CN103514512B - 电力系统在线孤岛并网快速辅助决策方法 - Google Patents
电力系统在线孤岛并网快速辅助决策方法 Download PDFInfo
- Publication number
- CN103514512B CN103514512B CN201310414073.0A CN201310414073A CN103514512B CN 103514512 B CN103514512 B CN 103514512B CN 201310414073 A CN201310414073 A CN 201310414073A CN 103514512 B CN103514512 B CN 103514512B
- Authority
- CN
- China
- Prior art keywords
- grid
- passage
- island
- aid decision
- stability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 62
- 238000011156 evaluation Methods 0.000 claims abstract description 5
- 230000005283 ground state Effects 0.000 claims description 6
- 230000010355 oscillation Effects 0.000 claims description 6
- 230000001105 regulatory effect Effects 0.000 claims description 6
- 230000003068 static effect Effects 0.000 claims description 5
- 230000002265 prevention Effects 0.000 claims description 4
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims description 3
- 240000002853 Nelumbo nucifera Species 0.000 claims description 3
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims description 3
- 238000013016 damping Methods 0.000 claims description 3
- 230000002542 deteriorative effect Effects 0.000 claims description 3
- 230000035945 sensitivity Effects 0.000 claims description 3
- 230000006641 stabilisation Effects 0.000 claims description 3
- 238000011105 stabilization Methods 0.000 claims description 3
- 230000001629 suppression Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 5
- 230000007123 defense Effects 0.000 abstract description 4
- 230000002596 correlated effect Effects 0.000 abstract description 2
- 230000000875 corresponding effect Effects 0.000 description 7
- 230000005611 electricity Effects 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310414073.0A CN103514512B (zh) | 2013-09-11 | 2013-09-11 | 电力系统在线孤岛并网快速辅助决策方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310414073.0A CN103514512B (zh) | 2013-09-11 | 2013-09-11 | 电力系统在线孤岛并网快速辅助决策方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103514512A CN103514512A (zh) | 2014-01-15 |
CN103514512B true CN103514512B (zh) | 2016-09-07 |
Family
ID=49897199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310414073.0A Active CN103514512B (zh) | 2013-09-11 | 2013-09-11 | 电力系统在线孤岛并网快速辅助决策方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103514512B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105656024B (zh) * | 2015-12-02 | 2018-05-15 | 国电南瑞科技股份有限公司 | 电力系统运行备用安全裕度在线评估方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5705637B2 (ja) * | 2011-04-26 | 2015-04-22 | 京セラ株式会社 | 電力制御装置及び電力制御方法 |
-
2013
- 2013-09-11 CN CN201310414073.0A patent/CN103514512B/zh active Active
Non-Patent Citations (2)
Title |
---|
故障条件下含分布式电源配电网的孤岛划分与重构优化策略研究;向月等;《电网技术》;20130430;第37卷(第4期);全文 * |
考虑分布式发电孤岛运行方式的智能配电网供电恢复策略研究;赵晶晶等;《电力系统保护与控制》;20110901;第39卷(第17期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103514512A (zh) | 2014-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108318782B (zh) | 基于网络拓扑与配变停电信息的配电网故障区域辨识方法 | |
Khalid et al. | Existing developments in adaptive smart grid protection: A review | |
CN106469908A (zh) | 一种多故障协调的静态安全综合辅助决策方法 | |
CN107085182B (zh) | 一种高压断路器抗短路电流能力校核方法 | |
CN104103019A (zh) | 含分布式电源的配电网运行风险评估方法及评估系统 | |
CN102982230A (zh) | 一种基于节点阻抗灵敏度的短路电流超标辅助决策方法 | |
CN104485660A (zh) | 一种基于有向关系图的配电网可靠性评估方法 | |
CN106849056B (zh) | 一种减少预想故障下切负荷的负荷转供策略搜索方法 | |
CN105391050A (zh) | 高周切机配置方案的校核方法和系统 | |
CN103714491A (zh) | 一种基于风险的电网调度操作票最佳序列生成方法 | |
Kim et al. | LSTM-based fault direction estimation and protection coordination for networked distribution system | |
CN104779608A (zh) | 基于离线策略的电力系统安全稳定在线附加紧急控制方法 | |
CN107067127A (zh) | 一种电力系统高风险连锁故障事故链搜索方法 | |
CN106548265A (zh) | 一种基于连锁故障事故链搜索的输电网可靠性评估方法 | |
CN103529709B (zh) | 电力系统故障联切装置模型实现方法及其系统 | |
CN107067126A (zh) | 一种基于潮流转移比的热稳定关键输电通道识别方法 | |
CN106130002B (zh) | 一种考虑电力安全事故风险的切负荷与动态分区协调控制方法 | |
Begovic et al. | System integrity protection schemes (SIPS) | |
Arabzadeh et al. | A new mechanism for remedial action schemes design in a multi-area power system considering competitive participation of multiple electricity market players | |
CN106684859A (zh) | 一种基于动态分区技术的电网短路电流抑制方法 | |
CN103514512B (zh) | 电力系统在线孤岛并网快速辅助决策方法 | |
CN105375463B (zh) | 一种基于scada系统的电网安全运行控制方法 | |
Qiu | Risk assessment of power system catastrophic failures and hidden failure monitoring & control system | |
Santos et al. | Real-time closed loop system controlled by an Artificial Neural Network for estimation of the optimal load shedding | |
CN109149532A (zh) | 利用扼流圈构造线路边界的单端电气量全线速动保护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. STATE GRID Z Free format text: FORMER OWNER: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY Effective date: 20141126 Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: NANJING NARI CO., LTD. Effective date: 20141126 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 210003 NANJING, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141126 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: NARI Technology Development Co., Ltd. Applicant after: State Grid Zhejiang Electric Power Company Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant before: Nanjing Nari Co., Ltd. Applicant before: State Grid Zhejiang Electric Power Company |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |