering field.
Background technology
Off-shore oil field Floating Production oil storage system (FPSO) is a kind of crude oil, the storage of natural fuels, production and processing, outer defeated of being mainly used in, and for oil field provide water, electricity and life support large-scale production oil storage tanker, generally existing: 5 ~ 300,000 tons, is the core facility that offshore oil and gas is produced.
Mooring system primarily of single point mooring's head, shake gram (YOKE) and mooring leg composition, mooring leg and shake gram (YOKE) as cacheable connecting device, by off-shore oil field Floating Production oil storage system (FPSO) permanent mooring on single-point, make off-shore oil field Floating Production oil storage system (FPSO) can with the wind, wave, flow and rotate around single-point.Seabed oil, gas, water pipe and cable are all connected on the flexible pipe between mooring head and oil field Floating Production oil storage system (FPSO) by single-point, for transferring oil, gas, water, electricity, to ensure the normal production in oil field.
In the installation of oil-gas field single buoy mooring system, being integrated by pinned connection normally by anchor chain and floating drum.Its advantage is, under tide and the effect of surging, floating drum can fluctuate, and pinned connection makes mooring anchor chain and floating drum connection location place can relatively rotate state, effectively offsets fatigue damage.But because bearing pin deadweight reaches up to a hundred kilograms, and the working space at floating drum place is limited, diver is under water by very difficult, consuming time longer for the operation during pin shaft hole of bearing pin through anchor chain and floating drum.
Summary of the invention
Main purpose of the present invention is the above-mentioned shortcoming overcoming prior art existence, and one bearing pin pull erecting stage is under water provided, it can not only make diver control bearing pin through dynamics, speed and bearing pin position in pin shaft hole process, and, substantially increase the speed that diver installs bearing pin, reduce construction period, efficiently solve the problem of diver's operational difficulty under water.
The object of the invention is to be realized by following technical scheme:
One is bearing pin pull erecting stage under water, it is characterized in that: be provided with: a platform base, be fixed on several platform base supporting legs below platform base, be fixed on the several platform struts above platform base, be fixed on upper mounting plate above several platform strut, wherein, the center of upper mounting plate is provided with the through hole I for pull cucurbit chain, and the center of platform base is provided with a through hole II passed through for the pull end of bearing pin; The top of upper mounting plate is provided with a pull cucurbit, and the cucurbit chain of this pull cucurbit is through the through hole of upper mounting plate and the through hole of platform base.
Described upper mounting plate and platform base are discoid, and upper mounting plate is identical with the diameter of platform base.
Beneficial effect of the present invention: the present invention is owing to adopting technique scheme, it can not only make diver control bearing pin through dynamics, speed and bearing pin position in pin shaft hole process, and, substantially increase the speed that diver installs bearing pin, efficiently solve the problem of diver's operational difficulty under water.
Accompanying drawing illustrates:
Fig. 1 is integral structure schematic diagram of the present invention.
Fig. 2 is anchor chain of the present invention and floating drum assembling schematic diagram.
Major label description in figure:
10. upper mounting plate, 11. platform base supporting legs, 12. platform bases, 13. platform base bearing pin through holes, 14. platform struts, 15. through holes, 16. hoist lifting hooks, 17. cucurbit rocking bars, 18. cucurbit chains, 19. pull cucurbits, 2. bearing pin, 21. bearing pin pull suspension centres, 22. bearing pins install locked nut, 3. floating drum, 31. float pin axis holes, 4. anchor chain head, 41. anchor chains, 42. anchor chain pin shaft holes.
Detailed description of the invention
As shown in Figure 1, the present invention is provided with: a platform base 12, employing welding manner are fixed on the several platform base supporting legs 11 below platform base 12, adopt welding manner to be fixed on several platform struts 14 above platform base 12, adopt welding manner to be fixed on upper mounting plate 10 above several platform strut 14, the top of upper mounting plate 10 is provided with pull cucurbit 19, wherein, the center of upper mounting plate 10 is provided with the through hole 15 for pull cucurbit chain, platform base 12 is discoid, the center of platform base 12 is provided with a through hole 13, passes through smoothly to enable the pull end of bearing pin 2; And make the cucurbit chain 18 of pull cucurbit 19 pass the through hole 15 of upper mounting plate 10 and the through hole 13 of platform base 12.
Above-mentioned upper mounting plate 10 is discoid, and upper mounting plate 10 is identical with the diameter of platform base 12.
As shown in Figure 2, during use, draw in place by diver by anchor chain head 4, that is: floating drum 3 penetrates anchor chain head 4, and float pin axis hole 31 and anchor chain pin shaft hole 42 coaxial.Then, diver is located in platform base 12 and several supporting leg 11 place thereof, bearing pin pull erecting stage 1 is under water sidelong in the side of anchor chain head 4, by hoist lifting hook 16 through anchor chain pin shaft hole 42 and float pin axis hole 31, and hoist lifting hook 16 is connected to bearing pin pull suspension centre 21, cucurbit chain 18 is tightened up by operation cucurbit rocking bar 17, treat that platform base supporting leg 11 is slightly stressed, the present invention will occupy stably in anchor chain head 4 side, diver adjusts platform pins shaft through-hole 13 and anchor chain anchor chain head pin shaft hole 42 makes it coaxial, continue operation cucurbit rocking bar 17 and complete for bearing pin 2 pull is crossed float pin axis hole 31 and anchor chain pin shaft hole 42, remove bearing pin pull suspension centre 21, the locked nut 22 of two bearing pins that bearing pin 2 is installed by both sides is fixed, thus complete the final connection of anchor chain 41 and floating drum 3.
Above-mentioned pull cucurbit is prior art, and the technology of not specified (NS) is prior art.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (2)

1. a bearing pin pull erecting stage under water, it is characterized in that: be provided with: a platform base, be fixed on several platform base supporting legs below platform base, be fixed on the several platform struts above platform base, be fixed on upper mounting plate above several platform strut, wherein, the center of upper mounting plate is provided with the through hole I for pull cucurbit chain, and the center of platform base is provided with a through hole II passed through for the pull end of bearing pin; The top of upper mounting plate is provided with a pull cucurbit, and the cucurbit chain of this pull cucurbit is through the through hole I of upper mounting plate and the through hole II of platform base.
2. the pull of bearing pin under water erecting stage according to claim 1, is characterized in that: described upper mounting plate and platform base are discoid, and upper mounting plate is identical with the diameter of platform base.
CN201310566605.2A 2013-11-14 2013-11-14 Bearing pin pull erecting stage under water Active CN103552657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310566605.2A CN103552657B (en) 2013-11-14 2013-11-14 Bearing pin pull erecting stage under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310566605.2A CN103552657B (en) 2013-11-14 2013-11-14 Bearing pin pull erecting stage under water

Publications (2)

Publication Number Publication Date
CN103552657A CN103552657A (en) 2014-02-05
CN103552657B true CN103552657B (en) 2016-02-10

Family

ID=50007085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310566605.2A Active CN103552657B (en) 2013-11-14 2013-11-14 Bearing pin pull erecting stage under water

Country Status (1)

Country Link
CN (1) CN103552657B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110979560B (en) * 2019-12-04 2021-12-24 江苏亚星锚链股份有限公司 Mooring chain underwater installation platform attached to anchor

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85101746A (en) * 1985-04-01 1987-01-31 布隆福斯造船公司 In one end grappling of oil carrier hull and the system that carries the liquids and gases medium
CN1177556A (en) * 1996-09-20 1998-04-01 辛格尔浮筒系船公司 Ship with quick separating device and separating device for same
US5816182A (en) * 1996-10-30 1998-10-06 Imodo, Inc. Tension mooring system
JP3063039B2 (en) * 1991-07-03 2000-07-12 三井造船株式会社 Mooring type measuring device
CN1387487A (en) * 1999-11-01 2002-12-25 近海能源发展公司 Subsea anchor line connection method and connector for use therein
CN102177065A (en) * 2008-10-10 2011-09-07 斯特弗劳斯有限公司 Anchor with measurement coupling
CN202138506U (en) * 2011-05-20 2012-02-08 无棣方正福利不锈钢制品有限公司 Quick retaining device for mooring rope

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01145292A (en) * 1987-12-02 1989-06-07 Mitsui Eng & Shipbuild Co Ltd Device for joining upper part of tendon of tension leg platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85101746A (en) * 1985-04-01 1987-01-31 布隆福斯造船公司 In one end grappling of oil carrier hull and the system that carries the liquids and gases medium
JP3063039B2 (en) * 1991-07-03 2000-07-12 三井造船株式会社 Mooring type measuring device
CN1177556A (en) * 1996-09-20 1998-04-01 辛格尔浮筒系船公司 Ship with quick separating device and separating device for same
US5816182A (en) * 1996-10-30 1998-10-06 Imodo, Inc. Tension mooring system
CN1387487A (en) * 1999-11-01 2002-12-25 近海能源发展公司 Subsea anchor line connection method and connector for use therein
CN102177065A (en) * 2008-10-10 2011-09-07 斯特弗劳斯有限公司 Anchor with measurement coupling
CN202138506U (en) * 2011-05-20 2012-02-08 无棣方正福利不锈钢制品有限公司 Quick retaining device for mooring rope

Also Published As

Publication number Publication date
CN103552657A (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN102491162A (en) Hoisting equipment and hoisting method
WO2011028102A3 (en) Offshore wind turbine installation
WO2012024608A4 (en) Offshore wind turbine and methods of installing same
RU2007130091A (en) “SPAR” FLOATING PLATFORM FOR FLOWING ICE FLOW CONDITIONS
CN102852147B (en) Method for righting jacket by using single cantilever gin pole and double hooks
CN102765466A (en) Semi-submersible offshore floating fan foundation
CN102815374B (en) Shoal sea area rescue operational ship with pile driving and pulling device and ship body fixing method
CN201140778Y (en) Flexible connection mooring apparatus for oil transportation on the sea
JP2011207446A (en) Assistant floating body, method of towing floating body using the same, and method of installing floating body using the same
KR101805482B1 (en) Jack-up Platform with Attaching And Detaching Spud Can and Attaching And Detaching Method of The Spud Can
CN102673755A (en) Deep sea in-water oil storage and outward transportation system and method
CN102140789A (en) Novel shallow water jacket design and installation method
CN103883273A (en) Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe
CN103552657B (en) Bearing pin pull erecting stage under water
CN105129629A (en) Large component lifting system, disassembling method thereof and large component lifting method
CN109515613B (en) Process suitable for floating transportation and floating installation of wind power pipe pile
CN202389573U (en) Oil and gas field engineering development system of extreme deepwater ocean
CN106232468B (en) Outer capstan head with steering framing wheel
CN103216678A (en) Grouting air sac method for suspending sea pipe
CN102514692B (en) Ultradeep sea oil-gas field engineering development system
CN102991646B (en) Manufacturing methods for gravity anchor
CN102206938A (en) Novel method for installing upper part block of offshore platform
WO2010120186A1 (en) Floating windmill and method of installation, intervention or decommissioning
CN103241348A (en) Floating platform stabilizer
CN101761691A (en) Bound floating pipeline towing pipe method process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CNOOC Shenzhen Ocean Engineering Technology Service Co.,Ltd.

Address before: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.