CN103490340A - Porcelain cross arm insulation baffle - Google Patents

Porcelain cross arm insulation baffle Download PDF

Info

Publication number
CN103490340A
CN103490340A CN201310421478.7A CN201310421478A CN103490340A CN 103490340 A CN103490340 A CN 103490340A CN 201310421478 A CN201310421478 A CN 201310421478A CN 103490340 A CN103490340 A CN 103490340A
Authority
CN
China
Prior art keywords
insulation barrier
insulation
semi
arm
porcelain pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310421478.7A
Other languages
Chinese (zh)
Other versions
CN103490340B (en
Inventor
范宇
汤晓青
郑和平
谢勇泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310421478.7A priority Critical patent/CN103490340B/en
Publication of CN103490340A publication Critical patent/CN103490340A/en
Application granted granted Critical
Publication of CN103490340B publication Critical patent/CN103490340B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Insulating Bodies (AREA)

Abstract

The invention discloses a porcelain cross arm insulation baffle. A first insulation baffle and a second insulation baffle are connected to form the insulation baffle with a hole in the middle portion, a first insulation seam shielding plate and a first semi-circular notch are arranged on the connecting edge of the first insulation baffle, and a second insulation seam shielding plate and a second semi-circular notch are arranged on the connecting edge of the second insulation baffle. A first semi-ring soft cushion is mounted on the first semi-circular notch, and a second semi-ring soft cushion is mounted on the second semi-circular notch. The porcelain cross arm insulation baffle enlarges the insulation shielding range of wire position operation. The seam between the first insulation baffle and the second insulation baffle is covered effectively, and insulation safety is improved. Further, the insulation baffle cannot loose and be off the position on the mounting part of a porcelain cross arm.

Description

A kind of porcelain pole arm insulation barrier
Technical field
The present invention relates to a kind of power construction safety protection equipment, be specifically related to a kind of insulation protection device.
Background technology
Along with construction and the development of distribution network, ensure that client's power quality and lasting reliable power supply are the top priorities of power supply enterprise.Adopt the live line working mode to be overhauled distribution network, the one, can effectively improve power supply quality, the 2nd, do not have a power failure or reduce interruption duration, guaranteed the power grid security reliability service, improve power supply enterprise's economic benefit.
At present, China's distribution line straight line pole mainly be take porcelain pole arm as insulating supporting material fixing cord.Adopt aerial lift device with insulated arm to carry out live line working to distribution line, when the lead location operation of straight line pole limit, its key operation point be wire in porcelain pole arm bearing, concrete operations for carry out the charged colligation of wire, wire charged take tear open first-class.The traditional work method adopts insulated target to carry out hot line job by near after mode far away is wrapped up wire, after using the order parcel of insulated target according to wire, porcelain pole arm, cross-arm, live line working is carried out in the wire fixed position.Can find out, use insulated target work flow complexity, elapsed time is long, easily causes operating personnel's physical demands excessive, to shortening the live line working time, reduces operating risk unfavorable.
Summary of the invention
Given this, the object of the invention is to provide a kind of live line work insulating device easy and simple to handle.
For solving above technical problem, technical scheme provided by the invention is, a kind of porcelain pole arm insulation barrier is provided, the first insulation barrier, the second insulation barrier engage and form middle part insulation barrier with holes, be provided with the first insulation sight shield and the first semicircle breach on the jointing edge of the first insulation barrier, be provided with the second insulation sight shield and the second semicircle breach on the jointing edge of the second insulation barrier; Be equiped with the first semi-ring cushion on the first semicircle breach, be equiped with the second semi-circular cushion on the second semicircle breach.
Further, described the first insulation sight shield and the second insulation sight shield lay respectively at the two sides of insulation barrier.
Further, on described the first insulation barrier and the second insulation barrier, pincerlike handle is installed.
Further, described the first insulation barrier is fixedly connected with the first linking arm of pincerlike handle, and described the second insulation barrier is fixedly connected with the second linking arm of pincerlike handle; The first linking arm and the second linking arm are rotationally connected by rotating shaft; The first linking arm and first in command's integral type arrange, and the second linking arm and second in command's integral type arrange.
Further, between the described first in command and the second in command, torsion spring is installed.
Preferably, the material of described pincerlike handle is PVC.
Preferably, described the first insulation barrier is or/and the material of the second insulation barrier is fiberglass.
Preferably, the material of described the first semi-ring cushion and the second semi-circular cushion is silicon rubber.
Preferably, plectane or square plate with holes centered by described insulation barrier.
Further, on the composition surface of described the first insulation barrier, be provided with slot, on the composition surface of described the second insulation barrier, be provided with cutting.
Compared with prior art, a technical scheme in technique scheme has following advantage:
1, the present invention has adopted insulation barrier, has enlarged the insulation range of defilade of lead location operation.
2, the present invention utilizes the double hyer insulation sight shield to overlap principle, and the gap of the first insulation barrier and the second insulation barrier junction is effectively covered, and the first insulation barrier and the second insulation barrier do not misplace while guaranteeing to use.
3, the first insulation barrier and the second insulation barrier engage and form a large insulation barrier, this insulation barrier middle part arranges porose, cushion on hole has guaranteed close contact between insulation barrier and porcelain pole arm, does not stay gap, and makes insulation barrier not loosening, not positioning in the porcelain pole arm installation place.
4, folding office adopts the design of PVC material clamp, makes the operating personnel having worn in the insulating gloves situation, can use flexibly.
5, use porcelain pole arm insulation barrier of the present invention, when carrying out above-mentioned live line working work, only need first with insulated target to wrapped in wire closely after, this porcelain pole arm insulation barrier directly is installed on to porcelain pole arm upper near the 3rd joint of wire, can carry out the hot line job of wire fixed position.It has covered electrified body effectively, has limited preferably the actuating range of operating personnel's hand, has lowered the operation complexity, has improved the safety of operating personnel and equipment, has shortened the operating time, has effectively improved the efficiency of work.
The accompanying drawing explanation
Fig. 1 is the front view of a preferred embodiment of the present invention.
Fig. 2 is the rearview of a preferred embodiment of the present invention.
Fig. 3 is A-A cutaway view in Fig. 1.
Fig. 4 is B-B cutaway view in Fig. 1.
Fig. 5 is the view of opening of a preferred embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing and a specific embodiment, describe.
Referring to Fig. 1 to Fig. 5.The described a kind of porcelain pole arm insulation barrier of the present embodiment, comprise the first insulation barrier 11a and the second insulation barrier 11b, and body, the material of the first insulation barrier 11a and the second insulation barrier 11b are identical.The first insulation barrier 11a and the second insulation barrier 11b are the rectangular slab of the glass steel material that insulation property are good.Fiberglass is to make the reinforced plastics of reinforcing material with glass fibre or its goods, or is fiberglass reinforced plastics, is a kind of common materials of the prior art.The present invention selects light weight and hard, and non-conductive, mechanical strength is high, corrosion resistant fiberglass.The thickness of fiberglass has a certain impact to insulation property, as indicative ground, the invention provides a fiberglass gauge, is 3.2mm.
Two long edge joints of the first insulation barrier 11a and the second insulation barrier 11b close or form an insulation barrier of the rectangle with centre bore while fitting together.As a kind of embodiment, be provided with slot on the composition surface of the first insulation barrier 11a, be provided with cutting on the composition surface of described the second insulation barrier 11b, the first insulation barrier 11a and the second insulation barrier 11b are by socket connection.Certainly, also slot or cutting can be set on the first insulation barrier 11a and the second insulation barrier 11b.Be provided with the first insulation sight shield 12a and the first semicircle breach on the jointing edge of the first insulation barrier 11a, be provided with the second insulation sight shield 12b and the second semicircle breach on the jointing edge of the second insulation barrier 11b.Be equiped with the first semi-ring cushion 21a on the first semicircle breach, be equiped with the second semi-circular cushion 21b on the second semicircle breach, on centre bore, be equiped with annular soft pad, the material of this annular soft pad is silicon rubber.During use, porcelain pole arm is stuck in centre bore, silicon rubber cushion and porcelain pole arm fit tightly, and do not stay gap, and make insulation barrier not loosening, not positioning in the porcelain pole arm installation place.The section of this cushion is herringbone, and its upper end is provided with for blocking the groove of the first insulation barrier 11a or the second insulation barrier 11b.As indicative ground, the thickness of cushion is 3mm.
The first insulation sight shield 12a and the second insulation sight shield 12b lay respectively at the two sides of insulation barrier, when the first insulation barrier 11a and the second insulation barrier 11b are bonded together, the first insulation sight shield 12a and the second insulation sight shield 12b lay respectively at the front and back of insulation barrier, under the effect of the first insulation sight shield 12a and the second insulation sight shield 12b, gap between the first insulation barrier 11a and the second insulation barrier 11b is covered, improve the insulation property of insulation barrier.
For ease of operation, the pincerlike handle of PVC material is installed on the first insulation barrier 11a and the second insulation barrier 11b.Specifically: the first insulation barrier 11a is fixedly connected with the first linking arm 31a of pincerlike handle, and described the second insulation barrier 11b is fixedly connected with the second linking arm 31b of pincerlike handle; The first linking arm 31a and the second linking arm 31b are rotationally connected by rotating shaft 33; The first linking arm 31a and first in command 32a integral type arrange, and the second linking arm 31b and second in command 32b integral type arrange.Between first in command 32a and second in command 32b, torsion spring 34 is installed.Have an angle a between first in command 32a and second in command 32b, as a kind of preferred version, when the first insulation barrier 11a and the second insulation barrier 11b are bonded together, angle a is 70 °.
When arranging of the installation of pincerlike handle and the first insulation sight shield or the second insulation shield occurs conflict in position, can select the shape of the linking arm of pincerlike handle is modified or the first insulation sight shield or second of cancelling pincerlike handle installation place shield that insulate.In the present embodiment, cancelled the first insulation sight shield of pincerlike handle installation place.
Under the material of each parts that provide in the present embodiment and the condition of thickness, the porcelain pole arm insulation barrier meets following test:
1, surperficial power frequency withstand test, industrial frequency withstand voltage 60kV, continue 1min, qualified;
2, power frequency withstand test, industrial frequency withstand voltage 30kV, continue 1min, qualified.
In above experiment, interelectrode distance is 300mm.
Carrying out live line working when work, only need first with insulated target to wrapped in wire closely after, the porcelain pole arm insulation barrier directly is installed on to porcelain pole arm upper near the 3rd joint of wire, can carry out the hot line job of wire fixed position.
Be below only the preferred embodiment of the present invention, it should be pointed out that above-mentioned preferred implementation should not be considered as limitation of the present invention, protection scope of the present invention should be as the criterion with the claim limited range.For those skilled in the art, without departing from the spirit and scope of the present invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. a porcelain pole arm insulation barrier, it is characterized in that, the first insulation barrier (11a), the second insulation barrier (11b) engage and form middle part insulation barrier with holes, be provided with the first insulation sight shield (12a) and the first semicircle breach on the jointing edge of the first insulation barrier (11a), be provided with the second insulation sight shield (12b) and the second semicircle breach on the jointing edge of the second insulation barrier (11b); Be equiped with the first semi-ring cushion (21a) on the first semicircle breach, be equiped with the second semi-circular cushion (21b) on the second semicircle breach.
2. porcelain pole arm insulation barrier according to claim 1, is characterized in that, described the first insulation sight shield (12a) and the second insulation sight shield (12b) lay respectively at the two sides of insulation barrier.
3. porcelain pole arm insulation barrier according to claim 1, is characterized in that, on described the first insulation barrier (11a) and the second insulation barrier (11b), pincerlike handle is installed.
4. porcelain pole arm insulation barrier according to claim 3, it is characterized in that, described the first insulation barrier (11a) is fixedly connected with first linking arm (31a) of pincerlike handle, and described the second insulation barrier (11b) is fixedly connected with second linking arm (31b) of pincerlike handle; The first linking arm (31a) is rotationally connected by rotating shaft (33) with the second linking arm (31b); The first linking arm (31a) and the setting of the first in command (32a) integral type, the second linking arm (31b) and the setting of the second in command (32b) integral type.
5. porcelain pole arm insulation barrier according to claim 4, is characterized in that, between the described first in command (32a) and the second in command (32b), torsion spring (34) is installed.
6. porcelain pole arm insulation barrier according to claim 3, is characterized in that, the material of described pincerlike handle is PVC.
7. porcelain pole arm insulation barrier according to claim 1, is characterized in that, described the first insulation barrier (11a) is or/and the material of the second insulation barrier (11b) is fiberglass.
8. porcelain pole arm insulation barrier according to claim 1, is characterized in that, the material of described the first semi-ring cushion (21a) and the second semi-circular cushion (21b) is silicon rubber.
9. porcelain pole arm insulation barrier according to claim 1, is characterized in that, plectane or square plate with holes centered by described insulation barrier.
10. porcelain pole arm insulation barrier according to claim 1, is characterized in that, on the composition surface of described the first insulation barrier (11a), is provided with slot, on the composition surface of described the second insulation barrier (11b), is provided with cutting.
CN201310421478.7A 2013-09-16 2013-09-16 Porcelain cross arm insulation baffle Active CN103490340B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310421478.7A CN103490340B (en) 2013-09-16 2013-09-16 Porcelain cross arm insulation baffle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310421478.7A CN103490340B (en) 2013-09-16 2013-09-16 Porcelain cross arm insulation baffle

Publications (2)

Publication Number Publication Date
CN103490340A true CN103490340A (en) 2014-01-01
CN103490340B CN103490340B (en) 2017-01-25

Family

ID=49830377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310421478.7A Active CN103490340B (en) 2013-09-16 2013-09-16 Porcelain cross arm insulation baffle

Country Status (1)

Country Link
CN (1) CN103490340B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106684759A (en) * 2017-01-25 2017-05-17 国网上海市电力公司 Insulated baffle plate for pole
CN106786166A (en) * 2017-01-25 2017-05-31 国网上海市电力公司 Phase terminal insulation barrier device in 10kV distribution corner lever apparatus
CN109510090A (en) * 2018-11-15 2019-03-22 珠海优特电力科技股份有限公司 The isolating device of terminal block and screen cabinet with it
CN109768495A (en) * 2018-11-26 2019-05-17 国网浙江省电力有限公司杭州供电公司 Arrester charged for replacement insulation barrier on a kind of easy to operate switch cross-arm

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101355244A (en) * 2008-07-10 2009-01-28 桐乡市供电局 Bird injury resistance baffle for high-voltage line
CN201766311U (en) * 2010-09-07 2011-03-16 福建省电力有限公司福州电业局 Needle type porcelain bottle clapboard
CN202423957U (en) * 2011-12-23 2012-09-05 河南省电力公司焦作供电公司 Insulation splint
CN202906299U (en) * 2012-11-14 2013-04-24 甘粛省电力公司白银供电公司 Isolation switch insulating baffle for high-voltage live working
CN203103840U (en) * 2013-03-01 2013-07-31 广州南方电力集团电安建设有限公司 10kV hot-line work insulating baffle
CN203504063U (en) * 2013-09-16 2014-03-26 国家电网公司 Porcelain cross arm insulation baffle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101355244A (en) * 2008-07-10 2009-01-28 桐乡市供电局 Bird injury resistance baffle for high-voltage line
CN201766311U (en) * 2010-09-07 2011-03-16 福建省电力有限公司福州电业局 Needle type porcelain bottle clapboard
CN202423957U (en) * 2011-12-23 2012-09-05 河南省电力公司焦作供电公司 Insulation splint
CN202906299U (en) * 2012-11-14 2013-04-24 甘粛省电力公司白银供电公司 Isolation switch insulating baffle for high-voltage live working
CN203103840U (en) * 2013-03-01 2013-07-31 广州南方电力集团电安建设有限公司 10kV hot-line work insulating baffle
CN203504063U (en) * 2013-09-16 2014-03-26 国家电网公司 Porcelain cross arm insulation baffle

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106684759A (en) * 2017-01-25 2017-05-17 国网上海市电力公司 Insulated baffle plate for pole
CN106786166A (en) * 2017-01-25 2017-05-31 国网上海市电力公司 Phase terminal insulation barrier device in 10kV distribution corner lever apparatus
CN106786166B (en) * 2017-01-25 2018-03-27 国网上海市电力公司 Phase terminal insulation barrier device in 10kV distribution corner lever apparatus
CN109510090A (en) * 2018-11-15 2019-03-22 珠海优特电力科技股份有限公司 The isolating device of terminal block and screen cabinet with it
CN109510090B (en) * 2018-11-15 2024-03-15 珠海优特电力科技股份有限公司 Isolating device of terminal strip and have its screen cabinet
CN109768495A (en) * 2018-11-26 2019-05-17 国网浙江省电力有限公司杭州供电公司 Arrester charged for replacement insulation barrier on a kind of easy to operate switch cross-arm

Also Published As

Publication number Publication date
CN103490340B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN103490340A (en) Porcelain cross arm insulation baffle
KR101160677B1 (en) Protecting cover for live front operate in distribution line
CN203504063U (en) Porcelain cross arm insulation baffle
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN104868262B (en) Ground loop
CN104756337B (en) Lightning protection device with insulated lead
CN105429031A (en) Special insulating barrier for changing pole-mounted circuit breaker
US20190119819A1 (en) Method for laying an anode system for cathodic corrosion protection
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN103178469A (en) Operating method for replacing suspension type porcelain bottle of straight line pole for 35-kV overhead distribution line in electrified manner
JP2012196040A (en) Salt-proof plate and method of mounting salt-proof plate
CN103269037A (en) Line arrestor replacing device
CN104218342B (en) Electric temporary lapping joint device applied to 10kV distribution network
CN203398619U (en) Line arrester replacing device
CN103390866B (en) A kind of spacer assembly for maintain isolation disconnecting link
CN106159798A (en) A kind of transmission line of electricity connection in series-parallel mixing ground wire de-icing method
KR20110073116A (en) Power supply module for on line electric vehicle
CN205008672U (en) Shearing tool
CN204927545U (en) Stake of pre -buried formula earth connection
CN203882812U (en) A humanized portable switching-off rod
CN205452910U (en) Electrified disappearing of GW7 type plug -in strip lacks specialized tool
CN104300244B (en) Case dress portable telescopic ground operation bar
CN104733223A (en) Automatic insulation protecting device for compression spring resetting type breaker
CN104113006A (en) Operation method for replacing linear rod angle steel cross arm of 35kV overhead distribution line in live state
CN204823508U (en) Moving cable dish

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant