CN103526718A - River flow-separating purification beautification treatment system and method - Google Patents

River flow-separating purification beautification treatment system and method Download PDF

Info

Publication number
CN103526718A
CN103526718A CN201310322102.0A CN201310322102A CN103526718A CN 103526718 A CN103526718 A CN 103526718A CN 201310322102 A CN201310322102 A CN 201310322102A CN 103526718 A CN103526718 A CN 103526718A
Authority
CN
China
Prior art keywords
river
cover plate
shunting
water
beautifies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310322102.0A
Other languages
Chinese (zh)
Other versions
CN103526718B (en
Inventor
王继远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310322102.0A priority Critical patent/CN103526718B/en
Publication of CN103526718A publication Critical patent/CN103526718A/en
Application granted granted Critical
Publication of CN103526718B publication Critical patent/CN103526718B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a river flow-separating purification beautification treatment system and method. A damming system comprises a hydraulic turnover plate gate which is arranged at the bottom of a riverbed, and a water retaining breast wall which is used in cooperation with the hydraulic turnover plate gate, wherein a flow drainage channel is formed between the hydraulic turnover plate gate and the water retaining breast wall, and the hydraulic turnover plate gate automatically adjusts the degree of opening of the flow drainage channel along with changes of the river discharge to have control over the discharged flow, and keeps the water level of the damming system stable. A flow separating system is arranged on the lower section of the damming system, a reinforced concrete cover plate is arranged on the tops of quay walls of a river channel, the cover plate covers the whole river channel, river water on the upper layer of the damming system flows through the cover plate, river water on the lower layer of the damming system is separated to flow through the river channel formed below the cover plate, sewage tanks are built on the lower portion, close to the quay walls on the two banks, of the river channel arranged below the cover plate, and urban sewage, flowing into the river channel, on the two banks can be guided to the downstream portion, and can flow into a sewage treatment system. According to the river flow-separating purification beautification treatment system and method, land can be saved, the visual field can be beautified, construction cost can be reduced, and management is convenient.

Description

River shunting purifies and beautifies governing system and method
Technical field
The present invention relates to river purification and beautify field, relate in particular to and a kind ofly can save soil, beautify the visual field, reduce cost, the river shunting of convenient management purifies and beautify governing system and method.
Background technology
Along with population increases sharply and the raising day by day of living standards of the people, sanitary sewage generation increases substantially.
Mountain stream City Section is many has at present destroyed river natural form, not only has lost the beautification function of river to city because building the narrow current of quaywall bundle by laying bricks or stones by canalization, and also the intrusion because of sewage dirt becomes the sewage ditch of sheltering evil people and countenance evil practices.For beautifying river City Section, often to build sluice or rubber dam and stop up high water surface formation water scenery (hereinafter to be referred as " lock-and-dam method ").As mountain stream, longitudinal grade is very large, and between 0.1~1.0%, every km drop reaches 1~10m.As every km drop 5m, in the long river section of 3km, to build terracing on the lock of 5 height of swell 3m or ,Xiang river course, dam.Not only the landscape effect that expense height also can not form.Meanwhile, because choking water the degree of depth from shallow to deeply, shallow section of people can not hydrophilic (quaywall be excessive to the water surface discrepancy in elevation), and dark section is hydrophilic dangerous, and the relation of people and water is intimately inharmonious.
Prior art purifies in the method for beautifying to river, lock-and-dam method could form making the scape water surface and also needs to build in addition sewer pipe net except flooding tract, the engineering of sewer pipe net is huge, it is many to take up an area, investment greatly, and lock-and-dam method also exists landscape effect bad, form the relation intimate inharmonious problem of making scape water body and people.
Therefore need badly and a kind ofly can save soil, beautify the visual field, reduce cost, the river shunting of convenient management purifies and beautifies governing system and method.
Summary of the invention
First object of the present invention is to provide a kind ofly can save soil, beautify the visual field, reduce cost, the river shunting of convenient management purifies and beautifies governing system.
Second object of the present invention is to provide a kind ofly can save soil, beautify the visual field, reduce cost, the river shunting of convenient management purifies and beautifies improvement method.
In order to realize above-mentioned first object, technical scheme provided by the invention is: provide the shunting of a kind of river to purify and beautify governing system, comprising:
Choke water system, the system of choking water is included in the hydraulic flap gate of bottom, riverbed setting and the dash breastwork being used in conjunction with it, both form current by pass jointly, hydraulic flap gate is along with the variation of streamflow amount, automatically regulate the aperture of current by pass to control letdown flow, keep choking water systematic water level stable;
Separate system, be arranged on the hypomere of the system of choking water, the cover plate of steel concrete is set at the quaywall top in river course, with in quaywall bottom, river course, build sump, cover plate covers whole river course, choke water system upper strata river flows above cover plate, without the river of the system of the choking water lower floor of flowing above cover plate, branch to the channel flow below cover plate, sump is built in bottom at the quaywall of two sides, river course, the municipal sewage that sump flows to river course by two sides stops and the downstream of leading flows into sewage disposal system, allow the municipal sewage being stopped by sump flow to downstream sewage disposal system through sump.
River shunting purifies and beautifies governing system and also comprise and be arranged on the trash block system of choking water system upstream, trash block system comprises the garbage barrier net that is arranged on river course and for the fixing anchoring pier of garbage barrier net, the structure of blocking dirty anchoring pier comprises steel framework, main wheel, accessory whorl, steel strand.
River shunting purification beautifies governing system and also comprises tonifying Qi vibration-proof structure, cover plate comprises steel concrete crossbeam and is carried on the armored concrete slab on steel concrete crossbeam, on limit, river course, between armored concrete slab and the quaywall in river course, be also reserved with tonifying Qi hole, tonifying Qi hole and extraneous connected entrance are inserted with reinforcing bar, and connected entrance is on water level.
River shunting purification beautifies governing system and also comprises streams usual friendship system, and streams usual friendship system comprises tube connector, and tube connector one end is arranged in quaywall soil layer below through quaywall, and the other end is communicated with the river on cover plate through cover plate.
When there is larger sand content in river a flood period, river shunting purifies and beautifies governing system and also comprise anti-silting system, and anti-silting system is included in the bend place in river course, the some longitudinal guide wall arranging according to the shape of bend.
River course below cover plate, has also built sump near quaywall, and the municipal sewage that sump flows to river course by two sides stops, and the downstream of leading, and flows into sewage disposal system.
In order to realize above-mentioned second object, technical scheme provided by the invention is: provide the shunting of a kind of river to purify and beautify improvement method, it comprises the steps:
District is choked water in making, the step that district is choked water in making comprises: the dash breastwork that hydraulic flap gate is set and is used in conjunction with it in bottom, riverbed, both form current by pass jointly, hydraulic flap gate is along with the variation of river discharge, automatically regulate the aperture of current by pass to control letdown flow, keep choking water systematic water level stable;
Make shunting zone, the step of making shunting zone comprises: the cover plate of laying steel concrete at the quaywall top in river course, with in quaywall bottom, river course, build sump, and allow cover plate cover whole river course, allow and choke water upper strata, district river and flow above cover plate, and allow and branch to the channel flow below cover plate without the river of choking water district lower floor flowing above cover plate, allow the municipal sewage being stopped by sump flow to downstream sewage disposal system through sump.
Choke water the river course in district and do antiseepage processing, at quaywall, set up 0.12~0.15 meter of thick steel concrete impervious barrier outward, in the lower berth, riverbed of choking water district, establish the steel concrete antiseepage topping that anti-seepage geotextile and 0.10-0.15 rice are thick.
Compared with prior art, the present invention purifies and beautifies in the method in river, purifies and beautifies the municipal downcomer network that corresponding location needn't be separately built in river course, can greatly save soil, reduce cost, simultaneously also facilitated management, and all pipelines all can concealed installation, purifies and beautifies the visual field along the river.The present invention only builds one and chokes water district, and after hydraulic flap gate, the quaywall top of section arranges reinforced concrete cover plate, and on the cover board scape is made in streams, and allows the channel flow below cover plate without river mobile above cover plate.Can save greatly soil, reduce cost.And streams makes scape and can form the multiple flow shapes such as current water, impounded body, waterfall, shoal, streams, drop, and be combined with greening vegetation, form abundant man-made tourist site.The depth of water, flow velocity all can be controlled, and people can hydrophilicly play with water, harmony between man and nature symbiosis.
By following description also by reference to the accompanying drawings, it is more clear that the present invention will become, and these accompanying drawings are used for explaining embodiments of the invention.
Accompanying drawing explanation
Fig. 1 beautifies the system in river and river course is carried out to the schematic diagram in improved river course for purifying by shunting of the present invention.
Fig. 2 is the drawing in side sectional elevation that shunting of the present invention purifies the river course of the system of beautifying river.
Fig. 3 is the structural representation of garbage barrier net of the present invention.
Fig. 4 is the structural representation of the anchoring pier of garbage barrier net as shown in Figure 3.
Fig. 5 is that river course arranges the structural representation of guide wall in corner.
Fig. 6 is the schematic diagram of tonifying Qi vibration-proof structure of the present invention.
Fig. 7 is the structural representation of streams of the present invention usual friendship system.
The specific embodiment
With reference now to accompanying drawing, describe embodiments of the invention, in accompanying drawing, similarly element numbers represents similar element.As shown in Fig. 1~7, river provided by the invention shunting purifies and beautifies improvement method, and it comprises the steps:
In river, need to shunt the two sides of improvement section and originally build quaywall 2;
District 10 is choked water in making, the step that district 10 is choked water in making comprises: the dash breastwork 24a that hydraulic flap gate 20 is set and is used in conjunction with hydraulic flap gate 20 in bottom, riverbed, and allow and form current by pass 25 between hydraulic flap gate 20 and dash breastwork 24a, hydraulic flap gate 20 is along with the variation of river course 1 discharge, automatically regulating hydraulic flap gate 20 apertures is that the size of controlled discharge passage 25 is to control letdown flow, keep choking water district's 10 stable levels, and upper strata current are introduced to shunting zone 30, in hydraulic flap gate 20 as shown in Figure 1, comprise gate pier 21, gate 22, service bridge 24, between gate pier 21 and gate 22, by articulated part 23, connect, and be provided with hydraulic system (not showing on figure).Present Domestic has many hydraulic flap gate factories, in concrete design process, can select by catalogue gate 22, gate pier 21, the hydraulic system of different size.In one embodiment, gate 22 is stopped up river high 2.5~3.5 meters, and can carry out discharge along with river course 1, automatically regulating gate 22 apertures and letdown flow, keep the stable level before hydraulic flap gate 20, meet streams, two sides entrance and will choke water 10 current introducing shunting zones 30, upper strata, district.
At the hypomere of choking water district 10, make shunting zone 30, the step of making shunting zone 30 comprises: the cover plate 40 of laying steel concrete at quaywall 2 tops of choking water the hypomere in district 10, formation covers the cover plate 40 in whole river course 1, allow the upper strata river of choking water district 10 flow above cover plate 40, and allow the river course below cover plate 40 1 without river mobile above cover plate 40 flow.
Correspondingly, the invention discloses the shunting purification of a kind of river and beautify governing system 100, it comprises:
Choke water system, the system of choking water is included in the hydraulic flap gate 20 of bottom, riverbed setting and the dash breastwork 24a being used in conjunction with hydraulic flap gate 20, between hydraulic flap gate 20 and dash breastwork 24a, form current by pass 25, hydraulic flap gate 20 is along with the variation of river course 1 discharge, automatically regulate the aperture of current by pass 25 to control letdown flow, keep choking water systematic water level stable;
Separate system, be arranged on the hypomere of the system of choking water, in river course, 1 quaywall 2 tops arrange the cover plate 40 of steel concrete, with in river course quaywall 2 bottoms, build sump 2a, cover plate 40 covers whole river course 1, choke water system upper strata river and flow above cover plate 40, the river of the system of the choking water lower floor of flowing above without cover plate 40 branches to cover plate 40 river course 1 below and flows, and allows the municipal sewage being stopped by sump 2a flow to downstream sewage disposal system through sump 2a.
Shunting purifies the method beautify river and is also included in to choke water between 10He shunting zone, district 30 and makes absorption basin 50, and its length is 5~12 meters.The 10He shunting zone, Bi Yong pool, riverbed 30 in absorption basin 50 regions riverbed all low.
Choke water the river course in district and do antiseepage processing, outside quaywall 2, set up 0.12~0.15 meter of thick steel concrete impervious barrier, in the lower berth, riverbed of choking water district 10, establish the steel concrete antiseepage topping that anti-seepage geotextile and 0.10-0.15 rice are thick.
As shown in Figure 6, river shunting purification beautifies governing system 100 and also comprises tonifying Qi vibration-proof structure, cover plate 40 comprises steel concrete crossbeam 41 and is carried on the armored concrete slab 42 on steel concrete crossbeam 41, on 1 limit, river course, between armored concrete slab 42 and the quaywall 2 in river course 1, be also reserved with tonifying Qi hole 43, tonifying Qi hole 43 is inserted with reinforcing bar 44 with extraneous connected entrance, and connected entrance is on water level.
As shown in Figure 7, river shunting purification beautifies governing system 100 and also comprises streams usual friendship system, streams usual friendship system comprises tube connector 45, and tube connector 45 one end are arranged on quaywall 2 soil place below through quaywall 2, and the other end is communicated with the river on cover plate 40 through cover plate 40.
As shown in Figure 5, river shunting purification beautifies governing system 100 and also comprises anti-silting system, and anti-silting system is included in bend 80 places in river course, the longitudinal guide wall 81 arranging according to the shape of bend 80.
As shown in Figure 2, sump 2a is also being built near quaywall 2 in cover plate 40 river course 1 below, and the municipal sewage that sump 2a flows to river course 1 by two sides stops, and municipal sewage imports sump 2a by conduit 2b by sewage, and allow municipal sewage pass through sump 2a guiding downstream, flow into sewage disposal system.
As shown in Figures 3 and 4, river shunting purifies and beautifies governing system 100 and also comprise and be arranged on the trash block system of choking water system upstream, trash block system comprises the garbage barrier net 60 that is arranged on river course and for the fixing anchoring pier 70 of garbage barrier net 60, the structure of anchoring pier 70 comprises steel framework 71, main wheel 72, accessory whorl 73, steel strand 74.
In conjunction with Fig. 1~7, the present invention purifies and beautifies in the method in river, purify and beautify the municipal downcomer network that corresponding location needn't be separately built in river course 1, can greatly save soil, reduce cost, also facilitated management simultaneously, and all pipelines all can concealed installation along the river, purification beautifies the visual field, the present invention only builds one and chokes water district 10, the cover plate 40 of steel concrete is set at quaywall 2 tops of hydraulic flap gate 20 rear sections, on cover plate 40, scape is made in streams, and allows the river course below cover plate 40 1 without river mobile above cover plate 40 flow.Can save greatly soil, reduce cost.And streams is made scape and can be formed the multiple flow shapes such as current water, impounded body, waterfall, shoal, streams, drop, and be combined with greening vegetation, forming abundant man-made tourist site, the depth of water, flow velocity all can be controlled, people can hydrophilicly play with water, harmony between man and nature symbiosis.
Disclosed above is only the preferred embodiments of the present invention, certainly can not limit with this interest field of the present invention, and the equivalent variations of therefore doing according to the present patent application the scope of the claims, still belongs to the scope that the present invention is contained.

Claims (9)

1. river shunting purifies and beautifies a governing system, for the river of City Section is purified and beautified, it is characterized in that, comprising:
Choke water system, the system of choking water is included in the hydraulic flap gate of bottom, riverbed setting and the dash breastwork being used in conjunction with hydraulic flap gate, between hydraulic flap gate and dash breastwork, form current by pass, hydraulic flap gate is along with the variation of river discharge, automatically regulate the aperture of current by pass to control letdown flow, keep choking water systematic water level stable;
Separate system, be arranged on the hypomere of the system of choking water, the cover plate of steel concrete is set at the quaywall top in river course, cover plate covers whole river course, the system of choking water is stopped up high upper strata river and is flowed above cover plate, the river of lower floor branches to the channel flow below cover plate, in the bottom of the quaywall of two sides, river course, builds sump, and the municipal sewage that sump flows to river course by two sides stops and the downstream of leading flows into sewage disposal system.
2. river as claimed in claim 1 shunting purifies and beautifies governing system, it is characterized in that, river shunting purifies and beautifies governing system and also comprise and be arranged on the trash block system of choking water system upstream, trash block system comprises the garbage barrier net that is arranged on river course and for the fixing anchoring pier of garbage barrier net, the structure of anchoring pier comprises reinforced concrete knoll, steel framework, main wheel, accessory whorl, steel strand.
3. river as claimed in claim 1 shunting purifies and beautifies governing system, it is characterized in that, river shunting purification beautifies governing system and also comprises tonifying Qi vibration-proof structure, cover plate comprises steel concrete crossbeam and is carried on the armored concrete slab on steel concrete crossbeam, on limit, river course, between armored concrete slab and the quaywall in river course, be also reserved with tonifying Qi hole, tonifying Qi hole and extraneous connected entrance are inserted with reinforcing bar, and connected entrance is on water level.
4. river as claimed in claim 1 shunting purifies and beautifies governing system, it is characterized in that, river shunting purification beautifies governing system and also comprises streams usual friendship system, streams usual friendship system comprises tube connector, tube connector one end is arranged on quaywall soil layer place below through quaywall, and the other end is communicated with the river on cover plate through cover plate.
5. river as claimed in claim 1 shunting purifies and beautifies governing system, it is characterized in that, river shunting purification beautifies governing system and also comprises anti-silting system, and anti-silting system is included in the bend place in river course, the some longitudinal guide wall arranging according to the shape of bend.
6. river as claimed in claim 1 shunting purifies and beautifies governing system, it is characterized in that, near quaywall, built sump, the municipal sewage that sump flows to river course by two sides stops, and allows municipal sewage by the sump downstream of leading, and flows into sewage disposal system.
7. river shunting purifies and beautifies an improvement method, it is characterized in that, comprises the steps:
District is choked water in making, the step that district is choked water in making comprises: the dash breastwork that hydraulic flap gate is set and is used in conjunction with hydraulic flap gate in bottom, riverbed, and allow and form current by pass between hydraulic flap gate and dash breastwork, hydraulic flap gate is along with the variation of river discharge, automatically regulate the aperture of current by pass to control letdown flow, keep choking water systematic water level stable;
Make shunting zone, the step of making shunting zone comprises: the cover plate of laying steel concrete at the quaywall top in river course, with in quaywall bottom, river course, build sump, and allow cover plate cover whole river course, allow and choke water upper strata, district river and flow above cover plate, and allow and branch to the channel flow below cover plate without the river of choking water district lower floor flowing above cover plate, allow the municipal sewage being stopped by sump flow to downstream sewage disposal system through sump.
8. river as claimed in claim 7 shunting purifies and beautifies improvement method, it is characterized in that, river shunting purifies and beautifies improvement method and be also included in to choke water between He Zao scenic spot, district absorption basin is set, and the length of described absorption basin is 5~12 meters.
9. river as claimed in claim 7 shunting purifies and beautifies improvement method; it is characterized in that; choke water the river course in district and do antiseepage processing; at quaywall, set up 0.12~0.15 meter of thick steel concrete impervious barrier outward, in the lower berth, riverbed of choking water district, establish anti-seepage geotextile and 0.10~0.15 meter of thick reinforced concrete protective layer.
CN201310322102.0A 2013-07-19 2013-07-19 River shunting purification beautifies governing system and method Expired - Fee Related CN103526718B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310322102.0A CN103526718B (en) 2013-07-19 2013-07-19 River shunting purification beautifies governing system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310322102.0A CN103526718B (en) 2013-07-19 2013-07-19 River shunting purification beautifies governing system and method

Publications (2)

Publication Number Publication Date
CN103526718A true CN103526718A (en) 2014-01-22
CN103526718B CN103526718B (en) 2016-02-17

Family

ID=49929038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310322102.0A Expired - Fee Related CN103526718B (en) 2013-07-19 2013-07-19 River shunting purification beautifies governing system and method

Country Status (1)

Country Link
CN (1) CN103526718B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104298261A (en) * 2014-08-22 2015-01-21 深圳朴方环保发展有限公司 Stepped water system and city and town belt close system
CN106315987A (en) * 2016-09-30 2017-01-11 中水珠江规划勘测设计有限公司 Multistage-strengthened water-self-purification and water-power-regulation-and-control water purification process and system
CN106836115A (en) * 2017-02-24 2017-06-13 水利部交通运输部国家能源局南京水利科学研究院 One kind broken end creek separate system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128028A (en) * 1994-10-28 1996-05-21 Pub Works Res Inst Ministry Of Constr Selective inflow device
CN2913451Y (en) * 2005-11-17 2007-06-20 严纪常 Liftable multiple-layer dashing frusta barrel and frusta box apparatus
CN201485831U (en) * 2009-08-21 2010-05-26 李玉萍 Door leaf type hydraulic gate
CN202023172U (en) * 2011-03-04 2011-11-02 深圳市立雅水务发展有限公司 Integrated treatment system for improving river channel
CN202509469U (en) * 2012-04-06 2012-10-31 朱占勇 Supination full-open type flap gate
CN203361088U (en) * 2013-07-19 2013-12-25 王继远 River diversion purification and beautification system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128028A (en) * 1994-10-28 1996-05-21 Pub Works Res Inst Ministry Of Constr Selective inflow device
CN2913451Y (en) * 2005-11-17 2007-06-20 严纪常 Liftable multiple-layer dashing frusta barrel and frusta box apparatus
CN201485831U (en) * 2009-08-21 2010-05-26 李玉萍 Door leaf type hydraulic gate
CN202023172U (en) * 2011-03-04 2011-11-02 深圳市立雅水务发展有限公司 Integrated treatment system for improving river channel
CN202509469U (en) * 2012-04-06 2012-10-31 朱占勇 Supination full-open type flap gate
CN203361088U (en) * 2013-07-19 2013-12-25 王继远 River diversion purification and beautification system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104298261A (en) * 2014-08-22 2015-01-21 深圳朴方环保发展有限公司 Stepped water system and city and town belt close system
CN104298261B (en) * 2014-08-22 2017-05-24 深圳朴方环保发展有限公司 Stepped water system and city and town belt close system
CN106315987A (en) * 2016-09-30 2017-01-11 中水珠江规划勘测设计有限公司 Multistage-strengthened water-self-purification and water-power-regulation-and-control water purification process and system
CN106315987B (en) * 2016-09-30 2023-11-21 中水珠江规划勘测设计有限公司 Multistage reinforced water self-cleaning and hydraulic regulation water quality purification treatment process and system
CN106836115A (en) * 2017-02-24 2017-06-13 水利部交通运输部国家能源局南京水利科学研究院 One kind broken end creek separate system
CN106836115B (en) * 2017-02-24 2023-06-30 水利部交通运输部国家能源局南京水利科学研究院 Broken-end creek shunt system

Also Published As

Publication number Publication date
CN103526718B (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN202031005U (en) Ecological drainage channel
CN100537911C (en) Environment-friendly type roads rain inlet
CN203361088U (en) River diversion purification and beautification system
CN103266724B (en) Drainage structure of planted roof
CN103132485A (en) External water interception and purification type urban river multi-element ecological embankment physical structural system
CN104032793B (en) The anti-rain-impact system of garden type for residential quarter road
CN207567889U (en) Residential quarters Rainwater collection system
CN211285921U (en) Sponge is rainwater regulation system for city construction
JP2008156974A (en) Rainwater treating structure and rainwater treating method
CN104563060A (en) Embankment integrating functions of river closure, regulation and storage flood drainage as well as method for improving water environment
CN105621617A (en) Comprehensive purifying device for road runoff
CN113818534A (en) Biological retention facility for sponge urban road
CN103526718B (en) River shunting purification beautifies governing system and method
CN103061327A (en) Comprehensive water control technique for dump
CN103184761A (en) Vertical rainwater zoning drainage system
CN106320494B (en) The construction method of sponge engineering system based on existing urban road and drainage condition
CN207776053U (en) It is a kind of for sponge urban construction without catch-basin drainage system
CN106088295A (en) Existing utility is transformed into the method and system that rainwater is controlled utilize
CN203174745U (en) Vertical rainwater zoned drainage system
CN108571013A (en) A kind of underground pipe gallery structure that band rain sewage becomes a mandarin
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN215630124U (en) Urban rainwater pipe gallery
CN206752629U (en) A kind of municipal works rainwater inspection well
CN109836017A (en) A kind of residential area rainwater-collecting and the system of utilizing
CN212477985U (en) Rainwater outlet infiltration system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20180719