CN103495842B - The improvement Processes and apparatus of winding gate tube connector hinge hole processing - Google Patents
The improvement Processes and apparatus of winding gate tube connector hinge hole processing Download PDFInfo
- Publication number
- CN103495842B CN103495842B CN201310463366.8A CN201310463366A CN103495842B CN 103495842 B CN103495842 B CN 103495842B CN 201310463366 A CN201310463366 A CN 201310463366A CN 103495842 B CN103495842 B CN 103495842B
- Authority
- CN
- China
- Prior art keywords
- steel band
- punching
- tube connector
- hinge hole
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P23/00—Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
- B23P23/06—Metal-working plant comprising a number of associated machines or apparatus
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B9/00—Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
- E06B9/02—Shutters, movable grilles, or other safety closing devices, e.g. against burglary
- E06B9/06—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type
- E06B9/0607—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position
- E06B9/0615—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position characterised by the closing elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Bending Of Plates, Rods, And Pipes (AREA)
Abstract
The present invention relates to a kind of improvement Processes and apparatus of winding gate tube connector hinge hole processing, this technique comprises unreeling machine, tubulation bonding machine, the square tube of colding pressing machine successively by manufacturing process order, before tubulation bonding machine, be also provided with the perforating press for steel band being carried out to punching simultaneously, in the diel of this perforating press, be arranged side by side along the vertical direction of steel band forward (FWD) the punching head that the punching of at least two is used, the distance between these two punching head geometric centers is width of steel band 1/2. Owing to having adopted above-mentioned equipment, therefore in the time making the tube connector of winding gate, before steel band tubulation, just carry out punching, there is the phenomenon of depression in the surface that can not cause steel band of this operation, can avoid again carrying out artificial punching simultaneously after blocking, therefore can greatly improve the efficiency of production, greatly reduce the cost of the manufacture processing of product.
Description
Technical field
The present invention relates to the manufacturing process of winding gate accessory, be specifically related to the technique of the manufacture of the tube connector accessory of winding gate.
Background technology
Many to the antitheft place that has certain requirement, capital is installed antitheft door miscellaneous and is reached antitheft effect, but simultaneously, conventionally the existing antitheft demand of people wishes that again antitheft door does not take larger space simultaneously, in these occasions, people usually can select winding gate, the structure of winding gate generally includes the upper and lower relatively-stationary chute frame that is provided with chute at present, and the bank tube vertically be arrangeding in parallel up and down in chute frame, between bank tube, be provided with each other and be hinged in centre, the two ends tube connector hinged with bank tube respectively, meeting telescopically launches or folding effect, thereby winding gate is in the process using, can play good antitheft effect, the gap that can keep again larger ensures to adopt photometric requirement, there is the effect of good ventilation simultaneously, can freely open or close, meet the requirement of fire-fighting life-saving. the winding gate that people often select at present, tube connector used adopts S shape structure conventionally, existing good antitheft effect has again certain aesthetic property simultaneously, but, the tube connector of manufacturing this structure under state-of-the-art is comparatively consuming time, while manufacturing the S shape tube connector that the most conventional cross section is rectangle at present, the technique adopting is after first using steel band to unreel, utilize welding tube-making machine first steel band to be made to pipe, further squeeze pipe is pressed into the square tube that cross section is rectangle again, then block into required length, again after both sides sealing is processed, finally at the enterprising eleven punch 11 of square tube (hinge hole), then be bent into S shape (or be first bent into S shape hole again), completing whole S shape tube connector produces, the technique of current this production exists following shortcoming: hole being bent into after square tube, prevent speed and pressure that square tube caves inward and must keep appropriate under the drill pressure of boring, cause the speed of boring slack-off, the phenomenon that expends a large amount of manpowers and still can exist boring edge to sink, not only cause human cost to rest on higher level, be unfavorable for the competitiveness of product, and affect the aesthetic property of product surface, particularly high human cost causes enterprise profit to reduce.
Summary of the invention
Technical purpose of the present invention is can manufacture fast winding gate tube connector accessory in order to provide, and can ensure the improvement Processes and apparatus of the winding gate tube connector hinge hole processing of product surface quality.
The improvement Processes and apparatus of winding gate tube connector hinge hole processing of the present invention, the improvement technique of this winding gate tube connector hinge hole processing comprises following processing step:
Step 1, by unreeling machine, steel band is emitted;
The steel band that step 2, step 1 are emitted first carries out punching operation through perforating press successively, and then completes rounding plumber order through tubulation bonding machine, then enters the square tube machine of colding pressing and complete square tube operation processed;
In the improvement technique of above-mentioned winding gate tube connector hinge hole processing, described punching operation on steel band along first group of punching of the steel band direction of motion successively punching, second group of punching and the 3rd group of punching, in this first group of punching, second group of punching and the 3rd group of punching, each group punching all includes two holes, the direction of the line of centres in these two holes and steel band operation is mutually vertical, and distance between Gai Lianggekong center be above-mentioned steel band width value 1/2.
In the improvement technique of above-mentioned winding gate tube connector hinge hole processing, the front side of described tubulation bonding machine is also provided with the position while welding adjusting device for adjusting the left and right position of steel band in forward (FWD) direction, enter the position of welding tube-making machine for left and right adjustment steel band, thereby control the position of weld seam on the welded tube obtaining, in addition, after the square tube machine of colding pressing completes square tube operation processed, also comprise that the pipe that square tube is blocked blocks operation, with the operation that the square tube obtaining is blocked according to the length of subscribing, to obtain the tube connector of design length.
The invention still further relates to improving equipment of a kind of winding gate tube connector hinge hole processing, improving equipment of this winding gate tube connector hinge hole processing, according to the order of procedure position, include successively the unreeling machine for emitting steel band, be used for the tubulation bonding machine of the conglobate steel pipe of steel band system, for steel pipe being made to the square tube machine of colding pressing of square tube, the more important thing is simultaneously, before tubulation bonding machine, be also provided for the perforating press of punching, the drift that this perforating press has at least two punchings that are arranged side by side perpendicular to steel band forward (FWD) direction to use, this perforating press is before steel band enters into tubulation bonding machine, on steel band, carry out punching processing according to predetermined order interval, the steel band through hole obtaining enters tubulation bonding machine and carries out the operation of tubulation, then make square tube through the square tube machine of colding pressing, on the winding gate tube connector obtaining like this, can there is relative circular punching, need to before entering into tubulation bonding machine, steel band carry out the left and right position adjustments operation of steel band, namely in the installed in front of tubulation bonding machine, for adjusting the position while welding adjusting device of the left and right position of steel band in forward (FWD) direction, this position while welding adjusting device includes the position adjustments frame that can horizontally slip in the frame of being located at tubulation bonding machine, and on adjusting bracket, arrange upper, lower upper scroll wheel and the lower scroll wheel of correspondence mutually, on, lower scroll wheel both sides are provided with and are fixedly connected with the adjustment sheet for promoting steel band edge left and right adjusting position with adjusting bracket, by the adjustment to position, steel band left and right, can regulate the position of weld seam and the position of weld seam be adjusted to the corner of square tube, the punching that can make the square tube obtaining is that hinge hole is positioned on the position of center line of square tube hinge hole place face, there is good processing quality, during this winding gate tube connector improves equipment, described punching head be shaped as circle, the distance in the center of circle of this two punching head is 1/2 of width of steel band size, conventionally, 1/2 of the longer rectangular edges length dimension that the distance of the side punching head close together one side steel band edge described in this is Box Section, like this in the time the soldered of square tube being adjusted to the edge of square-section of square tube, described hinge hole will be positioned at the center of the side that is provided with hinge hole of square tube, meet the requirement using.
In the improving equipment of this winding gate tube connector hinge hole processing, the rear side of the described square tube machine of colding pressing is also provided with the square tube cutting machine for square tube being carried out to break-in operation, conventionally, when this fixed-length cutting device that is used for the square tube to be cut to the tube connector of consistent length it should be noted that each batch carries out press work, conventionally in the rear end of colding pressing square tube machine, also be provided with fixed length pipe cutting machine, this fixed length pipe cutting machine carries out the operation of Pipe Cutting according to the length of design, just obtain the tube connector product of the needed pipe of operating a switch, and then carry out the operation of edge sealing, just can obtain described winding gate tube connector, this industry and equipment can be used for making the winding gate tube connector in all size and cross section, comprise that cross section is circular, square etc. all can obtain good processing quality, meet the needs of the tube connector of various winding gates.
Beneficial effect: the improvement technique of winding gate tube connector hinge hole processing of the present invention, owing to having adopted above-mentioned processing step, therefore in the time making the tube connector of winding gate, before steel band tubulation, just carry out punching, the technique of this operation can not cause the surface of steel band to occur the phenomenon of depression, can avoid again carrying out artificial punching simultaneously after blocking, both expended a large amount of artificial, increasing human cost has increased again the loss of rig simultaneously, can cause at product surface again the defect of depression, therefore can greatly improve the efficiency of production, greatly reduce the cost of the manufacture processing of product, improve the production efficiency of enterprise, meet the requirement that national energy-saving reduces discharging, what achieve many things at one stroke is social creativity value.
Relevant detailed content of the present invention and technology, hereby just coordinate brief description of the drawings as follows.
Brief description of the drawings
Fig. 1, be hinge hole process equipment schematic diagram of the present invention;
Fig. 2, be existing hinge hole process equipment schematic diagram;
Fig. 3, be processed to the distortion schematic diagram of the straight tube of tube connector for steel band;
Fig. 4, be the sectional view of the A-A of Fig. 3;
Fig. 5, be the front view of tube connector.
Detailed description of the invention
Please refer to Fig. 1, Fig. 2, Fig. 3, shown in Fig. 4 and Fig. 5, for a kind of specific embodiment of the improvement Processes and apparatus of a kind of winding gate tube connector of the present invention hinge hole processing, the improvement Processes and apparatus of this winding gate tube connector hinge hole processing, include successively the unreeling machine 1 for emitting steel band 10 according to the order procedure position of manufacturing, be used for the tubulation bonding machine 3 of the conglobate steel pipe of the steel band system after punching, for steel pipe being made to the square tube machine 4 of colding pressing of square tube, before tubulation bonding machine, be also provided with the perforating press for steel band being carried out to punching simultaneously, in the diel of this perforating press, be arranged side by side along the vertical direction of steel band forward (FWD) the punching head that the punching of at least two is used, distance between these two punching head geometric centers is width of steel band 1/2.
Further, the front side of described tubulation bonding machine is also provided with the position while welding adjusting device for adjusting the left and right position of steel band in forward (FWD) direction, this position while welding adjusting device includes the position adjustments frame that can horizontally slip in the frame of being located at tubulation bonding machine, and the upper scroll wheel of the upper and lower mutual correspondence arranging on adjusting bracket and lower scroll wheel, upper and lower scroll wheel both sides are provided with and are fixedly connected with the adjustment sheet for promoting steel band edge left and right adjusting position with adjusting bracket.
Further, described punching head be shaped as circle, the distance L in the center of circle of this two punching head is 1/2 of width of steel band size; 1/2 of the longer rectangular edges length dimension that the distance N of a described side punching head close together one side steel band edge is Box Section.
Further, the rear side of the described square tube machine of colding pressing is also provided with the square tube cutting machine 5 for square tube being carried out to break-in operation; The party's tube cut-off machine is also provided with the fixed-length cutting device of the tube connector 6 for square tube being cut to consistent length, after cut-out, obtain tube connector Len req, hinge hole 61 on this tube connector has better crudy, regulate by weld seam 63 positions on the tube connector to above-mentioned, can make accurately correspondence of two above-mentioned punchings.
Claims (9)
1. an improvement technique for winding gate tube connector hinge hole processing, is characterized in that: the improvement technique of this winding gate tube connector hinge hole processing comprises following processing step:
Step 1, by unreeling machine, steel band is emitted;
The steel band that step 2, step 1 are emitted first carries out punching operation through perforating press successively, and then completes rounding plumber order through tubulation bonding machine, then enters the square tube machine of colding pressing and complete square tube operation processed; Described punching operation on steel band along first group of punching of the steel band direction of motion successively punching, second group of punching and the 3rd group of punching, in this first group of punching, second group of punching and the 3rd group of punching, each group punching all includes two holes, the direction of the line of centres in these two holes and steel band operation is mutually vertical, and distance between these two pore geometry centers be above-mentioned steel band width value 1/2.
2. the improvement technique of winding gate tube connector hinge hole processing according to claim 1, it is characterized in that: before completing rounding plumber order through tubulation bonding machine, also there is the operation of the steel band left and right position adjustments of adjusting the left and right position of steel band in forward (FWD) direction.
3. the improvement technique of winding gate tube connector hinge hole processing according to claim 1, is characterized in that: after the square tube machine of colding pressing completes square tube operation processed, also comprise that the pipe that square tube is blocked blocks operation.
4. improving equipment of a winding gate tube connector hinge hole processing, it is characterized in that: the improvement of this winding gate tube connector hinge hole processing, include successively the unreeling machine for emitting steel band according to the order procedure position of manufacturing, be used for the tubulation bonding machine of the conglobate steel pipe of the steel band system after punching, for steel pipe being made to the square tube machine of colding pressing of square tube, before tubulation bonding machine, be also provided with the perforating press for steel band being carried out to punching simultaneously, in the diel of this perforating press, be arranged side by side along the vertical direction of steel band forward (FWD) the punching head that the punching of at least two is used, distance between these two punching head geometric centers is width of steel band 1/2.
5. improving equipment of winding gate tube connector hinge hole processing according to claim 4, it is characterized in that: the front side of described tubulation bonding machine is also provided with the position while welding adjusting device for adjusting the left and right position of steel band in forward (FWD) direction, this position while welding adjusting device includes the position adjustments frame that can horizontally slip in the frame of being located at tubulation bonding machine, and on adjusting bracket, arrange upper, lower upper scroll wheel and the lower scroll wheel of correspondence mutually, on, lower scroll wheel both sides are provided with and are fixedly connected with the adjustment sheet for promoting steel band edge left and right adjusting position with adjusting bracket.
6. improving equipment of winding gate tube connector hinge hole according to claim 4 processing, is characterized in that: described punching head be shaped as circle, this two distance of rushing the nominal center of circle is 1/2 of width of steel band size.
7. improving equipment of winding gate tube connector hinge hole processing according to claim 4, is characterized in that: 1/2 of the longer rectangular edges length dimension that the distance of a described side punching head close together one side steel band edge is Box Section.
8. improving equipment of winding gate tube connector hinge hole processing according to claim 4, is characterized in that: the rear side of the described square tube machine of colding pressing is also provided with the square tube cutting machine for square tube being carried out to break-in operation.
9. improving equipment of winding gate tube connector hinge hole processing according to claim 8, is characterized in that: described square tube cutting machine is also provided with the fixed-length cutting device for square tube being cut to the tube connector of consistent length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310463366.8A CN103495842B (en) | 2013-10-09 | 2013-10-09 | The improvement Processes and apparatus of winding gate tube connector hinge hole processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310463366.8A CN103495842B (en) | 2013-10-09 | 2013-10-09 | The improvement Processes and apparatus of winding gate tube connector hinge hole processing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103495842A CN103495842A (en) | 2014-01-08 |
CN103495842B true CN103495842B (en) | 2016-05-04 |
Family
ID=49861150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310463366.8A Active CN103495842B (en) | 2013-10-09 | 2013-10-09 | The improvement Processes and apparatus of winding gate tube connector hinge hole processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103495842B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106392471B (en) * | 2016-08-31 | 2018-09-28 | 宁波市奥图机械科技有限公司 | A kind of end processing technology of geothermal heating system current divider |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3394442A (en) * | 1966-09-19 | 1968-07-30 | Gulf General Atomic Inc | Tube plugging apparatus |
JPS5877714A (en) * | 1982-05-10 | 1983-05-11 | Nakajima:Kk | Manufacturing equipment for large sized square steel tube |
CN1304832A (en) * | 2000-12-01 | 2001-07-25 | 甘国工 | Mehod and equipment for manufacturing metal skeleton reinforced composite plastic pipe |
CN2483114Y (en) * | 2001-05-01 | 2002-03-27 | 十堰市佳辉特种焊管有限公司 | Shape-forming and diameter-determining set for working non-ferrous metal high frequency welding thin wall tube |
CN101011791A (en) * | 2007-02-09 | 2007-08-08 | 青静 | Manufacturing process for porous opening metal pipe |
CN203566232U (en) * | 2013-10-09 | 2014-04-30 | 区锦全 | Improved device for sliding door connecting tube hinging hole machining |
-
2013
- 2013-10-09 CN CN201310463366.8A patent/CN103495842B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3394442A (en) * | 1966-09-19 | 1968-07-30 | Gulf General Atomic Inc | Tube plugging apparatus |
JPS5877714A (en) * | 1982-05-10 | 1983-05-11 | Nakajima:Kk | Manufacturing equipment for large sized square steel tube |
CN1304832A (en) * | 2000-12-01 | 2001-07-25 | 甘国工 | Mehod and equipment for manufacturing metal skeleton reinforced composite plastic pipe |
CN2483114Y (en) * | 2001-05-01 | 2002-03-27 | 十堰市佳辉特种焊管有限公司 | Shape-forming and diameter-determining set for working non-ferrous metal high frequency welding thin wall tube |
CN101011791A (en) * | 2007-02-09 | 2007-08-08 | 青静 | Manufacturing process for porous opening metal pipe |
CN203566232U (en) * | 2013-10-09 | 2014-04-30 | 区锦全 | Improved device for sliding door connecting tube hinging hole machining |
Non-Patent Citations (1)
Title |
---|
浅论平面闸门制作工艺与焊接;李争权;《水电站机电技术》;19911231(第04期);48-53 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106392471B (en) * | 2016-08-31 | 2018-09-28 | 宁波市奥图机械科技有限公司 | A kind of end processing technology of geothermal heating system current divider |
Also Published As
Publication number | Publication date |
---|---|
CN103495842A (en) | 2014-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100544852C (en) | Rolling depression method and device that a kind of transformer is handled with copper belt part | |
CN103949886B (en) | A kind of mental package tank metal handle fully automatic high-speed making method and equipment thereof | |
CN206425400U (en) | The progressive die for producing the circular bushing of automobile | |
CN108422486A (en) | One kind being used for the molding die-cutting machine of lug and its application method | |
CN103962446A (en) | Production process of air-conditioner fin | |
CN103495842B (en) | The improvement Processes and apparatus of winding gate tube connector hinge hole processing | |
CN106734590A (en) | The progressive die and method for producing automobile circle bushing | |
CN204913981U (en) | Mechanism shears | |
CN203566232U (en) | Improved device for sliding door connecting tube hinging hole machining | |
CN202310296U (en) | High strength PCB jointed board | |
CN204220764U (en) | Many bending-types electric appliance mounting support production progressive die | |
CN108237582B (en) | Die-cutting spare processing is with multi-functional hardware mould | |
CN204220770U (en) | Double-turnup type antenna holder production progressive die | |
CN211679518U (en) | Novel connect sword structure | |
CN103495647B (en) | Winding gate connects improving technique and the equipment of the mouth sealing processing of pipe end limit | |
CN203565629U (en) | Improved device for sliding door connecting tube end edge opening sealing machining | |
CN207872864U (en) | Auto parts extension cuts punching die structure | |
CN204195852U (en) | Automatic waste discharging device during cross cutting stamping-out | |
CN206425410U (en) | Mould for producing the circular bushing of automobile | |
CN204209224U (en) | A kind of arrangements for automotive doors sectional material for upper railing cuts off special tooling | |
CN106102338B (en) | A kind of coaxial soft copy surface mount method | |
CN205702005U (en) | The facing attachment of deburring | |
CN103071792B (en) | A kind of curved plate forming mold of hard alloy | |
CN203266793U (en) | Processing die for plastic earphone net of mobile phone | |
CN202780001U (en) | Multitube cut-off tool device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |