CN103538027B - Adhesive tape installation equipment - Google Patents
Adhesive tape installation equipment Download PDFInfo
- Publication number
- CN103538027B CN103538027B CN201310220318.6A CN201310220318A CN103538027B CN 103538027 B CN103538027 B CN 103538027B CN 201310220318 A CN201310220318 A CN 201310220318A CN 103538027 B CN103538027 B CN 103538027B
- Authority
- CN
- China
- Prior art keywords
- adhesive tape
- width
- installation equipment
- guide rail
- body construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/56—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor using mechanical means or mechanical connections, e.g. form-fits
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Adhesives Or Adhesive Processes (AREA)
Abstract
A kind of adhesive tape installation equipment of the present invention, at least comprise: body construction, the below of described body construction is provided with first guide rail suitable with the guide rail of package; Location structure, is located on described body construction; Force application structure, is located on described body construction; Guide structure, inclination is located at above the front end of described body construction, and the front end of described body construction is extended in the front end of described guide structure; Expansion structure, is located at the front end of described guide structure, and the width of described expansion structure is greater than the width of described first guide rail; Second guide rail, is located at the front end of described expansion structure, and the width of described second guide rail equals the width of described first guide rail.Whereby, the present invention adhesive tape can be made to install more fast, save time, laborsaving and ensure installation quality.
Description
Technical field
The present invention relates to technical field of processing equipment, particularly relate to a kind of adhesive tape installation equipment.
Background technology
Existingly on package, adhesive tape is installed, is normally installed by manual compression.The banister rod in parking lot such as, need adhesive tape is installed, crashing vehicle when falling to prevent banister rod.On normally artificial guide rail adhesive tape be arranged on below banister rod, not only installation effectiveness is low for it, and labour intensity is large, and installation quality is not high.
In summary, obviously there is inconvenience and defect in actual use in prior art, so be necessary to be improved.
Summary of the invention
For above-mentioned defect, the object of the present invention is to provide a kind of adhesive tape installation equipment, it can make adhesive tape install more fast, saves time, laborsaving and ensure installation quality.
To achieve these goals, the invention provides a kind of adhesive tape installation equipment, at least comprise:
Body construction, the below of described body construction is provided with first guide rail suitable with the guide rail of package;
Location structure, is located on described body construction;
Force application structure, is located on described body construction;
Guide structure, inclination is located at above the front end of described body construction, and the front end of described body construction is extended in the front end of described guide structure;
Expansion structure, is located at the front end of described guide structure, and the width of described expansion structure is greater than the width of described first guide rail;
Second guide rail, is located at the front end of described expansion structure, and the width of described second guide rail equals the width of described first guide rail.
According to adhesive tape installation equipment of the present invention, described body construction is roughly in tabular, and a stator is extended in the rear end of described body construction;
Described guide structure tilts to be located on the front end of described stator of described body construction, the front section of described guide structure is globoidal structure and is positioned at the top of described stator, the hindfoot portion of described guide structure is slab construction and extends the front end of described stator, the width of described globoidal structure is greater than the width of described slab construction, and the width of described globoidal structure equals the width of described first guide rail;
Described expansion structure is half globoidal structure, the front end of the described slab construction of described guide structure is located in the rear end of described half globoidal structure, and the width of the rear end of described half globoidal structure equals the width of described slab construction, the width of the front end of described half globoidal structure is greater than the width of the rear end of described half globoidal structure.
According to adhesive tape installation equipment of the present invention, described guide structure, described expansion structure and described second guide rail are formed in one.
According to adhesive tape installation equipment of the present invention, described force application structure is handle, and the front end of described body construction is located at by described handle.
According to adhesive tape installation equipment of the present invention, described force application structure is shackle, and the front end of described body construction is located at by described shackle; Described adhesive tape installation equipment also comprises motor and the stay cord for transmission, and described stay cord one end is connected with described shackle, and the other end of described stay cord is connected with described motor.Described adhesive tape installation equipment also comprises the remote controller for controlling described motor.
According to adhesive tape installation equipment of the present invention, described adhesive tape installation equipment also comprises the fixed mount for fixing described package.
According to adhesive tape installation equipment of the present invention, be connected between described fixed mount with described motor by extension slot, the length of described extension slot is greater than the length of described body construction.
According to adhesive tape installation equipment of the present invention, described location structure is locating ring, and described locating ring is located at above the front end of described body construction.
According to adhesive tape installation equipment of the present invention, described package is banister rod.
Adhesive tape installation equipment of the present invention includes body construction, location structure, force application structure, guide structure, expansion structure and the second guide rail, it adopts professional tool and utilizes adhesive tape elastic deformation properties, adhesive tape is slipped into the guide rail of banister rod by guide structure, expansion structure and the second guide rail, adhesive tape is installed more fast, saves time, laborsaving, and adhesive tape installation quality can be ensured.
Accompanying drawing explanation
Fig. 1 is the stereogram of the preferred adhesive tape installation equipment of the present invention;
Fig. 2 A is the operation principle side view (installing adhesive tape) of the preferred adhesive tape installation equipment of the present invention;
Fig. 2 B is the operation principle top view (installing adhesive tape) of the preferred adhesive tape installation equipment of the present invention;
Fig. 3 A is the operation principle side view (not installing adhesive tape) of the preferred adhesive tape installation equipment of the present invention;
Fig. 3 B is the operation principle top view (not installing adhesive tape) of the preferred adhesive tape installation equipment of the present invention;
Fig. 4 A is the cross-sectional view at lines A place in above-mentioned Fig. 2 A;
Fig. 4 B is the cross-sectional view at lines B place in above-mentioned Fig. 2 A;
Fig. 4 C is the cross-sectional view at lines C place in above-mentioned Fig. 2 A.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1 to 4, the invention provides a kind of adhesive tape installation equipment, at least comprise body construction 10, location structure 20, force application structure, guide structure 40, expansion structure 50 and the second guide rail 60, wherein:
The below of described body construction 10 is provided with first guide rail 11 suitable with the guide rail 301 of package 300, and described body construction 10 is carrying main bodys of described adhesive tape installation equipment.Described package 300 can be various equipment, material, the vehicles, building etc.Preferably, the banister rod 300 that uses for parking lot inlet/outlet of described package 300.The width of the first guide rail 11 of body construction 10 is identical with the width of the guide rail 301 of package 300, plays adhesive tape installation equipment located lateral and acts in axial sliding.
Described location structure 20 is located on body construction 10, and location structure 20 is for when adhesive tape installation equipment installs adhesive tape 200, and the front end of adhesive tape 200 is introduced location structure 20 to position adhesive tape 200, when preventing from installing, off normal occurs adhesive tape 200.Preferably, described location structure 20 is locating ring 20, and this locating ring 20 is located at above the front end of body construction 10.
Described force application structure is located on body construction 10, and when installing adhesive tape 200, described force application structure applies power for external power source, so that axially (namely along the direction of the guide rail 300 of banister rod 300) slip adhesive tape installation equipment realizes the installation of adhesive tape.
Described guide structure 40 tilts to be located at above the front end of body construction 10, and the front end of body construction 10 is extended in the front end of guide structure 40.Described guide structure 40 is preferably in tabular, and between guide structure 40 and body construction 40, preferred weld is fixed, and keeps predetermined angle of inclination between guide structure 40 and body construction 10.Described adhesive tape 200 includes adhesive tape guide rail 201, and the width of adhesive tape guide rail 201 is identical with the width of the guide rail 301 of package 300.When installing adhesive tape 200, described guide structure 40 is for first introducing adhesive tape installation equipment by the adhesive tape guide rail 201 of adhesive tape 200.
Described expansion structure 50 is located at the front end of guide structure 40, and the width of expansion structure 50 is greater than the width of the first guide rail 11.When installing adhesive tape 200, expansion structure 50 utilizes the elasticity of adhesive tape 200, and the width of expansion adhesive tape 200, so that follow-up importing second guide rail 60.
The front end of expansion structure 50 is located at by described second guide rail 60, and the width of the second guide rail 60 equals the width of the first guide rail 11.Second guide rail 60 shrinks the guide rail 301 of rear importing package 300 for adhesive tape 200.When installing adhesive tape 200, the second guide rail 60 utilizes the elasticity of adhesive tape 200, shrinks the width of adhesive tape 200, so that the final guide rail 301 importing package 300.
Preferably, described body construction 10 is roughly in tabular, and a stator 12 is extended in the rear end of body construction 10.Described guide structure 40 tilts to be located on the front end of stator 12 of body construction 10, the front section of guide structure 40 is globoidal structure 41 and is positioned at the top of stator 12, the hindfoot portion of guide structure 40 is slab construction 42 and extends the front end of stator 12, the width of globoidal structure 41 is greater than the width of slab construction 42, and the width of globoidal structure 41 equals the width of the first guide rail 11.Described expansion structure 50 is half globoidal structure, the front end of the slab construction 42 of guide structure 40 is located in the rear end of half globoidal structure 50, intersection between half globoidal structure 50 and guide structure 40 preferably seamlessly transits, and the width of the rear end of half globoidal structure 50 equals the width of slab construction 42, the width of the front end of half globoidal structure 50 is greater than the width of the rear end of half globoidal structure 50.Described expansion structure 50 is located at the front end of slab construction 42, and the width of expansion structure 50 is greater than the width of the first guide rail 11.Intersection between half globoidal structure 50 and expansion structure 50 preferably seamlessly transits.
Be more preferably, described adhesive tape installation equipment can be made up of metal or alloy material.Described guide structure 40, expansion structure 50 and the second guide rail 60 are preferably one-body molded.
Preferably, described force application structure is handle 31, and the front end of body construction 10 is located at by described handle 31.Handle 31 installs adhesive tape 200 for manual force, and the present invention states adhesive tape installation equipment can promote adhesive tape installation effectiveness about 5 times according to manual force.
Preferably, described force application structure is shackle 32, and the front end of body construction 10 is located at by described shackle 32.Adhesive tape installation equipment also comprises motor 70 and the stay cord 80 for transmission, and described stay cord 80 one end is connected with shackle 32, and the other end of stay cord 80 is connected with motor 70.The power of motor 70 for providing electric power to change, the length of stay cord 80 is relevant with the length of adhesive tape 200.Be more preferably, described adhesive tape installation equipment also comprises the remote controller for controlling motor 80, to facilitate user's operated from a distance.The present invention states adhesive tape installation equipment can promote adhesive tape installation effectiveness about 10 times according to motor force.
Preferably, described adhesive tape installation equipment also comprises the fixed mount 90 for fixing package 300, and package 300 is fixed on fixed mount 90 to be convenient to install adhesive tape 200.Be connected by extension slot 100 between fixed mount 90 with motor 70, the length of extension slot 100 is greater than the length of body construction 10, and the effect of extension slot 100 is reservation operations spaces, when adhesive tape installs, conveniently adhesive tape installation equipment is pulled out.
The operating process that adhesive tape installation equipment of the present invention installs adhesive tape 200 on banister rod 300 is described below:
1) when installing adhesive tape 200, as shown in Figure 1, Figure 2 shown in A and Fig. 2 B, first the first guide rail 11 of the body construction 10 of adhesive tape installation equipment being arranged on the guide rail 301 of banister rod 300, and adhesive tape installation equipment being placed in the rear end of the guide rail 301 of banister rod 300.
2) by the locating ring 20 of the front end of adhesive tape 200 through adhesive tape installation equipment, and the adhesive tape 200 of mating with banister rod 300 length is pulled out.
3) the adhesive tape guide rail 201 of the adhesive tape 200 being positioned at guide structure 40 place of adhesive tape installation equipment is imported guide structure 40, be namely inserted in globoidal structure 41 with adhesive tape guide rail 201, as shown in Figure 4 A.
4) by the electric force application structure of motor 70, stay cord 80 and shackle 32 composition, by rear end the moving axially (in Fig. 2 A and Fig. 2 B be from left to right move) from back to front of adhesive tape installation equipment along the guide rail 301 of banister rod 300, and adhesive tape 200 can't move axially.Due to moving axially of adhesive tape installation equipment, the adhesive tape guide rail 201 of original position in guide structure 40 place will slip into expansion structure 50 place of half globoidal structure, width due to expansion structure 50 is greater than the width of adhesive tape guide rail 201, therefore the adhesive tape guide rail 201 of adhesive tape 200 expands because of elastic deformation, as shown in Figure 4 B.
5) continue guide rail 301 the moving axially from back to front of adhesive tape installation equipment along banister rod 300, the adhesive tape guide rail 201 of original position in expansion structure 50 place will slip into the second guide rail 60 place, width due to the second guide rail 60 is less than the width of expansion structure 50, therefore adhesive tape 200 adhesive tape guide rail 201 elastic deformation and reduce, and finally slip into and be installed on the guide rail 301 of banister rod 300, as shown in Figure 4 C.
6), after adhesive tape installation equipment moves to the front end of banister rod 300 from back to front along the guide rail 301 of banister rod 300, adhesive tape 200 will be arranged on the guide rail 301 of whole banister rod 300, and so far, the adhesive tape installment work of described banister rod 300 completes.
In sum, adhesive tape installation equipment of the present invention includes body construction, location structure, force application structure, guide structure, expansion structure and the second guide rail, it adopts professional tool and utilizes adhesive tape elastic deformation properties, adhesive tape is slipped into the guide rail of banister rod by guide structure, expansion structure and the second guide rail, adhesive tape is installed more fast, saves time, laborsaving, and adhesive tape installation quality can be ensured.
Certainly; the present invention also can have other various embodiments; when not deviating from the present invention's spirit and essence thereof; those of ordinary skill in the art are when making various corresponding change and distortion according to the present invention, but these change accordingly and are out of shape the protection domain that all should belong to the claim appended by the present invention.
Claims (10)
1. an adhesive tape installation equipment, is characterized in that, at least comprises:
Body construction, the below of described body construction is provided with first guide rail suitable with the guide rail of package;
Location structure, is located on described body construction;
Force application structure, is located on described body construction;
Guide structure, inclination is located at above the front end of described body construction, and the front end of described body construction is extended in the front end of described guide structure;
Expansion structure, is located at the front end of described guide structure, and the width of described expansion structure is greater than the width of described first guide rail;
Second guide rail, is located at the front end of described expansion structure, and the width of described second guide rail equals the width of described first guide rail.
2. adhesive tape installation equipment according to claim 1, is characterized in that, described body construction is roughly in tabular, and a stator is extended in the rear end of described body construction;
Described guide structure tilts to be located on the front end of described stator of described body construction, the front section of described guide structure is globoidal structure and is positioned at the top of described stator, the hindfoot portion of described guide structure is slab construction and extends the front end of described stator, the width of described globoidal structure is greater than the width of described slab construction, and the width of described globoidal structure equals the width of described first guide rail;
Described expansion structure is half globoidal structure, the front end of the described slab construction of described guide structure is located in the rear end of described half globoidal structure, and the width of the rear end of described half globoidal structure equals the width of described slab construction, the width of the front end of described half globoidal structure is greater than the width of the rear end of described half globoidal structure.
3. adhesive tape installation equipment according to claim 2, is characterized in that, described guide structure, described expansion structure and described second guide rail are formed in one.
4. adhesive tape installation equipment according to claim 1, is characterized in that, described force application structure is handle, and the front end of described body construction is located at by described handle.
5. adhesive tape installation equipment according to claim 1, is characterized in that, described force application structure is shackle, and the front end of described body construction is located at by described shackle; Described adhesive tape installation equipment also comprises motor and the stay cord for transmission, and described stay cord one end is connected with described shackle, and the other end of described stay cord is connected with described motor.
6. adhesive tape installation equipment according to claim 5, is characterized in that, described adhesive tape installation equipment also comprises the remote controller for controlling described motor.
7. adhesive tape installation equipment according to claim 5, is characterized in that, described adhesive tape installation equipment also comprises the fixed mount for fixing described package.
8. adhesive tape installation equipment according to claim 7, is characterized in that, is connected between described fixed mount with described motor by extension slot, and the length of described extension slot is greater than the length of described body construction.
9. adhesive tape installation equipment according to claim 1, is characterized in that, described location structure is locating ring, and described locating ring is located at above the front end of described body construction.
10. the adhesive tape installation equipment according to any one of claim 1 ~ 9, is characterized in that, described package is banister rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310220318.6A CN103538027B (en) | 2013-06-05 | 2013-06-05 | Adhesive tape installation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310220318.6A CN103538027B (en) | 2013-06-05 | 2013-06-05 | Adhesive tape installation equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103538027A CN103538027A (en) | 2014-01-29 |
CN103538027B true CN103538027B (en) | 2015-11-25 |
Family
ID=49962077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310220318.6A Active CN103538027B (en) | 2013-06-05 | 2013-06-05 | Adhesive tape installation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103538027B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105150167A (en) * | 2015-09-25 | 2015-12-16 | 国网山东汶上县供电公司 | Tool special for adhesive tape sealing |
CN105459009A (en) * | 2015-11-30 | 2016-04-06 | 石家庄飞机工业有限责任公司 | Rapid assembling tool for embedded sealing rubber strip |
CN113927280B (en) * | 2021-11-09 | 2023-04-07 | 泰德阳光(浙江)建筑科技集团有限公司 | Building element automatic installation adhesive tape equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4172313A (en) * | 1977-02-24 | 1979-10-30 | Yoshida Kogyo K.K. | Gasket installing device |
CN2170234Y (en) * | 1993-05-17 | 1994-06-29 | 铁道部长春客车工厂 | Claw type adhesive strip mounting device |
CN202248936U (en) * | 2011-08-31 | 2012-05-30 | 沈阳远大铝业工程有限公司 | Rolling type section cavity adhesive tape installer |
CN202428395U (en) * | 2012-01-11 | 2012-09-12 | 樊志斌 | Tool for installing rubber strips of door/window |
-
2013
- 2013-06-05 CN CN201310220318.6A patent/CN103538027B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4172313A (en) * | 1977-02-24 | 1979-10-30 | Yoshida Kogyo K.K. | Gasket installing device |
CN2170234Y (en) * | 1993-05-17 | 1994-06-29 | 铁道部长春客车工厂 | Claw type adhesive strip mounting device |
CN202248936U (en) * | 2011-08-31 | 2012-05-30 | 沈阳远大铝业工程有限公司 | Rolling type section cavity adhesive tape installer |
CN202428395U (en) * | 2012-01-11 | 2012-09-12 | 樊志斌 | Tool for installing rubber strips of door/window |
Also Published As
Publication number | Publication date |
---|---|
CN103538027A (en) | 2014-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103538027B (en) | Adhesive tape installation equipment | |
GB2525338A (en) | Range extender control | |
MX2012005227A (en) | Vehicle frame assembly, system and method. | |
CN204387494U (en) | A kind of closed two-tube card structure | |
CN104993547A (en) | Electric vehicle charging device for mechanical spatial car parking garage | |
CN204696601U (en) | A kind of wire harness passing-hole sheath and there is the vehicle of this wire harness passing-hole sheath | |
CN205065925U (en) | Air -conditioning indoor unit | |
CN201824886U (en) | Auxiliary fascia used on automobile | |
IN2014DE01728A (en) | ||
CN106129917A (en) | A kind of bilateral bayonet socket wire casing | |
CN204186800U (en) | A kind of guide rail mechanism slide block assembly | |
CN203875838U (en) | Three-opening sealing strip rapid mounting tool | |
CN203020013U (en) | Automobile air conditioner wire drawing fixing structure | |
CN203827112U (en) | A novel tubular motor which is flexible and stable in braking | |
CN106183744A (en) | Panoramic sunroof of automobile front beam | |
CN103042896B (en) | Vehicle air conditioner wiredrawing fixed structure | |
CN204402497U (en) | Be suitable for the driving chassis forward beam of different length drill steel | |
CN204794256U (en) | A electric automobile charging device for mechanical type stereo garage | |
CN209700660U (en) | A kind of air-conditioning installation frame connecting structure of EMU | |
CN203871819U (en) | Wire winding apparatus | |
CN203902553U (en) | Fastening device for vehicle interior panel | |
CN206727785U (en) | Copper sheathing fixed structure | |
CN103100992B (en) | Auxiliary device for air conditioning panel assembly | |
CN204580675U (en) | Curtain head and the general metal installation base of roller shutter tail | |
CN204183229U (en) | Wheeled guiding mechanism and install its frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |