CN103489112A - Method for realizing out-of-order comprehensive bid evaluation - Google Patents

Method for realizing out-of-order comprehensive bid evaluation Download PDF

Info

Publication number
CN103489112A
CN103489112A CN201310457964.4A CN201310457964A CN103489112A CN 103489112 A CN103489112 A CN 103489112A CN 201310457964 A CN201310457964 A CN 201310457964A CN 103489112 A CN103489112 A CN 103489112A
Authority
CN
China
Prior art keywords
bid
value
assessment
bids
enterprise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310457964.4A
Other languages
Chinese (zh)
Inventor
李志锴
黄敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN SUIXING SOFTWARE Co Ltd
Original Assignee
FUJIAN SUIXING SOFTWARE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN SUIXING SOFTWARE Co Ltd filed Critical FUJIAN SUIXING SOFTWARE Co Ltd
Priority to CN201310457964.4A priority Critical patent/CN103489112A/en
Publication of CN103489112A publication Critical patent/CN103489112A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method for realizing out-of-order comprehensive bid evaluation. The method is characterized by comprising the following steps: step 1, after enterprises submit technical bits, each technical bit is disassembled into N files, each file is stored independently, and the files are disorganized before the experts conduct bid evaluation, wherein the N is a natural number greater than 2; step 2, serial numbers of the enterprises are arranged from number zero in a precedence order of entering a hall for the first time; step 3, an information publication bar displays the list of the enterprises which sign up at bidding closing time, and bid announcement is conducted automatically; step 4, a K value is calculated, wherein each K value interval is divided into 100 equal parts according to a reasonable K value taking interval specified by a bidding document, the sum of the accumulated value of the bid price of all bidders and the number of the bidders is divided by the sum of one and the number of the equal parts of the K value intervals to obtain a remainder, and the value of the K value interval corresponding to the remainder is the K value; step 5, bid evaluation standard price is calculated, wherein bid evaluation standard price = (1-K) * construction cost of contestable projects + construction cost of incontestable projects. The method for realizing out-of-order comprehensive bid evaluation can avoid artificial participation and improve the reliability of bid submission and evaluation.

Description

A kind of implementation method of the out of order comprehensive assessment of bids
Technical field
The present invention relates to the implementation method of the industry field of engineering, e-bidding, particularly a kind of out of order comprehensive assessment of bids.
Background technology
Existing e-bidding technology is by technology such as information such as computing machine, networks, the bid business is carried out to combing again, the workflow of optimum combination bid, carry out a series of business operations such as online bid, bid, open sealed tenders and supervision supervision on network, final efficient, specialty, standard, safety, the bidding management cheaply of realizing.And take network as medium, utilize infotech to carry out the work compound of bid business, the real-time of network and synchronism have been broken traditional regional difference and space constraint, as long as ground of living in can surf the Net, the user can be at any time initiates transaction and can obtain real-time response to client thousands of miles away.Based on this point, e-bidding helps bid to participate in each side and has saved a large amount of time and financial cost; Information is able to timely communication, has naturally also just accelerated the whole progress of bid activity.
The mode that traditional Engineering bid assessment of bids adopts similar sports lottery ticket to turn ball is carried out successful tenderer, and the electronic bidding assessment of bids of the current Engineering method of getting the bid is at random mainly adopting by computer random function ROUND(traditionally) method generates the mode of random sequence number, makes bid winner.This mode is the simplest, but has also brought a series of to the incredible query of acceptance of the bid result.
Summary of the invention
The implementation method that the purpose of this invention is to provide a kind of out of order comprehensive assessment of bids, but can this become the drawback which bidding documents traditional expert's identification is, avoid artificial participation, improve the reliability of the bid assessment of bids.
The present invention adopts following scheme to realize: a kind of implementation method of the out of order comprehensive assessment of bids is characterized in that:
Step 1, enterprise, after submitting technical bid, split into N part file by technical bid, and every part of file is stored alone, after when expert evaluating, file being upset, then give expert evaluating, and wherein N is greater than 2 natural number;
Step 2, enterprise's sequence number are to advance for the first time hall precedence since No. 0 layout;
Step 3, deadline for accepting bid time one show registration enterprise list to the information disclosure hurdle, and automatically sing mark;
Step 4, calculating K value, reasonable K value interval according to the bidding document regulation, every 1 K value interval is divided into to 100 equal portions, by each tenderer offer by tender accumulated value add the family's number of submitting a tender and divided by 1 add the umbers such as K value is interval with, complementation, the corresponding K value of remainder interval value is the K value;
Step 5, calculate assessment of bids standard price, wherein the * of assessment of bids standard price=(1-K) can compete the cost of project+can not compete the cost of project;
Step 6, offer by tender score calculating formula:
Offer by tender score=80-| Bid Evaluation Price-assessment of bids standard price | ÷ assessment of bids standard price * 100Q; Wherein said Q is a parameter of being determined in Bid Evaluation Method by the bid inviter; Bid Evaluation Price is compared with assessment of bids standard price, equals getting full marks of assessment of bids standard price; Every 1% button Q lower than assessment of bids standard price divides; Higher than every 1% of assessment of bids standard price, detain 2 minutes; The offer by tender scoring retains 2 significant digits.
In an embodiment of the present invention, described N is 12.
In an embodiment of the present invention, also comprise tender documents be encrypted to only have this enterprise to see, after deciphering, this enterprise and assessment of bids expert can see, do not register or decipher unsuccessfully as enterprise, password ceases to be in force automatically after closing time in deciphering, and this enterprise and assessment of bids expert can see.In an embodiment of the present invention, before described step 2 deadline for accepting bid, registration enterprise can modify to tender documents at any time or cancel registration.
The present invention can split into technical bid 12 parts of files, and every part of file is stored alone, when expert evaluating, file is upset to expert evaluating after by technological means, and it is which enterprise difficulty of practising fraud strengthens that the expert wants to identify file.The personnel such as the bid personnel of bid enterprise, legal person, project manager do not need the assessment of bids on-the-spot next, have saved the very large bid expense (the bid expense with bid at least eight thousand under front, only need 330-480 unit now) of construction enterprises.
The accompanying drawing explanation
Fig. 1 is the inventive method schematic flow sheet.
Fig. 2 is complementation algorithm schematic diagram of the present invention.
Embodiment
Below in conjunction with drawings and Examples, the present invention will be further described.
As shown in Figure 1, the present embodiment provide a kind of out of order comprehensive assessment of bids implementation method, it is characterized in that:
Step 1, enterprise's sequence number are to advance for the first time hall precedence since No. 0 layout;
Step 2, deadline for accepting bid time one show registration enterprise list to the information disclosure hurdle, and automatically sing mark;
Step 3, calculating K value, reasonable K value interval according to the bidding document regulation, every 1 K value interval is divided into to 100 equal portions, by each tenderer offer by tender accumulated value add the family's number of submitting a tender and divided by 1 add the umbers such as K value is interval with, complementation, the corresponding K value of remainder interval value is the K value; Refer to Fig. 2, a means to suppose that the quotation summation of 8 enterprises is 1000 yuan, and dividend=quotation summation+effective enterprise number, i.e. 1000+8=1008 register; B means to suppose bidding document, and fixed reasonable K value interval is 2%-5%, and K value interval will be divided into 300 equal portions.Divisor is 300+1=301; C means K value interval value; In figure, the K value of 105 correspondences is (105/10000) * 100%+2%=3.05%.
Step 4, calculate assessment of bids standard price, wherein the * of assessment of bids standard price=(1-K) can compete the cost of project+can not compete the cost of project;
Step 5, offer by tender score calculating formula: offer by tender score=80-| Bid Evaluation Price-assessment of bids standard price | ÷ assessment of bids standard price * 100Q.(seeing " Fujian Province's construction of hydro project invite and submit bids integrated evaluating method (trying) ")
Enterprise, after submitting technical bid, splits into N part file by technical bid, and every part of file is stored alone, after when expert evaluating, file being upset, then gives expert evaluating, and wherein N is greater than 2 natural number.In the present embodiment, described N is 12.
In order to increase confidentiality, the inventive method also comprises tender documents is encrypted to only have this enterprise to see, after deciphering, this enterprise and assessment of bids expert can see, do not register or decipher unsuccessfully as enterprise, password ceases to be in force automatically after closing time in deciphering, and this enterprise and assessment of bids expert can see.In an embodiment of the present invention, before described step 2 deadline for accepting bid, registration enterprise can modify to tender documents at any time or cancel registration.
The foregoing is only preferred embodiment of the present invention, all equalizations of doing according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.

Claims (4)

1. the implementation method of an out of order comprehensive assessment of bids is characterized in that:
Step 1, enterprise, after submitting technical bid, split into N part file by technical bid, and every part of file is stored alone, after when expert evaluating, file being upset, then give expert evaluating, and wherein N is greater than 2 natural number;
Step 2, enterprise's sequence number are to advance for the first time hall precedence since No. 0 layout;
Step 3, deadline for accepting bid time one show registration enterprise list to the information disclosure hurdle, and automatically sing mark;
Step 4, calculating K value, reasonable K value interval according to the bidding document regulation, every 1 K value interval is divided into to 100 equal portions, by each tenderer offer by tender accumulated value add the family's number of submitting a tender and divided by 1 add the umbers such as K value is interval with, complementation, the corresponding K value of remainder interval value is the K value;
Step 5, calculate assessment of bids standard price, wherein the * of assessment of bids standard price=(1-K) can compete the cost of project+can not compete the cost of project;
Step 6, offer by tender score calculating formula:
Offer by tender score=80-| Bid Evaluation Price-assessment of bids standard price | ÷ assessment of bids standard price * 100Q; Wherein said Q is a parameter of being determined in Bid Evaluation Method by the bid inviter; Bid Evaluation Price is compared with assessment of bids standard price, equals getting full marks of assessment of bids standard price; Every 1% button Q lower than assessment of bids standard price divides; Higher than every 1% of assessment of bids standard price, detain 2 minutes; The offer by tender scoring retains 2 significant digits.
2. the implementation method of the out of order comprehensive assessment of bids according to claim 1, it is characterized in that: described N is 12.
3. the implementation method of the out of order comprehensive assessment of bids according to claim 2, it is characterized in that: also comprise tender documents are encrypted, only have this enterprise to see, after deciphering, this enterprise and assessment of bids expert can see, as enterprise does not register or deciphers unsuccessful, password ceases to be in force automatically after deciphering closing time, and this enterprise and assessment of bids expert can see.
4. the implementation method of the out of order comprehensive assessment of bids according to claim 1 is characterized in that: before the rear opening of bid of described step 3, registration enterprise can modify to tender documents at any time or cancel registration.
CN201310457964.4A 2013-09-30 2013-09-30 Method for realizing out-of-order comprehensive bid evaluation Pending CN103489112A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310457964.4A CN103489112A (en) 2013-09-30 2013-09-30 Method for realizing out-of-order comprehensive bid evaluation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310457964.4A CN103489112A (en) 2013-09-30 2013-09-30 Method for realizing out-of-order comprehensive bid evaluation

Publications (1)

Publication Number Publication Date
CN103489112A true CN103489112A (en) 2014-01-01

Family

ID=49829314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310457964.4A Pending CN103489112A (en) 2013-09-30 2013-09-30 Method for realizing out-of-order comprehensive bid evaluation

Country Status (1)

Country Link
CN (1) CN103489112A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107169651A (en) * 2017-05-11 2017-09-15 安徽谦通信息科技有限公司 A kind of contractor's professional skill assessment system analyzed based on big data
CN108055272A (en) * 2017-12-21 2018-05-18 广州科瑞工程信息咨询有限公司 Tender documents screening technique and system based on remote authorization
CN108319860A (en) * 2018-02-07 2018-07-24 南通市公共资源交易中心 A kind of long-range bid opening and bid appraisal management method, management system and management equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001118011A (en) * 1999-10-20 2001-04-27 Nec Corp System and method for automatic bidden article determination, system and method for automatic bidding, system and method for assisting bidding, and recording medium
CN101192210A (en) * 2006-11-26 2008-06-04 杜若平 Bid evaluation system
CN101510290A (en) * 2009-03-20 2009-08-19 张展奕 Electronic interactive method and system for attracting tender
CN101635037A (en) * 2008-07-21 2010-01-27 深圳市建设工程交易服务中心 Method for automatically accrediting bidding documents in building industry

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001118011A (en) * 1999-10-20 2001-04-27 Nec Corp System and method for automatic bidden article determination, system and method for automatic bidding, system and method for assisting bidding, and recording medium
CN101192210A (en) * 2006-11-26 2008-06-04 杜若平 Bid evaluation system
CN101635037A (en) * 2008-07-21 2010-01-27 深圳市建设工程交易服务中心 Method for automatically accrediting bidding documents in building industry
CN101510290A (en) * 2009-03-20 2009-08-19 张展奕 Electronic interactive method and system for attracting tender

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱胜奎: "一种基于电子招投标的暗标实施方案", 《实践与思考;七省市第十二届建筑市场与招标投标联席会优秀论文集》 *
福建省水利厅 福建省发展和改革委员会: "福建省水利工程施工招标投标综合评价方法(试行)", 《闽水建设[2008]53号》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107169651A (en) * 2017-05-11 2017-09-15 安徽谦通信息科技有限公司 A kind of contractor's professional skill assessment system analyzed based on big data
CN108055272A (en) * 2017-12-21 2018-05-18 广州科瑞工程信息咨询有限公司 Tender documents screening technique and system based on remote authorization
CN108055272B (en) * 2017-12-21 2021-05-18 广州科瑞工程信息咨询有限公司 Remote authorization-based bid document screening method and system
CN108319860A (en) * 2018-02-07 2018-07-24 南通市公共资源交易中心 A kind of long-range bid opening and bid appraisal management method, management system and management equipment
CN108319860B (en) * 2018-02-07 2021-05-11 南通市公共资源交易中心 Remote bid evaluation management method, management system and management equipment

Similar Documents

Publication Publication Date Title
Pangestu et al. Fifty years of trade policy in Indonesia: New world trade, old treatments
CN107358500A (en) Evaluation sort method based on block chain
Groeger A study of participation in dynamic auctions
Obidzinski et al. Smallholder timber plantation development in Indonesia: what is preventing progress?
CN106980488A (en) Random digit generation method and device
CN107103097A (en) Drawing method and terminal device based on block chain technology
CN106296391A (en) A kind of assessment exceeds the time limit the method and apparatus of probability
Fazekas et al. New ways to measure institutionalised grand corruption in public procurement
CN106789927A (en) A kind of on-line bid method and system
CN106875171A (en) A kind of micro- many block chain distribution credit investigation systems and reference method
CN105260930A (en) Inquiry purchasing online closed bidding system
CN110069637A (en) Online way of invitation for bid and system based on block chain
Solis South Korea’s fateful decision on the Trans-Pacific Partnership
CN114282929B (en) A digital transaction method for rice supply chain based on blockchain token
CN103489112A (en) Method for realizing out-of-order comprehensive bid evaluation
CN106302357A (en) The ownership altering system of GID and application process thereof
CN106920168A (en) Futures point valency exchange information processing method and device
JP6254337B2 (en) Point exchange system
CN103489074A (en) Achieving method for automatically calculating bid winning enterprises
Nadeem et al. An Investigation of the Various Factors Influence on Exports
Tu et al. Testing the relationship between corporate governance and bank performance–an empirical study on Vietnamese banks
Bunyan et al. The neoliberal policy context of youth work management
Biffaro Unfair commercial practices and online consumer reviews: The Italian Tripadvisor case
CN108460291A (en) A kind of file fraction system and method
Reinecke et al. From constructive ambiguity to escalating commitment: The evolution of the Bangladesh accord as a transnational institution for collective action

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zheng Chufei

Inventor after: Li Zhijie

Inventor after: Huang Min

Inventor after: Huang Yongfu

Inventor after: Cai Zhidong

Inventor before: Li Zhijie

Inventor before: Huang Min

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI ZHIKAI HUANG MIN TO: ZHENG CHUFEI LI ZHIKAI HUANG MIN HUANG YONGFU CAI ZHIDONG

RJ01 Rejection of invention patent application after publication

Application publication date: 20140101

RJ01 Rejection of invention patent application after publication