CN103541513B - Edge FRP muscle reinforced concrete anchoring piece in a kind of - Google Patents

Edge FRP muscle reinforced concrete anchoring piece in a kind of Download PDF

Info

Publication number
CN103541513B
CN103541513B CN201310431077.XA CN201310431077A CN103541513B CN 103541513 B CN103541513 B CN 103541513B CN 201310431077 A CN201310431077 A CN 201310431077A CN 103541513 B CN103541513 B CN 103541513B
Authority
CN
China
Prior art keywords
muscle
frp
reinforced concrete
anchoring piece
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310431077.XA
Other languages
Chinese (zh)
Other versions
CN103541513A (en
Inventor
张延年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201310431077.XA priority Critical patent/CN103541513B/en
Publication of CN103541513A publication Critical patent/CN103541513A/en
Application granted granted Critical
Publication of CN103541513B publication Critical patent/CN103541513B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This invention provides a kind of interior edge FRP muscle reinforced concrete anchoring piece, solving the problem of FRP muscle anchoring effect, forming by wearing muscle pipe, vertical linkage muscle, lateral ties muscle, anchor rib and FRP muscle etc. by simple way.4 rectangular distributions of anchor rib, two minor faces of rectangle are connected by two vertical linkage muscle; The side on two long limits of rectangle is connected by lateral ties muscle, and side connects by wearing muscle pipe.Anchor rib free end adopts bolt to fix.Wearing muscle pipe is curve-like, is less than 45 degree of arcs.Effect of the present invention and advantage are simple, economical and anchoring effect is good.

Description

Edge FRP muscle reinforced concrete anchoring piece in a kind of
Technical field
The present invention relates to the novel anchoring piece in a kind of technical field of buildings, particularly relate to a kind of interior edge FRP muscle reinforced concrete anchoring piece.
Background technology
Fiber-reinforced polymer (FRP) application in civil engineering is divided into two large classes, and a class replaces reinforcing bar for newly-built structure with FRP muscle, and another kind of is maintenance network FRP muscle being used for old structure thing.The current research about the rib prestressed reinforced concrete structure of FRP is subject to the most attention of research institution of various countries and engineering circles.The case history of FRP muscle reinforcement bridge is increasing.The present invention summarizes the domestic and international newest research results about FRP material, has made prospect to the development in FRP material future.
In current prestressing force and underground pile foundation structure, the etching problem of reinforcing bar is serious.It is found that use corrosion resistant FRP material to replace the feature such as high-tensile that reinforcing bar is the essence method addressed this problem, particularly FRP material and corrosion resistance makes it become the ideal material of prestressed structure.FRP material is used in many engineerings, but it is slightly poor relative to reinforcing bar with concrete adhesive property, and FRP material is fragile material, cause the security performance of FRP concrete structure to reduce, therefore utilize the most basic problem of FRP muscle replacement reinforcing bar to be always to solve ductility and the endurance issues of FRP and concrete adhesive property and FRP concrete structure.
Destruction due to FRP is fragility, and the research of the crooked deformability of FRP concrete structure seems particularly important.The people such as the Janet.M.Lees of Britain have studied aramid fiber muscle and concrete bonds entirely, do not bond and part adhesive 3 kinds of bonding modes mix the impact of beam deformed ability to aramid fiber muscle and concrete binding power and aramid fiber muscle.Part adhesive is divided into two kinds of forms in test: one is interval bonding, and fiber bar bonds in beam longitudinal axis and concrete interval; Two is absorption bondings, is coated with one deck resin, controls fiber bar and concrete adhesion stress by face coat on the surface of fiber bar.
Test proves, the ultimate bearing capacity of the aramid fiber Concrete Beam Reinforced that 1. entirely bonds is very high, and extreme flexion distortion is less, and the destruction of beam is pulled off by fiber bar to cause; 2. the ultimate bearing capacity that the aramid fiber muscle that do not bond mixes beam is lower, only has a crack to produce during destruction, but extreme flexion distortion is very large, and the destruction of beam is because concrete is crushed; 3. part adhesive aramid fiber Concrete Beam Reinforced shows higher ultimate bearing capacity and the distortion of larger extreme flexion, and the destruction of beam is because fiber bar is pulled off.Beam crack when destroying is more, avoids concrete crushed, and the ultimate bearing capacity of particularly absorption bonding and spiral wound spacer bonding aramid fiber Concrete Beam Reinforced reaches the ultimate bearing capacity of full bonding aramid fiber Concrete Beam Reinforced.This shows that part adhesive can optimize ultimate bearing capacity and the crooked deformability of the rib prestressed concrete beam of FRP.
Part adhesive fiber bar prestressed concrete beam shows good mechanical property and ductility, but two kinds of part adhesive construction complexity, the technical difficulty of more than test are high, should not promote the use of, therefore seeking easy part adhesive mode is following developing direction, needs the destruction characteristic of further study portion viscose fibre Concrete Beam Reinforced and cutting performance etc. simultaneously.
For most of old concrete structure, particularly bridge, parking lot and some memorable buildings etc., due to the change of using function, the raising of structural requirement, the time limit of service life, the reasons such as the defect in former design and structure damage in use, simultaneously in order to reach the principle of economic optimization, need to repair old mixed structure and reinforce.A method of effectively repairing and reinforce carries out external prestress reinforcing to works exactly.Externally reinforced have easy construction and be convenient to the advantage of monitoring outside muscle.Outside muscle all adopted reinforcing bar in the past, because it has good ductility, but due to exposed in appearance, easily corroded, needed long-term maintenance, economical not.Nearest people often adopt FRP muscle as outside muscle.To the greatest extent let it be, and ductility is poor, and modulus of elasticity is lower, but it has that intensity is high, quality is light and the advantage such as corrosion-resistant.The stress less (ultimate bearing capacity far below fiber bar) that outside muscle bears when outside prestressed reinforcement, and low elasticity mould has and in reduction loss of prestress, therefore utilizes FRP muscle to carry out to old structure thing the developing direction that external prestress reinforcing is structural strengthening.
Ground tackle has prestressed key issue.Carry out external prestress reinforcing for employing fiber bar to structure, anchoring property directly affects the consolidation effect to beam.Domestic and international many experts and scholars conduct in-depth research this problem.The fiber bar of general broken line arrangement form is anchored at the two ends of beam.One end is fixed, and the other end is moveable hinge, at movable end jack to fiber bar Shi Hanzhang.Current ground tackle form has: 1. ground tackle is wedge shape steel hinge, and wedge shape cuts with scissors direct stretch-draw and anchoring fiber muscle, and this ground tackle can stretch-draw fiber bar effectively; 2. because the surface of fiber bar is more fragile and side direction anti-pressure ability is poor, easily make fiber bar produce lateral compression when adopting wedge shape steel to cut with scissors direct anchoring fiber bar and destroy.The people such as Canada Raafat.El-Hacha improve wedge shape steel hinge, and they have added a wedge metal mold between wedge shape steel hinge and fiber bar, add a mold, and add two molds at jack loading end at fixed end.Test shows that it can reduce the damage of hinge to fiber bar effectively; 3. when ground tackle adopts wedge shape steel to cut with scissors, also easily generation stress is concentrated destroys in wedge-like tip with fiber bar, and the Houssam.Toutany of the U.S. improves this shortcoming, utilizes polyamide to replace steel to make wedge shape and cuts with scissors, got good effect.Although the anchoring of outmost fiber muscle has reached the stage of a relative maturity, need to reduce hinge further to the damage of fiber bar and the contact surface performance optimizing hinge and fiber bar.
In addition, often there is fastening destruction in interior edge FRP muscle reinforced concrete, FRP muscle cannot play its superior stress performance.Therefore, in order to ensure that interior edge FRP muscle has good anchoring property, be necessary to develop the good anchoring piece of anchoring property.
Summary of the invention
The object of the present invention is to provide a kind of in edge FRP muscle reinforced concrete anchoring piece, mainly for when ensureing interior edge FRP muscle reinforced concrete, FRP muscle has good anchoring property, and then guarantee FRP muscle plays its good stress performance.
The object of the invention is to be achieved through the following technical solutions:
Interior edge FRP muscle reinforced concrete anchoring piece forms by wearing muscle pipe, vertical linkage muscle, lateral ties muscle, anchor rib and FRP muscle, and it is characterized in that: 4 rectangular distributions of anchor rib, two minor faces of rectangle are connected by two vertical linkage muscle; The side on two long limits of rectangle is connected by lateral ties muscle, and side connects by wearing muscle pipe.Bolt is adopted to fix at anchor rib free end.Wearing muscle pipe is curve-like, is less than 45 degree of arcs.
Advantage of the present invention and beneficial effect:
In the present invention, the investigation and application of FRP muscle as described in the background art, and achievement a lot, but does not also have successful and simple and effective anchoring piece, and the anchoring effect of concrete anchor is very important to the application of FRP muscle.Effect of the present invention and advantage are simple, economical and anchoring effect is good.Wearing muscle pipe in invention is curve-like, better through test effect.
Accompanying drawing explanation
Fig. 1 is the floor map of interior edge FRP muscle reinforced concrete anchoring piece;
Fig. 2 is the left view of interior edge FRP muscle reinforced concrete anchoring piece Fig. 1;
Fig. 3 is the elevation of Fig. 1 of interior edge FRP muscle reinforced concrete anchoring piece;
Using state schematic diagram when Fig. 4 is the reinforcing of interior edge FRP muscle reinforced concrete anchoring piece.
In figure, 1 for wearing muscle pipe; 2 is vertical linkage muscle; 3 is lateral ties muscle; 4 is anchor rib; 5 is nut; 6 is FRP muscle; 7 is beam; 8 is post.
Detailed description of the invention
Below in conjunction with technical scheme with reference to accompanying drawing, the present invention is described in detail.
The interior edge FRP muscle reinforced concrete anchoring piece that the present invention proposes is as shown in Fig. 1 ~ Fig. 4.
Whole device is primarily of wearing the compositions such as muscle pipe 1, vertical linkage muscle 2, lateral ties muscle 3, anchor rib 4, bolt 5, FRP muscle 6, beam 7 and post 8.
Make as requested and wear muscle pipe 1, vertical linkage muscle 2, lateral ties muscle 3, anchor rib 4 etc., and welded.4 rectangular distributions of anchor rib 4, two minor faces of rectangle are connected by two vertical linkage muscle 2; The side on two long limits of rectangle is connected by lateral ties muscle 4, and side connects by wearing muscle pipe 1.Bolt 5 is adopted to fix at anchor rib 4 free end.Wear muscle pipe 1 for curve-like, be less than 45 degree of arcs.In using, between two beams 8, be fixed on beam 7 with bolt 5 by interior edge FRP muscle reinforced concrete anchoring piece free end, FRP muscle 6, through wearing muscle pipe 1, owing to wearing muscle pipe 1 for curve-like, is conducive to certain distortion.

Claims (2)

1. inlay FRP muscle reinforced concrete anchoring piece in one kind, comprise and wear muscle pipe (1), vertical linkage muscle (2), lateral ties muscle (3), anchor rib (4) and FRP muscle (6), the rectangular distribution of 4 anchor ribs (4), two minor faces of rectangle are connected by two vertical linkage muscle (2); The side on two long limits of rectangle is connected by lateral ties muscle (3), and opposite side connects by wearing muscle pipe (1), it is characterized in that: wearing muscle pipe (1) is curve-like, is less than 45 degree of arcs.
2. edge FRP muscle reinforced concrete anchoring piece in one according to claim 1, is characterized in that: anchor rib (4) free end adopts bolt (5) to fix.
CN201310431077.XA 2013-09-22 2013-09-22 Edge FRP muscle reinforced concrete anchoring piece in a kind of Expired - Fee Related CN103541513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310431077.XA CN103541513B (en) 2013-09-22 2013-09-22 Edge FRP muscle reinforced concrete anchoring piece in a kind of

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310431077.XA CN103541513B (en) 2013-09-22 2013-09-22 Edge FRP muscle reinforced concrete anchoring piece in a kind of

Publications (2)

Publication Number Publication Date
CN103541513A CN103541513A (en) 2014-01-29
CN103541513B true CN103541513B (en) 2016-04-20

Family

ID=49965334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310431077.XA Expired - Fee Related CN103541513B (en) 2013-09-22 2013-09-22 Edge FRP muscle reinforced concrete anchoring piece in a kind of

Country Status (1)

Country Link
CN (1) CN103541513B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1507051A1 (en) * 2003-08-13 2005-02-16 Sika Technology AG Force transfer element
US20050252116A1 (en) * 2002-10-23 2005-11-17 Markus Maier Tensioning device for strip-shaped tension members
CN101603353A (en) * 2009-06-26 2009-12-16 湖南大学 A kind of composite anchorage that is used for anchoring multiple fibre reinforced plastic twisted wire muscle or drag-line
KR100989947B1 (en) * 2010-02-11 2010-10-26 민경기술 주식회사 Apparatus for reinforcing beam structure using re-tentioning device
CN102061811A (en) * 2010-11-17 2011-05-18 建研科技股份有限公司 Method for reinforcing concrete structure by utilizing prestressed high-tensile steel wire fabric
CN102644384A (en) * 2012-03-12 2012-08-22 河海大学 Anchoring device for reinforcing reinforced concrete beam by using FRP (Fiber Reinforce Plastic) strip and using method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050252116A1 (en) * 2002-10-23 2005-11-17 Markus Maier Tensioning device for strip-shaped tension members
EP1507051A1 (en) * 2003-08-13 2005-02-16 Sika Technology AG Force transfer element
CN101603353A (en) * 2009-06-26 2009-12-16 湖南大学 A kind of composite anchorage that is used for anchoring multiple fibre reinforced plastic twisted wire muscle or drag-line
KR100989947B1 (en) * 2010-02-11 2010-10-26 민경기술 주식회사 Apparatus for reinforcing beam structure using re-tentioning device
CN102061811A (en) * 2010-11-17 2011-05-18 建研科技股份有限公司 Method for reinforcing concrete structure by utilizing prestressed high-tensile steel wire fabric
CN102644384A (en) * 2012-03-12 2012-08-22 河海大学 Anchoring device for reinforcing reinforced concrete beam by using FRP (Fiber Reinforce Plastic) strip and using method thereof

Also Published As

Publication number Publication date
CN103541513A (en) 2014-01-29

Similar Documents

Publication Publication Date Title
CN104675141B (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN104790424A (en) Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN107217788A (en) Full FRP muscle enhancing ECC Combined concrete beams and preparation method thereof
CN104805767A (en) Prefabricated assembly FRP-reinforcing steel-bar-concrete combined bridge deck and construction method
CN109972538B (en) Steel plate inner filling material combined reinforced concrete bridge structure and construction technology
CN101230562A (en) External prestress strengthening method for prestressed concrete box-beam bridge
CN103194969A (en) FRP (Fiber Reinforce Plastic)-concrete combined bridge deck
CN102493660A (en) Anchoring method and anchoring tool for carbon fiber reinforced composite material prestressed bar
CN201713959U (en) Novel stretchable pressing reinforced concrete support
CN113062233A (en) Pre-tensioning method prestressed steel plate-concrete reinforcing method for box girder
CN204386036U (en) A kind of pre-stressed carbon fiber beaverboard anchorage
CN103291082A (en) Wood beam reinforcing body external pre-stress construction method
CN203559329U (en) Steel-RPC (reactive powder concrete) combined bridge
CN208346611U (en) Assembled steel-UHPC composite structure
CN103541513B (en) Edge FRP muscle reinforced concrete anchoring piece in a kind of
CN204571341U (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN203160126U (en) FRP-concrete composite bridge panel
CN105484355B (en) A kind of linked system of wooden concrete combined structure
CN106522573A (en) Clamping piece type anchorage device applied to prestressed FRP gridding stretching and construction method of clamping piece type anchorage device
CN201016157Y (en) Steel-mixing composite box beam
CN202610711U (en) Combination bridge deck formed by steel-fiber reinforced cement-base composite material
CN210976324U (en) Prestressed composite-ultra-high performance concrete composite beam
CN114673259A (en) Structure for improving ductility of assembled combined structure and construction method
CN204000644U (en) Large-span prestressed concrete bridge bracing means under tropical monsson climate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20160922

CF01 Termination of patent right due to non-payment of annual fee