CN103489520B - A kind of slip-off preventing pays the preparation method of copper core cable in advance - Google Patents

A kind of slip-off preventing pays the preparation method of copper core cable in advance Download PDF

Info

Publication number
CN103489520B
CN103489520B CN201310448941.7A CN201310448941A CN103489520B CN 103489520 B CN103489520 B CN 103489520B CN 201310448941 A CN201310448941 A CN 201310448941A CN 103489520 B CN103489520 B CN 103489520B
Authority
CN
China
Prior art keywords
cable
advance
branch
slip
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310448941.7A
Other languages
Chinese (zh)
Other versions
CN103489520A (en
Inventor
赵保森
姚鸣
霍帅营
闫明强
陈伟
蒲铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN XINRONG ELECTRIC CABLE CO Ltd
Original Assignee
SICHUAN XINRONG ELECTRIC CABLE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN XINRONG ELECTRIC CABLE CO Ltd filed Critical SICHUAN XINRONG ELECTRIC CABLE CO Ltd
Priority to CN201310448941.7A priority Critical patent/CN103489520B/en
Publication of CN103489520A publication Critical patent/CN103489520A/en
Application granted granted Critical
Publication of CN103489520B publication Critical patent/CN103489520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cable Accessories (AREA)

Abstract

The invention discloses the preparation method that a kind of slip-off preventing pays copper core cable in advance, belong to field of cables, belong to the one of pre-branched cable terminal.The present invention, by the conductor thread core pressing and forming of main cable and branch cable, obtains paying copper core cable in advance after being wound around insulating tape, injection moulding, then installs the netted head that hangs and obtain finished product.Adopt the present invention, have that termination process structure is simple, safe and reliable, mounting or dismounting are convenient, lifting firmly, good seal, high temperature resistant, corrosion-resistant, fire prevention, explosion-proof feature, insulation resistance can not be reduced because of moist, the advantage of various industry and civil building can be widely used in.

Description

A kind of slip-off preventing pays the preparation method of copper core cable in advance
Technical field
The invention discloses the preparation method that a kind of slip-off preventing pays copper core cable in advance, belong to field of cables, belong to the one of pre-branched cable terminal.
Background technology
The method of current manufacture rubber pre-branched cable is outer protective sleeve, primary insulation on one section of backbone cable of first strip off select location, makes its metallic conductor exposed; Again a point branch cable is peelled off sheath, insulation, be crimped on after exposing cable end and peel off on the backbone cable metal conductor of insulation.It is shaping that described crimping carries out crimping by conductor connector, and finally shaping to this crimping joint vulcanizing press of this moulding process carries out compression molding.This method is due to needs vulcanizing press, and branch cable crimps shaping with the connection of backbone, and not only difficulty is large, and it is large to crimp shaping connection resistance, and useful life is short.And joint appearance is easily uneven, rough, reliability, consistency are poor, and the junction bonding strength of protective layer is low in addition, are difficult to use for a long time in wet environment.The method production cycle of mold pressing is long, and what simultaneously at present the rubber-covered of this moulding process of application adopted is natural/butylbenzene is the material of main body, and its insulation property, well below second third electro-insulating rubber, are difficult to the insulation property ensureing rubber pre-branched cable.
Thus in numerous cable use occasions, the joint process of backbone cable and point branch cable, just becomes the outstanding problem in the construction of supply and distribution networking.Rubber pre-branched cable is used widely in buried, middle-high building, tunnel, mine, airport, harbour and modernization Standard Factory Room, but because the problems referred to above, enables and should be subject to certain restrictions.
In order to improve joint efficiency, have also appeared a kind of pre-branched cable manufacture method closed by metal case fastening at present, the method is first connected backbone with branch cable, then do insulation processing, is fastened and be fastenedly connected afterwards to form by described metal case.Because metal case self can not contribute to bonding strength, in order to reach reliable connection, usual backbone also needs extra connector to be connected with the core of branch cable, complex structure, and bonding strength cannot ensure.In addition, the syndeton poor sealing performance of this fastening, under rugged environment, serviceability is poor.
Subsequently, occurred that the patent No. is 201010123890.7, denomination of invention is the art solutions of pre-branched cable and preparation method thereof, and the technical scheme of this patent is as follows:
A kind of pre-branched cable, comprises branch cable and the backbone of electric connection, and described branch cable and backbone connecting portion and the metallic conductor exhumed in advance when being connected are coated with separator and insulating barrier; And this pre-branched cable also comprises described branch cable to be connected formed joint and backbone and branch cable partial protection layer with backbone is injected the integral and protective layer formed of rubber packaging.Described branch cable is vertically connected on described backbone.The branch cable core of described branch cable is axially arranged in order connection along described backbone.Described joint entirety is triangular in shape.Described branch cable and the connection of backbone are the welding of the metallic conductor of corresponding core.The thickness of described separator is not less than the thickness of the master core separator of described backbone; The thickness of described insulating barrier is not less than the thickness of the master core insulating barrier of described backbone.Described separator box insulating barrier totally three layers, wherein insulating barrier forms intermediate layer, and separator is formed separately two-layer.A) precalculated position of backbone and branch cable connection end head are peeled off shaping by connection request; B) backbone and branch cable is electrically connected; It is characterized in that it is further comprising the steps of: c) colligation of the current electrical connection class of insulation is carried out to form separator and insulating barrier to the metallic conductor of exposed backbone and branch cable; And inject rubber-moulding together with partial protection layer d) described branch cable being connected formed joint and backbone and branch cable with backbone.Backbone is connected to adopt with the metallic conductor of branch cable and welds, and makes contact resistance be less than predetermined resistance.Described injection rubber-moulding is placed in a molding chamber by the partial protection layer of described joint and backbone and branch cable, adopts rubber injection machine injection to form rubber cover.Described step c) first colligation first separator, then rubber-coated insulating barrier, is wound around the second separator afterwards.Described first separator selects polyester belt.Described polyester belt selects resistance to temperature grade at the polyurethane tape of 150 DEG C.Described coated insulating barrier is second third glue is the insulating barrier of main body.Described protective layer is the rubber cover based on haloflex.Described second separator selects nonwoven fabric belts.The thickness of described second separator is 0.07 ~ 0.10mm.
Above-mentioned art solutions, although substantially solve the defect that the insulation property of pre-branched cable are bad, but because it have employed the mode of welding on joint, increase technology difficulty, and then have impact on construction and the scope of application, for field operation increases difficulty, and, this technical scheme, does not solve the problem of tune.
Summary of the invention
The invention provides a kind of applied widely, termination is easy to lifting, termination process structure is simple, safe and reliable, mounting or dismounting are convenient, clamp firmly, good seal, high temperature resistant, corrosion-resistant, fire prevention, explosion-proof feature, insulation resistance can not be reduced, cable applied widely because of moist.
For realizing above-mentioned technical purpose, technical scheme of the present invention is as follows:
Slip-off preventing pays a preparation method for copper core cable in advance, comprises main cable, at least one branch cable, and copper ring, it is characterized in that, prepares in accordance with the following steps:
A) respectively the end of the middle part of main cable and branch cable is divested insulation and sheath, make each cable core exposed, and the exposed length of each cable core is suitable, short section of the 10 ~ 15cm that grown up by the sheath skin transverse cutting that main cable divests stand-by;
B) respectively by the core of branch cable exposure and the exposed core laminating of main cable, then with copper ring by core sticking part card and, cable connecting part is put into crimp, starting pressure machine, pressing copper ring;
C) first wrapped mica tape or insulating tape in copper ring connector and exposed core position, and then lapped insulation adhesive tape, water-proof self-adhesion band, insulating tape successively;
D) by A) the sheath suitcase that obtains of step is rolled in the insulated wire cores of each main cable, and cutting knife mouth is outwardly;
E) with nylon cable tie or Halogen band, the coupling part of main cable and branch cable is evenly tightened;
F) with clean plastic film coated branch head, with packaging film, main cable and branch cable are tightly wound around, take in take-up reel together to be injected;
G) by F) the wrapped shaping branch's head part of crimping that obtains inserts injection molding machine, selects corresponding mold injection molding;
H) by G) the injection molding branch head that obtains is placed on water tank, and wrap up whole branch head with the infantees of immersion and carry out water-bath cooling, after sizing, take infantees off; The insulated wire cores termination of branch cable is separated, is wound around the insulated wire cores termination of branch cable with respective color insulating tape, then with the insulated wire cores termination of thermoplastic cap sealing branch cable;
I) by H) top ends of paying the main cable of copper core cable in advance that obtains axially opens one otch, push sheath aside, then on overlapping in the insulated wire cores of each main cable thermoplastic tube and heating make it shrink, again on the insulated wire cores termination point casing of each main cable pyrocondensation cap and heating make it shrink, obtain the cable that end seals is good;
J) a plastic cement chock is set in the middle of the insulated wire cores of each main cable, and tightly wraps with 5 layers of insulating tape.
K) recover the sheath of main cable to home position, tighten with inhibiting tape, obtaining termination is tapered cable ;
L) by K) step obtain cable end socket heat-shrink tube and heating make it shrink, then put pyrocondensation cap and heat shrink;
M) on heat-shrink tube, install guard suspension hook, the netted outside socket larynx hoop hanging head, fastening guard suspension hook, obtains slip-off preventing and pays copper core cable in advance;
N) check cable break-make, obtain slip-off preventing and pay copper core cable finished product in advance.
Copper ring of the present invention is " U " type copper ring of copper bar by obtaining after die mould.
F of the present invention) injection pressure of step is 10-20Mpa, temperature is 110-150 degree Celsius, and preheating injection time is 10-45 minute.
H of the present invention) water bath time of step is 5 ~ 15 minutes, described C) insulating tape is wound around 3 ~ 6 layers in step.
I of the present invention) incision length in step is 300 ~ 350mm.
J of the present invention) chock in step be long for 100mm, wide be 20mm, the high plastic cement cuboid for 20mm.
K of the present invention) in the rate of putting up of inhibiting tape be 50%, coiling length is 400 ± 10mm.
L of the present invention) in heat-shrink tube there is good heat-shrinkable, its length is 550 ± 10mm.
M of the present invention) larynx hoop in step is 3, respectively on fastening guard suspension hook.
The installation of netted suspension hook is as follows:
Described guard suspension hook is that one end open one end is closed, suspension hook is positioned at the outside of blind end, also comprise insulated wire cores heat-shrink tube, insulated wire cores pyrocondensation cap, described insulated wire cores heat-shrink tube is socketed in every root insulated wire cores, insulated wire cores pyrocondensation cap is arranged on the end of insulated wire cores, and the end of cable is stretched into fixing from the openend of described guard suspension hook.Also comprise insulation filling block, described collets are tapered in the chien shih cable inside end of insulated wire cores.Also comprise the insulation wearing layer be arranged between the guard inwall of guard suspension hook and cable outer wall.Described insulation wearing layer is cable core pyrocondensation cap and cable core heat-shrink tube, and cable core pyrocondensation cap is arranged on the end of cable, and cable core heat-shrink tube is socketed in the outer wall of cable.Also comprise at least one larynx hoop, described larynx hoop is fastened on outside the guard of guard suspension hook 2.Described larynx hoop 6 is 3.
Owing to present invention employs technique scheme and technique, there is following beneficial effect:
The first, because dry cable core and branch cable core all adopt copper material, clasp also uses identical copper material, greatly ensure that the electric conductivity of shaping rear cable; Further, copper ring, in " U " shape, facilitates fastening;
The second, fastened by copper ring and press shaping, two cores can being combined better, closely, efficiently avoid because junction loosens, contact resistance is excessive and the short circuit caused is burnt;
3rd, adopt plastic cement rectangular chock, make cable end tapered, allow the netted head that hangs under the effect of larynx hoop, fix firmly, prevent and hang head and come off;
4th, during branch, the sheath peeled off, for being wrapped in the insulated wire cores of each main cable, and cutting knife mouth is outwardly; Not only save cost, and, add the insulation property of cable;
5th, chock specification adopts: long for 100mm, wide be 20mm, high be 20mm, just can adapt to the inside of main cable, make, end is tapered;
6th, employing injection pressure is 10-20Mpa, and temperature is 110-150 degree Celsius, and preheating injection time is the technological parameter of 10-45 minute, not only can meet common pre-branched cable but also can meet the shaping of low smoke and zero halogen pre-branched cable branch head;
Seven, water bath time is 5 ~ 15 minutes, rapidly branch's head injection molding body ground temperature to normal temperature, can will be ensured branch's head shapes, and then ensure that the electrical insulation properties of branch's head effectively from degree more than 100;
Eight, the branch cable lifting insulated wire cores of end and cable core all have employed heat-shrinkable T bush and pyrocondensation cap packaging, effectively can ensure an electrical insulation properties for an insulated wire cores, and then ensure that the whole head that hangs has good electric insulating quality;
Nine, be incision length at the length setting of the top ends axially open of main cable being 300 ~ 350mm, can length of fit be the heat-shrinkable T bush of 550mm and netted installation of hanging head well;
figure of description
Fig. 1 is the schematic diagram that joint paid in advance by cable of the present invention;
Fig. 2 is that schematic diagram dissected by the suspension hook of cable end of the present invention;
Fig. 3 is the suspension hook schematic diagram of cable end of the present invention;
Fig. 4 is one of installation of the present invention figure.
In figure: (1) main cable core, (2) guard suspension hook, (3) collets, (4) insulated wire cores heat-shrink tube, (5) insulated wire cores pyrocondensation cap, (6) larynx hoop, (7) main cable, (8) cable core pyrocondensation cap, (9) cable core heat-shrink tube, (10) branch cable, (11) copper ring.
Embodiment
embodiment 1
Slip-off preventing pays a preparation method for copper core cable in advance, comprises main cable, at least one branch cable, and copper ring, it is characterized in that, prepares in accordance with the following steps:
A) respectively the end of the middle part of main cable and branch cable is divested insulation and sheath, make each cable core exposed, and the exposed length of each cable core is suitable, by stand-by for short section of sheath skin transverse cutting growth 10cm that main cable divests;
B) respectively by the core of branch cable exposure and the exposed core laminating of main cable, then with copper ring by core sticking part card and, cable connecting part is put into crimp, starting pressure machine, pressing copper ring;
C) first wrapped mica tape or insulating tape in copper ring connector and exposed core position, and then lapped insulation adhesive tape, water-proof self-adhesion band, insulating tape successively;
D) by A) the sheath suitcase that obtains of step is rolled in the insulated wire cores of each main cable, and cutting knife mouth is outwardly;
E) with nylon cable tie or Halogen band, the coupling part of main cable and branch cable is evenly tightened;
F) with clean plastic film coated branch head, with packaging film, main cable and branch cable are tightly wound around, take in take-up reel together to be injected;
G) by F) the wrapped shaping branch's head part of crimping that obtains inserts injection molding machine, selects corresponding mold injection molding;
H) by G) the injection molding branch head that obtains is placed on water tank, and wrap up whole branch head with the infantees of immersion and carry out water-bath cooling, after sizing, take infantees off; The insulated wire cores termination of branch cable is separated, is wound around the insulated wire cores termination of branch cable with respective color insulating tape, then with the insulated wire cores termination of thermoplastic cap sealing branch cable;
I) by H) top ends of paying the main cable of copper core cable in advance that obtains axially opens one otch, push sheath aside, then on overlapping in the insulated wire cores of each main cable thermoplastic tube and heating make it shrink, again on the insulated wire cores termination point casing of each main cable pyrocondensation cap and heating make it shrink, obtain the cable that end seals is good;
J) a plastic cement chock is set in the middle of the insulated wire cores of each main cable, and tightly wraps with 5 layers of insulating tape.
K) recover the sheath of main cable to home position, tighten with inhibiting tape, obtaining termination is tapered cable ;
L) by K) step obtain cable end socket heat-shrink tube and heating make it shrink, then put pyrocondensation cap and heat shrink;
M) on heat-shrink tube, install guard suspension hook, the netted outside socket larynx hoop hanging head, fastening guard suspension hook, obtains slip-off preventing and pays copper core cable in advance;
N) check cable break-make, obtain slip-off preventing and pay copper core cable finished product in advance.
Copper ring of the present invention is " U " type copper ring of copper bar by obtaining after die mould.
F of the present invention) injection pressure of step is 10Mpa, temperature is 110 degrees Celsius, and preheating injection time is 10 minutes.
H of the present invention) water bath time of step is 5 minutes, described C) insulating tape is wound around 3 layers in step.
I of the present invention) incision length in step is 300mm.
J of the present invention) chock in step be long for 100mm, wide be 20mm, the high plastic cement cuboid for 20mm.
K of the present invention) in the rate of putting up of inhibiting tape be 50%, coiling length is 390mm.
L of the present invention) in heat-shrink tube there is good heat-shrinkable, its length is 540mm.
M of the present invention) larynx hoop in step is 3, respectively on fastening guard suspension hook.
embodiment 2
Slip-off preventing pays a preparation method for copper core cable in advance, comprises main cable, at least one branch cable, and copper ring, it is characterized in that, prepares in accordance with the following steps:
A) respectively the end of the middle part of main cable and branch cable is divested insulation and sheath, make each cable core exposed, and the exposed length of each cable core is suitable, by stand-by for short section of sheath skin transverse cutting growth 15cm that main cable divests;
B) respectively by the core of branch cable exposure and the exposed core laminating of main cable, then with copper ring by core sticking part card and, cable connecting part is put into crimp, starting pressure machine, pressing copper ring;
C) first wrapped mica tape or insulating tape in copper ring connector and exposed core position, and then lapped insulation adhesive tape, water-proof self-adhesion band, insulating tape successively;
D) by A) the sheath suitcase that obtains of step is rolled in the insulated wire cores of each main cable, and cutting knife mouth is outwardly;
E) with nylon cable tie or Halogen band, the coupling part of main cable and branch cable is evenly tightened;
F) with clean plastic film coated branch head, with packaging film, main cable and branch cable are tightly wound around, take in take-up reel together to be injected;
G) by F) the wrapped shaping branch's head part of crimping that obtains inserts injection molding machine, selects corresponding mold injection molding;
H) by G) the injection molding branch head that obtains is placed on water tank, and wrap up whole branch head with the infantees of immersion and carry out water-bath cooling, after sizing, take infantees off; The insulated wire cores termination of branch cable is separated, is wound around the insulated wire cores termination of branch cable with respective color insulating tape, then with the insulated wire cores termination of thermoplastic cap sealing branch cable;
I) by H) top ends of paying the main cable of copper core cable in advance that obtains axially opens one otch, push sheath aside, then on overlapping in the insulated wire cores of each main cable thermoplastic tube and heating make it shrink, again on the insulated wire cores termination point casing of each main cable pyrocondensation cap and heating make it shrink, obtain the cable that end seals is good;
J) a plastic cement chock is set in the middle of the insulated wire cores of each main cable, and tightly wraps with 5 layers of insulating tape.
K) recover the sheath of main cable to home position, tighten with inhibiting tape, obtaining termination is tapered cable ;
L) by K) step obtain cable end socket heat-shrink tube and heating make it shrink, then put pyrocondensation cap and heat shrink;
M) on heat-shrink tube, install guard suspension hook, the netted outside socket larynx hoop hanging head, fastening guard suspension hook, obtains slip-off preventing and pays copper core cable in advance;
N) check cable break-make, obtain slip-off preventing and pay copper core cable finished product in advance.
Copper ring of the present invention is " U " type copper ring of copper bar by obtaining after die mould.
F of the present invention) injection pressure of step is 20Mpa, temperature is 150 degrees Celsius, and preheating injection time is 10-45 minute.
H of the present invention) water bath time of step is 15 minutes, described C) insulating tape is wound around 6 layers in step.
I of the present invention) incision length in step is 350mm.
J of the present invention) chock in step be long for 100mm, wide be 20mm, the high plastic cement cuboid for 20mm.
K of the present invention) in the rate of putting up of inhibiting tape be 50%, coiling length is 410mm.
L of the present invention) in heat-shrink tube there is good heat-shrinkable, its length is 560mm.
M of the present invention) larynx hoop in step is 3, respectively on fastening guard suspension hook.
embodiment 3
Slip-off preventing pays a preparation method for copper core cable in advance, comprises main cable, at least one branch cable, and copper ring, it is characterized in that, prepares in accordance with the following steps:
A) respectively the end of the middle part of main cable and branch cable is divested insulation and sheath, make each cable core exposed, and the exposed length of each cable core is suitable, by stand-by for short section of sheath skin transverse cutting growth 12.5cm that main cable divests;
B) respectively by the core of branch cable exposure and the exposed core laminating of main cable, then with copper ring by core sticking part card and, cable connecting part is put into crimp, starting pressure machine, pressing copper ring;
C) first wrapped mica tape or insulating tape in copper ring connector and exposed core position, and then lapped insulation adhesive tape, water-proof self-adhesion band, insulating tape successively;
D) by A) the sheath suitcase that obtains of step is rolled in the insulated wire cores of each main cable, and cutting knife mouth is outwardly;
E) with nylon cable tie or Halogen band, the coupling part of main cable and branch cable is evenly tightened;
F) with clean plastic film coated branch head, with packaging film, main cable and branch cable are tightly wound around, take in take-up reel together to be injected;
G) by F) the wrapped shaping branch's head part of crimping that obtains inserts injection molding machine, selects corresponding mold injection molding;
H) by G) the injection molding branch head that obtains is placed on water tank, and wrap up whole branch head with the infantees of immersion and carry out water-bath cooling, after sizing, take infantees off; The insulated wire cores termination of branch cable is separated, is wound around the insulated wire cores termination of branch cable with respective color insulating tape, then with the insulated wire cores termination of thermoplastic cap sealing branch cable;
I) by H) top ends of paying the main cable of copper core cable in advance that obtains axially opens one otch, push sheath aside, then on overlapping in the insulated wire cores of each main cable thermoplastic tube and heating make it shrink, again on the insulated wire cores termination point casing of each main cable pyrocondensation cap and heating make it shrink, obtain the cable that end seals is good;
J) a plastic cement chock is set in the middle of the insulated wire cores of each main cable, and tightly wraps with 5 layers of insulating tape.
K) recover the sheath of main cable to home position, tighten with inhibiting tape, obtaining termination is tapered cable ;
L) by K) step obtain cable end socket heat-shrink tube and heating make it shrink, then put pyrocondensation cap and heat shrink;
M) on heat-shrink tube, install guard suspension hook, the netted outside socket larynx hoop hanging head, fastening guard suspension hook, obtains slip-off preventing and pays copper core cable in advance;
N) check cable break-make, obtain slip-off preventing and pay copper core cable finished product in advance.
Copper ring of the present invention is " U " type copper ring of copper bar by obtaining after die mould.
F of the present invention) injection pressure of step is 15Mpa, temperature is 130 degrees Celsius, and preheating injection time is 35 minutes.
H of the present invention) water bath time of step is 10 minutes, described C) insulating tape is wound around 5 layers in step.
I of the present invention) incision length in step is 320mm.
J of the present invention) chock in step be long for 100mm, wide be 20mm, the high plastic cement cuboid for 20mm.
K of the present invention) in the rate of putting up of inhibiting tape be 50%, coiling length is 410mm.
L of the present invention) in heat-shrink tube there is good heat-shrinkable, its length is 560mm.
M of the present invention) larynx hoop in step is 3, respectively on fastening guard suspension hook.

Claims (9)

1. slip-off preventing pays a preparation method for copper core cable in advance, comprises main cable, at least one branch cable, and copper ring, it is characterized in that, prepares in accordance with the following steps:
A) respectively the end of the middle part of main cable and branch cable is divested insulation and sheath, make each cable core exposed, and the exposed length of each cable core is suitable, short section of the 10 ~ 15cm that grown up by the sheath skin transverse cutting that main cable divests stand-by;
B) respectively by the core of branch cable exposure and main cable exposed core laminating, then with copper ring by core sticking part engage, cable connecting part is put into crimp, starting pressure machine, pressing copper ring;
C) first wrapped mica tape or insulating tape in copper ring connector and exposed core position, and then lapped insulation adhesive tape, water-proof self-adhesion band, insulating tape successively;
D) by A) the sheath suitcase that obtains of step is rolled in the insulated wire cores of each main cable, and cutting knife mouth is outwardly;
E) with nylon cable tie or Halogen band, the coupling part of main cable and branch cable is evenly tightened;
F) with clean plastic film coated branch head, with packaging film, main cable and branch cable are tightly wound around, take in take-up reel together to be injected;
G) by F) the wrapped shaping branch's head part of crimping that obtains inserts injection molding machine, selects corresponding mold injection molding;
H) by G) the injection molding branch head that obtains is placed on water tank, and wrap up whole branch head with the infantees of immersion and carry out water-bath cooling, after sizing, take infantees off; Each insulated wire cores of branch cable socket is separated, is wound around insulated wire cores termination with respective color insulating tape, then uses thermoplastic cap sealed insulation core termination;
I) by H) top ends of paying the main cable of copper core cable in advance that obtains axially opens one otch, push sheath aside, then on overlapping in the insulated wire cores of each main cable thermoplastic tube and heating make it shrink, again on the insulated wire cores termination point casing of each main cable pyrocondensation cap and heating make it shrink, obtain the cable that end seals is good;
J) a plastic cement chock is set in the middle of the insulated wire cores of each main cable, and tightly wraps with 5 layers of insulating tape;
K) recover the sheath of main cable to home position, tighten with inhibiting tape, obtaining termination is tapered cable;
L) by K) step obtain cable end socket heat-shrink tube and heating make it shrink, then put pyrocondensation cap and heat shrink;
M) on heat-shrink tube, install guard suspension hook, the netted outside socket larynx hoop hanging head, fastening guard suspension hook, obtains slip-off preventing and pays copper core cable in advance;
N) check cable break-make, obtain slip-off preventing and pay copper core cable finished product in advance.
2. a kind of slip-off preventing according to claim 1 pays the preparation method of copper core cable in advance, it is characterized in that, described copper ring is " U " type copper ring of copper bar by obtaining after die mould.
3. a kind of slip-off preventing according to claim 1 and 2 pays the preparation method of copper core cable in advance, it is characterized in that, described F) injection pressure of step is 10-20Mpa, temperature is 110-150 degree Celsius, and preheating injection time is 10-45 minute.
4. a kind of slip-off preventing according to claim 3 pays the preparation method of copper core cable in advance, it is characterized in that, described H) water bath time of step is 5 ~ 15 minutes, described C) insulating tape is wound around 3 ~ 6 layers in step.
5. a kind of slip-off preventing according to claim 4 pays the preparation method of copper core cable in advance, it is characterized in that, described I) incision length in step is 300 ~ 350mm.
6. a kind of slip-off preventing according to claim 5 pays the preparation method of copper core cable in advance, it is characterized in that, described J) chock in step be long for 100mm, wide be 20mm, the high plastic cement cuboid for 20mm.
7. a kind of slip-off preventing according to claim 6 pays the preparation method of copper core cable in advance, it is characterized in that, described K) in the rate of putting up of inhibiting tape be 50%, coiling length is 400 ± 10mm.
8. a kind of slip-off preventing according to claim 7 pays the preparation method of copper core cable in advance, it is characterized in that, described L) in heat-shrink tube there is good heat-shrinkable, its length is 550 ± 10mm.
9. a kind of slip-off preventing according to claim 8 pays the preparation method of copper core cable in advance, it is characterized in that, described M) larynx hoop in step is 3, respectively on fastening guard suspension hook.
CN201310448941.7A 2013-09-28 2013-09-28 A kind of slip-off preventing pays the preparation method of copper core cable in advance Active CN103489520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310448941.7A CN103489520B (en) 2013-09-28 2013-09-28 A kind of slip-off preventing pays the preparation method of copper core cable in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310448941.7A CN103489520B (en) 2013-09-28 2013-09-28 A kind of slip-off preventing pays the preparation method of copper core cable in advance

Publications (2)

Publication Number Publication Date
CN103489520A CN103489520A (en) 2014-01-01
CN103489520B true CN103489520B (en) 2015-12-23

Family

ID=49829680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310448941.7A Active CN103489520B (en) 2013-09-28 2013-09-28 A kind of slip-off preventing pays the preparation method of copper core cable in advance

Country Status (1)

Country Link
CN (1) CN103489520B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104767151A (en) * 2015-04-14 2015-07-08 上虞市舜兴电力有限公司 Connecting technology and connecting structure among guide lines of overhead distribution lines
CN105186237B (en) * 2015-08-03 2017-11-07 深圳市金达照明有限公司 A kind of DMX control devices arborizations cable
CN105427924A (en) * 2015-12-23 2016-03-23 山东华凌电缆有限公司 Long-lifetime ready-made branch cable and production method thereof
CN107942440B (en) * 2018-01-02 2024-01-30 任丘市志强塑料制品有限公司 Miniature optical fiber heat shrinkage tube and production process thereof
CN108010639B (en) * 2018-01-02 2019-08-13 四川新蓉电缆有限责任公司 A kind of flexible mineral insulation fire prevention first-born production. art of pre-branched cable branch
CN114300913A (en) * 2022-01-05 2022-04-08 四川新蓉电缆有限责任公司 Processing method of injection-molding-free pre-branch connecting body

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1534691A (en) * 2003-03-30 2004-10-06 九川电器有限公司 Armoured premade multi core branching cable
CN101221835A (en) * 2007-12-27 2008-07-16 上海胜武电缆有限公司 Prefabricated branch cable and manufacturing method thereof
CN101521052A (en) * 2009-04-20 2009-09-02 宝胜科技创新股份有限公司 Multi-core integrated branch cable and production method thereof
CN101800091A (en) * 2010-03-15 2010-08-11 兖矿集团有限公司 Pre-branched cable and manufacturing method thereof
CN102332345A (en) * 2011-08-09 2012-01-25 兴乐电缆有限公司 Manufacturing method for prefabricated branch flexible cable
CN102360614A (en) * 2011-10-08 2012-02-22 江苏亨通电力电缆有限公司 Intelligent electrical network fiber composite prefabricated branch cable and manufacture method thereof
CN103065723A (en) * 2012-12-19 2013-04-24 上海特缆电工科技有限公司 Preparation method for multi-branch control wire harness for high-power locomotive

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1534691A (en) * 2003-03-30 2004-10-06 九川电器有限公司 Armoured premade multi core branching cable
CN101221835A (en) * 2007-12-27 2008-07-16 上海胜武电缆有限公司 Prefabricated branch cable and manufacturing method thereof
CN101521052A (en) * 2009-04-20 2009-09-02 宝胜科技创新股份有限公司 Multi-core integrated branch cable and production method thereof
CN101800091A (en) * 2010-03-15 2010-08-11 兖矿集团有限公司 Pre-branched cable and manufacturing method thereof
CN102332345A (en) * 2011-08-09 2012-01-25 兴乐电缆有限公司 Manufacturing method for prefabricated branch flexible cable
CN102360614A (en) * 2011-10-08 2012-02-22 江苏亨通电力电缆有限公司 Intelligent electrical network fiber composite prefabricated branch cable and manufacture method thereof
CN103065723A (en) * 2012-12-19 2013-04-24 上海特缆电工科技有限公司 Preparation method for multi-branch control wire harness for high-power locomotive

Also Published As

Publication number Publication date
CN103489520A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103489520B (en) A kind of slip-off preventing pays the preparation method of copper core cable in advance
CN103972825B (en) Manufacture method around packet mode transition joint
CN105913904B (en) A kind of pre- branch's fireproof cable of flexible mineral matter insulation
CN105552791A (en) Method for making 10KV heat-shrinkable three-core cross-linked polyethylene cable intermediate joint
CN101800091A (en) Pre-branched cable and manufacturing method thereof
CN108683149A (en) A kind of crosslinked cable hot melting connector and preparation method thereof
CN2874880Y (en) Middle joint welding fitting for 66KV-500KV crosslink polyvinyl insulation power cable
CN106384658A (en) Oil-immersed inversion type current transformer major insulation wrapping connection structure and method
CN104300479B (en) A kind of mounting process of power cable aluminium alloy waterproof drawing head
CN106400685B (en) A kind of cord clip of suspension bridge and its construction method of installation with sealing structure
CN208190228U (en) A kind of crosslinked cable hot melting connector
CN208874266U (en) A kind of twisted polyethylene cable multilayer fusion transition joint
CN201820889U (en) Waterproof sleeve of heat-shrinkable pipe for harness branch
CN206789786U (en) A kind of waterproof leakproof electrical connecting wire
CN208849434U (en) A kind of wrapped transition joint of cable
CN107968377B (en) Low-cost bunched overhead cable end sealing method
CN106936016A (en) A kind of waterproof leakproof electrical connecting wire and its processing method
CN206850348U (en) A kind of overall flexibility waterproof construction of more wire harness
CN106786217B (en) Wrapping type emergency repair method for distribution network cable fault terminal
CN211150821U (en) Full-recovery type cable welding head
CN104078915A (en) Cable middle connector and connecting method thereof
CN203895944U (en) Cable intermediate connector
CN109378775B (en) Optimized manufacturing method for sealing and water-blocking of cable cold-shrinkage type joint
CN216412727U (en) New energy automobile pencil
CN201741426U (en) Prebranch cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant