CN103505869A - Method and facility system of ball game imitating modern warfare game form - Google Patents

Method and facility system of ball game imitating modern warfare game form Download PDF

Info

Publication number
CN103505869A
CN103505869A CN201210201088.4A CN201210201088A CN103505869A CN 103505869 A CN103505869 A CN 103505869A CN 201210201088 A CN201210201088 A CN 201210201088A CN 103505869 A CN103505869 A CN 103505869A
Authority
CN
China
Prior art keywords
goal
altitude
court
ball
attack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210201088.4A
Other languages
Chinese (zh)
Inventor
孟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210201088.4A priority Critical patent/CN103505869A/en
Publication of CN103505869A publication Critical patent/CN103505869A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Professional, Industrial, Or Sporting Protective Garments (AREA)

Abstract

The invention relates to a method and a facility system of a ball game imitating a modern warfare game form. According to the invention, through the configuration of a relative high goal system, an attacking side can score by attacking and goal (in a single direction) to the high goal under a direct confrontation situation. Also, players and the game ball can continuously move back and forth under the high goal system, such that continuous transitions are realized, and effective (re)attacking and defending are formed. Therefore, a sport game form imitating the air and space war of modern warfare is constructed. On the other hand, through the configuration of low goal systems on two ends of the court and other appropriate positions, the attacking side can directly attacking the low goal systems of the other side, or can continue attacking the low goal systems of the other side after scoring in the high goals, such that the game process of the entire ball game well imitates a complete air-space-land-sea integral modern warfare form. With the ball game method, sports and game are more exciting, and the understanding and awareness of people upon modern wars can be improved. The method is a sports form with highly integrated intellectual and physical practice.

Description

A kind of ball game method and facility system thereof of imitative modern-war form
Affiliated technical field
Belong to ball game and sports equipment field.
Background technology
The main ball game that contemporary world is carried out: as football, basketball, vollyball, rugby, handballs etc. all produce and are ripe in 18, modern western society before and after 19th-century, its all with Modern West industrialization at the beginning of social economy, social life and culture adapt with consistent, the mode of its sports is all mainly the game on the utmost point low spatial of ground and ground proximity, what in motion, mainly take is horizontal direction Shang soil and space, particularly the required site area of the motion such as football and rugby is very large, the society of this and contemporary many countries and regions can land used and nervous situation form great contradiction, restricting carrying out of relevant motion, both made to resemble the modern soccer motion that is called as the first in the world motion simultaneously, the obvious not enough situation such as also can show in the many important top races in the Qi world that competition scenes are excellent not, heat is uninteresting, changes and is transformed into people's thinking and the important topic of exploring accordingly, Qi San, contemporary society is in economy, science and technology, material view, life culture form, all many-sides such as the consciousness structure of knowledge have formed great difference and different from certain era at the beginning of the modern industry and even thereafter, if by 18, 19 centuries such as grade were called ocean century, in the ocean epoch, that 21st century can be called the empty day epoch, in empty day century, empty day epoch, space was explored by society, people go frequently in Gao Tian, look at the sky frequently, look up blue sky, look up high buildings and large mansions, the human lives in sky day epoch has larger height and abundanter content request with culture in space existence and spatial perception, the most crucial game technology that the game technology of empty day and game culture become the epoch and one of culture, as most important physical culture game culture and one of form, ball game contemporary and following century should break through the limitation of traditional ground game, embody new times flavour and requirements of the times, so create include more excellent, more modern high-flying attack, high-altitude competition, the new ball game mode of the content of high-altitude game and form, the game content that simultaneously also makes to come from the main ball game of modern times in west reveals new higher in succession and in innovating with form, brighter brightness.
The ball game such as football are called peaceful war by people sometimes, this illustrates that its competitive way has the feature of stronger approximate wargame, and in modern times and future war, space warfare (air battle, day war) more and more becomes first-selected and starting war form, the decision meaning more and more with left and right victory or defeat, if do not make empty day ability, in whole war, will be unable to escape situation passive and vulnerable to attack, can embody preferably the game form of the empty day Great War of modern war and the key character that game method should be called the present age and following many ball game.
The main ball game itself that comprises football of now carrying out, apart from the game form of empty day Great War formula of modern war, all falls far short, is difficult to contact directly; In once carrying out the Cuju motion of Guo high-altitude simple gate form, ancient Chinese can obtain the enlightenment of " high-altitude " ball game, but its game both sides' indirect antagonism, sportsman's place restriction etc. are had a greatly reduced quality the excellence of its game and value, we can get, and it is desirable, abandon its deficiency, realize innovation and breakthrough.
Modern war also can not depart from land and waters forever, there is no continental rise and sea base basis, and an empty day system will be lost support; There is no the triumph of land battle and sea warfare, the triumph of whole war can be also that incomplete, complete modern war is the supersolid war that contains complete land, ocean, sky, huge three-dimensional system.The game form of imitating the ball game of this supersolid war should include game method and the process of ground ball type games simultaneously, the elite of succession, reference and the modern various ground type ball game of extensively carrying out of absorption is with excellent, not only can make the ball game of the innovation of future tense have real powerful basis, also more meet inherent law and the requirement of ball game progress simultaneously.
The object of innovation and creation
The object of the invention is to provide a kind of method that includes the ball game of " high-altitude formula " the game form that can be bordering on the empty day Great War of imitative modern war, certainly it also can comprise simultaneously, merges and innovate form and the content of the ball game of the modern all kinds of ground type games of extensively carrying out, thus create more excellent, more scientific, also more real, have more education and inspiration new physical culture game and the form of culture adapting with new era development meaning.It not only can be taught through lively activities and promote the common people's physique and life taste, make perception that the common people obtain the game forms such as modern war in participating in and viewing and admiring more excellent athletic competition with cognitive, also can adapt to well the physical site of facing with solution modern city and social development very not enough, football Deng great place sports events universal difficult, excellent difficult circumstances and problem simultaneously.
Technical scheme and beneficial effect
The object of the present invention is achieved like this: first, in the facility system of ball game method of the present invention, comprise and be provided with can be in central space region, court the signified satellite with high height, guided missile spatial movement track-missile trajectory, at least one goal, high-altitude and the high-altitude goal system of the rum point-anti-ballistic node of attack and interception guided missile etc., there is high height and the lower end of the high-altitude goal system of the complete unsettled setting of trying one's best should be able to guarantee normal sportsman during the games apart from the distance of court surface (water surface), official ball and even sportsman take advantage of carries that instrument---first-class can facilitating freely passes through vessel car.
In match sportsman not only can be can facedown in the situation that by making the motion of ball from one's own side court to opponents' court direction by goal, high-altitude and score, can also make sportsman and official ball etc. freely travel to and fro between the below of high-altitude goal system and realize transition quickly and easily, constantly to form new effective attack and defence, thereby constructed the game form of the excellent ball game of the sky sky Great War that can be bordering on imitative modern war.
When a high-altitude goal system on midfield is only set, sportsman both can squeeze into opponents' court and score by ball by the goal, high-altitude of midfield by corresponding attack in one's own side's court; Can in the other side's court, by corresponding defence behavior, prevent that the other side from squeezing into one's own side court by ball by goal, high-altitude and not losing points again; When needing that ball is reached to one's own side court after opponents' court ball-handling, sportsman could attack again goal, high-altitude, and then make to pass through goal, high-altitude and score in the motion of ball from one's own side court to opponents' court direction, situation be: near the other side's one side that sportsman can be the juncture area of both sides court by the modes such as banana kick also can make ball aloft with in the motion from one's own side court to opponents' court direction by a goal, high-altitude, therefore also can remember minute;
In the situation that two and a plurality of high-altitudes goal system are set, thus grand occasion and advantage that both sides all can start continuously the attack manufacture at goal, Dui Gengduo high-altitude forward to score continuously, run; Can also stipulate as required, sportsman still can in time return ball from some high-altitude goal system, and then forward new attack is started in these goals, high-altitude more simultaneously, thereby realizes the continual attack of passback formula and the situation of running;
Above-mentioned multiple tactics of attacking forward again after signifying satellite, missile trajectory and other sky temmoku target high-altitude goal system and can implementing continuously attack forward and passback makes ball game method of the present invention have the unique advantage of the empty day Great War of good simulation modern war.
They are two years old, for reflecting all sidedly and imitate the overall picture of modern war, corresponding with the high-altitude goal system that central region top in court arranges, near the positions such as outside in the court two ends in court can add existing goal football, handball door, rugby golf, the low latitude goal system of existing form and the low latitude goal system of other new innovation form such as basketball ball frame, thereby make sportsman both can in one's own side's court, by corresponding high-flying attack behavior, make ball squeeze into opponents' court and score by goal, high-altitude, after score, can continue to obtain ball, ball-handling, attack again the other side's goal, low latitude, thereby create the meeting of more multimachine and the effect of in an attack, running, also can select by ball directly being shot to the other side low latitude goal system or first ball being phoresied to opponents' court and ball shot to the other side low latitude goal system and score again by the below of high-altitude goal system.
In the court of sportsman one's own side, by corresponding attack, ball is squeezed into opponents' court by goal, high-altitude and after score, if offense sportsman continues to obtain ball at opponents' court, can be further in opponents' court directtissima the other side's low latitude goal system, or select to pass ball back own half and again attack high-altitude goal system, thereby chance and the effect that all can create continuous attack, run; When making great efforts attack, sportsman should take precautions against opposing team and obtain ball and directtissima one's own side's low latitude goal system in one's own side court, takes precautions against again opposing team directtissima high-altitude goal system or one's own side court attack one's own side's the goal, low latitude of driving straight in after opponents' court obtains ball; Both sides' attack with defence be all three-dimensional, multizone, multi-level, be all also can plan more, more options, diverse; In whole match, realize more ball-handling chance and just can grasp more the initiative of game, thereby select a good opportunity and create more chance and attack score, reduce the other side's threat and open goal simultaneously; In whole match, realize more ball-handling chance and just can grasp more the initiative of game, thereby select a good opportunity and create more chance and attack score, reduce the other side's threat and open goal simultaneously.
In ball war and game, be good at land battle person ,Ke Duozou ground, attack goal, the other side low latitude more; Be good at air battle person, can walk sky more, attack goal, the other side high-altitude more; Land battle, air battle be kind person all, can select a good opportunity and move, wound machine and going, strive for maximum combat success;
Three, as required, T-ground portion region also can add the low latitude goal system of suitable form, at two ends, court, also can establish the high-altitude goal system of suitable form, thereby middle part, Ke Shi court, the attack at two ends, court and the form of game and content become more rich and varied.
Different goal, high-altitude forms and different goal, low latitude forms can be set as required, simultaneously according to the complexity of scoring not square one set different high-altitudes score value and the different low latitudes score value of scoring to obtain of scoring to obtain, in the whole match, the high person of various goal total mark score value is winner.
Set goal, low latitude, court also can adopt combined type goal and other the new suitable goal form that simultaneously contains big or small goal.
Basic skills and the facility system thereof of the grand formula ball game of war of the above-mentioned space warfare feature that can embody preferably and reflect modern war, can merge mutually, adapt with now ongoing various ball motion, thereby design and create the grand formula football of war, the grand formula handball of fighting, the grand Touch Rugby of fighting, the grand formula basketball of fighting, fight grand formula water polo and other all multi-form brand-new ball game method and the facility system thereof that can be bordering on imitative modern-war form.
Above-mentioned new ball war system, ball war game method and game process can become that important military sports is combined, one of the construction form of the advanced modern cultural of manufacturing products for both peacetime and wartime us and construction content.
Accompanying drawing explanation
Situation as shown in Figure of description 1-11 page:
Fig. 1 a in accompanying drawing 1, Fig. 1 b, Fig. 1 c are respectively the court of a kind of Yi Ge of containing high-altitude goal system and front view, top view, the side view of facility system thereof.
Fig. 2 a in accompanying drawing 2, Fig. 2 b, Fig. 2 c are respectively the court of a kind of Liang Ge of containing high-altitude goal system and front view, top view, the side view of facility system thereof.
Accompanying drawing 3 is a kind of court of high-altitude goal system of containing horizontal arched framework and the stereogram of facility system thereof.
Accompanying drawing 4 is the court of a kind of San Ge of containing high-altitude goal system and the stereogram of facility system thereof.
Accompanying drawing 5 is a kind of court of containing basket type high-altitude goal system and the front view of facility system thereof.
Accompanying drawing 6 is that a kind of T-ground portion region is provided with high-altitude goal system and the court of low latitude goal system and the stereogram of facility system thereof simultaneously.
Fig. 7 a in accompanying drawing 7, Fig. 7 b, Fig. 7 c are respectively a kind of court of a plurality of high-altitudes goal system and front view, top view, side views of facility system thereof of arranging on longitudinal arched skeleton.
Fig. 8 a in accompanying drawing 8, Fig. 8 b, Fig. 8 c view situation when to be respectively some multi-form high-altitude goal system of reflection be located at together among Yi Ge court with multi-form low latitude goal system.
Fig. 9 a in accompanying drawing 9, Fig. 9 b, Fig. 9 c are respectively the view situations at a kind of goal of containing the soft block structure of weight-curtain falling type and the goal of containing the soft block structure of spring-curtain falling type.
Figure 10 a in accompanying drawing 10, Figure 10 b, Figure 10 c, Figure 10 e, Figure 10 f, Figure 10 g be respectively a kind of round target formula goal employing level, vertically, front view and the top view of the three kinds of different set-up modes that tilt.
Accompanying drawing 11a, accompanying drawing 11b are respectively front view and the side views of a kind of ballistic high-altitude goal system.
Accompanying drawing 12a, accompanying drawing 12b are respectively a kind of front view and side views of room cage type court facility system of high tower form of guided missile moulding.
Figure 13 a in accompanying drawing 13, Figure 13 b, Figure 13 c are respectively front view, top view, the side views of the room cage type court facility system of a kind of ridge room form.
Figure 14 a in accompanying drawing 14, Figure 14 b, Figure 14 c are respectively front view, top view, the side views of the room cage type court facility system of a kind of " cage in cage " form.
Figure 15 a in accompanying drawing 15, Figure 15 b, Figure 15 c are respectively a kind of front view, top view, side views of being located at the room cage type court facility system on vessel.
Figure 16 a in accompanying drawing 16, Figure 16 b, Figure 16 c are respectively a kind of front view, top view, side views of vessel for the ball war of goal system that be provided with.
The specific embodiment
From a plurality of broad aspect, the specific embodiment of ball game method of the present invention and facility system thereof and example thereof etc. are set forth respectively below.
The first, method more more specifically and the process of the basic comprising of high-altitude goal system and the facilities of T-ground and corresponding ball game are:
First, high-altitude goal system can be by least one goal, high-altitude 1, goal, high-altitude skeleton 2, can select goal, the high-altitude Intranet 3 that adopts with goal, high-altitude outer net 4, the outer network framework 5 in goal, high-altitude, play support, suspend the compositions such as connecting framework 6 that whole high-altitude goal system etc. acts in midair; Connecting framework 6 grades can be rigid structure and also can be inflatable structure; Goal, high-altitude etc. can be set as the adjustable version of height, thereby can become as required goal, low latitude, the version of also can be set as energy easy disassembly, packing up etc.(situation as shown in accompanying drawing 1,2,3,4 etc.).
When whole court arranges Yi Ge high-altitude goal system, this high-altitude goal system can be located at the whole court of decile court center line 7 directly over, court center line and on high-altitude goal system whole court and space thereof are divided into two, in match, the high-altitude goal system that both sides can only attack zone line from one's own side's one side direction the other side direction, shoot goal postscript score, certainly in the situation that being provided with low latitude goal system, both sides all can catch and create openings realize to goal, high-altitude and goal, the other side low latitude minute other effectively attack.(situation as shown in accompanying drawing 1,3 etc.).
When Liang Ge high-altitude goal system is set, they can be located on court center line 7 both sides corresponding position and space symmetrically, thereby between the goal system of Ke Liangge high-altitude, form midfield and space, midfield, midfield and both sides, space, midfield can be regarded as respectively one's own side court, space, one's own side court and opponents' court, opponents' court space.(situation as shown in Figure 2).
In match, both can stipulate: both sides all can be from comprise that the one's own side's one side direction the other side direction in midfield and one's own side court selects and attack above-mentioned Liang Ge high-altitude goal system simultaneously, and shoot goal, corresponding high-altitude and can all remember minute; Also can stipulate as required: both sides only just remember when comprising that one's own side's one side direction the other side direction in midfield and one's own side court is shot goal, Chu high-altitude, opponents' court forward position minute, when now having a mind to or being not intended to make ball to pass through the goal, high-altitude in forward position, one's own side court from one's own side court to the other side's direction, can both not include score, also not very error, and be only considered as pass behavior.
When high-altitude goal system is set more than two, except balanced laying symmetrically, in match, both can take orientation to shoot the equal score in goal, high-altitude used, the game method that also can adopt the goal, part high-altitude of only shooting near the other side's one side just to remember minute, other goal can only be considered as the behavior of passing normally.(situation as shown in accompanying drawing 4,7).
As required, can in standard football pitch and space, other area compare great court, San Ge high-altitude goal system be set simultaneously, its adoptable set-up mode is: high-altitude, She Yige midfield goal system directly over T-ground line 7, simultaneously on the suitable distance of goal system both sides, high-altitude, midfield and suitable locational space, establish again respectively Yi Ge front court high-altitude goal system and a back court high-altitude goal system of symmetry each other.(situation as shown in Figure 7).
In the situation that two and plural high-altitude goal system are set, when ball is directly aloft shot again and remembered that thereby Fen goal forms high-altitude and drops in while scoring by disregarding the goal, high-altitude of score, can be considered effectively and efficiently score, can remember minute even can remember higher score; When ball continues to pass through two and a plurality ofly remember that a point formation high-altitude, goal drops in while scoring aloft, can remember the accumulated value that is respectively broken goal, even can on the basis of above-mentioned accumulated value, to above-mentioned high-altitude, drop in to score to increase and reward score.
Above-mentioned, be provided with in one, two, two the various situations with the high-altitude goal system of first-class varying number, when shooting goal, Yi Ge high-altitude and even directly shoot again goal, the other side low latitude after high-altitude continues to pass through goal, more high-altitude, ball forms height empty string croquet, now also can not only remember the accumulated value of each goal, also can further increase corresponding award score.
As required, on the goal system of above-mentioned situation Zhong Ge high-altitude, can all establish web frame 4 outside goal, corresponding high-altitude; Outside goal, web frame 4 can cut down the attack ball that very big part trains off, thereby make offense not only cannot score also can create the chance that obtains ball and counterattack fast for the other side, thereby the attack of Shi Dui high-altitude goal system has the dual character that score and risk coexist, the accurate ability of its attack for offense and attack effect propose higher requirement.(situation as shown in accompanying drawing 1,2,3,4,7 etc.).
Outside above-mentioned each goal, high-altitude, web frame 4 can be likened the empty day systems of defense such as missile shield in modern war approx to, although it can not go interception to squeeze into the ball of the attack at goal, high-altitude on one's own initiative, but its interception for the ball of the attack training off can become more general situation, and for very just to and the high-altitude ball of dropping in accurately, the special goals such as height empty string croquet, the continuous inefficacy of the empty day system of defense of goal, high-altitude outer net type can be very special situation, certainly as required, by expanding goal, high-altitude, reduce goal, high-altitude height, be conducive to the design of the attack track of goal continuously, can make the above-mentioned chance of scoring of dropping in increase significantly, thereby becoming, the goal of dropping in that makes high score and high-quality attack can ask and attainable strike sharp weapon.
As required, web frame outside Ye Kebushe goal on the goal system of above-mentioned situation Zhong high-altitude, the ball training off only cuts down or keeps off back in institutes such as goal, situation Xia Kebei high-altitude skeleton 2 seldom, the forwards court that falls, the invalid space through goal system region, high-altitude outside the goal, attack Zhi Qiuke high-altitude in most cases training off, even if now can not, directly by high-altitude goal score, also can create the chance near aspects such as distances for the attack to the other side low latitude goal system to the risk of attacks of high-altitude goal system is less.(situations as shown in accompanying drawing 6 grades).
The selection of above-mentioned Zhi Sheyige high-altitude goal system is more suitable for the relatively little situation of court horizontal space size; At many levels, the setting of multiple tracks high-altitude goal system is applicable to the larger situation of court horizontal space depth.
Owing to there being the existence of the high-altitude goal system between the goal system of the low latitude at two ends, court, offense is in one's own side court and during the ball-handling such as region, midfield, both can select nearby high-altitude goal system to be attacked, thereby can transfer the other side has to the sportsman of necessary amount for front court, the defence of midfield, contention and preparation counteroffensive, can be chosen in again opponents' court number of player less, in situation a little less than defence, drive straight in suddenly, the rapidly and efficiently strike of enforcement to the other side low latitude goal system, thereby create excellent attack scene and more magical game process and plot.
Certainly, besieging the other side low latitude goal system, thereby make the other side by sportsman during more for the defence at its goal, low latitude, attacking and defending also can return ball suddenly, thereby cause, the other side is defendd to the favourable attack situation of the high-altitude goal system of weakening relatively, successfully rushing out above-mentioned back thrust and realizing after high-altitude goal and score, offense also can continue select to attack goal, the other side low latitude or again with forms such as back thrust, threaten the other side high-altitude goal system, or continuation high-altitude scores the goal, or again transfer the other side etc., making thus the grand formula ball game of whole war be full of changes and entertaining, also the value such as more creative and inspiration.
As required, if offense goes smoothly with directtissima and the above-mentioned modes such as back thrust in real racetrack, break through after goal, high-altitude score, can limit it and again in the mode of above-mentioned back thrust, carry out score, and offense can only be relied on forward attack goal, the other side low latitude and increase score, this kind of situation, the high-altitude target that can be similar to enemy in actual war was attacked hit and was destroyed by last time, again hit without actual capabilities or value; On the other hand, if continue allowance offense, repeatedly in the mode of back thrust, attack goal, high-altitude and continuous score, can be similar to enemy and have more high-altitude target and can be attacked and destroy, also be fine, just may be unfavorable for like this refining and optimizing of whole ball game game process; Certainly can in real racetrack, constantly obtain continuously ball, ball-handling, rush out back thrust until finally to create the situation of scoring in continuous high-altitude be also more difficult continuously, therefore also can to it, not carry out the restriction of any systematicness, all at one's discretion field player freely strive for and create.
In the grand formula ball game of war, one side that can realize efficient ball-handling will obtain great battlefield supremacy, thereby in game status extremely initiatively, it can have object, has rhythm, have and freely select and transfer the other side---and soldier the other side that cutting edge of a knife or a sword is instigated has to be guarded against, the sudden change of soldier's cutting edge of a knife or a sword makes the other side hard to guard against; All the time in strategy, can only by the other side, be transferred more with a side of defence status, battlefield, in status passive and vulnerable to attack, lose more goal bitterly and striking out at last.
Offense's efficient possession of the ball is exactly battlefield supremacy, can transfer exactly the other side's power, can create exactly the right of good attack and scoring opportunity, the power of getting the upper hand of exactly!
The good anti-ability of controlling the ball of defence is exactly the strategic containing ability in battlefield, strategic counterforce capability, thus change from passive to active exactly countercharge the other side, the anti-ability that wins the other side.
" ball-handling, variation and transfer the other side, creation attack good opportunity---countercharge ball, anti-transfer, the anti-goalscoring opportunity of creating " will become substance and the process of court game, and grasp good opportunity, one arrow hits, an arrow punching, become the link that good opportunity is got the upper hand of into combat success becomes with the most critical of final hit, this link is not good, and all that has been achieved is spoiled!
When Dang Jiang low latitude goal system is configured to simultaneously and contains the version at compound goal 8 at large and small goal of " by the handsome account formula of door ", the danger that the handsome account formula of the high score of the one sword life heart is scored also will cause defence and the difficulty of selecting for defender, also become attacking and defending and transfer one of important dependence of defence simultaneously, the defence of adding high-altitude goal system with can attack, the grand formula ball game of whole war by become the combination of intelligence height, technology and tactics equal altitudes Great Game unified, that comprehensively color, integration capability represent extremely strongly.(situation as shown in accompanying drawing 1,2 etc.).
In part, fight in grand formula football according to condition and needs, some goals, low latitude, particularly for Zhong compare great goal, combined type goal, can adopt and not take the contest method that pin goal is goal, to avoid competition area too small, big foot shooting easily damages and shoots the situations such as compare great goal is too easy, owing to there being the existence at goal, high-altitude, on field, more high-altitude falling sphere will be there is, people can be by potential energy and the speed of lower falling sphere, other position with health heads into ball more, keep off into, push compare great goal and score, certainly the size little goal arranging for low latitude, as Zhong little goal, compound goal, can adopt and take pin attack and score that to calculate be the contest method of effective score simultaneously.
Attack at war goal, grand formula football Zhong,Dui high-altitude can adopt various attacks mode and the footworks such as flip shot, backward flight, side fly.
At some, fight in grand formula ball game, even can adopt that phoresy in people's ladder type, the formula of leaping high, Pao Renshideng high-altitude, the offensive pattern of high-flying attack, be summarized as follows:
1, people's ladder type high-flying attack method: near the goal system of high-altitude or other sportsman of suitable space place climb up after being formed helper by one's own side sportsman or occuping on helper to obtain ball after obtaining ball, thereby form the chance of the people's ladder type high-altitude strike that makes the other side be difficult to defence, so that the possibility of scoring in high-altitude improves greatly.
2, the formula high-flying attack method of leaping high: sportsman can be take one's own side team member as fulcrum, the height, the boosting strength of while by teammate that by " trampling " one's own side team member, promote own upper punch starting point realize jumping up and aerial stop of maximum possible height, and implement in this course the efficient attack that the distance at goal, Ji Ju high-altitude that the other side is difficult to defence also can be nearer, it also can be called padded formula tactics, step on people's formula tactics etc. of jumping up.。
3, throw people's formula tactics: sportsman is mainly thrown in the air by teammate's strength, thereby obtain the attack altitude and attack position accordingly with advantage, thereby it also can be described as people and plays method, people's arrow formula tactics etc.
Above-mentioned high-altitude tactics can make attacker obtain chance and the advantage of favourable high-flying attack, can be relative passive if defender wants to organize corresponding Deep Air Defence and halting to take action, on time, easily lag behind, effectively the locus of block is also difficult to hold, thereby make attacker that the high-altitude at goal, high-altitude is hit and easily be gone smoothly, certainly attacker also can pay larger personnel for this reason and too concentrate the cost with physical consumption Hui compare great Deng aspect, if attack is accidentally dropped, its ground obtains ball again, the chance of ball-handling can reduce, thereby easily for the other side, obtain the chance of good counterattack, therefore above-mentioned high-altitude tactics is both favourable, also there is a fraud, key be the utilization that will realize high level with the risk of failure etc. is down to minimum.
The high-altitude tactics of above-mentioned form, can be applicable to fight among the grand formula ball game of the war such as grand formula handball, the grand formula basketball of fighting, the grand Touch Rugby of fighting, the grand formula football of fighting, its game scene by the grand formula ball game that makes to fight has more three-dimensional color, is more imbued with spatial impression, will further promote the excellence, technical and ornamental of whole motion.
The second, about the concrete structure of whole high-altitude goal system and impact of concrete methods of ball game etc. etc. is described as follows:
First, the setting principle of high-altitude goal system concrete structure should be: on the one hand the setting of goal, high-altitude and system thereof should be able to reflect the needs that can facilitate the various inherences that the ball game of high-altitude target formula carries out better best, make it that inherent rule and requirement that fully meets motion itself is set, emphasize inherent independence and the material impact to low latitude goal system and whole motion each side thereof that high-altitude goal system arranges; The form of high-altitude goal system etc. also should adapt with the ball game such as existing football, rugby, basketball, handball and the goal system adopting thereof on the other hand, so that new ball game and game process can be connected mutually, coordinate mutually with existing ball game mode better and unified.
Qi Er, high-altitude goal system structure with arrange some more specifically situation be respectively described below:
(1) lower end of the connecting framework 6 of ,Ying Shi high-altitude goal system etc. is located at outside whole court as far as possible, to form accessible court, low latitude.
(2), connecting framework 6 can adopt the version of arch, and make the structures such as skeleton of bottom, domes two ends outside court, to form accessible court, low latitude, the other parts of high-altitude goal system can be located at below, top and other suitable place of arch connecting framework, and can adopt optionally can adjust height and the version of position are set.
As required, can adopt the horizontal arch connecting framework 601 paralleling with court center line.(situation as shown in accompanying drawing 1,3 etc.).
As required, also can adopt the longitudinal arched connecting framework 602 perpendicular with court center line, in the suitable location of longitudinal arched connecting framework 602, establish at least one high-altitude goal system; Skeleton structure integrated design and the setting of the low latitude goal system at the two ends, skeleton structure Ke Yu court of longitudinal arched connecting framework 602 bottoms, two ends; Longitudinal arched connecting framework 602 can adopt the various structures forms such as single arch formula skeleton of closely paralleling, double-arc skeleton, multiple arch formula skeleton.(situation as shown in Figure 7).
When longitudinal arched skeleton structures such as double-arc that employing parallels, can consider to make two distances between the longitudinal framework paralleling close even identical with the width of the skeleton at goal, low latitude, bottom, two ends 9, the setting that can make thus total system more rationally, more efficient.(situation as shown in Figure 7).
(3), at some in particular cases, as excessive in worked as dimension of the court, directly arrange across the accessible court, low latitude of larger space structurally during more difficult, high cost, can consider the connecting framework of the high-altitude goal system of the forms such as brace type that on court magnitude setting is the least possible, as only containing the open side type connecting framework 603 of a corbeling etc., if establish two supporting constructions, can consider to make it can form the function of the skeleton structure with needed certain goal, low latitude simultaneously.(situations as shown in accompanying drawing 6 grades).
(4), can adopt supporting construction to add that crossbeam adds the goal, connecting framework structure 604, high-altitude of the versions such as suspension cable and other parts of high-altitude goal system can be hung on the supporting construction 604a of both sides; Also on the crossbeam above can being hung on, suspended-cable structure 604b etc.; The supporting construction 604a of both sides and above crossbeam, suspended-cable structure 604b etc. on optionally setting tool have sunshade, the barrier structure 604C of the effect such as take shelter from rain.(situation as shown in accompanying drawing 2,4 etc.).
(5), can consider to establish the aerial chinampa of main dependence aerostatic buoyancy and gravity that other aerial floating structure is born high-altitude goal system etc., its concrete mode can be:
Goal, A ,Jiang high-altitude is hung at independently on aerial chinampa by certain syndeton.
B, by aerial goal skeleton and air ball outdoors network framework etc. be set as the version with certain aerial buoyancy, and they are had can further take on balanced ball net, the location isostructural part of stay cord and even whole abilities of gravity outdoors.
C, location structure of tow line are located in the air to the other parts of aerial chinampa and high-altitude goal system, and make them there is the ability that can bear certain wind-force interference, location structure of tow line can consist of the high and lightweight material of intensity, locate as required structure of tow line and also can be designed to have the version of certain buoyancy, in being formed by low density material as adopted, fill the tubular style version of low density gas etc.
(6), high-altitude goal system can adopt the version that contains goal, high-altitude outer net 4, as ancient Chinese containing the goal, middle high-altitude of goal outer net form etc., in near the certain space of goal, high-altitude outer net 4 skeleton 2 peripheries of goal, high-altitude, and can hang on outside goal, high-altitude skeleton 2 and goal, high-altitude between network framework 5, outside goal, high-altitude, network framework 5 and goal, whole high-altitude outer net 4 can be set as the various shape forms such as rhombus, (length) be square, semicircle, oval, circular.(certain situation as shown in accompanying drawing 1,2,3 etc.).
Goal, high-altitude outer net 4 can be blocked and be got to the official ball near the certain space of goal, high-altitude periphery, thereby making offense have when the ball of attack trains off keep off back to the attack at goal, high-altitude is conducive to the other side and obtains ball and create the quick abnormal risks such as chance of counterattacking, it is relevant that size, height and the goal outer net at the goal, big or small Ye Yu high-altitude of certain this risk arranges the size of area etc., thus its be also can select, programmable.
In match, official ball can be squeezed into goal and score, also can by bounce-back, be returned because hitting goal outer net, thereby the attack of Shi Dui high-altitude goal system has favourable goal score and disadvantageously the contrary result such as is blocked, and locates to make attacker will have higher attack level and implement careful attack.
(7), high-altitude goal system also can adopt the version that does not contain goal outer net, as be similar to English, the set-up mode of the forms such as American football door, in such cases, even fail to squeeze into goal and score while attacking goal, ball also can be from the skeleton of goal through high-altitude goal system and forward, direction motion to the goal, low latitude away from one's own side etc., thereby the probability that the situation that makes to be unfavorable for accordingly one's own side occurs reduces greatly, the situation that causes ball to be rebounded to return as long as avoid hitting goal, high-altitude skeleton 2 grades as far as possible, both sides all can implement the more attack to high-altitude goal system with lower risk.
(8), imitative basketball goal formula: its can be divided into again have backboard formula with without backboard formula.(as shown in Figure 5).
Have that backboard Shi-it can be similar to the existing version that has the basketball device system of backboard, just its can arrange relatively symmetrically in backboard 10 both sides at least two basket structures 11 and backboard and basket structure as the important component part of high-altitude goal system in having on the space, court of high height position.
Without backboard formula-at least one basket structure is directly located on the connecting framework 12 of high-altitude goal system.
No matter there is backboard formula or without backboard formula, its bottom of playing the skeleton structure system of the connection functions such as support all can be located at outside court, to be formed with accessible court, the low latitude system that is beneficial to motion.
As required, high-altitude basketry skeleton both can be horizontally disposed with, also can with the setting that has a certain degree of horizontal plane shape, as formed the form that arranges of the basketry skeleton 13 of the high outside and low outside formula that can score more easily, a distance, syndeton Ke top of the outer upper end of the basketry skeleton 13 of two high outside and low outside formulas that are now symmetrically set can be handed over, thereby can form side-looking projection, can be closely the shape form of placed arrow type.
As required, it is the basketry skeleton structure of a level that the basketry skeleton structure of two levels that are symmetrically set can " unite two into one ", and the corresponding syndeton of high-altitude goal system can connect in symmetrical mode this horizontal basketry skeleton structure; It is a vertical basketry skeleton structure 14 that above-mentioned two symmetrical basketry skeleton structures that are obliquely installed can " unite two into one ", and the backstop structure 15 with abilities such as certain deceleration and demonstrations of the effect forms such as curtain falling type identical with traditional basketry linked network can be set in vertical basketry skeleton 14.
Basketry skeleton both can be positive circular formula, also can be ellipse and other suitable shape and form.
The goal, high-altitude of the ball game of other types also can adopt the set-up mode that is similar to above-mentioned basketball basketry, can optionally be set as level, inclination, the various ways such as vertical.
(9), the connecting framework structure 6 of high-altitude goal system can be set as the version that can connect dissimilar goal, high-altitude, thereby on space, same court, can select easily to arrange dissimilar goal, high-altitude, to carry out the ball game of different modes and form.
As required, in same ball game, can adopt suitable dissimilar goal, high-altitude simultaneously.
In the situation that being provided with Duo Tao high-altitude goal system, on different goal system, identical goal type and form can be set simultaneously, also not identical goal type and form can be set simultaneously, to strengthen diversity, variability and the excellent degree of heat and content.
(10) goal, She Yige center at least on the goal system of, high-altitude, need to arrange the left and right at goal, Shi,Ke center, a plurality of goal and even size that some peripheries goal, periphery goal are established in upper following peripheral identical from goal, form Ke Yu center, also can be different.(situation as shown in accompanying drawing 8a).
As required, on the contrary the large I at goal, center and other each goal adopt near the Yue Jin goal, position at goal, center can be larger can be less etc. difference method to set up.
As required, on the goal, high-altitude of the forms such as rectangle, rhombus, ellipse outer net 4, can become the mode of the layout such as cross that some goals are set.(situation as shown in accompanying drawing 8b).
(11), electric hoist high-altitude goal system can be set as required, it can be by being consisted of the larger a plurality of goal distributing to less excessive similar calabash shaped respectively successively from the bottom to top, when shooting goal, highly lower Qie compare great bottom, can remember less score, when shooting goal, highly higher Qie compare little top, can remember larger score, form thus the goal of more easily shooting less, the game form that more meets game principle and game situation that the more difficult goal of shooting is larger.
Both sides at some goals of the above-mentioned electric hoist layout of positions such as being located in the middle of goal outer net 4 can arrange goal, some left and right symmetrically, and the point system of the size at goal, left and right and goal score can be with reference to the situation at the middle goal of close height.(situation as shown in accompanying drawing 1, accompanying drawing 8c).
(12), as required, can be to umbrella crown structure being set in the goal system of whole high-altitude, it can be both the net formula form consisting of block formula net and corresponding skeleton thereof, also can be the board-like form being formed by glass, plastics and other structural slab, structural member, with when ball is implemented to effective block, the effect such as also can bring into play sunshade, take shelter from rain, to reduce the adverse effect to sportsman and place such as direct sunlight, rainwater.
The concrete structure at goal, San, high-altitude and the impact on concrete methods of ball game etc. thereof.
(1), Buddhism formula: in goal, space is completely empty naked, does not establish the goal form of any section of gear structure, its official ball that can make to shoot goal, high-altitude without any obstacle by goal, (situations as shown in accompanying drawing 1,2,3,4 etc.).
(2), the net formula of hanging down: vertical and have and set the vertical web frame in goal that the Duan Ji left and right sides can automatically change and open under can the impact force action at ball on the vertical shop front at the goal that certain vertical angle of inclination arranges and space, thereby can make the ball with certain attack dynamics enter opponents' court and score by goal, can suitably reduce the pace of ball simultaneously so that goal, high-altitude score be unlikely to fly excessively far away, be unlikely to directly to fly out place; Net system is hung down at goal can be automatically in state and the position of direct soft block goal correlation space with returning vertical laying under the effect of self gravitation and other suitable power.
(3), curtain falling type: the vertical structure line paralleling of the stretching some even layings that naturally drop by relying on gravity, stay cord 17 grades form the goal form of the soft block structure in space in goal, in each soft block structure stay cord 17 lower end, can all hang and establish little weight 18, so that stay cord can be by naturally stretching under the effect of the gravity of little weight 18 after by ball impact bending, each little weight 18 can all be arranged at can the structural frames that include relative closure space 19 of balling-up lower door frame effect among, each soft block structure stay cord 17 need be connected with little weight 18 through being located at the corresponding minor structure hole on structural frames 19, with the needs that meet safety and do not disturb mutually etc.(situation as shown in accompanying drawing 9a).
(4), drag rope of elasticity formula: by the structure line paralleling that relies on the stretching some even layings of elastic force, stay cord 17 grades form the goal form of the soft block structure in space in goal, in each soft block structure stay cord 17 lower end, can all hang and establish spring 20, so that stay cord can be by naturally stretching under the effect of the pulling force of spring 20 after by ball impact bending, spring 20 also can all be arranged among the structural frames that includes relative closure space 19 that can play woodwork effect, soft block structure stay cord 17 need through being located at the corresponding minor structure hole on structural frames 19, spring 20 be connected for each.(situation as shown in accompanying drawing 9b).
As required, among structural frames 19, also can establish at least one with the nearly perpendicular drag rope of elasticity 21 of soft block structure stay cord 17, each soft block structure stay cord 17 can all be connected with drag rope of elasticity 21, thereby can realize the effect that relies on the stretcher strain of drag rope of elasticity 21 and make each soft block structure stay cord 17 distortion and ball is passed through.(situation as shown in accompanying drawing 9c).
As required, each soft block structure stay cord 17 itself can be the spring rope with good bullet sex change energy, to guarantee that the official ball that hits accordingly goal can pass through goal effectively.
(5), umbrella hat type: contain between the goal, suitable space Chu Yu high-altitude that is located at top, goal, high-altitude the goal form that forms suitable angle, can form the umbrella hat type block structure of suitable block effect to the ball of high-flying attack, umbrella hat type block structure can be the net formula form consisting of block net and corresponding skeleton, thus the umbrella hat type block net system of putting on also forming; As required, umbrella hat type block structure also can be made as membrane type, the version such as board-like.
(6) goal, high-altitude both can be various single formulas goal, also can be and contained the combined type goal at big or small goal and the combined type goal of alternate manner simultaneously.
(7) round target formula goal system: simultaneously contain in Yi Ge great goal that to take minimum goal, center 22 be target center, form outside some goals arranged evenly successively circlewise, each ring-type goal skeleton 23 can by simple and direct as far as possible, meet the syndeton 24 that sphere area is as far as possible little and be connected, each ring-type goal skeleton 23 as required both can in same plane, also can be non-in same plane; On each ring-type goal skeleton, hang the net that length is different, wherein the net in inner end can be longer than the adjacent net in outer end, and the net 25 at goal, center 22 can be the longest, with this, can make the goal at different goals be distinguished more significantly; Between ring-type goal skeleton place plane and horizontal plane, can form the required suitable angle that arranges, both can be the zero degree that parallels, also can be 90 perpendicular degree and other suitable angles of inclination.(situation as shown in Figure 10 a, Figure 10 b, Figure 10 c, Figure 10 d, Figure 10 e, Figure 10 f in accompanying drawing 10).
The setting on the whole of round target formula goal, can be similar to the setting of aforesaid hoop formula goal system, and it both can be located on the goal system of high-altitude, also can be located on the goal system of low latitude; When the round target formula goal of angle of inclination form is located on the high-altitude goal system in the middle part of court, be the attack requirement that adapts to opposition both sides different directions, need symmetrically setting in pairs.
The buffering web frame of the suitable forms such as curtain falling type can be set, suitably to weaken the Negotiation speed of ball and to be beneficial to identification goal position etc. in vertically disposed round target formula goal.
In match, squeeze into the goal at minimum goal, center 22 and can remember maximum score, what scored and remember in other each ring-type goal must can reduce by score value from inside to outside successively, and minimum score is remembered in the goal at the maximum ring-type goal of outermost end,
(8) relevant each goal, high-altitude can be set as variable versions such as can selecting increase and decrease, switch, convergent-divergent as required, to adapt to the different requirements of different balls war forms and process.
Four, mode and the method for ballistic goal and the ball game that can form thereof:
Ballistic goal: be provided with the wikipedia type trajectory passage 26 that can signify missile flight trajectory in the middle of goal, wikipedia type trajectory passage 26 can establish at two ends inner small and outside big horn mouth formula structure 27, thereby form, both ends open is large, the version at the ballistic goal of intermediate elongated.(situation as shown in accompanying drawing 11a, Figure 11 b).
The needs of the visual match of length of wikipedia type trajectory passage 26 etc. are determined; The sectional dimension of wikipedia type trajectory passage 26 can be little to the ball accusing each other that makes two relative motions cannot be simultaneously by, the degree that can only mutually collide.
Among wikipedia type trajectory passage 26, can establish as required soft section of gear structure 28, to play the effects such as movement velocity that delay the ball that passes through; Also can among the horn mouth formula structure 27 at wikipedia type trajectory passage 26 two ends, establish as required soft section of gear structure 28.(situation as shown in accompanying drawing 11a, Figure 11 b).
The ball of the attack on ,Ke She goal ectosphere web frame 4 ,Da goal ectosphere web frames 4 will be blocked as required, thereby make that the attack at ballistic goal is also had to income and risk simultaneously and chance and the effect of depositing.
As required, in the goal system of high-altitude, can establish simultaneously various ways from size different ballistic goals.
During match, both sides sportsman in antagonism can be simultaneously or is being differed in extremely short time and from both sides, goal, attack respectively together same ballistic goal, when both sides almost shoot respectively after the horn mouth of both sides, goal simultaneously, both sides' attack in most cases can be met, bump against in compare Chang goal wikipedia type trajectory passage 26 with ball, and following three kinds of basic conditions appear in the possibility of result of shock:
A, both sides attack with ball due to all attack accurately and attack dynamics suitable, all bounce-backs all fall after rise to we and attack place fast after meeting, bumping against, now both sides can be evenly matchedly, optionally can all forget minute, also can optionally all record score.
B, the attack degree of accuracy and the dynamics of one side's ball are obviously better than the opposing party, as: a side attacks Yong Qiuzhiru goal wikipedia type trajectory passage 26, not at bell-mouth structure of air 27 places in outside because of collision, break-ins etc. consume kinetic energy or consume very little, and the opposing party may be not accurate enough owing to attacking, ball at horn mouth place because of collision, it is larger that break-ins etc. consume kinetic energy, although also may standard but the situation such as ball speed and dynamics be inadequate, after causing two balls to bump against, fly in pairs and enter and fall to weak tendency Yi Fang court, thereby make advantage one side obtain the situation of double play and double and even many times of scores.
Under certain above-mentioned condition, also may occur that weak tendency one side is hit back own half with ball, and after the hitting with ball of advantage one side, rest on the situation among the trajectory of goal, now advantage can be remembered corresponding score, both sides can continue to attack the ballistic goal of this ball that retains attack last time, in corresponding new attack, may occur that two are squeezed into the situation of opponents' court with ball above by ballistic goal simultaneously, thereby be that advantage one side creates larger scores.
Utilize ballistic goal, can carry out the match of the indirect confrontation type that each side all the time can only be in own half; Also can carry out the match that both sides all can enter the facedown formula that opponents' court attacks, defends and control ball.
As required, the match of a complete facedown formula can be divided into some joints, that at every joint, competes is initial, both sides sportsman's large portion and even all can be all first in own half, and part so all sportsman all but everyone at least holds a ball bullet and starts ball bullet to attack to ballistic goal, after commence firing, what by ballistic goal, shoot space, away ground is score live ball, not by ballistic goal but what enter opponents' court space is score live ball not, the ball bullet in own half space of falling back after being stopped by goal outer net and being hit by the attack of the other side's ball is dead ball, dead ball will be stood down, and score live ball and not score live ball all can continue to participate in match.
As required, both sides all can come and go and fight in one's own side and opponents' court: hold ball, ball-handling, transition, attack and defence, in each is attacked, hit a ball outdoors net and being kick-backed behind one's own side court by other marble of marble, all becomes dead ball and stand down; The mid game stage squeezes into the ace-shot of goal, low latitude, the other side two ends and other special balls door and also can calculate dead ball and stand down; The marble that the mid game stage gets out-of-bounds also can be regarded as dead ball and stand down, if but directly fall outside court and will count corresponding score again after first squeezing into goal, high-altitude.
One can select apart from edge, court closely but goal, get Geng little high-altitude can be set to attack, and squeezes into goal, Geng little high-altitude and it is directly fallen into outside court, can remember larger score and the other side is lost the chance that obtains ball and counterattack.
Club through the competition on canto time back court is fewer and feweri, when remaining last official ball and the end of match time also not then, on field, will remain and carry out the form of single ball Great War, until fixture finishes, the mode of other single ball Great War in grand formula ball game of fighting that the mode in single ball Great War stage and method can be introduced with methods and this case of existing ball game is close with method same.
In fact, if condition is permitted in match, in the match that all indirect type in own half resists all the time of Ru each side, and for example in each side, all can enter the Competition Phase of the non-direct contact antagonism in the direct-type antagonism match of opponents' court, (as competed, initially waiting the stage), both sides all can start the intensive attack of the continuous saturation type of running fire fast successively of many balls to a certain or some ballistic goal simultaneously, to strive accurately having group's bullet of dynamics to attack the attack of suppressing efficiently and hit the other side and the other side; In high-caliber match, the many ball bullets of both sides may meet simultaneously, meet, bump against among the narrow ballistic space at corresponding goal, finally will there will be the multiple result of attacking against each other, whole process will be unusually brilliant, create mirable competition scenes and payoff.
If both sides are offensive attack simultaneously, the group's bullet that will suppress the other side with maximum advantage in the shortest time, with a side of maximum precision and the maximum ball bullets of dynamics tapping is attacked, finally more ball bullet is squeezed into, bangs into, sent into the other side's position, court, thereby create maximum score and triumph.
In the match mode of indirectly antagonism, after the ball bullet of both sides' specified quantity and form has been beaten, can be considered an independently end for a trifle ball match for complete attack echelons thatch of symbol, squeeze into the other side's ball bullet total quantity and total taste and account for the superior and win; In can the form of play of facedown, one square tube is crossed the ace-shot that the other side is shot at ballistic goal, can continue as one's own side sportsman grabs, controls, and can be from door inferior space passback can form the new attack to ballistic goal, the offensive attacks such as goal, low latitude to the other side forward of certainly also can directly controlling ball.
Above-mentioned ballistic goal and the many balls of many bullets process and the scene of the missile attack of game mode in can simulate modern war and anti-ballistic volley etc. such as attack against each other simultaneously, when guided missile is attacked against each other and the large postwar of anti-missile interception, both sides sportsman can kill opponents' court, continues contention and strive for the ball and make great efforts to hit the goal, low latitude of getting the other side, thereby exploit success or retrieve the rough sledding of guided missile in attacking against each other, it can simulate and general flow process and the shell type method of deduction modern war.
The methods of Wu, room cage type court apparatus system and ball game thereof:
As required, can adopt and can utilize efficiently space, Deng vacant lot, city, have the court apparatus system from the room cage every functions such as protecting, can modify tone, it both can be the pure cage construction form only consisting of corresponding skeleton and various net 29 etc., also can be roof and periphery have can be rainproof, the room formula version of the function such as sunshade and even holding chamber internal gas pressure; In room cage type court apparatus system, be at least provided with Yi Ge high-altitude goal system, can be provided with the low latitude goal system of requirement simultaneously; The places, locus such as room cage type court apparatus system can be built on the ground, waterborne and building roof.
Room cage type court apparatus system can adopt following more concrete different forms and form according to space, place, ball game type philosophy:
(1), high tower: Ci Zhong room cage type court apparatus system is similar to high wide larger point building on appearance profile, therefore can be described as: " high tower ", it is suitable for take empty day Great War---and to the attack of high-altitude goal system, be main game exercise, because its relative floor space is less, for site coverage Gao city, also can adapt to preferably, it is relatively little that its goal, low latitude can be established, to adapt to the little feature of court plane depth.
According to needs such as space, place, plastic arts, the high tower court facility system of guided missile moulding can be set, its floor projection can be the difformity forms such as circle, ellipse.(situation as shown in accompanying drawing 12a, accompanying drawing 12b).
In the room of high tower and some other form cage type court apparatus system, due to horizontal space size and place circumferential size all relatively too small, can adopt accordingly and highly be greater than obviously larger goal, vertical low latitude of width, even high wide ratio, to be convenient for people to falling spheres such as high-altitudes with head, to shoot goal with chest, abdomen, leg etc., can stipulate deliberately directly with pin, to attack above-mentioned vertical goal, pin is attacked ball, and score and possession of the ball are not given to the other side yet simultaneously; As required, in inside, vertical goal, compare little goal can be set, even class is brought up the forms such as chamber Geng little goal in ancient Chinese can be set, less and even Geng little goal can score the goal with pin for people.
(2), mongolia yurt type: it can be considered a kind of special shape of ridge room formula, its top can be the shape forms such as hemispheric, centrum formula, in the space of top bump configurable suitable form high-altitude goal system, court, bottom etc. can be the forms such as circle, ellipse.
(3), the orange field device system of the form such as above-mentioned guided missile formula, mongolia yurt type can be set as required can be under the effect of the power such as manpower can integrally rotated version, thereby make corresponding room cage type court apparatus system not only can make people carry out corresponding various ball game in portion space within it, also can allow people are outside and inner at it to be made it carry out whole rotatablely moving to make people obtain exercise by the mode such as promoting or pull.
As required, can form the motion such as ball of part population in inner place and space promote with space (also can comprise inside) externally and pull the collective motion of the integrally rotated part population of whole apparatus system to respond to and cooperate with each other across a great distance, the motion scene of phase mutual excitation etc.
As required, everybody drives the power of the whole apparatus system of lower rotation to be converted into electric power by suitable mode, thereby make this exercise process can create certain energy and economic worth, the electric power producing can be directly or by modes such as electric power storages, is supplied with the needs such as illumination of whole telecontrol equipment system simultaneously.
As required, whole apparatus system can be by the circuit orbit system of bottom, the main part of the apparatus system on top, be located at some wheel constructions below the main part of apparatus system on top etc. and form; Some wheel constructions that the main body of whole apparatus system can arrange by its underpart in shuttling movement on the circuit orbit system of bottom, the rotatablely moving of the low angular speed of the main body of whole apparatus system under manpower effect can be changed the rotatablely moving of higher angular speed of some wheel constructions that its underpart arranges into, and some wheel constructions can directly or by necessary accelerator drive motor generate electricity; The process of generating is also the process of the resistance of motion that provides for whole telecontrol equipment and people's exercise motion; The adjustable resistance structural system that also can add independently as required or work with TRT simultaneously, thus people can be adapted to better by the needs that drive said apparatus system to carry out motion and exercise preferably.
As required, also can in the orange field device system of the forms such as the guided missile formula being fixedly installed, mongolia yurt type, establish the structural system that can rotate around orange field device under the effect of the power such as manpower, thereby can in the complete actionless situation of whole room cage type court apparatus system main body, still can realize scene and the function of in aforesaid, moving outside the venue simultaneously, still can make whole apparatus system performance multiple action; Can, by structures such as some steamboats provided thereon in the circuit orbit cocycle campaign of being located in orange field device system periphery, can certainly allow to can in the structures such as some steamboats of being located in orange field device system periphery, do shuttling movement by circular ring-shaped track provided thereon around the structural system of orange field device rotation around the structural system of orange field device rotation; In above-mentioned motion, thereby the structure such as some steamboats can obtain higher rotating speed and can directly or generate electricity by corresponding accelerator drive motor; The adjustable resistance structural system that also can add again independently as required or work with TRT simultaneously.
(4) ,Ji room formula: can be the room cage type court apparatus system that is similar to the construction style that contains the raised ridge structure in middle part and space, raised Chu She high-altitude, the space goal system at middle part, the dimension of the court of this kind of form is changeable, the setting at goal, low latitude also can according to circumstances be selected flexibly, can, as one of principal mode of room cage type court apparatus system, can be applicable on the suitable space and place of vast Urban Areas generally.(situation as shown in Figure 13 a in accompanying drawing 13, Figure 13 b, Figure 13 c).
(5), trapezoidal roof type: the room cage type court apparatus system that the vertical section of top ridge structure and space profiles is tapered in form, it is more suitable for being provided with in the ball game of two and a plurality of high-altitudes goal system simultaneously.
(6), overhead type and hanging type: whole room cage type court apparatus system is located on a certain space by some strut supports of bottom or is relied on that corresponding syndeton is unsettled is affiliated on some larger structure and building system, due to built on stilts or unsettled setting, therefore whole apparatus system can directly not take or only take minimum ground space, thus can Shi Qixia ground and space as uses such as road, land use for greening, other athletic grounds.
As required, on the outside at overhead type and apparatus system top, hanging type court, can add outside upper high-altitude goal system, overhead type and hanging type court apparatus system (outside) lower end and periphery certain limit Nei place thereof can form outdoor Zhan Yishi court system with space together with outside upper high-altitude goal system etc., overhead type and the hanging type room cage type court apparatus system central area in above-mentioned outdoor Zhan Yishi court space system, forms the spatial relationship form of parcel room, outdoor court cage covered court.
As required, outside in overhead type and apparatus system bottom, hanging type court also can hang outside lower high-altitude goal system simultaneously, and outside lower high-altitude goal system can be independently or with ground space etc. is common, form outdoor Zhan Yishi court system together with the goal system of outside upper high-altitude.
(7), greenhouse and " solar tower " formula---utilizing the materials such as plastics, glass with impact resistance to construct can be every the greenhouse type that protects, has an X-rayed, views and admires and can gather sunlight, the insulation degree court of moving, when whole greenhouse type motion court becomes the high tower shape form that is easier to poly-harvest season season sunlight, can be described as " solar tower " formula.
By the setting of the means such as necessary daylighting, insulation, ventilation, sunshade, greenhouse and " solar tower ”Shi court system can be created better naturally cool in summer and warm in winter and air pressure adapt circumstance, thereby is particularly suitable for the use in the areas such as cold, severe cold and high height above sea level.
(8), semi-underground type---system bottom, court is in underground, the room cage type court system containing underground sinking space form of top in ground, it can make full use of the underground space, reduce whole court system ground level, there is feature cool in summer and warm in winter, simultaneously the wall of under ground portion can naturally be built into easily again cheap and durable every protecting and enclosed construction system, thereby reduce the cost of the life cycle management of system; And aerial part can be set as full cage net formula, containing rain and sun roof type and aforesaid greenhouse and the form such as the sun is tower.
(9), cage in cage: also can be described as Wu Zhong room formula (double deck formula), on the suitable location such as center within vertically height and compare great great room, space cage type court apparatus system and space, can build that aforesaid bottom departs from ground completely and unsettled cabin cage type court apparatus system compared with little being similar to, the space that corresponding size should be continued to employ in cabin cage type court apparatus system top outer and periphery outside, for the passage that the large high-altitude goal system of large room cage type court apparatus system is set and attacks as Dui great high-altitude goal system etc.
Space and the facility system of the grand formula ball game of war of complete together with the spatial channel that the space of unsettled cabin cage type court apparatus system bottom is attacked with goal system Ji Dui great high-altitude, above-mentioned large high-altitude goal system etc.(situation as shown in Figure 14 a in accompanying drawing 14, Figure 14 b, Figure 14 c).
Above-mentioned method to set up can be utilized space and apparatus system more efficiently, it can not increase whole apparatus system and shared space size thereof, in the time of ball war motion game in the large room of not excessive impact cage type court apparatus system simultaneously, increase and corresponding cabin cage type court apparatus system, and the larger cabin cage type court device of width is further separated out to several Geng little room cage type court apparatus systems in transverse region.
Due to the cabin cage type court apparatus system of zone position in space exist cage type court apparatus system Zhong high-altitude, , great room ball to fight some is similar to mountain on the other way round and the artillery action of carrying out every sky and the war of guided missile.
When Dang great room cage type court apparatus system adopts partly-exposed basement form, the Ke Yu ground, bottom of its inner cabin cage type court apparatus system arranging is with high, the also certain altitude that can be above the ground level, thereby forms all cage---large systems of double deck formula in cage good and that efficiently utilized the underground space of total use function and art of architectural modelling.
As required, in cage cage type court apparatus system can be around center according to big-and-middle containing in little, little containing less mode be designed to containing more multi-layered time the version of multiple sheathed formula.
(10), skeleton inflatable---court components of system as directed and even all skeleton all adopt the version of the inflatable with functions such as can conveniently packing up, thereby form together inflatable back bone network, on inflatable back bone network, can establish the light-duty safeguard structure of the forms such as net formula, membrane type.
(11), inflatable in whole: whole facility system periphery adopts the structures such as membrane type to seal, and make in whole system space be filled with to there is certain air pressure higher than atmospheric environment air pressure, utilize the inside and outside draught head of system to prop up the membrane structure etc. of whole system periphery, simultaneously, ad hoc load-carrying members face above the goal system of high-altitude, on load-carrying members face, establish load-bearing skeleton net and can rely on the floating such as the closing membrane structure of the poor floating of system inner and outer air pressure, load-bearing skeleton net can consist of main framing and branch's skeleton etc., the floating structure that branch's skeleton is distributed in place, Bing Yuge zonule on whole load-carrying members face equably is directly connected, combine, even with the buoyancy making progress that whole floating structure is subject to, pass to fully branch's skeleton, main framing and whole load-bearing skeleton net, thereby can make each main framing and the whole load-bearing skeleton netting gear that are connected with all multiple-limb skeletons have suitable weight capacity, and then can be on some main framings direct Diao She high-altitude goal system.
As required, can set up in the some regions that do not join some independently load-carrying members faces separately simultaneously, thereby on the more large-area floating structural plane with buoyancy that makes that corresponding gravity load can drop on whole interior inflatable facility system top more equably, on some load-carrying members faces simultaneously Diao Sheyige high-altitude goal system, also can hang simultaneously and establish a plurality of high-altitudes goal system.
As required, the skeleton structure of the empty goal system of above-mentioned load-bearing skeleton net height etc. can further be set as the version of the lighter weight of the forms such as interior inflatable, can reduce the gravity load of whole system like this, be beneficial to again high-altitude goal system setting, pack up and safety, can make above-mentioned interior inflatable skeleton structure etc. with whole in the pneumatic system of inflatable court system unified mutually.
As required, also can an at least ad hoc arch in the apparatus system of inflatable court in whole etc. the large span inflatable skeleton structure that is exclusively used in Diao She high-altitude goal system of form, large span inflatable skeleton structure can connect as one with the floating structures such as closing membrane of the poor floating of dependence system inner and outer air pressure; Because large span inflatable skeleton structure itself can be carried certain gravity load, in the acting in conjunction that adds the available larger buoyancy of floating structure of the dependence inside and outside differential pressure that connected area can be larger, can further make total can carry the weight loading of Geng great high-altitude goal system etc., certainly, also can make as required the pressure reduction inside and outside the space system of whole court suitably reduce, more to adapt to the needs of people motion etc., can correspondingly reduce, maintain the poor required relevant power consumption of whole court space system inner and outer air pressure simultaneously.
Inflatable spatial structure system in the above-mentioned integral body that contains large span inflatable skeleton structure, even the structures such as goal, Bu She high-altitude, not as court apparatus system, its set-up mode is also favourable in many-side, can be applicable in other many interior inflatable spatial structure system.
Inflatable court facility system in above-mentioned integral body, is particularly suitable for place and the situation of the narrow spaces such as city, is particularly suitable for the ground of the unfavorable motion of high height above sea level rarefaction of air, is particularly suitable for relying on cold and the severe cold area of environment temperature in the lifter motions such as solar energy; It can be the morphology form such as tower, arched ,Ji room formula on the whole; It should both fully meet the needs of space, can consider efficiently to utilize again the needs of solar energy, geothermal energy, thereby can adopt the membrane structure with abilities such as high-efficiency lighting insulations and the frame mode that optionally can adopt half ground formula.
(12), water boat formula---can utilize Water space to build fixing and water boat-shaped Shi court system movably, this court system can all be built on water surface deck, also can adopt the mode of similar aforesaid " semi-underground cell-type ", make the bottom of court system among the cabin lower than the water surface, even can make whole court system be built in other appropriate architecture Ti top on ship, thereby the boat that makes whole ball war can have better space utilization ability, and the boat of ball war also can become the new-type travel tool with functions such as pleasure-boats, the boat of large-scale ball war also can become the large-scale new-type pleasure-boat with brand-new characteristic, certain above-mentioned ball war facility system also can be located among the boats and ships of other purposes, for uses such as crewman and passengers.(situation as shown in Figure 15 a in accompanying drawing 15, Figure 15 b, Figure 15 c).
Six, utilize game mode and the method for the ball game that the tool systems such as special vessel, car first and even " power " aircraft carry out:
First, can on the suitable water surface, establish high-altitude and low latitude goal system, the Great Game that opposing teams can carry out corresponding ball game waterborne by Waterborne movable modes such as vessel, swimming.
Can imitate aforesaid ground set-up mode waterborne fixed high-altitude and the low latitude goal system of suitable form are set, to realize the game process waterborne that is similar to ground game process, can on all or part of competition vessel, establish movable goal system simultaneously, in match, both sides sportsman not only can resemble in court, aforesaid ground match like that by attacking high-altitude and low latitude fixedly goal and score, can also pass through movable goal on attack the other side ship and score.
High-altitude waterborne goal system and low latitude goal system can be located at relatively fixedly on vessel, chinampa etc., the match driving with at least one people can come and go, gallop on the whole match water surface with vessel, player on vessel can utilize that hand, foot, other suitable position of health and club etc. are held ball, batting instrument, to realize, obtain ball, ball-handling, and to catch and create openings makes great efforts ball to shoot the other side's goal, low latitude and goal, corresponding high-altitude.
In all or part of match of both sides, also can establish the portable goal system of moving with vessel on vessel, both sides' match can be attacked opponent vessel Shang goal with ball with the player on vessel, hit and score, in match both sides' man-of-war will be all in continuous motion, to create favourable attack position and state and formation can prevent position and the state attacked preferably; Both sides drive between power hand that vessel advances and the player who is responsible for attacking etc. and want the close coordination of height of formation and coordinate, to create at the volley and to catch favourable attack opportunity to complete rapidly the other side is moved to goal and fixedly effective attack at goal.(situation as shown in Figure 16 a in accompanying drawing 16, Figure 16 b, Figure 16 c).
After movable goal on a certain match vessel is hit, offense not only can remember minute, also can be in some cases, as hit the other side a certain lifeblood formula goal and non-lifeblood formula goal and repeatedly hit etc. in situation, all players that can sentence on this vessel and ship stand down together, thereby make score side obtain the upper advantage in larger field, it is also consistent with the war rule such as real sea warfare simultaneously.
On each vessel of both sides, can be equipped with some suitable model, the attack ball of suitable number, the weight of ball for the attack of different model, shape and size etc. can be not identical, be beneficial to in distance, just, size, sound, choice for use in the attack at the goal that the aspects such as speed are different, certainly, if the various attack of suitable number is all finished with ball, corresponding vessel system will be lost attacking ability, while not needed to stand down but if it does not inflict heavy losses on, it on the one hand also can be as the fixing shield of goal system in the important vessel of other one's own side and low latitude, can also disturb and destroy in the mode of other allowance opponent's attack action on the other hand, as passage, hinder that the other side passes through etc.
Power hand in above-mentioned vessel system and controlling among the space system of the safety that hand etc. can be in being surrounded by net protection structure 30 and cabin etc., so that its not threat of ball under fire, net protection structure 30 can jointly form the portable goal system on vessel together with other web frame etc. simultaneously, when the ball of attack hits above-mentioned net protection structure 30 and other web frame, its impulsive force can by the absorptions such as door net with dissolve, the ball of attack can be at effect whereabouts introduction ends off the net such as gravity, and can enter among ad hoc ball gathering system through ad hoc collection channel, the situations such as number of times of being hit by a bullet with this provable this ship, both sides' marble used can have obviously not identical color as required, pattern, to facilitate differentiation etc.(situation as shown in Figure 16 a in accompanying drawing 16, Figure 16 b, Figure 16 c).
Attacking driving hand in vessel system can the naked suitable location in vessel on, also can freely move and obtain best attack position to implement efficient attack; Attacking driving hand can optionally determine whether to undertake the protection of this ship goal system, and the removable goal system on each vessel also can optionally determine whether to establish goal defence personnel.
If two, by court, displacement land, court waterborne, above-mentioned vessel waterborne is become to land car first simultaneously, can form game form and the game playing system of the land car first Great War of similar aforementioned vessel Great War waterborne.
Three, waterborne and land area can be located in motion and the court of game simultaneously, corresponding battle on water vessel and land battle Che Jiake participate in game simultaneously, form " land sea Great War ", its can be that is virtually reality like reality the certain situation of land sea Great War, and can make game battlefield among artificial space and real place.
Four, can adopt with the nature's mystery system with motor-driven vessel, Che Jiawei support and traction compared with strong power waterborne, on the ground and participate in game, the drive system of whole nature's mystery system Ke You bottom, the flight system at top and the connection drive system in middle part and the compositions such as connected system of flight system; The aircraft system at top can be all the time in higher space; On nature's mystery system, can establish some attacking driving hands, driver etc., in the suitable location of nature's mystery system, establish at least one goal, high-altitude simultaneously, can be for the movable high-altitude target target control system accusing each other to form.
Aircraft system on the flight system at top can be directly regularly on the connected system of middle part, also can be flexibly can be aircraft and provide on the motor platform system of Multidirectional motion space and Multidirectional motion ability on connected system top, middle part, thereby make aircraft not only can with the water surface, the drive system part motion together on ground, also can in certain height and spatial dimension, have and independently can carry out up and down, left and right, faster motor-driven ability is waited in front and back, thereby further promote the air mobile of aircraft system, the ability that attack and defence etc. comprehensively fought.
Because the power of nature's mystery system is large, its movement velocity can be apparently higher than the movement velocity that relies on manpower, weak motor-driven power-actuated vessel, car first system, simultaneously due to its can be all the time in compare Gao locus and there is good airmobility, therefore no matter it is the attack to movable and fixing goal, the low latitude target in waterborne and ground, or all can form obvious advantage to the attack of goal, the fixed high-altitude target in compared with high-altitude.
Nature's mystery system Shang high-altitude goal system etc., also nature can become the active attack target of the ball bullet of launching on Ground Vehicle first, water surface vessel etc., certainly both sides' nature's mystery system also can the game in target of attack each other among.
As required, whole nature's mystery system also can become the three-dimensional attack system jointly consisting of the attacking system (player, batting instrument etc.) on the platform of the multi-level differing heights such as bottom drive system, middle connected system, top flight system, it not only can have height and the speed advantage of air attack like this, also has the three-dimensional powerful attacking ability that can be similar to aircraft carrier fleet simultaneously; Certainly on the other hand, on nature's mystery system, correspondingly also can establish multi-level a plurality of goal system of the differing heights that can be used as target attack.
Five, different from aforesaid bottom motor driven nature's mystery system, also can establish as required rail mounted nature's mystery system:
By establishing the flight track system that can move for quick high-altitudes of aircraft such as aircrafts on the whole with in the direction of the perpendicular direction of high-altitude goal system and other matters, realize the aircraft such as aircraft in aspect advantages such as height and speed.
As required, flight track system can be built on the domes system of large span of whole court system, certainly the system such as Ke She high-altitude and goal, low latitude simultaneously on the domes system of large span.
The advantage of rail mounted nature's mystery system is: set-up mode and structural system are relatively simple, and shortcoming is: the flight path of aircraft is limited on specific track, makes it lose larger outmaneuver, becomes the easily locked target with attacking.
Rail mounted nature's mystery system is more suitable for building in land, containing the ,Lu island, land of the water surface and have on the water surface on island of more comparatively dense.
Six, by setting and the utilization of above-mentioned water, land and air sky system, can form the methods of the ball game of more complete simulation modern war:
In the ball game of above-mentioned situation and alternate manner of the present invention, can adopt directly as required, indirectly rely on manpower and the delivery device of other strength transmitting ball bullet and the ball pitching tool of other form to participate in match.
In match, both sides can first select to hit the other side's reserve force or seize the critical positions that threatens the safety such as opponents' goal, thereby weaken and transfer enemy, obtain battlefield supremacy.
The core bead door of the goal system of the positions such as low latitude in both sides' great depth rear etc. can be considered one of game both sides' strategic interests of wanting most and lifeblood, the ground that both sides must go all out to fight the floods, therefore will become the most important attack of both sides and defended target, become important induction and the support that can transfer the other side's strength simultaneously; As signifying that empty day target, the trajectories of missile attack such as satellite are, the fixed high-altitude goal system of the important war systems such as node of anti-missile interception and key element aspect is also most important attack and defense target; Vessel, car first and nature's mystery etc. have the common both sides' of formation such as the technical equipment of the higher performance such as motor-driven and the power hand on it, driver, player, commanding effective strength, are the main bodys of game, are the keys and basis that determines victory or defeat.
Qi, high-altitude goal system can become the motor-driven every the systems such as protecting wire net and the lifting to space, whole court usefulness thereof of court simultaneously:
After the height of adjustable high-altitude goal system is reduced to a certain degree, it not only can become a kind of optionally low latitude goal system that has, can also optionally make high-altitude goal system become the motor-driven every systems such as protecting wire nets of court, be beneficial to the efficient utilization in space, whole court.
As required, goal, all high-altitudes is closed by structures such as nets, sealing, corresponding whole goal system both can become can to official ball carry out gross area block every protecting wire net system, if by the goal in overhead, region such as middle parts, court-fall to the suitable height on ground along corresponding structural system every the system such as protecting wire net, former larger area court can be separated easily as a plurality of courts system, vice versa is returned to original larger area situation easily, thereby make whole court equipment and space system thereof there is good changeability and applicability.
In the middle of can simultaneously establishing in standard football pitch and other area compare great court and front court, back court Gong Sange high-altitude goal system, if as required, by the goal bottom of middle high-altitude goal system fall to ground, Jiang Ge goal is sealed with net simultaneously, primary standard football pitch can be divided into two identical new courts; By setting up the goal, high-altitude of goal system ,Bing Jiang front court, motor-driven low latitude, back court, be adjusted to suitable height, can form two new Zhan Yishi court systems.
As required, if by the goal bottom of the high-altitude goal system of front and back field fall to ground, Jiang Ge goal is sealed with net simultaneously, primary standard football pitch can be divided into the San Gexin court in court in the middle of comprising, court, two outsides; By setting up corresponding motor-driven low latitude goal system, and goal, middle high-altitude is adjusted to suitable height, in the middle of can making, court becomes Zhan Yishi court system; Court, two outsides can be used for traditional football motion.
Because standard football pitch has the large width of 68 meters, each high-altitude goal system also can be horizontal two goals, Tao Jiduotao high-altitude are set, therefore above-mentioned formed less Zhan Yishi court system further laterally can be separated out to two and a plurality of less Zhan Yishi court system at net with lower etc.; As when middle high-altitude goal system is fallen and be made as filter after formed two new compared with little Zhan Yishi court system, separate further again, thereby can on the place in whole standard football pitch and space, form four, six and even more less Zhan Yishi court system, thereby can make the more people grand formula football that participates in fighting.
In fact, when in space, Yi Ge great court, (as space, standard football pitch) top arranges two and even a plurality of high-altitudes goal system, and make this great court space system as a complete large court, for two teams sportsman ,Liang Zhi forces have at many levels, when the attack of multiple tracks high-altitude goal system and large space depth and game, the grand formula ball game of war such as the grand formula football of whole war are also larger by having stronger space warfare color, its entertaining and inspiration meaning.
Due to the existence of a plurality of high-altitudes goal system with can be attacked, it makes the very big part position in whole court can become the direct attack point that obtains, the transfer velocity of ball between many direct attack points also can be accelerated greatly simultaneously, therefore the defence personnel's that make the difficulty of defence and need to drop into quantity is increased significantly, thereby can make both sides drop into more forces and participate in whole motion, in some time part sportsman may be generally relative be active in some FX, to tackle the attacking chances of unexpected acquisition and the defence task of facing suddenly, other sportsmen undertake the task of large region and even whole fast reserve, certainly the large region of high flow rate and even the task of whole court fast reserve can be undertaken by sportsman's alternate turns of different piece, thereby make entire squad have all the time efficient fighting capacity.
If do not carry out the grand formula ball game of war of the large space of whole formula of above-mentioned unification, can utilize above-mentioned many high-altitude goal system and on goal, many high-altitudes carry out air battle between many troops rehearsal, thereby can make more personnel utilize space, above-mentioned court, with larger the utilization ratio that improves space, whole court and facility simultaneously.
Eight, the building system that space, Ke Yu place is set of relevant court facility system etc. organically combines:
First due to setting and the efficient utilization to vertical and whole space thereof of high-altitude goal system, in the motions such as attack of people Xiang high-altitude goal system can by relevant many health strength such as strength of one's legs, hand-power and the time discharges fully, shows so the property made widely known bring into play, thereby even if make, in its space in horizontal depth compare little urban cells, also can obtain compare Qiang place, survival ability.
Two, in areas such as the high latitude of cold and severe cold, high height above sea level, can consider with the construction of the solar building system of building distance unified mutually, make many need to, compared with 11 people of greater room and even ball game facility systems such as the grand formula football of war that can more numbers, can being located at better among following sun city.
Its San,Ke Jiang high-altitude goal system is directly located at the top of the tier building of bottom overhead type.
Four, the goal system of some differing heights can be located to the built on stilts multilayer of form and some intermediate spaces region of skyscraper and even the top of building, particularly, in the middle of Ke building body, build the built on stilts part of some suitable forms, hanging garden can be done, Ke She great high-altitude goal system on each hanging garden space in the bottom of built on stilts part.
The structures such as protecting wire net, protective plate of can setting up defences between great high-altitude goal system and hanging garden, it can make the ball of the attack of downstairs court Shang Dui great high-altitude goal system attack can not fall among hanging garden on the one hand, the structure such as protection network, protective plate can make again hanging garden become a cage space, room on the other hand, forms room cage hanging garden.
Among Ke room cage hanging garden, establish as required corresponding little high-altitude goal system, thereby make this hanging garden become aerial room cage type court, if certain She great high-altitude goal system on garden aloft not, the residing whole overhead space of hanging garden can be set as larger aerial room cage type court.
The window and the body of wall that five, are provided with the building of high-altitude goal system and the relevant building of periphery thereof can adopt the flexible network structure with low noise and necessary intensity and durability to protect, the metope of the body of wall of building also can be done the protective processing that the anti-pellet impact of meeting of other form and low noise etc. require, thereby the impact that the crowd in building is subject to is very little, also building is not caused damage, the building that simultaneously also can effectively utilize periphery forms naturally preferably every protecting court.
Six, can utilize in the middle of the court and overhead type individual layer, the multilayer structure of periphery more easily arranges high-altitude goal system, hangs corresponding court protecting film simultaneously, every protecting wire net etc., thereby form the room cage type court system that relies on relevant building, this method can be applicable among the building system of villa, garden, hotel and even community, thereby forms corresponding cage villa court system, cage garden court system, cage hotel court system, court, cage community system etc.
Seven, in cold and severe cold area, when the above-mentioned room intrasystem building of cage type court adopts east-west construction style, in the directions such as Ke Qi southern side, establish can more efficient glass and the directions such as light transmissive material ,Er Qi north side such as film can add the solar building room cage type court system that the better material of the performances such as insulation contains building system jointly to enclose inside in good time.
In solar building room cage type court internal system, the overhead space of the bottom of middle building system, the high-altitude net system space on top, and between the space of building system south and north flanks, can jointly form around and surround in the middle of the unobstructed annular space of building system, in the winter time and surrounding time, building surface and air in this region, annular space south will be heated by sunlight, temperature rises, thereby the south and north flanks in building forms the temperature difference and draught head, and then in unobstructed annular space passage by the circulated air that forms the temperature difference and draught head and promote, circulated air is passed to north side naturally by the solar heat that system southern side is obtained, pass to each position of annular space, so just be equivalent to middle building system to form Ge Hu space and a heat-insulation system having higher than environment temperature, Gai Gehu space and heat-insulation system can be brought into play lifting temperature to building system in the middle of whole, buffering and the warming soft effect every protecting.
Annular space passage (Ji Gehu space and heat-insulation system) as ball game game play space, on the one hand by the heat that naturally obtains greenhouse effects and produce, also the middle building system institute dispersed heat surround will be obtained on the other hand, therefore its temperature can be more significantly higher than the temperature of ambient air, and its with higher temperature to middle building system every protect also can make in the middle of building system heat loss still less.
Eight,, for more fully utilizing efficiently space and the solar energy resources of relevant range, can adopt the room cage covered court system that makes to rely on winter solar energy natural heating---the distribution form that court, greenhouse system and outdoor outdoor court system are arranged in order by suitable interval, north and south.
For utilizing better whole resource, Ke Jiang room cage covered court system is set as semi-underground form, it can be single formula, also can be combined type, as primary-secondary type etc., like this its both can to have utilized ground temperature to realize cool in summer and warm in winter etc., can unlikelyly because whole height is too high, take again too much space and sunshine resource.
Can court, some Pai greenhouse system be set by minimums distance for sunlight such as six hour sunshines of winter solstice, to realize the solar energy in winter greenhouse court, naturally heat, certainly due to the temperature of the spaces such as court, can be starkly lower than the requirement of other human residential space, therefore can optionally reduce actual relevant minimum distance for sunlight for utilizing space resources more efficiently.
Between the system of court, greenhouse, can establish the outdoor court of some rows, the periphery of court, greenhouse system is gone along with sb. to guard him etc. every protection structure, not only can the official ball of covered court be shielded and be protected, also can carry out effectively screen to the ball of the match in the outdoor court between the system of court, greenhouse and protect, thereby can make whole space and each court system of having realizes best positioning efficiency and service efficiency.
Nine, as required, thus on above-mentioned court system cage net used etc., can establish green vegetation etc. forms the green ecology movement space system of protecting of shielding.
Ten, as required, high-altitude goal system can fix or flexibly be located on outside of the city and even important square between ,Lou tall building and even tall and big trees, can be hung under arch building and even arch bridge pier, and can and corresponding place, ecological space, culture and space thereof etc. between form rational, efficient, artistic organically blending.

Claims (10)

1. ball game method and the facility system thereof of an imitative modern-war form, (can be referred to as: formula ball game method and facility system thereof are played chess in war), Qi You court, goal system, sportsman, laws of the game, judges etc. form and implement, it is characterized in that: comprising and be provided with can be in court middle part and at least one high-altitude goal system with high height of other area of space, in the goal system of high-altitude, at least contain goal, Yi Ge high-altitude, the lower end of the high-altitude goal system of portion and whole unsettled settings should be able to guarantee normal sportsman during the games apart from the distance of court surface (water surface) greatly, official ball and even take advantage of the vessel that carries sportsman, car first can facilitate and freely pass through,
In match sportsman not only can be can facedown in the situation that by making the motion of ball from one's own side Yi Ce court to the other side Yi Ce court direction by goal, high-altitude and score, can also make sportsman, official ball and other match freely travel to and fro between the below of high-altitude goal system and realize transition quickly and easily with instrument, constantly to form new effective attack and defence, thereby constructed the game form of the excellent ball game of the sky sky Great War that can be bordering on imitative modern war;
When a high-altitude goal system on midfield is only set, sportsman both can squeeze into opponents' court and score by ball by the goal, high-altitude of midfield by corresponding attack in one's own side's court; Can in the other side's court, by corresponding defence behavior, prevent that the other side from squeezing into one's own side court by ball by goal, high-altitude and not losing points again; When needing that ball is reached to one's own side court after opponents' court ball-handling, sportsman could attack again goal, high-altitude, and then make to pass through goal, high-altitude and score in the motion of ball from one's own side court to opponents' court direction, situation be: near the other side's one side that sportsman can be the juncture area of both sides court by the modes such as banana kick also can make ball aloft with in the motion from one's own side court to opponents' court direction by a goal, high-altitude, therefore also can remember minute;
In the situation that two and a plurality of high-altitudes goal system are set, thus grand occasion and advantage that both sides all can start continuously the attack manufacture at goal, Dui Gengduo high-altitude forward to score continuously, run; Can also stipulate as required, sportsman still can in time return ball from some high-altitude goal system, and then forward new attack is started in these goals, high-altitude more simultaneously, thereby realizes the continual attack of passback formula and the situation of running;
Above-mentioned multiple tactics of attacking forward again after signifying satellite, missile trajectory and other sky temmoku target high-altitude goal system and can implementing continuously attack forward and passback makes ball game method of the present invention have the unique advantage of the empty day Great War of good simulation modern war.
2. ball game method according to claim 1 and facility system thereof, it is characterized in that: on the end line of the both sides, court that Yu high-altitude goal system parallels and near, distinguish relatively symmetrically at least Ge Sheyige low latitude goal system, in each low latitude goal system, at least contain goal, Yi Ge low latitude, in match, sportsman not only can be by making to pass through goal, high-altitude and score in the motion of ball on the direction from one's own side court to opponents' court, can also realize score by ball being shot to goal, the other side low latitude simultaneously, goal, high-altitude goal score and goal, low latitude goal score are added, the high person of total mark is winner,
In real racetrack, offense both can select directtissima low latitude goal, also can formerly attack after the goal of high-altitude, continued to obtain ball, ball-handling, then attacked the other side's goal, low latitude, thereby created the meeting of more multimachine and the effect of running in an attack;
When sportsman squeezes into the other side Yi Ce court by ball by goal, high-altitude by corresponding attack and after score in one's own side Yi Ce court, if offense sportsman continues to obtain ball in the other side Yi Ce court, can be further in the other side Yi Ce court directtissima the other side's low latitude goal system, also can select to pass ball back our Yi Ce court and again attack high-altitude goal system, thus chance and the effect that all can create continuous attack, run; When making great efforts attack, sportsman should take precautions against opposing team and obtain ball and directtissima one's own side's low latitude goal system in one's own side Yi Ce court, takes precautions against again opposing team directtissima high-altitude goal system or one's own side Yi Ce court attack one's own side's the goal, low latitude of driving straight in after the other side Yi Ce court obtains ball; Both sides' attack with defence be all three-dimensional, multizone, multi-level, be all also can plan more, more options, diverse;
In whole match, realize more ball-handling chance and just can grasp more the initiative of game, thereby select a good opportunity and create more chance and attack score, reduce the other side's threat and open goal simultaneously;
In ball war and game, be good at land battle person ,Ke Duozou ground, attack goal, the other side low latitude more; Be good at air battle person, can walk sky more, attack goal, the other side high-altitude more; Land battle, air battle be kind person all, can select a good opportunity and move, wound machine and going, strive for maximum combat success;
Different goal, high-altitude forms and different goal, low latitude forms can be set as required, simultaneously according to the complexity of scoring not square one set different high-altitudes score value and the different low latitudes score value of scoring to obtain of scoring to obtain, in the whole match, the high person of various goal total mark score value is winner;
Set goal, low latitude, court can adopt the version at the goal having adopted in ongoing football, rugby, basketball and other suitable ball game now, also can adopt the combined type goal and other the new suitable goal form that contain big or small goal simultaneously;
Basic skills and the facility system thereof of the grand formula ball game of war of the above-mentioned space warfare feature that can embody preferably and reflect modern war, can merge mutually, adapt with now ongoing various ball motion, thereby design and create the grand formula football of war, the grand formula handball of fighting, the grand Touch Rugby of fighting, the grand formula basketball of fighting, fight grand formula water polo and other all multi-form brand-new ball game method and the facility system thereof that can be bordering on imitative modern-war form.
3. according to ball game method and facility system thereof described in claim 1,2, it is characterized in that: as required, T-ground portion region also can add the low latitude goal system of suitable form, at two ends, court, also can establish the high-altitude goal system of suitable form, thereby middle part, Ke Shi court, the attack at two ends, court and the form of game and content become more rich and varied.
4. according to ball game method and facility system thereof described in claim 1,2,3, it is characterized in that: method more more specifically and the process of the basic comprising of high-altitude goal system and the facilities of T-ground and relevant ball game are:
First, high-altitude goal system can be by least one goal, high-altitude 1, goal, high-altitude skeleton 2, can select goal, the high-altitude Intranet 3 that adopts with goal, high-altitude outer net 4, the outer network framework 5 in goal, high-altitude, play support, suspend the compositions such as connecting framework 6 that whole high-altitude goal system etc. acts in midair; Connecting framework 6 grades can be rigid structure and also can be inflatable structure; Goal, high-altitude etc. can be set as the adjustable version of height, thereby can become as required goal, low latitude, the version of also can be set as energy easy disassembly, packing up etc.;
When whole court arranges Yi Ge high-altitude goal system, this high-altitude goal system can be located at the whole court of decile court center line 7 directly over, court center line and on high-altitude goal system whole court and space thereof are divided into two, in match, the high-altitude goal system that both sides can only attack zone line from one's own side's one side direction the other side direction, shoot goal postscript score, certainly in the situation that being provided with low latitude goal system, both sides all can catch and create openings realize to goal, high-altitude and goal, the other side low latitude minute other effectively attack;
When Liang Ge high-altitude goal system is set, they can be located on court center line 7 both sides corresponding position and space symmetrically, thereby between the goal system of Ke Liangge high-altitude, form midfield and space, midfield, midfield and both sides, space, midfield can be regarded as respectively one's own side court, space, one's own side court and opponents' court, opponents' court space;
In match, both can stipulate: both sides all can be from comprise that the one's own side's one side direction the other side direction in midfield and one's own side court selects and attack above-mentioned Liang Ge high-altitude goal system simultaneously, and shoot goal, corresponding high-altitude and can all remember minute; Also can stipulate as required: both sides only just remember when comprising that one's own side's one side direction the other side direction in midfield and one's own side court is shot goal, Chu high-altitude, opponents' court forward position minute, when now having a mind to or being not intended to make ball to pass through the goal, high-altitude in forward position, one's own side court from one's own side court to the other side's direction, can both not include score, also not very error, and be only considered as pass behavior;
When high-altitude goal system is set more than two, except balanced laying symmetrically, in match, both can take orientation to shoot the equal score in goal, high-altitude used, the game method that also can adopt the goal, part high-altitude of only shooting near the other side's one side just to remember minute, other goal can only be considered as the behavior of passing normally;
As required, can in standard football pitch and space, other area compare great court, San Ge high-altitude goal system be set simultaneously, its adoptable set-up mode is: high-altitude, She Yige midfield goal system directly over T-ground line 7, simultaneously on the suitable distance of goal system both sides, high-altitude, midfield and suitable locational space, establish again respectively Yi Ge front court high-altitude goal system and a back court high-altitude goal system of symmetry each other;
In the situation that two and plural high-altitude goal system are set, when ball is directly aloft shot again and remembered that thereby Fen goal forms high-altitude and drops in while scoring by disregarding the goal, high-altitude of score, can be considered effectively and efficiently score, can remember minute even can remember higher score; When ball continues to pass through two and a plurality ofly remember that a point formation high-altitude, goal drops in while scoring aloft, can remember the accumulated value that is respectively broken goal, even can on the basis of above-mentioned accumulated value, to above-mentioned high-altitude, drop in to score to increase and reward score;
Above-mentioned, be provided with in one, two, two the various situations with the high-altitude goal system of first-class varying number, when shooting goal, Yi Ge high-altitude and even directly shoot again goal, the other side low latitude after high-altitude continues to pass through goal, more high-altitude, ball forms height empty string croquet, now also can not only remember the accumulated value of each goal, also can further increase corresponding award score;
As required, on the goal system of above-mentioned situation Zhong Ge high-altitude, can all establish web frame 4 outside goal, corresponding high-altitude; Outside goal, web frame 4 can cut down the attack ball that very big part trains off, thereby make offense not only cannot score also can create the chance that obtains ball and counterattack fast for the other side, thereby the attack of Shi Dui high-altitude goal system has the dual character that score and risk coexist, the accurate ability of its attack for offense and attack effect propose higher requirement;
Outside above-mentioned each goal, high-altitude, web frame 4 can be likened the empty day systems of defense such as missile shield in modern war approx to, although it can not go interception to squeeze into the ball of the attack at goal, high-altitude on one's own initiative, but its interception for the ball of the attack training off can become more general situation, and for very just to and the high-altitude ball of dropping in accurately, the special goals such as height empty string croquet, the continuous inefficacy of the empty day system of defense of goal, high-altitude outer net type can be very special situation, certainly as required, by expanding goal, high-altitude, reduce goal, high-altitude height, be conducive to the design of the attack track of goal continuously, can make the above-mentioned chance of scoring of dropping in increase significantly, thereby becoming, the goal of dropping in that makes high score and high-quality attack can ask and attainable strike sharp weapon,
As required, web frame outside Ye Kebushe goal on the goal system of above-mentioned situation Zhong high-altitude, the ball training off only cuts down or keeps off back in institutes such as goal, situation Xia Kebei high-altitude skeleton 2 seldom, the forwards court that falls, the invalid space through goal system region, high-altitude outside the goal, attack Zhi Qiuke high-altitude in most cases training off, even if now can not, directly by high-altitude goal score, also can create the chance near aspects such as distances for the attack to the other side low latitude goal system to the risk of attacks of high-altitude goal system is less;
The selection of above-mentioned Zhi Sheyige high-altitude goal system is more suitable for the relatively little situation of court horizontal space size; At many levels, the setting of multiple tracks high-altitude goal system is applicable to the larger situation of court horizontal space depth;
Owing to there being the existence of the high-altitude goal system between the goal system of the low latitude at two ends, court, offense is in one's own side court and during the ball-handling such as region, midfield, both can select nearby high-altitude goal system to be attacked, thereby can transfer the other side has to the sportsman of necessary amount for front court, the defence of midfield, contention and preparation counteroffensive, can be chosen in again opponents' court number of player less, in situation a little less than defence, drive straight in suddenly, the rapidly and efficiently strike of enforcement to the other side low latitude goal system, thereby create excellent attack scene and more magical game process and plot,
Certainly, besieging the other side low latitude goal system, thereby make the other side by sportsman during more for the defence at its goal, low latitude, attacking and defending also can return ball suddenly, thereby cause, the other side is defendd to the favourable attack situation of the high-altitude goal system of weakening relatively, successfully rushing out above-mentioned back thrust and realizing after high-altitude goal and score, offense also can continue select to attack goal, the other side low latitude or again with forms such as back thrust, threaten the other side high-altitude goal system, or continuation high-altitude scores the goal, or again transfer the other side etc., making thus the grand formula ball game of whole war be full of changes and entertaining, also the value such as more creative and inspiration,
As required, if offense goes smoothly with directtissima and the above-mentioned modes such as back thrust in real racetrack, break through after goal, high-altitude score, can limit it and again in the mode of above-mentioned back thrust, carry out score, and offense can only be relied on forward attack goal, the other side low latitude and increase score, this kind of situation, the high-altitude target that can be similar to enemy in actual war was attacked hit and was destroyed by last time, again hit without actual capabilities or value; On the other hand, if continue allowance offense, repeatedly in the mode of back thrust, attack goal, high-altitude and continuous score, can be similar to enemy and have more high-altitude target and can be attacked and destroy, also be fine, just may be unfavorable for like this refining and optimizing of whole ball game game process; Certainly can in real racetrack, constantly obtain continuously ball, ball-handling, rush out back thrust until finally to create the situation of scoring in continuous high-altitude be also more difficult continuously, therefore also can to it, not carry out the restriction of any systematicness, all at one's discretion field player freely strive for and create;
In the grand formula ball game of war, one side that can realize efficient ball-handling will obtain great battlefield supremacy, thereby in game status extremely initiatively, it can have object, has rhythm, have and freely select and transfer the other side---and soldier the other side that cutting edge of a knife or a sword is instigated has to be guarded against, the sudden change of soldier's cutting edge of a knife or a sword makes the other side hard to guard against; All the time in strategy, can only by the other side, be transferred more with a side of defence status, battlefield, in status passive and vulnerable to attack, lose more goal bitterly and striking out at last;
Offense's efficient possession of the ball is exactly battlefield supremacy, can transfer exactly the other side's power, can create exactly the right of good attack and scoring opportunity, the power of getting the upper hand of exactly;
The good anti-ability of controlling the ball of defence is exactly the strategic containing ability in battlefield, strategic counterforce capability, thus change from passive to active exactly countercharge the other side, the anti-ability that wins the other side;
" ball-handling, variation and transfer the other side, creation attack good opportunity---countercharge ball, anti-transfer, the anti-goalscoring opportunity of creating " will become substance and the process of court game, and grasp good opportunity, one arrow hits, an arrow punching, become the link that good opportunity is got the upper hand of into combat success becomes with the most critical of final hit, this link is not good, and all that has been achieved is spoiled;
When Dang Jiang low latitude goal system is configured to simultaneously and contains the version at compound goal 8 at large and small goal of " by the handsome account formula of door ", the danger that the handsome account formula of the high score of the one sword life heart is scored also will cause defence and the difficulty of selecting for defender, also become attacking and defending and transfer one of important dependence of defence simultaneously, the defence of adding high-altitude goal system with can attack, the grand formula ball game of whole war by become the combination of intelligence height, technology and tactics equal altitudes Great Game unified, that comprehensively color, integration capability represent extremely strongly;
In part, fight in grand formula football according to condition and needs, some goals, low latitude, particularly for Zhong compare great goal, combined type goal, can adopt and not take the contest method that pin goal is goal, to avoid competition area too small, big foot shooting easily damages and shoots the situations such as compare great goal is too easy, owing to there being the existence at goal, high-altitude, on field, more high-altitude falling sphere will be there is, people can be by potential energy and the speed of lower falling sphere, other position with health heads into ball more, keep off into, push compare great goal and score, certainly the size little goal arranging for low latitude, as Zhong little goal, compound goal, can adopt and take pin attack and score that to calculate be the contest method of effective score simultaneously,
Attack at war goal, grand formula football Zhong,Dui high-altitude can adopt various attacks mode and the footworks such as flip shot, backward flight, side fly;
At some, fight in grand formula ball game, even can adopt that phoresy in people's ladder type, the formula of leaping high, Pao Renshideng high-altitude, the offensive pattern of high-flying attack, be summarized as follows:
(1), people's ladder type high-flying attack method: near the goal system of high-altitude or other sportsman of suitable space place climb up after being formed helper by one's own side sportsman or occuping on helper to obtain ball after obtaining ball, thereby form the chance of the people's ladder type high-altitude strike that makes the other side be difficult to defence, so that the possibility of scoring in high-altitude improves greatly;
(2), the formula high-flying attack method of leaping high: sportsman can be take one's own side team member as fulcrum, the height, the boosting strength of while by teammate that by " trampling " one's own side team member, promote own upper punch starting point realize jumping up and aerial stop of maximum possible height, and implement in this course the efficient attack that the distance at goal, Ji Ju high-altitude that the other side is difficult to defence also can be nearer, it also can be called padded formula tactics, step on people's formula tactics etc. of jumping up; .
(3), throw people's formula tactics: sportsman is mainly thrown in the air by teammate's strength, thereby obtains the attack altitude and attack position accordingly with advantage, thereby it also can be described as people and plays method, people's arrow formula tactics etc.;
Above-mentioned high-altitude tactics can make attacker obtain chance and the advantage of favourable high-flying attack, can be relative passive if defender wants to organize corresponding Deep Air Defence and halting to take action, on time, easily lag behind, effectively the locus of block is also difficult to hold, thereby make attacker that the high-altitude at goal, high-altitude is hit and easily be gone smoothly, certainly attacker also can pay larger personnel for this reason and too concentrate the cost with physical consumption Hui compare great Deng aspect, if attack is accidentally dropped, its ground obtains ball again, the chance of ball-handling can reduce, thereby easily for the other side, obtain the chance of good counterattack, therefore above-mentioned high-altitude tactics is both favourable, also there is a fraud, key be the utilization that will realize high level with the risk of failure etc. is down to minimum,
The high-altitude tactics of above-mentioned form, can be applicable to fight among the grand formula ball game of the war such as grand formula handball, the grand formula basketball of fighting, the grand Touch Rugby of fighting, the grand formula football of fighting, its game scene by the grand formula ball game that makes to fight has more three-dimensional color, is more imbued with spatial impression, will further promote the excellence, technical and ornamental of whole motion.
5. according to ball game method and facility system thereof described in claim 1,2,3, it is characterized in that: the concrete structure of whole high-altitude goal system and be on the impact of concrete methods of ball game etc.:
First, the setting principle of high-altitude goal system concrete structure should be: on the one hand the setting of goal, high-altitude and system thereof should be able to reflect the needs that can facilitate the various inherences that the ball game of high-altitude target formula carries out better best, make it that inherent rule and requirement that fully meets motion itself is set, emphasize inherent independence and the material impact to low latitude goal system and whole motion each side thereof that high-altitude goal system arranges; The form of high-altitude goal system etc. also should adapt with the ball game such as existing football, rugby, basketball, handball and the goal system adopting thereof on the other hand, so that new ball game and game process can be connected mutually, coordinate mutually with existing ball game mode better and unified;
Qi Er, high-altitude goal system structure with arrange some more specifically situation be respectively described below:
(1) lower end of the connecting framework 6 of ,Ying Shi high-altitude goal system etc. is located at outside whole court as far as possible, to form accessible court, low latitude;
(2), connecting framework 6 can adopt the version of arch, and make the structures such as skeleton of bottom, domes two ends outside court, to form accessible court, low latitude, the other parts of high-altitude goal system can be located at below, top and other suitable place of arch connecting framework, and can adopt optionally can adjust height and the version of position are set;
As required, can adopt the horizontal arch connecting framework 601 paralleling with court center line;
As required, also can adopt the longitudinal arched connecting framework 602 perpendicular with court center line, in the suitable location of longitudinal arched connecting framework 602, establish at least one high-altitude goal system; Skeleton structure integrated design and the setting of the low latitude goal system at the two ends, skeleton structure Ke Yu court of longitudinal arched connecting framework 602 bottoms, two ends; Longitudinal arched connecting framework 602 can adopt the various structures forms such as single arch formula skeleton of closely paralleling, double-arc skeleton, multiple arch formula skeleton;
When longitudinal arched skeleton structures such as double-arc that employing parallels, can consider to make two distances between the longitudinal framework paralleling close even identical with the width of the skeleton at goal, low latitude, bottom, two ends 9, the setting that can make thus total system more rationally, more efficient;
(3), at some in particular cases, as excessive in worked as dimension of the court, directly arrange across the accessible court, low latitude of larger space structurally during more difficult, high cost, can consider the connecting framework of the high-altitude goal system of the forms such as brace type that on court magnitude setting is the least possible, as only containing the open side type connecting framework 603 of a corbeling etc., if establish two supporting constructions, can consider to make it can form the function of the skeleton structure with needed certain goal, low latitude simultaneously;
(4), can adopt supporting construction to add that crossbeam adds the goal, connecting framework structure 604, high-altitude of the versions such as suspension cable and other parts of high-altitude goal system can be hung on the supporting construction 604a of both sides; Also on the crossbeam above can being hung on, suspended-cable structure 604b etc.; The supporting construction 604a of both sides and above crossbeam, suspended-cable structure 604b etc. on optionally setting tool have sunshade, the barrier structure 604C of the effect such as take shelter from rain;
(5), can consider to establish the aerial chinampa of main dependence aerostatic buoyancy and gravity that other aerial floating structure is born high-altitude goal system etc., its concrete mode can be:
Goal, A ,Jiang high-altitude is hung at independently on aerial chinampa by certain syndeton;
B, by aerial goal skeleton and air ball outdoors network framework etc. be set as the version with certain aerial buoyancy, and they are had can further take on balanced ball net, the location isostructural part of stay cord and even whole abilities of gravity outdoors;
C, location structure of tow line are located in the air to the other parts of aerial chinampa and high-altitude goal system, and make them there is the ability that can bear certain wind-force interference, location structure of tow line can consist of the high and lightweight material of intensity, locate as required structure of tow line and also can be designed to have the version of certain buoyancy, in being formed by low density material as adopted, fill the tubular style version of low density gas etc.;
(6), high-altitude goal system can adopt the version that contains goal, high-altitude outer net 4, as ancient Chinese containing the goal, middle high-altitude of goal outer net form etc., in near the certain space of goal, high-altitude outer net 4 skeleton 2 peripheries of goal, high-altitude, and can hang on outside goal, high-altitude skeleton 2 and goal, high-altitude between network framework 5, outside goal, high-altitude, network framework 5 and goal, whole high-altitude outer net 4 can be set as the various shape forms such as rhombus, (length) be square, semicircle, oval, circular;
Goal, high-altitude outer net 4 can be blocked and be got to the official ball near the certain space of goal, high-altitude periphery, thereby making offense have when the ball of attack trains off keep off back to the attack at goal, high-altitude is conducive to the other side and obtains ball and create the quick abnormal risks such as chance of counterattacking, it is relevant that size, height and the goal outer net at the goal, big or small Ye Yu high-altitude of certain this risk arranges the size of area etc., thus its be also can select, programmable;
In match, official ball can be squeezed into goal and score, also can by bounce-back, be returned because hitting goal outer net, thereby the attack of Shi Dui high-altitude goal system has favourable goal score and disadvantageously the contrary result such as is blocked, and locates to make attacker will have higher attack level and implement careful attack;
(7), high-altitude goal system also can adopt the version that does not contain goal outer net, as be similar to English, the set-up mode of the forms such as American football door, in such cases, even fail to squeeze into goal and score while attacking goal, ball also can be from the skeleton of goal through high-altitude goal system and forward, direction motion to the goal, low latitude away from one's own side etc., thereby the probability that the situation that makes to be unfavorable for accordingly one's own side occurs reduces greatly, the situation that causes ball to be rebounded to return as long as avoid hitting goal, high-altitude skeleton 2 grades as far as possible, both sides all can implement the more attack to high-altitude goal system with lower risk,
(8), imitative basketball goal formula: its can be divided into again have backboard formula with without backboard formula;
Have that backboard Shi-it can be similar to the existing version that has the basketball device system of backboard, just its can arrange relatively symmetrically in backboard 10 both sides at least two basket structures 11 and backboard and basket structure as the important component part of high-altitude goal system in having on the space, court of high height position;
Without backboard formula-at least one basket structure is directly located on the connecting framework 12 of high-altitude goal system.
No matter there is backboard formula or without backboard formula, its bottom of playing the skeleton structure system of the connection functions such as support all can be located at outside court, to be formed with accessible court, the low latitude system that is beneficial to motion;
As required, high-altitude basketry skeleton both can be horizontally disposed with, also can with the setting that has a certain degree of horizontal plane shape, as formed the form that arranges of the basketry skeleton 13 of the high outside and low outside formula that can score more easily, a distance, syndeton Ke top of the outer upper end of the basketry skeleton 13 of two high outside and low outside formulas that are now symmetrically set can be handed over, thereby can form side-looking projection, can be closely the shape form of placed arrow type;
As required, it is the basketry skeleton structure of a level that the basketry skeleton structure of two levels that are symmetrically set can " unite two into one ", and the corresponding syndeton of high-altitude goal system can connect in symmetrical mode this horizontal basketry skeleton structure; It is a vertical basketry skeleton structure 14 that above-mentioned two symmetrical basketry skeleton structures that are obliquely installed can " unite two into one ", and the backstop structure 15 with abilities such as certain deceleration and demonstrations of the effect forms such as curtain falling type identical with traditional basketry linked network can be set in vertical basketry skeleton 14;
Basketry skeleton both can be positive circular formula, also can be ellipse and other suitable shape and form;
The goal, high-altitude of the ball game of other types also can adopt the set-up mode that is similar to above-mentioned basketball basketry, can optionally be set as level, inclination, the various ways such as vertical;
(9), the connecting framework structure 6 of high-altitude goal system can be set as the version that can connect dissimilar goal, high-altitude, thereby on space, same court, can select easily to arrange dissimilar goal, high-altitude, to carry out the ball game of different modes and form;
As required, in same ball game, can adopt suitable dissimilar goal, high-altitude simultaneously;
In the situation that being provided with Duo Tao high-altitude goal system, on different goal system, identical goal type and form can be set simultaneously, also not identical goal type and form can be set simultaneously, to strengthen diversity, variability and the excellent degree of heat and content;
(10) goal, She Yige center at least on the goal system of, high-altitude, need to arrange the left and right at goal, Shi,Ke center, a plurality of goal and even size that some peripheries goal, periphery goal are established in upper following peripheral identical from goal, form Ke Yu center, also can be different;
As required, on the contrary the large I at goal, center and other each goal adopt near the Yue Jin goal, position at goal, center can be larger can be less etc. difference method to set up;
As required, on the goal, high-altitude of the forms such as rectangle, rhombus, ellipse outer net 4, can become the mode of the layout such as cross that some goals are set;
(11), electric hoist high-altitude goal system can be set as required, it can be by being consisted of the larger a plurality of goal distributing to less excessive similar calabash shaped respectively successively from the bottom to top, when shooting goal, highly lower Qie compare great bottom, can remember less score, when shooting goal, highly higher Qie compare little top, can remember larger score, form thus the goal of more easily shooting less, the game form that more meets game principle and game situation that the more difficult goal of shooting is larger;
Both sides at some goals of the above-mentioned electric hoist layout of positions such as being located in the middle of goal outer net 4 can arrange goal, some left and right symmetrically, and the point system of the size at goal, left and right and goal score can be with reference to the situation at the middle goal of close height;
(12), as required, can be to umbrella crown structure being set in the goal system of whole high-altitude, it can be both the net formula form consisting of block formula net and corresponding skeleton thereof, also can be the board-like form being formed by glass, plastics and other structural slab, structural member, with when ball is implemented to effective block, the effect such as also can bring into play sunshade, take shelter from rain, to reduce the adverse effect to sportsman and place such as direct sunlight, rainwater;
(13) thereby, high-altitude goal system can become the motor-driven usefulness of utilizing that promotes whole court facility and space every systems such as protecting wire nets in court simultaneously:
After the height of adjustable high-altitude goal system is reduced to a certain degree, it not only can become a kind of optionally low latitude goal system that has, can also optionally make high-altitude goal system become the motor-driven every systems such as protecting wire nets of court, be beneficial to the efficient utilization in space, whole court;
As required, (sealing) closed to by structures such as nets in goal, all high-altitudes, corresponding whole goal system both can become can to official ball carry out gross area block every protecting wire net system, if by the goal in overhead, region such as middle parts, court---every systems such as protecting wire nets, along corresponding structural system, fall to the suitable height on ground, former larger area court can be separated easily as a plurality of courts system, vice versa is more easily returned to original larger area situation, thereby make whole court equipment and space system thereof there is good changeability and applicability,
In the middle of can simultaneously establishing in standard football pitch and other area compare great court and front court, back court Gong Sange high-altitude goal system, if as required, by the goal bottom of middle high-altitude goal system fall to ground, Jiang Ge goal is sealed with net simultaneously, primary standard football pitch can be divided into two identical new courts; By setting up the goal, high-altitude of goal system ,Bing Jiang front court, motor-driven low latitude, back court, be adjusted to suitable height, can form two new Zhan Yishi court systems;
Bottom, the goal of the high-altitude goal system of ,Ruo Jiang front court, back court falls to ground as required, Jiang Ge goal is sealed with net simultaneously, primary standard football pitch can be divided into the San Gexin court in court in the middle of comprising, court, two outsides; By setting up corresponding motor-driven low latitude goal system, and goal, middle high-altitude is adjusted to suitable height, in the middle of can making, court becomes Zhan Yishi court system; Court, two outsides can be used for traditional football motion;
Because standard football pitch has the large width of 68 meters, each high-altitude goal system also can be horizontal two goals, Tao Jiduotao high-altitude are set, therefore above-mentioned formed less Zhan Yishi court system further laterally can be separated out to two and a plurality of less Zhan Yishi court system at net with lower etc.; As when middle high-altitude goal system is fallen and be made as filter after formed two new compared with little Zhan Yishi court system, separate further again, thereby can on the place in whole standard football pitch and space, form four, six and even more less Zhan Yishi court system, thereby can make the more people grand formula football that participates in fighting;
In fact, when in space, Yi Ge great court, (as space, standard football pitch) top arranges two and even a plurality of high-altitudes goal system, and make this great court space system as a complete large court, for two teams sportsman ,Liang Zhi forces have at many levels, when the attack of multiple tracks high-altitude goal system and large space depth and game, the grand formula ball game of the wars such as the grand formula football of whole war is also larger by having the meanings such as stronger space warfare color, its entertaining and inspiration;
Due to the existence of a plurality of high-altitudes goal system with can be attacked, it makes the very big part position in whole court can become the direct attack point that obtains, the transfer velocity of ball between many direct attack points also can be accelerated greatly simultaneously, therefore the defence personnel's that make the difficulty of defence and need to drop into quantity is increased significantly, thereby can make both sides drop into more forces and participate in whole motion, in some time part sportsman may be generally relative be active in some FX, to tackle the attacking chances of unexpected acquisition and the defence task of facing suddenly, other sportsmen undertake the task of large region and even whole fast reserve, certainly the large region of high flow rate and even the task of whole court fast reserve can be undertaken by sportsman's alternate turns of different piece, thereby make entire squad have all the time efficient fighting capacity,
If do not carry out the grand formula ball game of war of the large space of whole formula of above-mentioned unification, can utilize above-mentioned many high-altitude goal system and on goal, many high-altitudes carry out air battle between many troops rehearsal, thereby can make more personnel utilize space, above-mentioned court, with larger the utilization ratio that improves whole ball park, space and facility simultaneously.
6. according to ball game method and facility system thereof described in claim 1,2,3, it is characterized in that: the concrete structure at goal, high-altitude and be on the impact of the concrete methods of ball game:
(1), Buddhism formula: in goal, space is completely empty naked, does not establish the goal form of any section of gear structure, its official ball that can make to shoot goal, high-altitude without any obstacle pass through goal;
(2), the net formula of hanging down: vertical and have and set the vertical web frame in goal that the Duan Ji left and right sides can automatically change and open under can the impact force action at ball on the vertical shop front at the goal that certain vertical angle of inclination arranges and space, thereby can make the ball with certain attack dynamics enter opponents' court and score by goal, can suitably reduce the pace of ball simultaneously so that goal, high-altitude score be unlikely to fly excessively far away, be unlikely to directly to fly out place; Net system is hung down at goal can be automatically in state and the position of direct soft block goal correlation space with returning vertical laying under the effect of self gravitation and other suitable power;
(3), curtain falling type: the vertical structure line paralleling of the stretching some even layings that naturally drop by relying on gravity, stay cord 17 grades form the goal form of the soft block structure in space in goal, in each soft block structure stay cord 17 lower end, can all hang and establish little weight 18, so that stay cord can be by naturally stretching under the effect of the gravity of little weight 18 after by ball impact bending, each little weight 18 can all be arranged at can the structural frames that include relative closure space 19 of balling-up lower door frame effect among, each soft block structure stay cord 17 need be connected with little weight 18 through being located at the corresponding minor structure hole on structural frames 19, with the needs that meet safety and do not disturb mutually etc.,
(4), drag rope of elasticity formula: by the structure line paralleling that relies on the stretching some even layings of elastic force, stay cord 17 grades form the goal form of the soft block structure in space in goal, in each soft block structure stay cord 17 lower end, can all hang and establish spring 20, so that stay cord can be by naturally stretching under the effect of the pulling force of spring 20 after by ball impact bending, spring 20 also can all be arranged among the structural frames that includes relative closure space 19 that can play woodwork effect, soft block structure stay cord 17 need through being located at the corresponding minor structure hole on structural frames 19, spring 20 be connected for each,
As required, among structural frames 19, also can establish at least one with the nearly perpendicular drag rope of elasticity 21 of soft block structure stay cord 17, each soft block structure stay cord 17 can all be connected with drag rope of elasticity 21, thereby can realize the effect that relies on the stretcher strain of drag rope of elasticity 21 and make each soft block structure stay cord 17 distortion and ball is passed through;
As required, each soft block structure stay cord 17 itself can be the spring rope with good bullet sex change energy, to guarantee that the official ball that hits accordingly goal can pass through goal effectively;
(5), umbrella hat type: contain between the goal, suitable space Chu Yu high-altitude that is located at top, goal, high-altitude the goal form that forms suitable angle, can form the umbrella hat type block structure of suitable block effect to the ball of high-flying attack, umbrella hat type block structure can be the net formula form consisting of block net and corresponding skeleton, thus the umbrella hat type block net system of putting on also forming; As required, umbrella hat type block structure also can be made as membrane type, the version such as board-like;
(6) goal, high-altitude both can be various single formulas goal, also can be and contained the combined type goal at big or small goal and the combined type goal of alternate manner simultaneously;
(7) round target formula goal system: simultaneously contain in Yi Ge great goal that to take minimum goal, center 22 be target center, form outside some goals arranged evenly successively circlewise, each ring-type goal skeleton 23 can by simple and direct as far as possible, meet the syndeton 24 that sphere area is as far as possible little and be connected, each ring-type goal skeleton 23 as required both can in same plane, also can be non-in same plane; On each ring-type goal skeleton, hang the net that length is different, wherein the net in inner end can be longer than the adjacent net in outer end, and the net 25 at goal, center 22 can be the longest, with this, can make the goal at different goals be distinguished more significantly; Between ring-type goal skeleton place plane and horizontal plane, can form the required suitable angle that arranges, both can be the zero degree that parallels, also can be 90 perpendicular degree and other suitable angles of inclination;
The setting on the whole of round target formula goal, can be similar to the setting of aforesaid hoop formula goal system, and it both can be located on the goal system of high-altitude, also can be located on the goal system of low latitude; When the round target formula goal of angle of inclination form is located on the high-altitude goal system in the middle part of court, be the attack requirement that adapts to opposition both sides different directions, need symmetrically setting in pairs;
The buffering web frame of the suitable forms such as curtain falling type can be set, suitably to weaken the Negotiation speed of ball and to be beneficial to identification goal position etc. in vertically disposed round target formula goal;
In match, squeeze into the goal at minimum goal, center 22 and can remember maximum score, what scored and remember in other each ring-type goal must can reduce by score value from inside to outside successively, and minimum score is remembered in the goal at the maximum ring-type goal of outermost end;
(8) relevant each goal, high-altitude can be set as variable versions such as can selecting increase and decrease, switch, convergent-divergent as required, to adapt to the different requirements of different balls war forms and process.
7. according to ball game method and facility system thereof described in claim 1,2,3, it is characterized in that: can adopt ballistic goal, and then can be bordering on the ball game campaign of simulation modern war missile attack war and anti-missile interception war:
Ballistic goal: be provided with the wikipedia type trajectory passage 26 that can signify missile flight trajectory in the middle of goal, wikipedia type trajectory passage 26 can establish at two ends inner small and outside big horn mouth formula structure 27, thereby form, both ends open is large, the version at the ballistic goal of intermediate elongated;
The needs of the visual match of length of wikipedia type trajectory passage 26 etc. are determined; The sectional dimension of wikipedia type trajectory passage 26 can be little to the ball accusing each other that makes two relative motions cannot be simultaneously by, the degree that can only mutually collide;
Among wikipedia type trajectory passage 26, can establish as required soft section of gear structure 28, to play the effects such as movement velocity that delay the ball that passes through; Also can among the horn mouth formula structure 27 at wikipedia type trajectory passage 26 two ends, establish as required soft section of gear structure 28;
The ball of the attack on ,Ke She goal ectosphere web frame 4 ,Da goal ectosphere web frames 4 will be blocked as required, thereby make that the attack at ballistic goal is also had to income and risk simultaneously and chance and the effect of depositing;
As required, in the goal system of high-altitude, can establish simultaneously various ways from size different ballistic goals;
During match, both sides sportsman in antagonism can be simultaneously or is being differed in extremely short time and from both sides, goal, attack respectively together same ballistic goal, when both sides almost shoot respectively after the horn mouth of both sides, goal simultaneously, both sides' attack in most cases can be met, bump against in compare Chang goal wikipedia type trajectory passage 26 with ball, and following three kinds of basic conditions appear in the possibility of result of shock:
A, both sides attack with ball due to all attack accurately and attack dynamics suitable, all bounce-backs all fall after rise to we and attack place fast after meeting, bumping against, now both sides can be evenly matchedly, optionally can all forget minute, also can optionally all record score;
B, the attack degree of accuracy and the dynamics of one side's ball are obviously better than the opposing party, as: a side attacks Yong Qiuzhiru goal wikipedia type trajectory passage 26, not at bell-mouth structure of air 27 places in outside because of collision, break-ins etc. consume kinetic energy or consume very little, and the opposing party may be not accurate enough owing to attacking, ball at horn mouth place because of collision, it is larger that break-ins etc. consume kinetic energy, although also may standard but the situation such as ball speed and dynamics be inadequate, after causing two balls to bump against, fly in pairs and enter and fall to weak tendency Yi Fang court, thereby make advantage one side obtain the situation of double play and double and even many times of scores,
Under certain above-mentioned condition, also may occur that weak tendency one side is hit back own half with ball, and after the hitting with ball of advantage one side, rest on the situation among the trajectory of goal, now advantage can be remembered corresponding score, both sides can continue to attack the ballistic goal of this ball that retains attack last time, in corresponding new attack, may occur that two are squeezed into the situation of opponents' court with ball above by ballistic goal simultaneously, thereby be that advantage one side creates larger scores;
Utilize ballistic goal, can carry out the match of the indirect confrontation type that each side all the time can only be in own half; Also can carry out the match that both sides all can enter the facedown formula that opponents' court attacks, defends and control ball;
As required, the match of a complete facedown formula can be divided into some joints, that at every joint, competes is initial, both sides sportsman's large portion and even all can be all first in own half, and part so all sportsman all but everyone at least holds a ball bullet and starts ball bullet to attack to ballistic goal, after commence firing, what by ballistic goal, shoot space, away ground is score live ball, not by ballistic goal but what enter opponents' court space is score live ball not, the ball bullet in own half space of falling back after being stopped by goal outer net and being hit by the attack of the other side's ball is dead ball, dead ball will be stood down, and score live ball and not score live ball all can continue to participate in match,
As required, both sides all can come and go and fight in one's own side and opponents' court: hold ball, ball-handling, transition, attack and defence, in each is attacked, hit a ball outdoors net and being kick-backed behind one's own side court by other marble of marble, all becomes dead ball and stand down; The mid game stage squeezes into the ace-shot of goal, low latitude, the other side two ends and other special balls door and also can calculate dead ball and stand down; The mid game stage is got the also dead ball and standing down at last of marble out-of-bounds, if but first squeeze into directly to fall again behind goal, high-altitude and outside court, will count corresponding score;
One can select apart from edge, court closely but goal, get Geng little high-altitude can be set to attack, and squeezes into goal, Geng little high-altitude and it is directly fallen into outside court, can remember larger score and the other side is lost the chance that obtains ball and counterattack;
Club through the competition on canto time back court is fewer and feweri, when remaining last official ball and the end of match time also not then, on field, will remain and carry out the form of single ball Great War, until fixture finishes, the mode of other single ball Great War in grand formula ball game of fighting that the mode in single ball Great War stage and method can be introduced with methods and this case of existing ball game is close with method same;
In fact, if condition is permitted in match, in the match that all indirect type in own half resists all the time of Ru each side, and for example in each side, all can enter the Competition Phase of the non-direct contact antagonism in the direct-type antagonism match of opponents' court, (as competed, initially waiting the stage), both sides all can start the intensive attack of the continuous saturation type of running fire fast successively of many balls to a certain or some ballistic goal simultaneously, to strive accurately having group's bullet of dynamics to attack the attack of suppressing efficiently and hit the other side and the other side; In high-caliber match, the many ball bullets of both sides may meet simultaneously, meet, bump against among the narrow ballistic space at corresponding goal, finally will there will be the multiple result of attacking against each other, whole process will be unusually brilliant, create mirable competition scenes and payoff;
If both sides are offensive attack simultaneously, the group's bullet that will suppress the other side with maximum advantage in the shortest time, with a side of maximum precision and the maximum ball bullets of dynamics tapping is attacked, finally more ball bullet is squeezed into, bangs into, sent into the other side's position, court, thereby create maximum score and triumph;
In the match mode of indirectly antagonism, after the ball bullet of both sides' specified quantity and form has been beaten, can be considered an independently end for a trifle ball match for complete attack echelons thatch of symbol, squeeze into the other side's ball bullet total quantity and total taste and account for the superior and win; In can the form of play of facedown, one square tube is crossed the ace-shot that the other side is shot at ballistic goal, can continue as one's own side sportsman grabs, controls, and can be from door inferior space passback can form the new attack to ballistic goal, the offensive attacks such as goal, low latitude to the other side forward of certainly also can directly controlling ball;
Above-mentioned ballistic goal and the many balls of many bullets process and the scene of the missile attack of game mode in can simulate modern war and anti-ballistic volley etc. such as attack against each other simultaneously, when guided missile is attacked against each other and the large postwar of anti-missile interception, both sides sportsman can kill opponents' court, continues contention and strive for the ball and make great efforts to hit the goal, low latitude of getting the other side, thereby exploit success or retrieve the rough sledding of guided missile in attacking against each other, it can simulate and general flow process and the shell type method of deduction modern war.
8. according to ball game method and facility system thereof described in claim 1,2, it is characterized in that: can adopt and can utilize efficiently space, Deng vacant lot, city, have the court apparatus system from the room cage every functions such as protecting, can modify tone, it both can be the pure cage construction form only consisting of corresponding skeleton and various net 29 etc., also can be roof and periphery have can be rainproof, the room formula version of the function such as sunshade and even holding chamber internal gas pressure; In room cage type court apparatus system, be at least provided with Yi Ge high-altitude goal system, can be provided with the low latitude goal system of requirement simultaneously; The places, locus such as room cage type court apparatus system can be built on the ground, waterborne and building roof;
Room cage type court apparatus system can adopt following more concrete different forms and form according to space, place, ball game type philosophy:
(1), high tower: Ci Zhong room cage type court apparatus system is similar to high wide larger point building on appearance profile, therefore can be described as: " high tower ", it is suitable for take empty day Great War---and to the attack of high-altitude goal system, be main game exercise, because its relative floor space is less, for site coverage Gao city, also can adapt to preferably, it is relatively little that its goal, low latitude can be established, to adapt to the little feature of court plane depth
According to needs such as space, place, plastic arts, the high tower court facility system of guided missile moulding can be set, its floor projection can be the difformity forms such as circle, ellipse;
In the room of high tower and some other form cage type court apparatus system, due to horizontal space size and place circumferential size all relatively too small, can adopt accordingly and highly be greater than obviously larger goal, vertical low latitude of width, even high wide ratio, to be convenient for people to falling spheres such as high-altitudes with head, to shoot goal with chest, abdomen, leg etc., can stipulate deliberately directly with pin, to attack above-mentioned vertical goal, pin is attacked ball, and score and possession of the ball are not given to the other side yet simultaneously; As required, in inside, vertical goal, compare little goal can be set, even class is brought up the forms such as chamber Geng little goal in ancient Chinese can be set, less and even Geng little goal can score the goal with pin for people;
(2), mongolia yurt type: it can be considered a kind of special shape of ridge room formula, its top can be the shape forms such as hemispheric, centrum formula, in the space of top bump configurable suitable form high-altitude goal system, court, bottom etc. can be the forms such as circle, ellipse;
(3), the orange field device system of the form such as above-mentioned guided missile formula, mongolia yurt type can be set as required can be under the effect of the power such as manpower can integrally rotated version, thereby make corresponding room cage type court apparatus system not only can make people carry out corresponding various ball game in portion space within it, also can allow people are outside and inner at it to be made it carry out whole rotatablely moving to make people obtain exercise by the mode such as promoting or pull;
As required, can form the motion such as ball of part population in inner place and space promote with space (also can comprise inside) externally and pull the collective motion of the integrally rotated part population of whole apparatus system to respond to and cooperate with each other across a great distance, the motion scene of phase mutual excitation etc.;
As required, everybody drives the power of the whole apparatus system of lower rotation to be converted into electric power by suitable mode, thereby make this exercise process can create certain energy and economic worth, the electric power producing can be directly or by modes such as electric power storages, is supplied with the needs such as illumination of whole telecontrol equipment system simultaneously;
As required, whole apparatus system can be by the circuit orbit system of bottom, the main part of the apparatus system on top, be located at some wheel constructions below the main part of apparatus system on top etc. and form; Some wheel constructions that the main body of whole apparatus system can arrange by its underpart in shuttling movement on the circuit orbit system of bottom, the rotatablely moving of the low angular speed of the main body of whole apparatus system under manpower effect can be changed the rotatablely moving of higher angular speed of some wheel constructions that its underpart arranges into, and some wheel constructions can directly or by necessary accelerator drive motor generate electricity; The process of generating is also the process of the resistance of motion that provides for whole telecontrol equipment and people's exercise motion; The adjustable resistance structural system that also can add independently as required or work with TRT simultaneously, thus people can be adapted to better by the needs that drive said apparatus system to carry out motion and exercise preferably;
As required, also can in the orange field device system of the forms such as the guided missile formula being fixedly installed, mongolia yurt type, establish the structural system that can rotate around orange field device under the effect of the power such as manpower, thereby can in the complete actionless situation of whole room cage type court apparatus system main body, still can realize scene and the function of in aforesaid, moving outside the venue simultaneously, still can make whole apparatus system performance multiple action; Can, by structures such as some steamboats provided thereon in the circuit orbit cocycle campaign of being located in orange field device system periphery, can certainly allow to can in the structures such as some steamboats of being located in orange field device system periphery, do shuttling movement by circular ring-shaped track provided thereon around the structural system of orange field device rotation around the structural system of orange field device rotation; In above-mentioned motion, thereby the structure such as some steamboats can obtain higher rotating speed and can directly or generate electricity by corresponding accelerator drive motor; The adjustable resistance structural system that also can add again independently as required or work with TRT simultaneously;
(4) ,Ji room formula: can be the room cage type court apparatus system that is similar to the construction style that contains the raised ridge structure in middle part and space, raised Chu She high-altitude, the space goal system at middle part, the dimension of the court of this kind of form is changeable, the setting at goal, low latitude also can according to circumstances be selected flexibly, can, as one of principal mode of room cage type court apparatus system, can be applicable on the suitable space and place of vast Urban Areas generally;
(5), trapezoidal roof type: the room cage type court apparatus system that the vertical section of top ridge structure and space profiles is tapered in form, it is more suitable for being provided with in the ball game of two and a plurality of high-altitudes goal system simultaneously;
(6), overhead type and hanging type: whole room cage type court apparatus system is located on a certain space by some strut supports of bottom or is relied on that corresponding syndeton is unsettled is affiliated on some larger structure and building system, due to built on stilts or unsettled setting, therefore whole apparatus system can directly not take or only take minimum ground space, thus can Shi Qixia ground and space as uses such as road, land use for greening, other athletic grounds;
As required, on the outside at overhead type and apparatus system top, hanging type court, can add outside upper high-altitude goal system, overhead type and hanging type court apparatus system (outside) lower end and periphery certain limit Nei place thereof can form outdoor Zhan Yishi court system with space together with outside upper high-altitude goal system etc., overhead type and the hanging type room cage type court apparatus system central area in above-mentioned outdoor Zhan Yishi court space system, forms the spatial relationship form of parcel room, outdoor court cage covered court;
As required, outside in overhead type and apparatus system bottom, hanging type court also can hang outside lower high-altitude goal system simultaneously, and outside lower high-altitude goal system can be independently or with ground space etc. is common, form outdoor Zhan Yishi court system together with the goal system of outside upper high-altitude;
(7), greenhouse and " solar tower " formula---utilizing the materials such as plastics, glass with impact resistance to construct can be every the greenhouse type that protects, has an X-rayed, views and admires and can gather sunlight, the insulation degree court of moving, when whole greenhouse type motion court becomes the high tower shape form that is easier to poly-harvest season season sunlight, can be described as " solar tower " formula;
By the setting of the means such as necessary daylighting, insulation, ventilation, sunshade, greenhouse and " solar tower ”Shi court system can be created better naturally cool in summer and warm in winter and air pressure adapt circumstance, thereby is particularly suitable for the use in the areas such as cold, severe cold and high height above sea level;
(8), semi-underground type---system bottom, court is in underground, the room cage type court system containing underground sinking space form of top in ground, it can make full use of the underground space, reduce whole court system ground level, there is feature cool in summer and warm in winter, simultaneously the wall of under ground portion can naturally be built into easily again cheap and durable every protecting and enclosed construction system, thereby reduce the cost of the life cycle management of system; And aerial part can be set as full cage net formula, containing rain and sun roof type and aforesaid greenhouse and the form such as the sun is tower;
(9), cage in cage: also can be described as Wu Zhong room formula (double deck formula), on the suitable location such as center within vertically height and compare great great room, space cage type court apparatus system and space, can build that aforesaid bottom departs from ground completely and unsettled cabin cage type court apparatus system compared with little being similar to, the space that corresponding size should be continued to employ in cabin cage type court apparatus system top outer and periphery outside, for the passage that the large high-altitude goal system of large room cage type court apparatus system is set and attacks as Dui great high-altitude goal system etc.;
Space and the facility system of the grand formula ball game of war of complete together with the spatial channel that the space of unsettled cabin cage type court apparatus system bottom is attacked with goal system Ji Dui great high-altitude, above-mentioned large high-altitude goal system etc.;
Above-mentioned method to set up can be utilized space and apparatus system more efficiently, it can not increase whole apparatus system and shared space size thereof, in the time of ball war motion game in the large room of not excessive impact cage type court apparatus system simultaneously, increase and corresponding cabin cage type court apparatus system, and the larger cabin cage type court device of width is further separated out to several Geng little room cage type court apparatus systems in transverse region;
Due to the cabin cage type court apparatus system of zone position in space exist cage type court apparatus system Zhong high-altitude, , great room ball to fight some is similar to mountain on the other way round and the artillery action of carrying out every sky and the war of guided missile;
When Dang great room cage type court apparatus system adopts partly-exposed basement form, the Ke Yu ground, bottom of its inner cabin cage type court apparatus system arranging is with high, the also certain altitude that can be above the ground level, thereby forms all cage---large systems of double deck formula in cage good and that efficiently utilized the underground space of total use function and art of architectural modelling; .
As required, in cage cage type court apparatus system can be around center according to big-and-middle containing in little, little containing less mode be designed to containing more multi-layered time the version of multiple sheathed formula;
(10), skeleton inflatable---court components of system as directed and even all skeleton all adopt the version of the inflatable with functions such as can conveniently packing up, thereby form together inflatable back bone network, on inflatable back bone network, can establish the light-duty safeguard structure of the forms such as net formula, membrane type;
(11), inflatable in whole: whole facility system periphery adopts the structures such as membrane type to seal, and make in whole system space be filled with to there is certain air pressure higher than atmospheric environment air pressure, utilize the inside and outside draught head of system to prop up the membrane structure etc. of whole system periphery, simultaneously, ad hoc load-carrying members face above the goal system of high-altitude, on load-carrying members face, establish load-bearing skeleton net and can rely on the floating such as the closing membrane structure of the poor floating of system inner and outer air pressure, load-bearing skeleton net can consist of main framing and branch's skeleton etc., the floating structure that branch's skeleton is distributed in place, Bing Yuge zonule on whole load-carrying members face equably is directly connected, combine, even with the buoyancy making progress that whole floating structure is subject to, pass to fully branch's skeleton, main framing and whole load-bearing skeleton net, thereby can make each main framing and the whole load-bearing skeleton netting gear that are connected with all multiple-limb skeletons have suitable weight capacity, and then can be on some main framings direct Diao She high-altitude goal system,
As required, can set up in the some regions that do not join some independently load-carrying members faces separately simultaneously, thereby on the more large-area floating structural plane with buoyancy that makes that corresponding gravity load can drop on whole interior inflatable facility system top more equably, on some load-carrying members faces simultaneously Diao Sheyige high-altitude goal system, also can hang simultaneously and establish a plurality of high-altitudes goal system;
As required, the skeleton structure of the empty goal system of above-mentioned load-bearing skeleton net height etc. can further be set as the version of the lighter weight of the forms such as interior inflatable, can reduce the gravity load of whole system like this, be beneficial to again high-altitude goal system setting, pack up and safety, can make above-mentioned interior inflatable skeleton structure etc. with whole in the pneumatic system of inflatable court system unified mutually;
As required, also can an at least ad hoc arch in the apparatus system of inflatable court in whole etc. the large span inflatable skeleton structure that is exclusively used in Diao She high-altitude goal system of form, large span inflatable skeleton structure can connect as one with the floating structures such as closing membrane of the poor floating of dependence system inner and outer air pressure; Because large span inflatable skeleton structure itself can be carried certain gravity load, in the acting in conjunction that adds the available larger buoyancy of floating structure of the dependence inside and outside differential pressure that connected area can be larger, can further make total can carry the weight loading of Geng great high-altitude goal system etc., certainly, also can make as required the pressure reduction inside and outside the space system of whole court suitably reduce, more to adapt to the needs of people motion etc., can correspondingly reduce, maintain the poor required relevant power consumption of whole court space system inner and outer air pressure simultaneously;
Inflatable spatial structure system in the above-mentioned integral body that contains large span inflatable skeleton structure, even the structures such as goal, Bu She high-altitude, not as court apparatus system, its set-up mode is also favourable in many-side, can be applicable in other many interior inflatable spatial structure system;
Inflatable court facility system in above-mentioned integral body, is particularly suitable for place and the situation of the narrow spaces such as city, is particularly suitable for the ground of the unfavorable motion of high height above sea level rarefaction of air, is particularly suitable for relying on cold and the severe cold area of environment temperature in the lifter motions such as solar energy; It can be the morphology form such as tower, arched ,Ji room formula on the whole; It should both fully meet the needs of space, can consider efficiently to utilize again the needs of solar energy, geothermal energy, thereby can adopt the membrane structure with abilities such as high-efficiency lighting insulations and the frame mode that optionally can adopt half ground formula;
(12), water boat formula---can utilize Water space to build fixing and water boat-shaped Shi court system movably, this court system can all be built on water surface deck, also can adopt the mode of similar aforesaid " semi-underground cell-type ", make the bottom of court system among the cabin lower than the water surface, even can make whole court system be built in other appropriate architecture Ti top on ship, thereby the boat that makes whole ball war can have better space utilization ability, and the boat of ball war also can become the new-type travel tool with functions such as pleasure-boats, the boat of large-scale ball war also can become the large-scale new-type pleasure-boat with brand-new characteristic, certain above-mentioned ball war facility system also can be located among the boats and ships of other purposes, for uses such as crewman and passengers.
9. according to ball game method and facility system thereof described in claim 1,2, it is characterized in that: can utilize the deliveries such as special vessel, car first and even " power " aircraft and armament systems to carry out corresponding game Great War:
First, can on the suitable water surface, establish high-altitude and low latitude goal system, the Great Game that opposing teams can carry out corresponding ball game waterborne by Waterborne movable modes such as vessel, swimming;
Can imitate aforesaid ground set-up mode waterborne fixed high-altitude and the low latitude goal system of suitable form are set, to realize the game process waterborne that is similar to ground game process, can on all or part of competition vessel, establish movable goal system simultaneously, in match, both sides sportsman not only can resemble in court, aforesaid ground match like that by attacking high-altitude and low latitude fixedly goal and score, can also pass through movable goal on attack the other side ship and score;
High-altitude waterborne goal system and low latitude goal system can be located at relatively fixedly on vessel, chinampa etc., the match driving with at least one people can come and go, gallop on the whole match water surface with vessel, player on vessel can utilize that hand, foot, other suitable position of health and club etc. are held ball, batting instrument, to realize, obtain ball, ball-handling, and to catch and create openings makes great efforts ball to shoot the other side's goal, low latitude and goal, corresponding high-altitude;
In all or part of match of both sides, also can establish the portable goal system of moving with vessel on vessel, both sides' match can be attacked opponent vessel Shang goal with ball with the player on vessel, hit and score, in match both sides' man-of-war will be all in continuous motion, to create favourable attack position and state and formation can prevent position and the state attacked preferably; Both sides drive between power hand that vessel advances and the player who is responsible for attacking etc. and want the close coordination of height of formation and coordinate, and to create at the volley and to catch favourable attack opportunity to complete rapidly, the other side are moved to goal and fixedly effective attack at goal;
After movable goal on a certain match vessel is hit, offense not only can remember minute, also can be in some cases, as hit the other side a certain lifeblood formula goal and non-lifeblood formula goal and repeatedly hit etc. in situation, all players that can sentence on this vessel and ship stand down together, thereby make score side obtain the upper advantage in larger field, it is also consistent with the war rule such as real sea warfare simultaneously;
On each vessel of both sides, can be equipped with some suitable model, the attack ball of suitable number, the weight of ball for the attack of different model, shape and size etc. can be not identical, be beneficial to in distance, just, size, sound, choice for use in the attack at the goal that the aspects such as speed are different, certainly, if the various attack of suitable number is all finished with ball, corresponding vessel system will be lost attacking ability, while not needed to stand down but if it does not inflict heavy losses on, it on the one hand also can be as the fixing shield of goal system in the important vessel of other one's own side and low latitude, can also disturb and destroy in the mode of other allowance opponent's attack action on the other hand, as passage, hinder that the other side passes through etc.,
Power hand in above-mentioned vessel system and controlling among the space system of the safety that hand etc. can be in being surrounded by net protection structure 30 and cabin etc., so that its not threat of ball under fire, net protection structure 30 can jointly form the portable goal system on vessel together with other web frame etc. simultaneously, when the ball of attack hits above-mentioned net protection structure 30 and other web frame, its impulsive force can by the absorptions such as door net with dissolve, the ball of attack can be at effect whereabouts introduction ends off the net such as gravity, and can enter among ad hoc ball gathering system through ad hoc collection channel, the situations such as number of times of being hit by a bullet with this provable this ship, both sides' marble used can have obviously not identical color as required, pattern, to facilitate differentiation etc.,
Attacking driving hand in vessel system can the naked suitable location in vessel on, also can freely move and obtain best attack position to implement efficient attack; Attacking driving hand can optionally determine whether to undertake the protection of this ship goal system, and the removable goal system on each vessel also can optionally determine whether to establish goal defence personnel;
If two, by court, displacement land, court waterborne, above-mentioned vessel waterborne is become to land car first simultaneously, can form game form and the game playing system of the land car first Great War of similar aforementioned vessel Great War waterborne;
Three, waterborne and land area can be located in motion and the court of game simultaneously, corresponding battle on water vessel and land battle Che Jiake participate in game simultaneously, form " land sea Great War ", its can be that is virtually reality like reality the certain situation of land sea Great War, and can make game battlefield among artificial space and real place;
Four, can adopt with the nature's mystery system with motor-driven vessel, Che Jiawei support and traction compared with strong power waterborne, on the ground and participate in game, the drive system of whole nature's mystery system Ke You bottom, the flight system at top and the connection drive system in middle part and the compositions such as connected system of flight system; The aircraft system at top can be all the time in higher space; On nature's mystery system, can establish some attacking driving hands, driver etc., in the suitable location of nature's mystery system, establish at least one goal, high-altitude simultaneously, can be for the movable high-altitude target target control system accusing each other to form;
Aircraft system on the flight system at top can be directly regularly on the connected system of middle part, also can be flexibly can be aircraft and provide on the motor platform system of Multidirectional motion space and Multidirectional motion ability on connected system top, middle part, thereby make aircraft not only can with the water surface, the drive system part motion together on ground, also can in certain height and spatial dimension, have and independently can carry out up and down, left and right, faster motor-driven ability is waited in front and back, thereby further promote the air mobile of aircraft system, the ability that attack and defence etc. comprehensively fought,
Because the power of nature's mystery system is large, its movement velocity can be apparently higher than the movement velocity that relies on manpower, weak motor-driven power-actuated vessel, car first system, simultaneously due to its can be all the time in compare Gao locus and there is good airmobility, therefore no matter it is the attack to movable and fixing goal, the low latitude target in waterborne and ground, or all can form obvious advantage to the attack of goal, the fixed high-altitude target in compared with high-altitude;
Nature's mystery system Shang high-altitude goal system etc., also nature can become the active attack target of the ball bullet of launching on Ground Vehicle first, water surface vessel etc., certainly both sides' nature's mystery system also can the game in target of attack each other among;
As required, whole nature's mystery system also can become the three-dimensional attack system jointly consisting of the attacking system (player, batting instrument etc.) on the platform of the multi-level differing heights such as bottom drive system, middle connected system, top flight system, it not only can have height and the speed advantage of air attack like this, also has the three-dimensional powerful attacking ability that can be similar to aircraft carrier fleet simultaneously; Certainly on the other hand, on nature's mystery system, correspondingly also can establish multi-level a plurality of goal system of the differing heights that can be used as target attack;
Five, different from aforesaid bottom motor driven nature's mystery system, also can establish as required rail mounted nature's mystery system:
In direction by the perpendicular direction of Ke Yu high-altitude goal system on the whole and other matters, establish the flight track system that can move for quick high-altitudes of aircraft such as aircrafts, realize the aircraft such as aircraft in aspect advantages such as height and speed;
As required, flight track system can be built on the domes system of large span of whole court system, certainly the system such as Ke She high-altitude and goal, low latitude simultaneously on the domes system of large span;
The advantage of rail mounted nature's mystery system is: set-up mode and structural system are relatively simple, and shortcoming is: the flight path of aircraft is limited on specific track, makes it lose larger outmaneuver, becomes the easily locked target with attacking;
Rail mounted nature's mystery system is more suitable for building in land, containing the ,Lu island, land of the water surface and have on the water surface on island of more comparatively dense;
Six, by setting and the utilization of above-mentioned water, land and air sky system, can form the methods of the ball game of more complete simulation modern war:
In the ball game of above-mentioned situation and alternate manner of the present invention, can adopt directly as required, indirectly rely on manpower and the delivery device of other strength transmitting ball bullet and the ball pitching tool of other form to participate in match;
In match, both sides can first select to hit the other side's reserve force or seize the critical positions that threatens the safety such as opponents' goal, thereby weaken and transfer enemy, obtain battlefield supremacy;
The core bead door of the goal system of the positions such as low latitude in both sides' great depth rear etc. can be considered one of game both sides' strategic interests of wanting most and lifeblood, the ground that both sides must go all out to fight the floods, therefore will become the most important attack of both sides and defended target, become important induction and the support that can transfer the other side's strength simultaneously; As signifying that empty day target, the trajectories of missile attack such as satellite are, the fixed high-altitude goal system of the important war systems such as node of anti-missile interception and key element aspect is also most important attack and defense target; Vessel, car first and nature's mystery etc. have the common both sides' of formation such as the technical equipment of the higher performance such as motor-driven and the power hand on it, driver, player, commanding effective strength, are the main bodys of game, are the keys and basis that determines victory or defeat.
10. according to ball game method and facility system thereof described in claim 1,2,3, it is characterized in that: the natural environment that space, Ke Yu place is set of relevant court facility system, society's building organically combine:
First due to setting and the efficient utilization to vertical and whole space thereof of high-altitude goal system, in the motions such as attack of people Xiang high-altitude goal system can by relevant many health strength such as strength of one's legs, hand-power and the time discharges fully, shows so the property made widely known bring into play, thereby even if make also can obtain in its space in horizontal depth compare little urban cells compare Qiang place, survival ability;
Two, in areas such as the high latitude of cold and severe cold, high height above sea level, can consider with the construction of the solar building system of building distance unified mutually, make many need to, compared with 11 people of greater room and even ball game facility systems such as the grand formula football of war that can more numbers, can being located at better among following sun city;
Its San,Ke Jiang high-altitude goal system is directly located at the top of the tier building of bottom overhead type;
Four, the goal system of some differing heights can be located to the built on stilts multilayer of form and some intermediate spaces region of skyscraper and even the top of building, particularly, in the middle of Ke building body, build the built on stilts part of some suitable forms, hanging garden can be done, Ke She great high-altitude goal system on each hanging garden space in the bottom of built on stilts part;
The structures such as protecting wire net, protective plate of can setting up defences between great high-altitude goal system and hanging garden, it can make the ball of the attack of downstairs court Shang Dui great high-altitude goal system attack can not fall among hanging garden on the one hand, the structure such as protection network, protective plate can make again hanging garden become a cage space, room on the other hand, forms room cage hanging garden simultaneously;
Among Ke room cage hanging garden, establish as required corresponding little high-altitude goal system, thereby make this hanging garden become aerial room cage type court, if certain She great high-altitude goal system on garden aloft not, the residing whole overhead space of hanging garden can be set as larger aerial room cage type court;
The window and the body of wall that five, are provided with the building of high-altitude goal system and the relevant building of periphery thereof can adopt the flexible network structure with low noise and necessary intensity and durability to protect, the metope of the body of wall of building also can be done the protective processing that the anti-pellet impact of meeting of other form and low noise etc. require, thereby the impact that the crowd in building is subject to is very little, also building is not caused damage, the building that simultaneously also can effectively utilize periphery forms naturally preferably every protecting court;
Six, can utilize in the middle of the court and overhead type individual layer, the multilayer structure of periphery more easily arranges high-altitude goal system, hangs corresponding court protecting film simultaneously, every protecting wire net etc., thereby form the room cage type court system that relies on relevant building, this method can be applicable among the building system of villa, garden, hotel and even community, thereby forms corresponding cage villa court system, cage garden court system, cage hotel court system, court, cage community system etc.;
Seven, in cold and severe cold area, when the above-mentioned room intrasystem building of cage type court adopts east-west construction style, in the directions such as Ke Qi southern side, establish can more efficient glass and the directions such as light transmissive material ,Er Qi north side such as film can add the solar building room cage type court system that the better material of the performances such as insulation contains building system jointly to enclose inside in good time;
In solar building room cage type court internal system, the overhead space of the bottom of middle building system, the high-altitude net system space on top, and between the space of building system south and north flanks, can jointly form around and surround in the middle of the unobstructed annular space of building system, in the winter time and surrounding time, building surface and air in this region, annular space south will be heated by sunlight, temperature rises, thereby the south and north flanks in building forms the temperature difference and draught head, and then in unobstructed annular space passage by the circulated air that forms the temperature difference and draught head and promote, circulated air is passed to north side naturally by the solar heat that system southern side is obtained, pass to each position of annular space, so just be equivalent to middle building system to form Ge Hu space and a heat-insulation system having higher than environment temperature, Gai Gehu space and heat-insulation system can be brought into play lifting temperature to building system in the middle of whole, buffering and the warming soft effect every protecting,
Annular space passage (Ji Gehu space and heat-insulation system) as ball game game play space, on the one hand by the heat that naturally obtains greenhouse effects and produce, also the middle building system institute dispersed heat surround will be obtained on the other hand, therefore its temperature can be more significantly higher than the temperature of ambient air, and its with higher temperature to middle building system every protect also can make in the middle of building system heat loss still less;
Eight,, for more fully utilizing efficiently space and the solar energy resources of relevant range, can adopt the room cage covered court system that makes to rely on winter solar energy natural heating---the distribution form that court, greenhouse system and outdoor outdoor court system are arranged in order by suitable interval, north and south;
For utilizing better whole resource, Ke Jiang room cage covered court system is set as semi-underground form, it can be single formula, also can be combined type, as primary-secondary type etc., like this its both can to have utilized ground temperature to realize cool in summer and warm in winter etc., can unlikelyly because whole height is too high, take again too much space and sunshine resource;
Can court, some Pai greenhouse system be set by minimums distance for sunlight such as six hour sunshines of winter solstice, to realize the solar energy in winter greenhouse court, naturally heat, certainly due to the temperature of the spaces such as court, can be starkly lower than the requirement of other human residential space, therefore can optionally reduce actual relevant minimum distance for sunlight for utilizing space resources more efficiently;
Between the system of court, greenhouse, can establish the outdoor court of some rows, the periphery of court, greenhouse system is gone along with sb. to guard him etc. every protection structure, not only can the official ball of covered court be shielded and be protected, also can carry out effectively screen to the ball of the match in the outdoor court between the system of court, greenhouse and protect, thereby can make whole space and each court system of having realizes best positioning efficiency and service efficiency;
Nine, as required, thus on above-mentioned court system cage net used etc., can establish green vegetation etc. forms the green ecology movement space system of protecting of shielding;
Ten, as required, high-altitude goal system can fix or flexibly be located on outside of the city and even important square between ,Lou tall building and even tall and big trees, can be hung under arch building and even arch bridge pier, and can and corresponding place, ecological space, culture and space thereof etc. between form rational, efficient, artistic organically blending.
CN201210201088.4A 2012-06-15 2012-06-15 Method and facility system of ball game imitating modern warfare game form Pending CN103505869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210201088.4A CN103505869A (en) 2012-06-15 2012-06-15 Method and facility system of ball game imitating modern warfare game form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210201088.4A CN103505869A (en) 2012-06-15 2012-06-15 Method and facility system of ball game imitating modern warfare game form

Publications (1)

Publication Number Publication Date
CN103505869A true CN103505869A (en) 2014-01-15

Family

ID=49889621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210201088.4A Pending CN103505869A (en) 2012-06-15 2012-06-15 Method and facility system of ball game imitating modern warfare game form

Country Status (1)

Country Link
CN (1) CN103505869A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111111116A (en) * 2019-12-23 2020-05-08 傅建熹 Drawn ball and drawn ball frame and drawn ball course special for same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111111116A (en) * 2019-12-23 2020-05-08 傅建熹 Drawn ball and drawn ball frame and drawn ball course special for same

Similar Documents

Publication Publication Date Title
Rawlings et al. Hoplite Martial and Combat Experiences Beyond the Phalanx,'
US11266892B2 (en) Flying object water game
CN102872582A (en) Ball game method imitating modern warfare game form, and facility system thereof
US20190091534A1 (en) Flying object game
Nylund Halo: The fall of reach
Ruck Tropic of football: The long and perilous journey of Samoans to the NFL
US7857718B2 (en) GolfDiscney: GolfDiscney World, the Triple Star GolfDiscney World and SanXing GolfDiscney World for Triple-Star Golf, SanXing Golf of GolfRing, GolfDisc, GolfBall and Golfrisbee, RingBall Golf
CN103505869A (en) Method and facility system of ball game imitating modern warfare game form
Denver et al. Damn few: Making the modern SEAL warrior
CN1048905C (en) Union chess, military chess, modern chess, transition chess and great harmony chess
Caldwell The Push: A Climber's Journey of Endurance, Risk, and Going Beyond Limits
Caldwell The Push: A Climber's Search for the Path
Mann Inside SEAL team six: my life and missions with America's elite warriors
Tootal Danger close: the true story of Helmand from the leader of 3 Para
Gullo Into the cage: The rise of UFC nation
Webb et al. Among Heroes: A US Navy SEAL's True Story of Friendship, Heroism, and the Ultimate Sacrifice
CN102824732B (en) Boundary line goal device and court system adopting same
CN103127675A (en) Ball game method provided with high-altitude goal and facility system thereof
CN202777677U (en) Ball field system
Daniels XX Olympiad
RU114418U1 (en) GAME SYSTEM
Posey XVI Olympiad
Rubaiyat Sports center Bhatiary, Chittagong
Paul The gutsy girl: Escapades for your life of epic adventure
Hannigan The Good Family

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140115