CN103500378B - Method and system with failure code management equipment deficiency - Google Patents

Method and system with failure code management equipment deficiency Download PDF

Info

Publication number
CN103500378B
CN103500378B CN201310460416.7A CN201310460416A CN103500378B CN 103500378 B CN103500378 B CN 103500378B CN 201310460416 A CN201310460416 A CN 201310460416A CN 103500378 B CN103500378 B CN 103500378B
Authority
CN
China
Prior art keywords
code
fault
failure
equipment
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310460416.7A
Other languages
Chinese (zh)
Other versions
CN103500378A (en
Inventor
叶生
李永兴
郭海峰
李继宝
陈涛
丁钊
张方斗
张百华
陈湘匀
杨宗强
王利亚
赵增涛
麻建超
周劲松
王晓翼
胡亭亭
刘勇
谢莫锋
柏毓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Tiaofeng Frequency Modulation Power Generation Co
Guangzhou Jianxin Technology Co ltd
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Original Assignee
Guangzhou Strong Automatisme Science And Technology Ltd
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Strong Automatisme Science And Technology Ltd, Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd filed Critical Guangzhou Strong Automatisme Science And Technology Ltd
Priority to CN201310460416.7A priority Critical patent/CN103500378B/en
Publication of CN103500378A publication Critical patent/CN103500378A/en
Application granted granted Critical
Publication of CN103500378B publication Critical patent/CN103500378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of method and system of failure code management equipment deficiency.By known equipment deficiency, according to phenomenon of the failure and failure cause, to failure modes, to each type and reason, give different codes by different phenomenons with reason and represent, form multilamellar failure code system.Level according to multilamellar failure code system sets up fault code link, obtains fault code link data model.Fault data after being processed by each equipment deficiency inputs according to fault code link data model, generates failure logging.According to failure logging, calculate equipment fault Probability.By according to fault type failure code classification being processed and setting up fault code link data model, then the fault data after each troubleshooting is inputted according to fault code link data model, generate failure logging, it is easy to failure logging is carried out inductive statistics, calculate equipment fault Probability, reduce error probability during statistics fault rate.

Description

Method and system with failure code management equipment deficiency
Technical field
The present invention relates to equipment Repairing Technology field, particularly relate to one failure code and manage equipment deficiency Method and system.
Background technology
In maintenance of equipment, report and description to equipment fault are critically important parts, on the one hand can With the report of specification accident, draw in detail and accident statistics form accurately, on the other hand can analyze and unite The meter reason of equipment fault, the frequency of system or equipment fault, the repair based on condition of component for equipment accumulates basic data.
Unified failure code system makes enterprise use the term of unified standard reporting various fault when Or code, it is unlikely to cause and obscures, be also beneficial to improve the quality that malfunction history data is analyzed.Failure code body System has played the biggest effect to maintenance of equipment process, also helps the reliability of the equipment that improves from side.
Traditional failure code system is usually three-decker, is respectively used to record element or the portion causing fault Position, cause the reason of fault, cause the reason of fault.This failure code architecture is simple, but due to In production equipment, contained component kind is various, and data are the most in disorder, there is bigger mistake during statistics fault rate Probability.
Summary of the invention
Based on this, it is necessary to provide one statistics fault rate time, it is possible to decrease error probability use failure code pipe The method and system of reason equipment deficiency.
The method of a kind of failure code management equipment deficiency, comprises the following steps: obtain failure code, and According to fault type, described failure code is classified, form multilamellar failure code system;According to described many The level of layer failure code system sets up fault code link, obtains fault code link data model;Will event every time Fault data after barrier processes inputs according to described fault code link data model, generates failure logging; According to described failure logging, calculate equipment fault Probability.
Wherein in an embodiment, described failure code includes main system failure code, main system bug list As code, subsystem fault codes, equipment fault code, equipment fault presentation code, equipment fault reason Code and equipment obstacle management measure code, described acquisition failure code, and according to fault type to described event Barrier code is classified, and forms the step of multilamellar failure code system, comprises the following steps:
Extract described main system failure code, obtain main system failure code layer;
Extract described main system the surface phenomenon of mal-function code, obtain main system the surface phenomenon of mal-function code layer;
Extract described subsystem fault codes, obtain subsystem fault codes layer;
Extract described equipment fault code, obtain equipment fault code layer;
Extract described equipment fault presentation code, obtain equipment fault presentation code layer;
Extract described equipment fault reason-code, obtain equipment fault reason-code layer;
Extract described equipment obstacle management measure code, obtain equipment obstacle management measure code layer;
Described main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, set Standby failure code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management are arranged Execute code layer and constitute described multilamellar failure code system.
Wherein in an embodiment, the described level according to described multilamellar failure code system sets up fault generation Code chain, obtains the step of fault code link data model, comprises the following steps:
According to described main system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem fault codes layer Set up associative combination, remove erroneous association combination, obtain primary associated group intersection;
According to described equipment fault code layer, equipment fault presentation code layer, equipment fault reason-code layer and Equipment obstacle management measure code layer sets up associative combination, removes erroneous association combination, obtains secondary associated group Intersection;
Set up associative combination according to described primary associated group intersection and secondary associated group intersection, remove erroneous association Combination, sets up described fault code link, obtains fault code link data model.
Wherein in an embodiment, described by the fault data foundation fault code link after each troubleshooting The rule of data model inputs, and after generating the step of failure logging, also includes storing described fault note The step of record.
A kind of system of failure code management equipment deficiency, including:
Failure code acquisition module, is used for obtaining failure code, and according to fault type to described failure code Classify, form multilamellar failure code system;
Failure code processing module, for setting up failure code according to the level of described multilamellar failure code system Chain, obtains fault code link data model;
Failure logging typing module, is used for the fault data after each troubleshooting according to described failure code Chain data model inputs, and generates failure logging;
Equipment fault statistical module, for according to described failure logging, calculates equipment fault Probability..
Wherein in an embodiment, described failure code includes main system failure code, main system bug list As code, subsystem fault codes, equipment fault code, equipment fault presentation code, equipment fault reason Code and equipment obstacle management measure code, described failure code acquisition module includes:
Main system failure code unit, is used for extracting described main system failure code, obtains main system fault generation Code layer;
Main system the surface phenomenon of mal-function code unit, is used for extracting described main system the surface phenomenon of mal-function code, obtains principal series System the surface phenomenon of mal-function code layer;
Subsystem fault codes unit, is used for extracting described subsystem fault codes, obtains subsystem fault generation Code layer;
Equipment fault code unit, is used for extracting described equipment fault code, obtains equipment fault code layer;
Equipment fault presentation code unit, is used for extracting described equipment fault presentation code, obtains equipment fault Presentation code layer;
Equipment fault reason-code unit, is used for extracting described equipment fault reason-code, obtains equipment fault Reason-code layer;
Equipment obstacle management measure code unit, is used for extracting described equipment obstacle management measure code, obtains Equipment obstacle management measure code layer;
Described main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, set Standby failure code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management are arranged Execute code layer and constitute described multilamellar failure code system.
Wherein in an embodiment, described main system failure code unit includes main system fault default code Unit, described main system fault default code unit is for generating main system according to described main system failure code Fault default code, and it is stored in described main system failure code layer;Described main system the surface phenomenon of mal-function code unit Including main system the surface phenomenon of mal-function default code unit, described main system the surface phenomenon of mal-function default code unit is used for root According to described main system the surface phenomenon of mal-function code building main system the surface phenomenon of mal-function default code, and it is stored in described main system The surface phenomenon of mal-function code layer.
Wherein in an embodiment, described failure code processing module includes:
Primary treatment unit, for according to described main system failure code layer, main system the surface phenomenon of mal-function code layer Set up associative combination with subsystem fault codes layer, remove erroneous association combination, obtain primary associated group intersection;
Minor processing blocks, is used for according to described equipment fault code layer, equipment fault presentation code layer, sets Standby failure cause code layer and equipment obstacle management measure code layer set up associative combination, remove erroneous association group Close, obtain secondary associated group intersection;
Code chain sets up unit, for setting up close according to described primary associated group intersection and secondary associated group intersection Joint group closes, and removes erroneous association combination, sets up described fault code link, obtain fault code link data model.
Wherein in an embodiment, the system of described failure code management equipment deficiency also includes fault generation Code knowledge base,
Described failure code knowledge base is used for the event after each troubleshooting in described failure logging typing module Barrier data input according to described fault code link data model, after generating failure logging, store described event Barrier record.
Wherein in an embodiment, described failure logging typing module includes extending Data Enter unit, institute State extension Data Enter unit for obtaining the extension information that described failure logging is corresponding, and send to the most described therefore Barrier code knowledge base, is associated storage by failure logging with corresponding extension information.
The above-mentioned method and system utilizing failure code management equipment deficiency, obtains failure code, and according to event Failure code is classified by barrier type, forms multilamellar failure code system.According to multilamellar failure code system Level set up fault code link, obtain fault code link data model.By the fault after each troubleshooting Data input according to described fault code link data model, generate failure logging.According to failure logging meter Calculate equipment fault Probability.By according to fault type failure code classification being processed and setting up failure code Chain data model, then inputs the fault data after each troubleshooting according to fault code link data model, Generate failure logging, it is simple to failure logging is carried out inductive statistics, calculate equipment fault Probability, reduce Error probability during statistics fault rate.Being also convenient for user and understand the multiple season of equipment fault, equipment runs How long interval it is possible to the information such as break down, is carried out and is prevented in advance, provide for equipment state overhauling feasible Statistical data foundation.
Accompanying drawing explanation
Fig. 1 is the flow chart of the method in an embodiment with failure code management equipment deficiency;
Fig. 2 is the flow chart of the method in another embodiment with failure code management equipment deficiency;
Fig. 3 is the structure chart of the system in an embodiment with failure code management equipment deficiency;
Fig. 4 is the structure chart of the system in another embodiment with failure code management equipment deficiency.
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, the most right The detailed description of the invention of the present invention is described in detail.Elaborate in the following description a lot of detail with It is easy to fully understand the present invention.But the present invention can come real to be a lot different from alternate manner described here Executing, those skilled in the art can do similar improvement in the case of intension of the present invention, therefore this Bright do not limited by following public specific embodiment.
Unless otherwise defined, all of technology used herein and scientific terminology and the technology belonging to the present invention The implication that the technical staff in field is generally understood that is identical.The art used the most in the description of the invention Language is intended merely to describe the purpose of specific embodiment, it is not intended that in limiting the present invention.Used herein Term " and/or " include the arbitrary and all of combination of one or more relevant Listed Items.
A kind of method of failure code management equipment deficiency, as it is shown in figure 1, comprise the following steps:
Step S110: obtaining failure code, and classify failure code according to fault type, formation is many Layer failure code system.
Failure code is the mass data according to equipment emerged in operation defect for many years, sum up defect presentation, Reason and processing method, the code data obtained, can be Power Plant Failures code, air-conditioning failure code and electricity Letter failure code etc..According to the difference of fault type, failure code is classified, obtains multilamellar failure code body System.
Wherein in an embodiment, failure code includes main system failure code, main system the surface phenomenon of mal-function generation Code, subsystem fault codes, equipment fault code, equipment fault presentation code, equipment fault reason-code With equipment obstacle management measure code.Step S110 includes that step 111 is to step 117.
Step 111: extract main system failure code, obtain main system failure code layer.
Step 112: extract main system the surface phenomenon of mal-function code, obtain main system the surface phenomenon of mal-function code layer.
Step 113: extract subsystem fault codes, obtain subsystem fault codes layer.
Step 114: extraction equipment failure code, obtains equipment fault code layer.
Step 115: extraction equipment the surface phenomenon of mal-function code, obtains equipment fault presentation code layer.
Step 116: extraction equipment failure cause code, obtains equipment fault reason-code layer.
Step 117: extraction equipment troubleshooting measure code, obtains equipment obstacle management measure code layer.
The event of main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, equipment Barrier code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management measure generation Code layer constitutes multilamellar failure code system.
It the present embodiment is i.e. failure code is divided into 7 code layers by 7 types, it is simple to failure code Arrangement.Being appreciated that the definition to fault type is different, the code layer number obtained would also vary from, Can be adjusted according to practical situation.
Additionally, after step 111, may also include and generate main system fault default generation according to main system failure code Code, and it is stored in the step of main system failure code layer.After step 112, may also include according to main system event Barrier presentation code building main system the surface phenomenon of mal-function default code, and it is stored in the step of main system the surface phenomenon of mal-function code layer Suddenly.
The event of the code such as " SYS01 ", " SYS02 " " SYS03 ", main system is included with main system failure code As a example by barrier presentation code includes codes such as " SYSP01 " " SYSP02 " " SYSP03 ", after step 111 Generate main system fault default code " SYS00 ", and be stored in main system failure code layer, after step 112 Generate main system the surface phenomenon of mal-function default code " SYSP00 ", and be stored in main system the surface phenomenon of mal-function code layer.Rear When continuous step sets up fault code link, the fault code link started with " SYS00-SYSP00 " can be formed, Represent " not causing main system fault " and " dereliction system the surface phenomenon of mal-function ".When main system fault and master do not occur During system failure presentation, after user can be by selecting " SYS00 " and " SYSP00 " code, then from subsystem System failure code starts to select, and can generate complete failure logging equally, it is simple to data management.
Step S120: set up fault code link according to the level of multilamellar failure code system, obtain failure code Chain data model.
Include the code of above-mentioned 7 types with failure code, main system failure code starts with " SYS ", main System failure presentation code starts with " SYSP ", subsystem fault codes starts with " SS ", equipment fault Code starts with " EPC ", equipment fault presentation code starts with " P ", equipment fault reason-code is with " C " Beginning, equipment obstacle management measure code are as a example by " R " starts, according to the level of multilamellar failure code system Set up fault code link, i.e. refer to respectively the failure code in failure code layer be set up associative combination so that The code that the code that " SYS " starts starts with each " SYSP " is associated, the generation that " SYSP " starts The code that code starts with each " SS " is associated, and by that analogy, sets up fault code link.Such as " SYS01-SYSP01-SS001-EPC0001-P0001-C0001-R0001 " is a wherein fault generation Code chain.
Wherein in an embodiment, step S120 includes that step 122 is to step 126.
Step 122: according to main system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem fault generation Code layer sets up associative combination, removes erroneous association combination, obtains primary associated group intersection.
Step 122 is i.e. to system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem fault generation Failure code in code layer sets up associative combination.As a example by failure code is for Power Plant Failures code, main system event Barrier code includes unit failure code " SYS01 ", the main system relevant to unit failure code " SYS01 " The surface phenomenon of mal-function code include pump startup failure code " SYSP01 ", generating startup separator code " SYSP02 ", Pump phase modulation failure code " SYSP03 ", turbine condenser mode failure code " SYSP04 ", machine halt trouble code " SYSP05 " and tripping fault code " SYSP06 ".Unit failure code " SYSP01 " with above-mentioned 6 kinds The associative combination that code outside main system the surface phenomenon of mal-function code is set up, is erroneous association combination, goes Remove, obtain primary associated group intersection.
Step 124: according to equipment fault code layer, equipment fault presentation code layer, equipment fault reason-code Layer and equipment obstacle management measure code layer set up associative combination, remove erroneous association combination, obtain secondary pass Joint group intersection.
Step 124 is i.e. to equipment fault code layer, equipment fault presentation code layer, equipment fault reason generation Failure code in code layer and equipment obstacle management measure code layer sets up associative combination.Remove erroneous association group The principle closed is similar with step 122, repeats no more.
Step 126: set up associative combination according to primary associated group intersection and secondary associated group intersection, remove mistake Associative combination, sets up fault code link, obtains fault code link data model.
The subsystem fault codes that primary associative combination is concentrated by step 126, with secondary associative combination concentration Associative combination set up by equipment fault code.The principle removing erroneous association combination is similar with step 122, no longer Repeat.
It the present embodiment is i.e. the pass respectively according to main system fault, main system the surface phenomenon of mal-function and subsystem fault Connection relation (SYS-SYSP-SS), equipment fault syntagmatic (EPC-P-C-R), subsystem fault and equipment Fault correlation relation (SS-EPC) is divided into three phases and sets up fault code link, equipment fault syntagmatic number According to include machinery, electrically, the career field such as water conservancy project, letter be logical.Step 122 and step 124 can be carried out simultaneously Set up the operation of associative combination, improve the speed setting up fault code link data model, time-consuming.Permissible Understand, carry out treatment by stages be not limited to aforesaid way to setting up fault code link.
Erroneous association combination also is carried out filtering by step 122 to step 126 removes, and reduces redundant data to reality The interference that border uses.It is appreciated that when setting up fault code link data model and also can not remove erroneous association Combination.In the step being subsequently generated failure logging, user selected main system failure code " SYS01 " it After, the main system the surface phenomenon of mal-function code that all " SYSP " starts all is shown, the most also can generate fault Record, but need the user effort more time to carry out code screening, it is not easy to user operation.
Step S130: the fault data after each troubleshooting is carried out defeated according to fault code link data model Enter, generate failure logging.
When user is after each equipment deficiency processes, according to fault code link data model input fault data, Same as a example by unit failure code " SYS01 ", after user selects " SYS01 ", will be with " SYS01 " " SYSP01 ", " SYSP02 ", " SYSP03 ", " SYSP04 ", " SYSP05 " and " SYSP06 " being correlated with All show, in order to user carries out next step and selects.Utilizing fault code link data model to show step by step can The failure code of choosing, is generated failure logging, is simply described equipment deficiency by failure code.
Step S140: according to failure logging, calculates equipment fault Probability.
Failure logging is carried out inductive statistics, calculates equipment fault Probability, when reducing statistics fault rate Error probability.Be also convenient for user and understand the multiple season of equipment fault, equipment interval how long it is possible to The information such as break down, and carries out and prevents in advance, provides feasible statistical data foundation for equipment state overhauling.
The above-mentioned method utilizing failure code management equipment deficiency, obtains failure code, and according to fault type Failure code is classified, forms multilamellar failure code system.Level according to multilamellar failure code system Set up fault code link, obtain fault code link data model.Fault data after each troubleshooting is depended on Input according to described fault code link data model, generate failure logging.Equipment is calculated according to failure logging Fault Probability.By failure code classification being processed and sets up fault code link data according to fault type Model, then inputs the fault data after each troubleshooting according to fault code link data model, generates event Barrier record, it is simple to failure logging carries out inductive statistics, calculates equipment fault Probability, reduces statistics Error probability during fault rate.Being also convenient for user and understand the multiple season of equipment fault, equipment interval is many For a long time it is possible to the information such as break down, carry out and prevent in advance, provide feasible statistics for equipment state overhauling Data foundation.
With hierarchical structure and the operating specification of the method specification failure code of failure code management equipment deficiency, Equipment fault is carried out specific definition from producing to the overall process eliminated, further enhances equipment control water Flat.
Wherein in an embodiment, as in figure 2 it is shown, after step S130, further comprising the steps of:
Step S150: storage failure logging.
Preserve after generating failure logging, it is simple to user checks, can be also the fault inductive statistics in later stage Analyze and data mining provides strong data basis.Step S150 can be before step S140, also Can after step s 140, in the present embodiment, step S150 is after step s 140.
Wherein in an embodiment, after step S150, may also include and obtain the extension that failure logging is corresponding Information, and failure logging is associated with corresponding extension information the step of storage.
The extension information that failure logging is corresponding specifically can include troubleshooting work order number, device coding, functional position Put coding, device class and materials and equipment classification coding etc..Association storage can be by failure logging and extension information It is stored in same position, as being stored in same form, it is also possible to be to failure logging and corresponding extension information Establish the link.
After generating failure logging, corresponding extension information is associated storage the most in the lump, for follow-up number Basic according to the data quoted, data query, statistical analysis apply offer more rich with data mining etc..
The present invention also provides for the system of a kind of failure code management equipment deficiency, as it is shown on figure 3, include event Barrier code acquisition module 110, failure code processing module 120, failure logging typing module 130 and equipment event Barrier statistical module 140.
Failure code acquisition module 110 is used for obtaining failure code, and carries out failure code according to fault type Classification, forms multilamellar failure code system.
Failure code is the mass data according to equipment emerged in operation defect for many years, sum up defect presentation, Reason and processing method, the code data obtained, can be Power Plant Failures code, air-conditioning failure code and electricity Letter failure code etc..According to the difference of fault type, failure code is classified, obtains multilamellar failure code body System.
Wherein in an embodiment, failure code includes main system failure code, main system the surface phenomenon of mal-function generation Code, subsystem fault codes, equipment fault code, equipment fault presentation code, equipment fault reason-code With equipment obstacle management measure code.Failure code acquisition module 110 include main system failure code unit, The event of main system the surface phenomenon of mal-function code unit, subsystem fault codes unit, equipment fault code unit, equipment Barrier presentation code unit, equipment fault reason-code unit and equipment obstacle management measure code unit.
Main system failure code unit is used for extracting main system failure code, obtains main system failure code layer.
Main system the surface phenomenon of mal-function code unit is used for extracting main system the surface phenomenon of mal-function code, obtains main system fault Presentation code layer.
Subsystem fault codes unit is used for extracting subsystem fault codes, obtains subsystem fault codes layer.
Equipment fault code unit is used for extraction equipment failure code, obtains equipment fault code layer.
Equipment fault presentation code unit is used for extraction equipment the surface phenomenon of mal-function code, obtains equipment fault presentation generation Code layer.
Equipment fault reason-code unit is used for extraction equipment failure cause code, obtains equipment fault reason generation Code layer.
Equipment obstacle management measure code unit is used for extraction equipment troubleshooting measure code, obtains equipment event Barrier treatment measures code layer.
The event of main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, equipment Barrier code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management measure generation Code layer constitutes multilamellar failure code system.
It the present embodiment is i.e. failure code is divided into 7 code layers by 7 types, it is simple to failure code Arrangement.Being appreciated that the definition to fault type is different, the code layer number obtained would also vary from, Can be adjusted according to practical situation.
Failure code processing module 120 is used for setting up fault code link according to the level of multilamellar failure code system, Obtain fault code link data model.
Include the code of above-mentioned 7 types with failure code, main system failure code starts with " SYS ", main System failure presentation code starts with " SYSP ", subsystem fault codes starts with " SS ", equipment fault Code starts with " EPC ", equipment fault presentation code starts with " P ", equipment fault reason-code is with " C " Beginning, equipment obstacle management measure code are as a example by " R " starts, according to the level of multilamellar failure code system Set up fault code link, i.e. refer to respectively the failure code in failure code layer be set up associative combination so that The code that the code that " SYS " starts starts with each " SYSP " is associated, the generation that " SYSP " starts The code that code starts with each " SS " is associated, and by that analogy, sets up fault code link.Such as " SYS01-SYSP01-SS001-EPC0001-P0001-C0001-R0001 " is a wherein fault generation Code chain.
Wherein in an embodiment, failure code processing module 120 includes at primary treatment unit, secondary Reason unit and code chain set up unit.
Primary treatment unit is for according to main system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem System failure code layer sets up associative combination, removes erroneous association combination, obtains primary associated group intersection.
Primary treatment unit is i.e. to system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem event Failure code in barrier code layer sets up associative combination.As a example by failure code is for Power Plant Failures code, principal series System failure code includes unit failure code " SYS01 ", the master relevant to unit failure code " SYS01 " System failure presentation code includes pump startup failure code " SYSP01 ", generating startup separator code " SYSP02 ", pump phase modulation failure code " SYSP03 ", turbine condenser mode failure code " SYSP04 ", shutdown Failure code " SYSP05 " and tripping fault code " SYSP06 ".Unit failure code " SYSP01 " with The associative combination that code outside above-mentioned 6 kinds of main system the surface phenomenon of mal-function codes is set up, is erroneous association combination, It is removed, obtains primary associated group intersection.
Minor processing blocks is for according to equipment fault code layer, equipment fault presentation code layer, equipment fault Reason-code layer and equipment obstacle management measure code layer set up associative combination, remove erroneous association combination, To secondary associated group intersection.
Minor processing blocks is i.e. former to equipment fault code layer, equipment fault presentation code layer, equipment fault Because the failure code in code layer and equipment obstacle management measure code layer sets up associative combination.Remove mistake to close The principle that joint group closes is similar with primary treatment unit, repeats no more.
Code chain sets up unit for setting up associated group according to primary associated group intersection and secondary associated group intersection Close, remove erroneous association combination, set up fault code link, obtain fault code link data model.
Code chain sets up the subsystem fault codes that primary associative combination is concentrated by unit, with secondary associative combination Associative combination set up by the equipment fault code concentrated.Remove principle and the primary treatment unit of erroneous association combination Similar, repeat no more.
It the present embodiment is i.e. the pass respectively according to main system fault, main system the surface phenomenon of mal-function and subsystem fault Connection relation (SYS-SYSP-SS), equipment fault syntagmatic (EPC-P-C-R), subsystem fault and equipment Fault correlation relation (SS-EPC) is divided into three phases and sets up fault code link, equipment fault syntagmatic number According to include machinery, electrically, the career field such as water conservancy project, letter be logical.Primary treatment unit and minor processing blocks can Carry out setting up the operation of associative combination simultaneously, improve the speed setting up fault code link data model, during saving Between.It is appreciated that and carries out treatment by stages and be not limited to aforesaid way setting up fault code link.
Primary treatment unit, minor processing blocks and code chain are set up unit and were also carried out erroneous association combination Elimination removes, and reduces redundant data to actually used interference.It is appreciated that and is setting up fault code link data Also erroneous association combination can not be removed during model.In the step being subsequently generated failure logging, user is the most selected After main system failure code " SYS01 ", will own the main system the surface phenomenon of mal-function code that " SYSP " starts All display, the most also can generate failure logging, but need the user effort more time to carry out code screening, It is not easy to user operation.
Failure logging typing module 130 is for by the fault data foundation fault code link after each troubleshooting Data model inputs, and generates failure logging.
When user is after each equipment deficiency processes, according to fault code link data model input fault data, Same as a example by unit failure code " SYS01 ", after user selects " SYS01 ", will be with " SYS01 " " SYSP01 ", " SYSP02 ", " SYSP03 ", " SYSP04 ", " SYSP05 " and " SYSP06 " being correlated with All show, in order to user carries out next step and selects.Utilizing fault code link data model to show step by step can The failure code of choosing, is generated failure logging, is simply described equipment deficiency by failure code.
Equipment fault statistical module 140, for according to failure logging, calculates equipment fault Probability.
Failure logging is carried out inductive statistics, calculates equipment fault Probability, when reducing statistics fault rate Error probability.Be also convenient for user and understand the multiple season of equipment fault, equipment interval how long it is possible to The information such as break down, and carries out and prevents in advance, provides feasible statistical data foundation for equipment state overhauling.
The above-mentioned system utilizing failure code management equipment deficiency, failure code acquisition module 110 obtains fault generation Code, and according to fault type, failure code is classified, form multilamellar failure code system.Failure code Processing module 120 sets up fault code link according to the level of multilamellar failure code system, obtains fault code link Data model.Failure logging typing module 130 by the fault data after each troubleshooting according to described fault Code chain data model inputs, and generates failure logging.Equipment fault statistical module 140 is remembered according to fault Record calculates equipment fault Probability.By according to fault type failure code classification being processed and setting up fault Code chain data model, then inputs the number of faults after each troubleshooting according to fault code link data model According to, generate failure logging, it is simple to failure logging is carried out inductive statistics, calculate equipment fault Probability, Reduce error probability during statistics fault rate.It is also convenient for user and understands the multiple season of equipment fault, equipment How long interval it is possible to the information such as break down, is carried out and is prevented in advance, provide for equipment state overhauling Feasible statistical data foundation.
With hierarchical structure and the operating specification of the system specifications failure code of failure code management equipment deficiency, Equipment fault is carried out specific definition from producing to the overall process eliminated, further enhances equipment control water Flat.
Wherein in an embodiment, the main system failure code unit of failure code processing module 120 includes Main system fault default code unit, the main system the surface phenomenon of mal-function code unit of failure code processing module 120 Including main system the surface phenomenon of mal-function default code unit.
Main system fault default code unit is for generating main system fault default generation according to main system failure code Code, and it is stored in main system failure code layer.
Main system the surface phenomenon of mal-function default code unit is for according to the event of main system the surface phenomenon of mal-function code building main system Barrier presentation default code, and it is stored in main system the surface phenomenon of mal-function code layer.
The event of the code such as " SYS01 ", " SYS02 " " SYS03 ", main system is included with main system failure code As a example by barrier presentation code includes codes such as " SYSP01 " " SYSP02 " " SYSP03 ", main system fault lacks Save code unit and generate main system fault default code " SYS00 ", and be stored in main system failure code layer, main System failure presentation default code unit generates main system the surface phenomenon of mal-function default code " SYSP00 ", and is stored in master System failure presentation code layer.Failure code processing module 120 when setting up fault code link, can be formed with The fault code link that " SYS00-SYSP00 " starts, represents " not causing main system fault " and " singular set System the surface phenomenon of mal-function ".When there is not main system fault and main system the surface phenomenon of mal-function, user can be by selecting After " SYS00 " and " SYSP00 " code, then start to select from subsystem fault codes, can generate equally Complete failure logging, it is simple to data management.
Wherein in an embodiment, as shown in Figure 4, also may be used by the system of failure code management equipment deficiency Including failure code knowledge base 150.
Failure code knowledge base 150 is used for the event after each troubleshooting in failure logging typing module 130 Barrier data input according to fault code link data model, after generating failure logging, store failure logging.
Preserve after generating failure logging, it is simple to user checks, can be also the fault inductive statistics in later stage Analyze and data mining provides strong data basis.
Wherein in an embodiment, failure logging typing module 130 may also include extension Data Enter unit, Extension Data Enter unit is for obtaining the extension information that failure logging is corresponding, and sends to failure code knowledge Storehouse 150, is associated storage by failure logging with corresponding extension information.
The extension information that failure logging is corresponding specifically can include troubleshooting work order number, device coding, functional position Put coding, device class and materials and equipment classification coding etc..Fault is processed by troubleshooting work order pointer Work order number, device coding refers to that the numbering of the equipment broken down, functional location code equipment can go out by correlation inquiry Equipment place POF, device class can go out the device class belonging to equipment by correlation inquiry, and materials and equipment classification is compiled Code can go out the materials and equipment classification belonging to equipment by correlation inquiry.Association storage can be by failure logging and extension information It is stored in same position, as being stored in same form, it is also possible to be to failure logging and corresponding extension information Establish the link.
After generating failure logging, corresponding extension information is sent the most in the lump to failure code knowledge base 150 It is associated storage, applies for follow-up data referencing, data query, statistical analysis and data mining etc. and carry For more rich data basis.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for this area Those of ordinary skill for, without departing from the inventive concept of the premise, it is also possible to make some deformation and Improving, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended Claim is as the criterion.

Claims (6)

1. the method with failure code management equipment deficiency, it is characterised in that comprise the following steps:
Obtain failure code, and according to fault type, described failure code is classified, form multilamellar fault Code system;
Level according to described multilamellar failure code system sets up fault code link, obtains fault code link data Model;
Fault data after each troubleshooting is inputted according to described fault code link data model, raw Become failure logging;
According to described failure logging, calculate equipment fault Probability;
Described failure code includes main system failure code, main system the surface phenomenon of mal-function code, subsystem fault generation Code, equipment fault code, equipment fault presentation code, equipment fault reason-code and equipment obstacle management are arranged Execute code, described acquisition failure code, and according to fault type, described failure code is classified, formed The step of multilamellar failure code system, comprises the following steps:
Extract described main system failure code, obtain main system failure code layer;
Extract described main system the surface phenomenon of mal-function code, obtain main system the surface phenomenon of mal-function code layer;
Extract described subsystem fault codes, obtain subsystem fault codes layer;
Extract described equipment fault code, obtain equipment fault code layer;
Extract described equipment fault presentation code, obtain equipment fault presentation code layer;
Extract described equipment fault reason-code, obtain equipment fault reason-code layer;
Extract described equipment obstacle management measure code, obtain equipment obstacle management measure code layer;
Described main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, set Standby failure code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management are arranged Execute code layer and constitute described multilamellar failure code system;
The described level according to described multilamellar failure code system sets up fault code link, obtains fault code link The step of data model, comprises the following steps:
According to described main system failure code layer, main system the surface phenomenon of mal-function code layer and subsystem fault codes layer Set up associative combination, remove erroneous association combination, obtain primary associated group intersection;
According to described equipment fault code layer, equipment fault presentation code layer, equipment fault reason-code layer and Equipment obstacle management measure code layer sets up associative combination, removes erroneous association combination, obtains secondary associated group Intersection;
Set up associative combination according to described primary associated group intersection and secondary associated group intersection, remove erroneous association Combination, sets up described fault code link, obtains fault code link data model.
The method of failure code the most according to claim 1 management equipment deficiency, it is characterised in that The described rule by the fault data foundation fault code link data model after each troubleshooting inputs, After generating the step of failure logging, also include the step storing described failure logging.
3. the system with failure code management equipment deficiency, it is characterised in that including:
Failure code acquisition module, is used for obtaining failure code, and according to fault type to described failure code Classify, form multilamellar failure code system;
Failure code processing module, for setting up failure code according to the level of described multilamellar failure code system Chain, obtains fault code link data model;
Failure logging typing module, is used for the fault data after each troubleshooting according to described failure code Chain data model inputs, and generates failure logging;
Equipment fault statistical module, for according to described failure logging, calculates equipment fault Probability;
Described failure code includes main system failure code, main system the surface phenomenon of mal-function code, subsystem fault generation Code, equipment fault code, equipment fault presentation code, equipment fault reason-code and equipment obstacle management are arranged Executing code, described failure code acquisition module includes:
Main system failure code unit, is used for extracting described main system failure code, obtains main system fault generation Code layer;
Main system the surface phenomenon of mal-function code unit, is used for extracting described main system the surface phenomenon of mal-function code, obtains principal series System the surface phenomenon of mal-function code layer;
Subsystem fault codes unit, is used for extracting described subsystem fault codes, obtains subsystem fault generation Code layer;
Equipment fault code unit, is used for extracting described equipment fault code, obtains equipment fault code layer;
Equipment fault presentation code unit, is used for extracting described equipment fault presentation code, obtains equipment fault Presentation code layer;
Equipment fault reason-code unit, is used for extracting described equipment fault reason-code, obtains equipment fault Reason-code layer;
Equipment obstacle management measure code unit, is used for extracting described equipment obstacle management measure code, obtains Equipment obstacle management measure code layer;
Described main system failure code layer, main system the surface phenomenon of mal-function code layer, subsystem fault codes layer, set Standby failure code layer, equipment fault presentation code layer, equipment fault reason-code layer and equipment obstacle management are arranged Execute code layer and constitute described multilamellar failure code system;
Described failure code processing module includes:
Primary treatment unit, for according to described main system failure code layer, main system the surface phenomenon of mal-function code layer Set up associative combination with subsystem fault codes layer, remove erroneous association combination, obtain primary associated group intersection;
Minor processing blocks, is used for according to described equipment fault code layer, equipment fault presentation code layer, sets Standby failure cause code layer and equipment obstacle management measure code layer set up associative combination, remove erroneous association group Close, obtain secondary associated group intersection;
Code chain sets up unit, for setting up close according to described primary associated group intersection and secondary associated group intersection Joint group closes, and removes erroneous association combination, sets up described fault code link, obtain fault code link data model.
The system of failure code the most according to claim 3 management equipment deficiency, it is characterised in that Described main system failure code unit includes main system fault default code unit, and described main system fault is default Code unit is for generating main system fault default code according to described main system failure code, and is stored in described Main system failure code layer;Described main system the surface phenomenon of mal-function code unit includes main system the surface phenomenon of mal-function default generation Code unit, described main system the surface phenomenon of mal-function default code unit is for according to described main system the surface phenomenon of mal-function code Generate main system the surface phenomenon of mal-function default code, and be stored in described main system the surface phenomenon of mal-function code layer.
The system of failure code the most according to claim 3 management equipment deficiency, it is characterised in that Also include failure code knowledge base,
Described failure code knowledge base is used for the event after each troubleshooting in described failure logging typing module Barrier data input according to described fault code link data model, after generating failure logging, store described event Barrier record.
The system of failure code the most according to claim 5 management equipment deficiency, it is characterised in that Described failure logging typing module includes extending Data Enter unit, and described extension Data Enter unit is used for obtaining Take the extension information that described failure logging is corresponding, and send to described failure code knowledge base, by failure logging Storage it is associated with corresponding extension information.
CN201310460416.7A 2013-09-30 2013-09-30 Method and system with failure code management equipment deficiency Active CN103500378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310460416.7A CN103500378B (en) 2013-09-30 2013-09-30 Method and system with failure code management equipment deficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310460416.7A CN103500378B (en) 2013-09-30 2013-09-30 Method and system with failure code management equipment deficiency

Publications (2)

Publication Number Publication Date
CN103500378A CN103500378A (en) 2014-01-08
CN103500378B true CN103500378B (en) 2016-11-09

Family

ID=49865583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310460416.7A Active CN103500378B (en) 2013-09-30 2013-09-30 Method and system with failure code management equipment deficiency

Country Status (1)

Country Link
CN (1) CN103500378B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104615513A (en) * 2013-11-05 2015-05-13 张永军 Multilevel code standardization breakdown analyzing method
CN106483472A (en) * 2015-08-20 2017-03-08 陕西千山航空电子有限责任公司 A kind of power system failure diagnostic method based on airborne power supply management and control device
CN106096058B (en) * 2016-06-29 2020-04-17 浙江万马新能源有限公司 Charging network fault analysis quantitative method and quantitative device based on AHP
CN107169700B (en) * 2017-05-02 2020-04-24 青岛海尔空调器有限总公司 Household appliance fault statistical method and device
CN108052354A (en) * 2017-11-06 2018-05-18 北京趣拿软件科技有限公司 Definite method, apparatus, processor and terminal of the application program without response
CN110278099A (en) * 2018-03-14 2019-09-24 比亚迪股份有限公司 Message test method, device and computer equipment
CN109581999B (en) * 2018-11-05 2021-06-01 中国航空工业集团公司西安飞机设计研究所 Method for processing state data of power distribution channel of aircraft electromechanical system
CN111915192A (en) * 2020-08-04 2020-11-10 南方电网调峰调频发电有限公司 Method and system for establishing power equipment fault management system and computer equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1465954A (en) * 2002-10-11 2004-01-07 中国南方航空股份有限公司 Long distance diagnosis real time tracking system and method thereof
CN1818967A (en) * 2006-03-23 2006-08-16 北京泰智咨询有限公司 Status assessing system of vehicle
CN101536029A (en) * 2006-09-27 2009-09-16 株式会社小松制作所 Failure countermeasure supporting system for mobile vehicle
CN101853478A (en) * 2009-04-01 2010-10-06 杭州信雅达科技有限公司 Automobile fault diagnosis system based on ontology and mobile network
CN102339419A (en) * 2010-07-21 2012-02-01 北京汽车研究总院有限公司 Method and device for realizing reliability, maintainability and supportability (RMS) of military vehicle product
CN102708134A (en) * 2011-03-10 2012-10-03 通用汽车环球科技运作有限责任公司 Developing fault model from service procedures

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8972330B2 (en) * 2011-08-15 2015-03-03 Xerox Corporation Identification of significant sequences of fault codes by statistical hypothesis testing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1465954A (en) * 2002-10-11 2004-01-07 中国南方航空股份有限公司 Long distance diagnosis real time tracking system and method thereof
CN1818967A (en) * 2006-03-23 2006-08-16 北京泰智咨询有限公司 Status assessing system of vehicle
CN101536029A (en) * 2006-09-27 2009-09-16 株式会社小松制作所 Failure countermeasure supporting system for mobile vehicle
CN101853478A (en) * 2009-04-01 2010-10-06 杭州信雅达科技有限公司 Automobile fault diagnosis system based on ontology and mobile network
CN102339419A (en) * 2010-07-21 2012-02-01 北京汽车研究总院有限公司 Method and device for realizing reliability, maintainability and supportability (RMS) of military vehicle product
CN102708134A (en) * 2011-03-10 2012-10-03 通用汽车环球科技运作有限责任公司 Developing fault model from service procedures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
多层故障代码体系的研究与应用;叶生 等;《水力发电》;20090430;第35卷(第4期);第82-83页,图2-3 *

Also Published As

Publication number Publication date
CN103500378A (en) 2014-01-08

Similar Documents

Publication Publication Date Title
CN103500378B (en) Method and system with failure code management equipment deficiency
CN103220180B (en) The processing method that a kind of OpenStack cloud platform is abnormal
CN109271272B (en) Big data assembly fault auxiliary repair system based on unstructured log
CN110645153B (en) Wind generating set fault diagnosis method and device and electronic equipment
CN104199961A (en) Data mining based public building energy consumption monitoring platform data processing method
CN103971025B (en) A kind of fault of numerical control machine tool correlationship Dynamic Variation Analysis method
CN103745293A (en) RCM analysis method
CN107907327B (en) A kind of Wind turbines epicyclic gearbox method for diagnosing faults
CN104820892A (en) Aviation power generation system quantitative hazardness analysis method based on data transmission
CN104486406A (en) Layered resource monitoring method based on cloud data center
CN115453356B (en) Power equipment operation state monitoring and analyzing method, system, terminal and medium
CN104182623A (en) Thermal process data detection method based on equivalent change rate calculation
CN105183610A (en) Cloud data center service monitoring system and method based on resource dependency relationship
CN105157294A (en) Control method and system for multi-online intelligent oil returning and multi-online system
CN108319673A (en) A kind of fault tree construction method based on relational database
CN103675355A (en) Anemometer monitoring method and system
CN108616145B (en) New energy generator tripping optimization method considering voltage influence effect after accident
CN106650076A (en) Ternary decision graph-based universal analysis method for fault-tolerant system
CN103498706A (en) Turboset performance monitoring and diagnosing method based on general logic table
CN103197186B (en) A kind of realtime prediction method for electronic product degradation state
CN102880778B (en) In the GO method of two status systems, determine the method for minimal cut set
Feng et al. Research on intelligent diagnosis method for large-scale ship engine fault in non-deterministic environment
CN104933491A (en) Industrial enterprise energy consumption diagnosis early warning system
CN111624985B (en) Gas turbine control system sensor fault diagnosis method
CN105787205B (en) Failure mode effect relationship based on FMEA illustrates method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510635 No. 32 Longkou East Road, Guangzhou, Guangdong, Tianhe District

Co-patentee after: GUANGZHOU JIANXIN TECHNOLOGY CO.,LTD.

Patentee after: China Southern Power Grid Tiaofeng Frequency Modulation Power Generation Company

Address before: 510635 No. 32 Longkou East Road, Guangzhou, Guangdong, Tianhe District

Co-patentee before: GUANGZHOU JIANXIN AUTOMATION TECHNOLOGY CO.,LTD.

Patentee before: China Southern Power Grid Tiaofeng Frequency Modulation Power Generation Company

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200115

Address after: 510635 room 208, No. 100, Dongxing Road, Donghuan street, Panyu District, Guangzhou City, Guangdong Province

Patentee after: SOUTHERN POWER GRID PEAK LOAD AND FREQUENCY REGULATION POWER GENERATION Co.,Ltd.

Address before: 510635 No. 32 Longkou East Road, Guangzhou, Guangdong, Tianhe District

Co-patentee before: GUANGZHOU JIANXIN TECHNOLOGY CO.,LTD.

Patentee before: China Southern Power Grid Tiaofeng Frequency Modulation Power Generation Company