CN103512739B - 对金属构件施加有效预应力的自平衡体系 - Google Patents

对金属构件施加有效预应力的自平衡体系 Download PDF

Info

Publication number
CN103512739B
CN103512739B CN201310439749.1A CN201310439749A CN103512739B CN 103512739 B CN103512739 B CN 103512739B CN 201310439749 A CN201310439749 A CN 201310439749A CN 103512739 B CN103512739 B CN 103512739B
Authority
CN
China
Prior art keywords
high tensile
metal plate
tensile metal
hardware
side high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310439749.1A
Other languages
English (en)
Other versions
CN103512739A (zh
Inventor
冯然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huangshan Development Investment Group Co.,Ltd.
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201310439749.1A priority Critical patent/CN103512739B/zh
Publication of CN103512739A publication Critical patent/CN103512739A/zh
Application granted granted Critical
Publication of CN103512739B publication Critical patent/CN103512739B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了对金属构件施加有效预应力的自平衡体系,包括有材质和尺寸相同的左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板,左外侧高强金属板与左内侧高强金属板之间夹置有油压千斤顶,右外侧高强金属板与右内侧高强金属板之间夹置有测力传感器,左内侧高强金属板与右内侧高强金属板之间夹置有试验金属构件,可以有效的对不同类型的金属构件施加预应力,且可以方便的控制施加预应力的大小,从而研究预应力对金属构件力学性能和破坏模式的影响,有效的模拟了金属构件的预应力试验。

Description

对金属构件施加有效预应力的自平衡体系
技术领域
本发明涉及土木工程结构试验领域,具体属于对金属构件施加有效预应力的自平衡体系。
背景技术
众所周知,预应力技术由于其显著的优越性和易于操作的特点在土木工程中得到了广泛的应用。但是,目前的预应力技术,无论是先张法还是后张法针对的主要是混凝土构件,其基本原理也是利用混凝土和预应力钢筋之间的粘结力来对混凝土构件施加预应力,因而并不适用于金属构件,且难以控制施加预应力的大小。目前,还没有专门针对金属构件的预应力技术。然而,在实际的工程结构尤其是钢结构中,一些主要的受力构件有可能在建成之后、实际使用之前承受一定大小的预应力,要想了解预应力对钢结构构件力学性能和破坏模式的影响,就有必要通过实验技术来进行研究。因而,如何有效的模拟金属构件的预应力试验就成了摆在我们面前的一道难题。
发明内容
本发明提供了一种对金属构件施加有效预应力的自平衡体系,可以有效的对不同类型的金属构件(包括开口截面和闭口截面)施加预应力,且可以方便的控制施加预应力的大小,从而研究预应力对金属构件力学性能和破坏模式的影响,有效的模拟了金属构件的预应力试验。
本发明的技术方案如下:
对金属构件施加有效预应力的自平衡体系,包括有材质和尺寸相同的左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板,左外侧高强金属板与左内侧高强金属板之间夹置有油压千斤顶,右外侧高强金属板与右内侧高强金属板之间夹置有测力传感器,左内侧高强金属板与右内侧高强金属板之间夹置有试验金属构件,左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板分别开有相对应的四个孔洞,四个孔洞内分别穿过四根相同材质和尺寸的高强钢筋形成自平衡体系;左内侧高强金属板、右内侧高强金属板上开有相互贯通的水平方向细槽、垂直方向细槽,水平方向细槽宽度等同于两个孔洞中心之间的水平距离。
所述的水平方向细槽、垂直方向细槽外侧边缘分别设有精密刻度。
所述的试验金属构件外侧设有应变片。
本发明的工作原理:
这套金属构件预应力试验自平衡体系主要由四块相同材质和尺寸的高强金属板和四条相同材质和尺寸的高强钢筋组成,高强金属板的材质与试验金属构件相同,从而起到相互融和的作用,高强金属板的尺寸大小根据试验金属构件的尺寸大小来确定,高强钢筋的长度则根据试验金属构件的长度来确定。在预应力试验之前,首先确定施加预应力大小的范围,根据施加预应力的大小,选择合适的油压千斤顶和测力传感器,分别固定在两块高强金属板的中间位置。将油压千斤顶和测力传感器分别布置在试验金属构件的左右两侧,使其保持平衡,不至于因为一侧过重而倾覆。将另外两块高强金属板分别置于试验金属构件、油压千斤顶、测力传感器之间,然后将四条高强钢筋分别穿过分布在四块高强金属板外围的四个孔洞之中,从而形成一套自平衡体系。
放置于试验金属构件、油压千斤顶、测力传感器之间的两块高强金属板由于与试验金属构件直接接触,因而其构造与布置在自平衡体系外侧,分别与油压千斤顶和测力传感器固定在一起的高强金属板略有不同。这两块布置在自平衡体系内侧,与试验金属构件直接接触的高强金属板,在其垂直方向的中间位置有一条贯通金属板的水平方形细槽,其宽度等同于高强金属板外围水平方向两个孔洞中心之间的距离,且水平方形细槽的上下边缘位置都刻有精密的刻度;在其水平方向和高强金属板外围两侧垂直方向孔洞中心相同的位置分别有两条贯通金属板的垂直方形细槽,其宽度略小于垂直方向两个孔洞内侧之间的距离,且垂直方形细槽的左右边缘位置同样都刻有精密的刻度,同时,水平方形细槽和两条垂直方形细槽相互贯通连接。
在进行预应力试验之前,先将设计的两块带有螺栓的特殊铁块分别通过布置在自平衡体系内侧,与试验金属构件直接接触的两块高强金属板的水平方形细槽,放入两条垂直方形细槽的最底端。然后,通过和测力传感器固定在一起的高强金属板外侧附着在四条高强钢筋上的四个高强螺帽,以及置于试验金属构件和测力传感器之间的高强金属板,将测力传感器及其固定在一起的高强金属板固定在自平衡体系之中。接着,根据试验金属构件的截面形状和垂直方向的尺寸大小,以及施加预应力的类型,调整两侧带有螺栓的特殊铁块的位置到同一垂直高度(参照垂直方形细槽左右边缘位置的精密刻度),拧紧螺栓上的螺帽及其垫圈将两侧的特殊铁块同时固定在与试验金属构件直接接触的两块高强金属板上,然后将试验金属构件放置于两侧特殊铁块之上,依靠其自身重量使两者紧密接触;再根据试验金属构件的截面形状和水平方向的尺寸大小,以及施加预应力的类型,调整试验金属构件的两侧端部到同一水平位置(参照水平方形细槽上下边缘位置的精密刻度),紧接着拧紧置于试验金属构件和油压千斤顶之间的高强金属板外侧附着在四条高强钢筋上的四个高强螺帽,使得试验金属构件通过置于其与油压千斤顶和测力传感器之间的两块高强金属板与固定在自平衡体系之中的测力传感器紧密接触,从而对试验金属构件施加一定大小的预应力,而与其紧密接触的测力传感器则可以准确的捕捉到施加预应力的大小。然后,同时放松固定在自平衡体系内侧与试验金属构件直接接触的两块高强金属板上的带有螺栓的特殊铁块螺栓上的螺帽,使得两侧带有螺栓的特殊铁块都置于两侧高强金属板上两条垂直方形细槽的最底端。接着,拧紧和油压千斤顶固定在一起的高强金属板外侧附着在四条高强钢筋上的四个高强螺帽,使得油压千斤顶通过置于其与试验金属构件之间的高强金属板与试验金属构件紧密接触,从而对试验金属构件进一步施加一定大小的预应力,而与试验金属构件紧密接触的测力传感器则可以准确的捕捉到施加预应力的大小。最后,拧紧和油压千斤顶固定在一起的高强金属板内侧附着在四条高强钢筋上的四个高强螺帽,将油压千斤顶及其固定在一起的高强金属板固定在自平衡体系之中。接着,开启油压千斤顶,对与其紧密接触的试验金属构件施加预先确定大小的预应力,并通过与试验金属构件紧密接触的测力传感器实时监控施加预应力的大小。除此之外,如果施加的预应力为轴心荷载,则均匀布置在试验金属构件四周的应变片还可以更为准确的探测到施加预应力的轴心位置,从而保证施加在试验金属构件上的预应力为轴心荷载,不会产生任何的偏心弯矩。至此,整套金属构件预应力试验自平衡体系完全形成。
本发明的有益效果如下:
设计的这套自平衡体系可以较为准确的对不同截面形状和尺寸大小(包括开口截面和闭口截面)的金属构件(包括碳素钢、不锈钢、铝合金等)施加不同类型的预应力(包括轴心荷载、平面内正负弯矩、平面外正负弯矩等),整体受力均匀,设计并不复杂,操作也较为简单方便。此外,这套自平衡体系中的主要构件都易于制作,且可以反复循环使用,因而其造价低廉,易于大范围推广。
附图说明
图1为本发明的结构示意图。
图2为图1的侧视图。
具体实施方式
参见附图,对金属构件施加有效预应力的自平衡体系,包括有材质和尺寸相同的左外侧高强金属板1、左内侧高强金属板2、右外侧高强金属板4、右内侧高强金属板3,左外侧高强金属板1与左内侧高强金属板2之间夹置有油压千斤顶5,右外侧高强金属板4与右内侧高强金属板3之间夹置有测力传感器6,左内侧高强金属板与右内侧高强金属板之间夹置有试验金属构件7,左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板分别开有相对应的四个孔洞8,四个孔洞8内分别穿过四根相同材质和尺寸的高强钢筋形成自平衡体系;左内侧高强金属板、右内侧高强金属板上开有相互贯通的水平方向细槽9、垂直方向细槽10,水平方向细槽9宽度等同于两个孔洞中心之间的水平距离,水平方向细槽、垂直方向细槽外侧边缘分别设有精密刻度,试验金属构件外侧设有应变片11。

Claims (3)

1.对金属构件施加有效预应力的自平衡体系,其特征在于:包括有材质和尺寸相同的左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板,左外侧高强金属板与左内侧高强金属板之间夹置有油压千斤顶,右外侧高强金属板与右内侧高强金属板之间夹置有测力传感器,左内侧高强金属板与右内侧高强金属板之间夹置有试验金属构件,左外侧高强金属板、左内侧高强金属板、右外侧高强金属板、右内侧高强金属板分别开有相对应的四个孔洞,四个孔洞内分别穿过四根相同材质和尺寸的高强钢筋形成自平衡体系;左内侧高强金属板、右内侧高强金属板上开有相互贯通的水平方向细槽、垂直方向细槽,水平方向细槽宽度等同于两个孔洞中心之间的水平距离;所述自平衡体系内侧设有两块带有螺栓的特殊铁块;和测力传感器固定在一起的高强金属板外侧附着在四条高强钢筋上的四个高强螺帽。
2.根据权利要求1所述对金属构件施加有效预应力的自平衡体系,其特征在于:所述的水平方向细槽、垂直方向细槽外侧边缘分别设有精密刻度。
3.根据权利要求1所述对金属构件施加有效预应力的自平衡体系,其特征在于:所述的试验金属构件外侧设有应变片。
CN201310439749.1A 2013-09-25 2013-09-25 对金属构件施加有效预应力的自平衡体系 Active CN103512739B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310439749.1A CN103512739B (zh) 2013-09-25 2013-09-25 对金属构件施加有效预应力的自平衡体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310439749.1A CN103512739B (zh) 2013-09-25 2013-09-25 对金属构件施加有效预应力的自平衡体系

Publications (2)

Publication Number Publication Date
CN103512739A CN103512739A (zh) 2014-01-15
CN103512739B true CN103512739B (zh) 2015-09-02

Family

ID=49895815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310439749.1A Active CN103512739B (zh) 2013-09-25 2013-09-25 对金属构件施加有效预应力的自平衡体系

Country Status (1)

Country Link
CN (1) CN103512739B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5027713A (en) * 1989-02-01 1991-07-02 Thyssen Industries Ag Track support for magnetic railroads and similar rail-borne transportation systems
CN201945464U (zh) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 钢结构分配梁式双线整孔箱梁静载试验装置
CN202299463U (zh) * 2011-09-08 2012-07-04 上海建科工程咨询有限公司 用于钢结构预应力检测调节装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5027713A (en) * 1989-02-01 1991-07-02 Thyssen Industries Ag Track support for magnetic railroads and similar rail-borne transportation systems
CN201945464U (zh) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 钢结构分配梁式双线整孔箱梁静载试验装置
CN202299463U (zh) * 2011-09-08 2012-07-04 上海建科工程咨询有限公司 用于钢结构预应力检测调节装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
钢结构预应力技术的特点及应用;杨巧等;《科技资讯》;20121231;第52,53页 *
预应力钢结构技术的创新和拓展;陆赐麟等;《钢结构》;20080831;第23卷(第8期);第1-5,35页 *

Also Published As

Publication number Publication date
CN103512739A (zh) 2014-01-15

Similar Documents

Publication Publication Date Title
Zhou et al. Seismic behavior and shear strength of tubed RC short columns
CN102721637B (zh) 一种持续压力作用下混凝土耐久性多功能试验系统及方法
CN102778389A (zh) 荷载与多因数耦合作用下混凝土试验加载装置及试验方法
CN106383039B (zh) 一种混凝土板柱结构连续倒塌性能测试装置及试验方法
CN105158072B (zh) 一种模拟均布荷载的试验装置
Mudie et al. Experimental study of moment sharing in multi-joist timber-concrete composite floors from zero load up to failure
CN110174233B (zh) 构件在长期荷载-腐蚀-侧向冲击荷载耦合作用下的试验装置
CN210465142U (zh) 一种隧道衬砌混凝土耐久性试验装置
Jasiński et al. Comparison research of bed joints construction and bed joints reinforcement on shear parameters of AAC masonry walls
CN202188929U (zh) 一种用于相似模拟实验的预应力锚杆装置
CN103512739B (zh) 对金属构件施加有效预应力的自平衡体系
CN207516180U (zh) 一种压剪复合加载装置
CN105372118A (zh) 柱状试件横向动态均布加载试验装置
CN201266152Y (zh) 一种变角板剪切仪
CN205175808U (zh) 柱状试件横向动态均布加载试验装置
CN203869941U (zh) 适用于混凝土柱、梁的回弹检测定位器
Hassan et al. Behavior of concentrically loaded CFT braces connections
CN214584529U (zh) 一种可施加单侧围压的加载装置
Pedreschi A preliminary study of the strength of non-prismatic columns using fabric formwork
CN203165295U (zh) 材料力学多功能组合实验台
Chithra et al. Studies on prefabricated cage reinforced steel–concrete composite beams
Šobra et al. Utilization of Splice Skew Joint with Key on Reconstruction of Historical Trusses
CN102323020B (zh) 滚动支座反力测试装置
Gunadi et al. The Behavior of Slab-Column Connections with Modified Shear Reinforcement under Cyclic Load.
Qu et al. Pseudo-Dynamic Test on the Anti-Seismic Performance of Turbine Generator Foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Feng Ran

Inventor after: Wan Haiying

Inventor after: Chen Anying

Inventor before: Feng Ran

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: FENG RAN TO: FENG RAN WAN HAIYING CHEN ANYING

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201223

Address after: 245000 No.50, Meilin Avenue, Huangshan Economic Development Zone, Huangshan City, Anhui Province

Patentee after: Huangshan Development Investment Group Co.,Ltd.

Address before: No. 193, Tunxi Road, Hefei, Anhui

Patentee before: Hefei University of Technology