CN103514520A - Production plan arrangement system - Google Patents
Production plan arrangement system Download PDFInfo
- Publication number
- CN103514520A CN103514520A CN201310480030.2A CN201310480030A CN103514520A CN 103514520 A CN103514520 A CN 103514520A CN 201310480030 A CN201310480030 A CN 201310480030A CN 103514520 A CN103514520 A CN 103514520A
- Authority
- CN
- China
- Prior art keywords
- module
- cycle
- product information
- production schedule
- production plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a production plan arrangement system which comprises a password setting login module, an order arrangement module, a product information input module, a process design module and a processing cycle arrangement module. The password setting login module is connected with the order arrangement module. The order arrangement module is connected with the product information input module. The product information input module is connected with the process design module. The process design module is connected with the processing cycle arrangement module. According to the production plan arrangement system provided by the invention, a variety of processes and staffing are modularized; production plan making is convenient; the work efficiency is greatly improved; the operation is simple; and the error probability is reduced.
Description
Technical field
The present invention relates to production schedule Software for Design field, particularly relate to a kind of production schedule arranging system.
Background technology
Well-regulated production environment be unable to do without rational production schedule arrangement, particularly Workshop Production task approach saturated in, only have thorough, reasonable that the production schedule makes, situation about just can again and again not cause confusion, incuring loss through delay.Present market competition is fiercer, and friendship phase and quality are determining to play a part no less important aspect enterprise competitiveness.
The content of the production schedule comprises the factor of productions such as personnel, material, equipment, operation, and there is the planner who specializes in production schedule work in general enterprise.Planner need to be familiar to the situation of enterprise's various aspects, but use still burdensome of work that hand-written or computer file makes the production schedule, and the content that lacks system supports the making of the production schedule, length consuming time, and easily make mistakes.
Summary of the invention
The technical matters that the present invention mainly solves is to provide a kind of production schedule arranging system, and modular construction is easy to the making of the production schedule, simple and fast.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of production schedule arranging system is provided, comprise: password setting logs in arrange module, product information load module, operation design module and process-cycle of module, order and arranges module, described password setting logs in module and the order module of arranging and is connected, the described order module of arranging is connected with product information load module, described product information load module is connected with operation design module, and described operation design module arranges module to be connected with the process-cycle.
In a preferred embodiment of the present invention, described operation design module comprises concrete operation content module and process unit's module.
In a preferred embodiment of the present invention, the described process-cycle arranges module to comprise overall process-cycle module and operation break-down process-cycle module.
The invention has the beneficial effects as follows: the production schedule arranging system that the present invention points out, can be various operations and staffing modularization, convenient and swift when making the production schedule, work efficiency improves greatly, and simple to operate, reduces the probability of makeing mistakes.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, do not paying under the prerequisite of creative work, can also according to these accompanying drawings, obtain other accompanying drawing, wherein:
Fig. 1 is the structural representation of production schedule arranging system one preferred embodiment of the present invention.
Embodiment
Below the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only a part of embodiment of the present invention, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills, not making all other embodiment that obtain under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 1, the embodiment of the present invention comprises:
A kind of production schedule arranging system, comprise: password setting logs in arrange module, product information load module, operation design module and process-cycle of module, order and arranges module, described password setting logs in module and the order module of arranging and is connected, the described order module of arranging is connected with product information load module, described product information load module is connected with operation design module, and described operation design module arranges module to be connected with the process-cycle.
Production schedule arranging system of the present invention has imported ripe operation content, described operation design module comprises concrete operation content module and process unit's module, if very F.F. edlin the preservation of operation content that product needed is new, practicality is good, and in process unit's module, comprise and the selection of personnel and equipment, make plan convenient and swift.
Further, the described process-cycle arranges module to comprise overall process-cycle module and operation break-down process-cycle module.Overall process-cycle module facilitates the control of administration and supervision authorities to overall work amount and progress, and operation break-down process-cycle module can allow basic staff clear to the work of oneself, thus reasonable arrangement daily schedule and job schedule.
In sum, a kind of production schedule arranging system that the present invention points out, carries out modular design to operation, personnel and equipment, facilitated the making of the production schedule, improve planner's work efficiency, reduce error rate, realize the further standard to Workshop Production rhythm.
The foregoing is only embodiments of the invention; not thereby limit the scope of the claims of the present invention; every equivalent structure or conversion of equivalent flow process that utilizes description of the present invention to do; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.
Claims (3)
1. a production schedule arranging system, it is characterized in that, comprise: password setting logs in arrange module, product information load module, operation design module and process-cycle of module, order and arranges module, described password setting logs in module and the order module of arranging and is connected, the described order module of arranging is connected with product information load module, described product information load module is connected with operation design module, and described operation design module arranges module to be connected with the process-cycle.
2. production schedule arranging system according to claim 1, is characterized in that, described operation design module comprises concrete operation content module and process unit's module.
3. production schedule arranging system according to claim 1, is characterized in that, the described process-cycle arranges module to comprise overall process-cycle module and operation break-down process-cycle module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310480030.2A CN103514520A (en) | 2013-10-15 | 2013-10-15 | Production plan arrangement system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310480030.2A CN103514520A (en) | 2013-10-15 | 2013-10-15 | Production plan arrangement system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103514520A true CN103514520A (en) | 2014-01-15 |
Family
ID=49897207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310480030.2A Pending CN103514520A (en) | 2013-10-15 | 2013-10-15 | Production plan arrangement system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103514520A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106779308A (en) * | 2016-11-23 | 2017-05-31 | 智能云科信息科技有限公司 | A kind of System and method for of the shop Planning scheduling towards discrete manufacture |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556486A (en) * | 2003-12-31 | 2004-12-22 | 冶金自动化研究设计院 | Integrated iron and steel enterprise production process on line planning and controlling system and method |
US20060106477A1 (en) * | 2002-07-09 | 2006-05-18 | Kazuo Miyashita | Production plan creation system, method, and program |
US20060212323A1 (en) * | 2005-03-15 | 2006-09-21 | Yoshio Ninomiya | Production management system |
CN101271543A (en) * | 2008-04-23 | 2008-09-24 | 永凯软件技术(上海)有限公司 | Production scheduling system and method using genetic algorithm based on elite solution pool |
CN101859405A (en) * | 2010-04-02 | 2010-10-13 | 浪潮集团山东通用软件有限公司 | Method for synchronizing data between BOMs by utilizing implicit BOM model |
-
2013
- 2013-10-15 CN CN201310480030.2A patent/CN103514520A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060106477A1 (en) * | 2002-07-09 | 2006-05-18 | Kazuo Miyashita | Production plan creation system, method, and program |
CN1556486A (en) * | 2003-12-31 | 2004-12-22 | 冶金自动化研究设计院 | Integrated iron and steel enterprise production process on line planning and controlling system and method |
US20060212323A1 (en) * | 2005-03-15 | 2006-09-21 | Yoshio Ninomiya | Production management system |
CN101271543A (en) * | 2008-04-23 | 2008-09-24 | 永凯软件技术(上海)有限公司 | Production scheduling system and method using genetic algorithm based on elite solution pool |
CN101859405A (en) * | 2010-04-02 | 2010-10-13 | 浪潮集团山东通用软件有限公司 | Method for synchronizing data between BOMs by utilizing implicit BOM model |
Non-Patent Citations (1)
Title |
---|
王新: "基于WEB构件的模具生产计划管理系统的研究", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106779308A (en) * | 2016-11-23 | 2017-05-31 | 智能云科信息科技有限公司 | A kind of System and method for of the shop Planning scheduling towards discrete manufacture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106294389A (en) | A kind of method and system realizing customizing form | |
CN105184462A (en) | Patent flow management system | |
CN103514520A (en) | Production plan arrangement system | |
CN203992111U (en) | A kind of lathe automatic material connection device | |
Hoffmann et al. | Analyzing the efficiency of a start-up cable yarding crew in Southern China under new forest management perspectives | |
CN105242928A (en) | Rapid development platform method based on module plant | |
CN204010029U (en) | Procedure for producing technique fool proof management system | |
CN204224854U (en) | Gantry structure frame for computerized embroidery machine | |
CN105195945A (en) | Tower ladder manufacturing device | |
CN205236688U (en) | Deformed steel bending apparatus | |
CN204279541U (en) | The go-cart of folder can be put | |
CN204242197U (en) | For the assembling gate-type barcode scanning frame of ERP inventory management system | |
CN204239646U (en) | The device that driven member can rest for a long time at limit position | |
CN204001215U (en) | A kind of wooden reinforced company extension bar | |
CN105095995A (en) | Precision compensation system for large-scale ship and maritime work construction | |
CN206805999U (en) | A kind of Chinese zither | |
CN203137506U (en) | Novel economic class file clamping frame | |
Campbell et al. | Work-based peer review of clinical supervision practice: A guide to creating a culture of quality supervision | |
CN204640373U (en) | A kind of erasing rubber cutting machine possessing protection mechanism | |
Marouni | Practical Engineering, Process, and Reliability Statistics | |
Fedoseeva et al. | Case-oriented information technology for quality and safety assesment software for technological prosess of drugs production in the pharmaseutical enterprise | |
CN204414847U (en) | A kind of comb structure with hidden function | |
CN204525645U (en) | PVC connecting plate blanking turnover tool | |
CN202874323U (en) | Simple operation desk | |
Xu et al. | Research on the IFC Based Data Flow of OA System for Construction Projects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140115 |