CN103498556A - Passing opening clamp for cast-in-place concrete wall construction - Google Patents

Passing opening clamp for cast-in-place concrete wall construction Download PDF

Info

Publication number
CN103498556A
CN103498556A CN201310434082.6A CN201310434082A CN103498556A CN 103498556 A CN103498556 A CN 103498556A CN 201310434082 A CN201310434082 A CN 201310434082A CN 103498556 A CN103498556 A CN 103498556A
Authority
CN
China
Prior art keywords
leading screw
concrete wall
wall construction
passing opening
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310434082.6A
Other languages
Chinese (zh)
Other versions
CN103498556B (en
Inventor
魏志光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310434082.6A priority Critical patent/CN103498556B/en
Publication of CN103498556A publication Critical patent/CN103498556A/en
Application granted granted Critical
Publication of CN103498556B publication Critical patent/CN103498556B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A passing opening clamp for cast-in-place concrete wall construction is provided with a lead screw, a stop piece is connected to the front end of the lead screw in a hinged mode, a nut is assembled on the lead screw, radial extension rods are symmetrically arranged on the nut, a slide groove is formed in each radial extension rod, a pair of connecting rods are connected to each radial extension rod through a hinge pin arranged in the slide groove, and a U-shaped clamping piece is arranged on the outer side end of each connecting rod. The passing opening clamp for cast-in-place concrete wall construction is simple in structure, convenient to manufacture, low in manufacturing cost, capable of being used repeatedly and thus capable of lowering construction cost. The passing opening clamp is easy and convenient to assemble and disassemble when being used, can fix wall formworks on the inner side, the outer side and the passing opening side well and thus effectively improves the efficiency and the quality of the cast-in-place concrete wall construction.

Description

An in-situ concrete wall construction mouthful card
Technical field
The present invention relates to the building operations apparatus, be specifically related to an a kind of in-situ concrete wall construction mouthful card.
Background technology
In the in-situ concrete wall work progress of construction work, need to be fixed the body of wall forming panel.Doorway on concrete wall, window waited a mouthful place to be provided with inside and outside both sides and crossed a mouthful side wall form.At present; in the in-situ concrete wall construction; generally use the fastening leading screw perpendicular to metope to be fixed crossing mouthful template at place; this fixed form can only solve the fixing of inside and outside two side templates of body of wall; and the template of crossing mouthful side is not had to fixation; therefore, usually also will be in crossing mouthful the employing strut add the template that the method for carrying on the back wedge crosses mouthful side to body of wall and be fixed.And the template that the method that adopts strut to add carry on the back wedge is crossed mouthful side to body of wall is fixed, troublesome poeration not only, the dress of support, tear open and need to expend a large amount of time, manpower and material, and the poor stability supported, and has a strong impact on the Forming Quality that body of wall is crossed mouth.
Summary of the invention
The object of the invention is to for the problems referred to above, provide a kind of loading, unloading simple and convenient, can play good fixation to inside and outside both sides and the wall form of crossing mouthful side, can effectively improve in-situ concrete wall efficiency of construction and quality, reduce the in-situ concrete wall construction mouthful card of construction cost.
The technical scheme that realizes above-mentioned purpose is: an a kind of in-situ concrete wall construction mouthful card, there is a leading screw, the front end of this leading screw is hinged a block piece, be equipped with nut on described leading screw, be symmetrical arranged radially extension rod on this nut, each radially arranges respectively a chute on extension rod, and pair of links is connected on described radially extension rod by the bearing pin be placed in described chute respectively, and the outboard end of each connecting rod arranges respectively a U-shaped fastener.
Further, the leading screw that described leading screw is hollow-core construction, the leading screw rear end of this hollow-core construction is provided with handle, and the leading screw front end of this hollow-core construction is provided with the front end-plate of leading screw, and described block piece and front end-plate are hinged by rivet.
Further, described block piece is the U-steel of one section notch towards front.
The construction of this in-situ concrete wall has following characteristics with crossing a mouthful jig:
1, simple in structure, the convenient making, low cost of manufacture, and can reuse, thereby can reduce construction cost;
2, loading, unloading are simple and convenient, to inside and outside both sides and the wall form of crossing mouthful side, can play good fixation, thereby effectively improve efficiency and the quality of in-situ concrete wall construction.
The accompanying drawing explanation
Fig. 1 is this in-situ concrete wall construction mouthful card structure schematic diagram;
Fig. 2 is that the construction of this in-situ concrete wall used a mouthful card to use view.
The specific embodiment
In conjunction with the accompanying drawings and embodiments the specific embodiment of the present invention is described.
As accompanying drawing 1, the construction of this in-situ concrete wall has a leading screw 1 with crossing a mouthful jig, the front end of this leading screw 1 is hinged a block piece 2, be equipped with nut 3 on leading screw 1, be symmetrical arranged radially extension rod 4 on this nut 3, each radially arranges respectively a chute 5 on extension rod 4, and pair of links 6 is connected to radially on extension rod 4 by being placed in bearing pins 7 in chute 5 respectively, and the outboard end of each connecting rod 6 arranges respectively a U-shaped fastener 8.
Leading screw 1 of the present invention can be the leading screw of solid construction, and the front end of its leading screw can adopt multiple being hinged of structure realization and block piece 2 that be hinged, and the rear end of its leading screw can arrange instruments such as being convenient to utilize spanner and leading screw be carried out to the structures such as square toes of rotating operation.The leading screw that the leading screw 1 of accompanying drawing embodiment is hollow-core construction, to alleviate its weight.Be provided with handle 9 in the rear end of leading screw 1, so that use the hand rotational lead screw.Handle 9 can adopt the handle of the various ways such as in-line, cross, annular, and the handle 9 of accompanying drawing embodiment is by the steel plate punched moulding, and middle part Cheng Yuan forms the rear end-plate of the leading screw of hollow-core construction, and uniform four convex bodys of circumferential edge, form the cross handle.End-plate 10 before the leading screw front end of hollow-core construction is provided with leading screw, block piece 2 and front end-plate 10 are hinged by rivet 11.
Block piece 2 of the present invention can adopt strip steel plate, rectangular steel tube, and the block piece 2 of accompanying drawing embodiment is the U-steel of one section notch towards front.That the block piece 2 of U-steel has advantages of is lightweight, Rigidity and strength is high.
Accompanying drawing 2 has provided this in-situ concrete wall construction mouthful use state of card, in use, U-shaped fastener 8 is hooked on respectively to body of wall to be crossed on the fixing horizontal back cord 12 of both walls template of mouth, make the fixing perpendicular back cord 13 of block piece 2 and mistake mouthful side template contact simultaneously, then rotational lead screw 1, make block piece 2 push ahead the thrust produced to crossing mouthful side template, thereby the fastening fixing perpendicular back cord 13 of mouthful side template of crossing, make U-shaped fastener 8 that two horizontal back cords 12 are inwardly strained simultaneously, complete to in-situ concrete wall is crossed the mouth inner and outer side template and crossed the fixing of mouthful side template.
The construction of this in-situ concrete wall can adopt coaxial line to be connected with crossing mouthful connecting rod 6 of card with U-shaped fastener 8, the connecting rod 6 of accompanying drawing embodiment is connected for non-coaxial line with U-shaped fastener 8, the axis of the relative connecting rod 6 of the axis of its U-shaped fastener 8 certain angle that turns forward, the non-coaxial line of this kind of connecting rod 6 and U-shaped fastener 8 is connected, and makes U-shaped fastener 8 better with the mated condition of the fixing horizontal back cord 12 of template.

Claims (3)

1. an in-situ concrete wall construction used mouth to block, it is characterized in that: there is a leading screw (1), the front end of this leading screw (1) is hinged a block piece (2), be equipped with nut (3) on described leading screw (1), be symmetrical arranged radially extension rod (4) on this nut (3), each radially arranges respectively a chute (5) on extension rod (4), pair of links (6) is connected to described radially extension rod (4) above by the bearing pin (7) be placed in described chute (5) respectively, and the outboard end of each connecting rod (6) arranges respectively a U-shaped fastener (8).
2. in-situ concrete wall construction according to claim 1 used mouth to block, it is characterized in that: described leading screw (1) is the leading screw of hollow-core construction, the leading screw rear end of this hollow-core construction is provided with handle (9), the leading screw front end of this hollow-core construction is provided with the front end-plate (10) of leading screw, and described block piece (2) and front end-plate (10) are hinged by rivet (11).
3. in-situ concrete wall construction according to claim 1 and 2 used mouth to block, and it is characterized in that: described block piece (2) is the U-steel of one section notch towards front.
CN201310434082.6A 2013-09-23 2013-09-23 Passing opening clamp for cast-in-place concrete wall construction Active CN103498556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310434082.6A CN103498556B (en) 2013-09-23 2013-09-23 Passing opening clamp for cast-in-place concrete wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310434082.6A CN103498556B (en) 2013-09-23 2013-09-23 Passing opening clamp for cast-in-place concrete wall construction

Publications (2)

Publication Number Publication Date
CN103498556A true CN103498556A (en) 2014-01-08
CN103498556B CN103498556B (en) 2015-05-13

Family

ID=49863806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310434082.6A Active CN103498556B (en) 2013-09-23 2013-09-23 Passing opening clamp for cast-in-place concrete wall construction

Country Status (1)

Country Link
CN (1) CN103498556B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389425A (en) * 2014-11-18 2015-03-04 魏志光 Passing opening clamp for concrete wall templates
CN104863354A (en) * 2015-06-11 2015-08-26 昆山征途建筑模架应用技术有限公司 Kitchen and toilet water stop composite formwork and construction method thereof
CN113738104A (en) * 2021-07-20 2021-12-03 中铁建工集团有限公司 Building template fastening assembly for concrete floor integrated construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389425A (en) * 2014-11-18 2015-03-04 魏志光 Passing opening clamp for concrete wall templates
CN104863354A (en) * 2015-06-11 2015-08-26 昆山征途建筑模架应用技术有限公司 Kitchen and toilet water stop composite formwork and construction method thereof
CN113738104A (en) * 2021-07-20 2021-12-03 中铁建工集团有限公司 Building template fastening assembly for concrete floor integrated construction
CN113738104B (en) * 2021-07-20 2023-02-17 中铁建工集团有限公司 Building template fastening assembly for concrete floor integrated construction

Also Published As

Publication number Publication date
CN103498556B (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN103498556B (en) Passing opening clamp for cast-in-place concrete wall construction
CN205116401U (en) Semi -rigid power consumption node of bamboo timber structure rapid Assembly formula
CN203475834U (en) Passing opening clamp for construction of cast-in-place concrete wall
CN202317538U (en) Manufacturing tool for mixing drum of concrete mixing truck
CN209670339U (en) A kind of building body formwork for placing rapid reinforcement structure
CN203238958U (en) Tool-type building template connecting piece
CN103100609B (en) Connecting-rod-type bending device for bending steel in steel forming machine
CN107775780A (en) A kind of test block mould of convenient dismounting
CN203531399U (en) Fixture for construction casting template
CN2858856Y (en) Ladder gate-type scaffold
CN201679215U (en) Plastering external angle bead for building
CN204531403U (en) A kind of beam side reinforcing shape-setting clamp
CN208122336U (en) A kind of tool for assembling reinforcement
CN206737403U (en) A kind of aluminum alloy mould plate
CN202247698U (en) Template structure of thin-walled hollow bridge pier
CN206352392U (en) A kind of arc beam forms adjustable connector
CN205604577U (en) Strenghthened type angle steel structure
CN204590609U (en) A kind of lock pin
CN207988559U (en) A kind of template fixed support device of construction
CN203547118U (en) Novel building formwork
CN203452377U (en) Plastic steel hollow porous internal corner template
CN204531634U (en) A kind of Miltifunctional handle
CN219993092U (en) Integrated combined template with disassembling structure
CN202081650U (en) Through-wall opposite-pull limiting bolt
CN208950312U (en) A kind of reusable shuttering supporting component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant