CN103488691A - 任务调度装置和任务调度方法 - Google Patents
任务调度装置和任务调度方法 Download PDFInfo
- Publication number
- CN103488691A CN103488691A CN201310392506.7A CN201310392506A CN103488691A CN 103488691 A CN103488691 A CN 103488691A CN 201310392506 A CN201310392506 A CN 201310392506A CN 103488691 A CN103488691 A CN 103488691A
- Authority
- CN
- China
- Prior art keywords
- task
- execution time
- execution
- time
- described current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提供了一种任务调度装置和一种任务调度方法,其中任务调度装置包括:判断单元,连接至计算单元,用于在当前任务准备完成时,判断数据库中是否有当前任务的执行历史数据;计算单元,用于在确定有执行历史数据时,根据执行历史数据预算当前任务的预估执行时间;任务调度单元,连接至计算单元,用于根据预估执行时间将当前任务追加到当前各任务队列中的指定任务队列中,等待当前任务执行。通过本发明的技术方案,能够根据所处的设备环境及执行的历史数据不断的优化和调整任务调度,从而提高任务处理效率。
Description
技术领域
本发明涉及计算机技术领域,具体而言,涉及一种任务调度装置和一种任务调度方法。
背景技术
在ERP系统中,存在各种各样的任务(例如审批任务、定时任务等)需要进入队列,通过任务调度来完成,实现任务的统一执行与管理。ERP系统中经常使用任务调度装置来实现任务的统一执行与管理。传统的任务调度引擎一般是根据任务的先来后到执行或按特定优先级执行,往往忽视了任务的执行上下文以及执行的特定环境、历史执行时间等数据,更不会去记录每个任务的属性及历史执行时间等数据。这样就会导致某些任务,如审批任务,其实只需要很短的时间就能完成,但它却有可能排队在很多需要长时间执行的任务之后,导致其需要不断的等待。另一方面,使用者往往不知道某些任务什么时候才能得到执行并完成,给用户的体验也不好。
传统的任务调度引擎一般是根据任务的先来后到顺序执行或按特定优先级执行。比如,总共有三条任务队列用于执行任务调度,此时新来一个任务,会被直接分配到任务数较少的那条任务队列中。相关任务调度方案建立流程的过程如图1所示。
在相关技术方案中,任务调度存在下面几个问题:(1)任务调度算法按照特定的优先顺序来执行任务,往往会导致本来只需要很短时间就能执行完成的任务,因为排在了许多需要长时间完成的任务后面,而进入无休止的等待中;(2)任务管理人员无法知道某个任务大概何时能够完成,用户体验不好。
发明内容
本发明正是基于上述技术问题,提出了一种新的任务调度技术,可提高任务调度效率。
有鉴于此,根据本发明的一个方面,提供了一种任务调度装置,包括:判断单元,连接至计算单元,用于在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;所述计算单元,用于在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;任务调度单元,连接至所述计算单元,用于根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
在有新任务时,会根据该新任务的执行历史数据来估算可能需要的时间,然后根据各任务队列的情况将该新任务追加到合适的队列中,最后等待该新任务的执行。因此,该技术方案与相关技术方案相比,不是按照固定的优先级顺序来执行任务,也不是直接将新任务安排在任务较少的队列中,而是结合了新任务的执行时间来确定合适的任务队列,从而能够统筹安排各任务,优化任务调度,提高了任务的执行效率。
在上述技术方案中,优选的,所述计算单元还可以包括获取单元和比较单元,所述获取单元用于获取所述当前各任务队列的前置任务执行时间之和,所述比较单元用于将所述当前任务的预估执行时间与所述执行时间之和进行比较;所述任务调度单元所述根据比较结果确定所述指定任务队列。
除了考虑新的任务的预估执行时间之外,还需要考虑当前各任务队列的执行总时间,从而确定最合适的任务队列。
在上述任一技术方案中,优选的,所述任务调度单元还用于在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中,以及在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中,以及在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
如果计算出新任务的执行时间很短,则可以将该新任务追加到执行时间最少的任务队列中,这样可以保证该新任务能够被快速完成,如果该新任务的执行时间很长,就可以将该新任务追加到执行时间稍长的队列中,以保证其他任务能够被优先执行。
在上述任一技术方案中,优选的,还可以包括:反馈单元,用于在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
本方案能够实时地反馈当前任务预计执行时间和需等待的时间,能够然该用户清楚任务的执行情况,既实现了ERP系统中任务调度的统一管理,又能够改善用户体验。
在上述任一技术方案中,优选的,还可以包括:记录单元,用于在所述当前任务开始被执行时,记录所述当前任务的执行数据。
根据任务的执行情况可以不断更新任务执行历史数据,当下次有类似的新任务时,能够依据执行历史数据来估算任务的执行时间。
根据本发明的另一方面,还提供了一种任务调度方法,包括:在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
在有新任务时,会根据该新任务的执行历史数据来估算可能需要的时间,然后根据各任务队列的情况将该新任务追加到合适的队列中,最后等待该新任务的执行。因此,该技术方案与相关技术方案相比,不是按照固定的优先级顺序来执行任务,也不是直接将新任务安排在任务较少的队列中,而是结合了新任务的执行时间来确定合适的任务队列,从而能够统筹安排各任务,优化任务调度,提高了任务的执行效率。
在上述技术方案中,优选的,还可以包括以下步骤:获取所述当前各任务队列的前置任务执行时间之和;将所述当前任务的预估执行时间与所述执行时间之和进行比较;根据比较结果确定所述指定任务队列。
除了考虑新的任务的预估执行时间之外,还需要考虑当前各任务队列的执行总时间,从而确定最合适的任务队列。
在上述任一技术方案中,优选的,在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中;在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中;在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
如果计算出新任务的执行时间很短,则可以将该新任务追加到执行时间最少的任务队列中,这样可以保证该新任务能够被快速完成,如果该新任务的执行时间很长,就可以将该新任务追加到执行时间稍长的队列中,以保证其他任务能够被优先执行。
在上述任一技术方案中,优选的,还可以包括以下步骤:在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
本方案能够实时地反馈当前任务预计执行时间和需等待的时间,能够然该用户清楚任务的执行情况,既实现了ERP系统中任务调度的统一管理,又能够改善用户体验。
在上述任一技术方案中,优选的,还可以包括:在所述当前任务开始被执行时,记录所述当前任务的执行数据。
根据任务的执行情况可以不断更新任务执行历史数据,当下次有类似的新任务时,能够依据执行历史数据来估算任务的执行时间。
因此,与相关技术方案相比,基于经验值、历史数据建模的任务调度能够更高效、准确、实时地执行任务,并且能够根据所处的设备环境及执行的历史数据不断的优化和调整任务调度,还能实时地反馈当前任务预计执行的时间和需要等待的时间,既实现了ERP中任务调度的统一管理,又能够持续改善用户体验。
附图说明
图1示出了相关技术中的任务调度处理过程流程示意图;
图2示出了根据本发明的实施例的任务调度装置的框图;
图3示出了根据本发明的一个实施例的任务调度方法的流程图;
图4示出了根据本发明的另一实施例的任务调度方法的流程图。
具体实施方式
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和具体实施方式对本发明进行进一步的详细描述。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用其他不同于在此描述的其他方式来实施,因此,本发明的保护范围并不受下面公开的具体实施例的限制。
图2示出了根据本发明的实施例的任务调度装置的框图。
如图2所示,根据本发明的实施例的任务调度装置200可以包括:判断单元202,连接至计算单元204,用于在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;所述计算单元204,用于在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;任务调度单元206,连接至所述计算单元204,用于根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
在有新任务时,会根据该新任务的执行历史数据来估算可能需要的时间,然后根据各任务队列的情况将该新任务追加到合适的队列中,最后等待该新任务的执行。因此,该技术方案与相关技术方案相比,不是按照固定的优先级顺序来执行任务,也不是直接将新任务安排在任务较少的队列中,而是结合了新任务的执行时间来确定合适的任务队列,从而能够统筹安排各任务,优化任务调度,提高了任务的执行效率。
在上述技术方案中,优选的,所述计算单元204还可以包括获取单元2042和比较单元2044,所述获取单元2042用于获取所述当前各任务队列的前置任务执行时间之和,所述比较单元2044用于将所述当前任务的预估执行时间与所述执行时间之和进行比较;所述任务调度单元206所述根据比较结果确定所述指定任务队列。
除了考虑新的任务的预估执行时间之外,还需要考虑当前各任务队列的执行总时间,从而确定最合适的任务队列。
在上述任一技术方案中,优选的,所述任务调度单元206还用于在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中,以及在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中,以及在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
如果计算出新任务的执行时间很短,则可以将该新任务追加到执行时间最少的任务队列中,这样可以保证该新任务能够被快速完成,如果该新任务的执行时间很长,就可以将该新任务追加到执行时间稍长的队列中,以保证其他任务能够被优先执行。
在上述任一技术方案中,优选的,还可以包括:反馈单元208,用于在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
本方案能够实时地反馈当前任务预计执行时间和需等待的时间,能够然该用户清楚任务的执行情况,既实现了ERP系统中任务调度的统一管理,又能够改善用户体验。
在上述任一技术方案中,优选的,还可以包括:记录单元210,用于在所述当前任务开始被执行时,记录所述当前任务的执行数据。
根据任务的执行情况可以不断更新任务执行历史数据,当下次有类似的新任务时,能够依据执行历史数据来估算任务的执行时间。
接下来结合图3和图4来详细说明根据本发明的任务调度方法。
在进行根据本发明的实施例的任务调度方法之前,需要先进行一些准备工作:
(1)初始化任务配置及任务调度引擎,简而言之,就是定义ERP系统中的任务都有哪些类别,需要维护多少个任务队列来执行任务的调度,以及默认每类任务预估要执行的时间;
(2)动态实时收集ERP中各种任务的执行时间等数据,即填充经验值数据库的过程;
(3)对上面收集的历史数据及人工配置数据进行数学建模,根据分析数据进行任务时间归类,至此训练出一个基于经验值的任务调度模型。
此时新来一个任务,采用根据本发明的任务调度装置和方法来实现以下几个功能:
(1)根据新增任务的类别及基于经验值建模分析得出的预估要执行的时间,将该任务分配到针对性的任务调度引擎中;
(2)自动记录该任务的执行数据,包括环境、执行时间等,进一步丰富经验值数据库;
(3)根据经验值数据库,自动分析与优化任务的执行效率,进一步优化任务调度引擎;
(4)将该当前任务的预计完成时间、等待时间返回给终端用户。
如图3所示,在步骤302,任务准备完成,进入本发明的处理流程;
步骤304,判断是否有当前任务的执行历史数据(经验值数据),如果有则执行步骤306,如果没有在执行步骤308;
步骤306,从数据库或缓存获取当前任务的执行历史数据;
步骤308,从系统默认配置中获取当前任务的默认配置数据(即默认的任务执行数据);
步骤310,对当前任务的历史经验数据或者默认配置数据进行数学建模分析,对当前任务的历史经验值数据(多次以往的执行时间)进行加权平均值分析,得出当前任务预计要执行的平均时间,以及通过对历史经验数据中的环境数据进行分析,得出各个任务调度队列的稳定性;
步骤312,获取各个任务调度队列的前置任务及预估的前置任务的执行时间和;
步骤314,判断当前任务的预估执行时间,如果小于2秒,则执行步骤316;如果大于2秒,并且小于30秒,则执行步骤318;如果大于30秒,则执行步骤320;
步骤316,将当前任务加入到前置任务预估执行时间总和最小并且稳定性好的任务调度队列中,这样,不仅可提高任务的处理效率,也能够提高任务的处理稳定性;
步骤318,则将当前任务加入到前置任务预估执行时间总和排倒数第二的任务调度队列中;
步骤320,则将当前任务加入到其它任务调度队列中;
步骤322,返回当前任务需要等待的总时间及当前任务预估要执行的时间;
步骤324,等待当前任务执行;
步骤326,开始当前任务执行,记录当前任务的开始执行的时间、上下文数据、环境变量数据等;
步骤328,当前任务执行完成,往数据库或缓存中记录当前任务执行的开始时间、等待时间、完成时间等。
因此,与相关技术方案相比,基于经验值、历史数据建模的任务调度能够更高效、准确、实时地执行任务,并且能够根据所处的设备环境及执行的历史数据不断的优化和调整任务调度,还能实时地反馈当前任务预计执行的时间和需要等待的时间,既实现了ERP中任务调度的统一管理,又能够持续改善用户体验。
图4示出了根据本发明的另一实施例的任务调度方法的流程图。
如图4所示,根据本发明的实施例的任务调度方法可以包括以下步骤:步骤402,在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;步骤404,在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;步骤406,根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
在有新任务时,会根据该新任务的执行历史数据来估算可能需要的时间,然后根据各任务队列的情况将该新任务追加到合适的队列中,最后等待该新任务的执行。因此,该技术方案与相关技术方案相比,不是按照固定的优先级顺序来执行任务,也不是直接将新任务安排在任务较少的队列中,而是结合了新任务的执行时间来确定合适的任务队列,从而能够统筹安排各任务,优化任务调度,提高了任务的执行效率。
在上述技术方案中,优选的,还可以包括以下步骤:获取所述当前各任务队列的前置任务执行时间之和;将所述当前任务的预估执行时间与所述执行时间之和进行比较;根据比较结果确定所述指定任务队列。
除了考虑新的任务的预估执行时间之外,还需要考虑当前各任务队列的执行总时间,从而确定最合适的任务队列。
在上述任一技术方案中,优选的,在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中;在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中;在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
如果计算出新任务的执行时间很短,则可以将该新任务追加到执行时间最少的任务队列中,这样可以保证该新任务能够被快速完成,如果该新任务的执行时间很长,就可以将该新任务追加到执行时间稍长的队列中,以保证其他任务能够被优先执行。
在上述任一技术方案中,优选的,还可以包括以下步骤:在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
本方案能够实时地反馈当前任务预计执行时间和需等待的时间,能够然该用户清楚任务的执行情况,既实现了ERP系统中任务调度的统一管理,又能够改善用户体验。
在上述任一技术方案中,优选的,还可以包括:在所述当前任务开始被执行时,记录所述当前任务的执行数据。
根据任务的执行情况可以不断更新任务执行历史数据,当下次有类似的新任务时,能够依据执行历史数据来估算任务的执行时间。
根据本发明的任务调度方法能够基于经验值、历史数据建模分析,提升任务执行的效率、改善用户体验。由于经验值数据库的填充与丰富,并实时根据经验值历史数据建模分析而优化任务执行,因此能够更大可能地提高任务调度的效率与实时性。同时反馈给用户当前任务的预估平均完成时间,能够更好地改善用户体验。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种任务调度装置,其特征在于,包括:
判断单元,连接至计算单元,用于在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;
所述计算单元,用于在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;
任务调度单元,连接至所述计算单元,用于根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
2.根据权利要求1所述的任务调度装置,其特征在于,所述计算单元还包括获取单元和比较单元,所述获取单元用于获取所述当前各任务队列的前置任务执行时间之和,所述比较单元用于将所述当前任务的预估执行时间与所述执行时间之和进行比较;
所述任务调度单元所述根据比较结果确定所述指定任务队列。
3.根据权利要求2所述的任务调度装置,其特征在于,所述任务调度单元还用于在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中,以及
在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中,以及
在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
4.根据权利要求1所述的任务调度装置,其特征在于,还包括:
反馈单元,用于在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
5.根据权利要求1至4中任一项所述的任务调度装置,其特征在于,还包括:记录单元,用于在所述当前任务开始被执行时,记录所述当前任务的执行数据。
6.一种任务调度方法,其特征在于,包括:
在当前任务准备完成时,判断数据库中是否有所述当前任务的执行历史数据;
在确定有所述执行历史数据时,根据所述执行历史数据预算所述当前任务的预估执行时间;
根据所述预估执行时间将所述当前任务追加到当前各任务队列中的指定任务队列中,等待所述当前任务执行。
7.根据权利要求6所述的任务调度方法,其特征在于,还包括:
获取所述当前各任务队列的前置任务执行时间之和;
将所述当前任务的预估执行时间与所述执行时间之和进行比较;
根据比较结果确定所述指定任务队列。
8.根据权利要求7所述的任务调度方法,其特征在于,在所述预估执行时间小于第一时间阈值时,将所述当前任务追加至前置任务执行时间之和最小的任务队列中;
在所述预估执行时间大于等于所述第一时间阈值小于等于第二时间阈值时,将所述当前任务追加至前置任务执行时间之和处于第二小的任务队列中;
在所述预估执行时间大于所述第二时间阈值时,将所述当前任务追加至其他任务队列中,其中所述第一时间阈值小于所述第二时间阈值。
9.根据权利要求6所述的任务调度方法,其特征在于,还包括:
在将所述当前任务追加至所述指定任务队列中后,反馈所述当前任务的预估执行时间和等待执行总时间。
10.根据权利要求6至9中任一项所述的任务调度方法,其特征在于,还包括:
在所述当前任务开始被执行时,记录所述当前任务的执行数据。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310392506.7A CN103488691A (zh) | 2013-09-02 | 2013-09-02 | 任务调度装置和任务调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310392506.7A CN103488691A (zh) | 2013-09-02 | 2013-09-02 | 任务调度装置和任务调度方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103488691A true CN103488691A (zh) | 2014-01-01 |
Family
ID=49828917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310392506.7A Pending CN103488691A (zh) | 2013-09-02 | 2013-09-02 | 任务调度装置和任务调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103488691A (zh) |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9389916B1 (en) | 2015-04-24 | 2016-07-12 | International Business Machines Corporation | Job scheduling management |
CN105955873A (zh) * | 2016-04-27 | 2016-09-21 | 乐视控股(北京)有限公司 | 一种任务处理方法和装置 |
CN106097088A (zh) * | 2016-06-07 | 2016-11-09 | 中国建设银行股份有限公司 | 账务数据的处理方法及系统 |
CN106325981A (zh) * | 2015-06-19 | 2017-01-11 | 阿里巴巴集团控股有限公司 | 一种任务调度方法及装置 |
CN106447242A (zh) * | 2016-11-28 | 2017-02-22 | 国网山东省电力公司济宁供电公司 | 用电业务受理时限管理方法及装置 |
CN106547492A (zh) * | 2016-12-08 | 2017-03-29 | 北京得瑞领新科技有限公司 | 一种nand闪存设备的操作指令调度方法及装置 |
CN106599161A (zh) * | 2016-12-08 | 2017-04-26 | 竹间智能科技(上海)有限公司 | 延长机器人思考时间的回复方法及系统 |
CN106775966A (zh) * | 2016-11-21 | 2017-05-31 | 青岛海信电器股份有限公司 | 一种用户操作任务处理方法及装置 |
CN107122877A (zh) * | 2017-02-20 | 2017-09-01 | 平安科技(深圳)有限公司 | 查勘任务分配方法和装置 |
CN107315627A (zh) * | 2017-05-31 | 2017-11-03 | 北京京东尚科信息技术有限公司 | 一种自动化配置数据仓库并行任务队列的方法和装置 |
CN107678843A (zh) * | 2017-09-20 | 2018-02-09 | 电子科技大学 | 一种采用多级反馈队列的进程调度方法 |
CN107748696A (zh) * | 2017-09-20 | 2018-03-02 | 上海壹账通金融科技有限公司 | 一种任务调度的方法及终端设备 |
CN107766129A (zh) * | 2016-08-17 | 2018-03-06 | 北京金山云网络技术有限公司 | 一种任务处理方法、装置及系统 |
CN107918613A (zh) * | 2016-10-08 | 2018-04-17 | 上海宝存信息科技有限公司 | 因应服务质量的固态硬盘访问方法以及使用该方法的装置 |
CN108509258A (zh) * | 2017-07-25 | 2018-09-07 | 平安科技(深圳)有限公司 | 撤回任务的方法、装置、计算机设备及存储介质 |
CN108595254A (zh) * | 2018-03-09 | 2018-09-28 | 北京永洪商智科技有限公司 | 一种查询调度方法 |
CN104820616B (zh) * | 2015-04-24 | 2018-10-30 | 中国联合网络通信集团有限公司 | 一种任务调度的方法及装置 |
CN109211159A (zh) * | 2018-09-28 | 2019-01-15 | 北京国金源富科技有限公司 | 一种计量器具检定任务调度方法及装置 |
CN110188023A (zh) * | 2019-05-21 | 2019-08-30 | 联想(北京)有限公司 | 资源健康检查方法和资源健康检查装置 |
CN110196775A (zh) * | 2019-05-30 | 2019-09-03 | 苏州浪潮智能科技有限公司 | 一种计算任务处理方法、装置、设备以及可读存储介质 |
CN110348818A (zh) * | 2019-07-17 | 2019-10-18 | 博仕瀚道(上海)信息科技有限公司 | 一种流程引擎的流程智能处理方法及系统 |
CN110689258A (zh) * | 2019-09-25 | 2020-01-14 | 重庆戴普思科技有限公司 | 一种车辆维修任务调度方法及系统 |
CN111143049A (zh) * | 2019-12-27 | 2020-05-12 | 中国银行股份有限公司 | 一种文件批量处理方法及装置 |
CN111178650A (zh) * | 2018-11-12 | 2020-05-19 | 程宇章 | 一种任务交互方法、装置及终端 |
CN111382921A (zh) * | 2018-12-29 | 2020-07-07 | 福建金风科技有限公司 | 海上风力发电机组的任务匹配方法、存储介质及计算装置 |
CN111737632A (zh) * | 2017-08-16 | 2020-10-02 | 北京嘀嘀无限科技发展有限公司 | 排队时间确定方法、装置、服务器和计算机可读存储介质 |
CN112000703A (zh) * | 2020-10-27 | 2020-11-27 | 港胜技术服务(深圳)有限公司 | 数据入库处理方法、装置、计算机设备和存储介质 |
CN112486644A (zh) * | 2020-11-27 | 2021-03-12 | 北京百度网讯科技有限公司 | 用于生成信息的方法、装置、设备以及存储介质 |
CN112988362A (zh) * | 2021-05-14 | 2021-06-18 | 南京蓝洋智能科技有限公司 | 一种任务处理方法、装置、电子设备及存储介质 |
CN113051063A (zh) * | 2021-06-02 | 2021-06-29 | 北京轻松筹信息技术有限公司 | 分布式任务的任务调度方法、装置及电子设备 |
US11422856B2 (en) * | 2019-06-28 | 2022-08-23 | Paypal, Inc. | Adaptive program task scheduling to blocking and non-blocking queues |
WO2022257435A1 (zh) * | 2021-06-11 | 2022-12-15 | 深圳前海微众银行股份有限公司 | 一种批量任务处理方法、装置、计算设备及存储介质 |
WO2024012280A1 (zh) * | 2022-07-11 | 2024-01-18 | 上海寒武纪信息科技有限公司 | 用于任务调度的方法、设备、板卡及其计算机可读存储介质 |
CN111737632B (zh) * | 2017-08-16 | 2024-05-31 | 北京嘀嘀无限科技发展有限公司 | 排队时间确定方法、装置、服务器和计算机可读存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080222640A1 (en) * | 2007-03-07 | 2008-09-11 | International Business Machines Corporation | Prediction Based Priority Scheduling |
CN101957780A (zh) * | 2010-08-17 | 2011-01-26 | 中国电子科技集团公司第二十八研究所 | 一种基于资源状态信息的网格任务调度处理器及方法 |
CN102831012A (zh) * | 2011-06-16 | 2012-12-19 | 日立(中国)研究开发有限公司 | 多节点分布式系统中的任务调度装置和任务调度方法 |
-
2013
- 2013-09-02 CN CN201310392506.7A patent/CN103488691A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080222640A1 (en) * | 2007-03-07 | 2008-09-11 | International Business Machines Corporation | Prediction Based Priority Scheduling |
CN101957780A (zh) * | 2010-08-17 | 2011-01-26 | 中国电子科技集团公司第二十八研究所 | 一种基于资源状态信息的网格任务调度处理器及方法 |
CN102831012A (zh) * | 2011-06-16 | 2012-12-19 | 日立(中国)研究开发有限公司 | 多节点分布式系统中的任务调度装置和任务调度方法 |
Cited By (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104820616B (zh) * | 2015-04-24 | 2018-10-30 | 中国联合网络通信集团有限公司 | 一种任务调度的方法及装置 |
US9389916B1 (en) | 2015-04-24 | 2016-07-12 | International Business Machines Corporation | Job scheduling management |
US9886311B2 (en) | 2015-04-24 | 2018-02-06 | International Business Machines Corporation | Job scheduling management |
CN106325981A (zh) * | 2015-06-19 | 2017-01-11 | 阿里巴巴集团控股有限公司 | 一种任务调度方法及装置 |
CN105955873A (zh) * | 2016-04-27 | 2016-09-21 | 乐视控股(北京)有限公司 | 一种任务处理方法和装置 |
CN106097088A (zh) * | 2016-06-07 | 2016-11-09 | 中国建设银行股份有限公司 | 账务数据的处理方法及系统 |
CN107766129B (zh) * | 2016-08-17 | 2021-04-16 | 北京金山云网络技术有限公司 | 一种任务处理方法、装置及系统 |
CN107766129A (zh) * | 2016-08-17 | 2018-03-06 | 北京金山云网络技术有限公司 | 一种任务处理方法、装置及系统 |
CN107918613B (zh) * | 2016-10-08 | 2022-01-21 | 上海宝存信息科技有限公司 | 因应服务质量的固态硬盘访问方法以及使用该方法的装置 |
CN107918613A (zh) * | 2016-10-08 | 2018-04-17 | 上海宝存信息科技有限公司 | 因应服务质量的固态硬盘访问方法以及使用该方法的装置 |
CN106775966A (zh) * | 2016-11-21 | 2017-05-31 | 青岛海信电器股份有限公司 | 一种用户操作任务处理方法及装置 |
CN106447242B (zh) * | 2016-11-28 | 2019-11-12 | 国网山东省电力公司济宁供电公司 | 用电业务受理时限管理方法及装置 |
CN106447242A (zh) * | 2016-11-28 | 2017-02-22 | 国网山东省电力公司济宁供电公司 | 用电业务受理时限管理方法及装置 |
CN106547492A (zh) * | 2016-12-08 | 2017-03-29 | 北京得瑞领新科技有限公司 | 一种nand闪存设备的操作指令调度方法及装置 |
US11112998B2 (en) | 2016-12-08 | 2021-09-07 | Dera Co., Ltd. | Operation instruction scheduling method and apparatus for nand flash memory device |
CN106599161A (zh) * | 2016-12-08 | 2017-04-26 | 竹间智能科技(上海)有限公司 | 延长机器人思考时间的回复方法及系统 |
CN106599161B (zh) * | 2016-12-08 | 2020-02-14 | 竹间智能科技(上海)有限公司 | 延长机器人思考时间的回复方法及系统 |
CN107122877A (zh) * | 2017-02-20 | 2017-09-01 | 平安科技(深圳)有限公司 | 查勘任务分配方法和装置 |
CN107315627A (zh) * | 2017-05-31 | 2017-11-03 | 北京京东尚科信息技术有限公司 | 一种自动化配置数据仓库并行任务队列的方法和装置 |
CN108509258A (zh) * | 2017-07-25 | 2018-09-07 | 平安科技(深圳)有限公司 | 撤回任务的方法、装置、计算机设备及存储介质 |
CN111737632B (zh) * | 2017-08-16 | 2024-05-31 | 北京嘀嘀无限科技发展有限公司 | 排队时间确定方法、装置、服务器和计算机可读存储介质 |
CN111737632A (zh) * | 2017-08-16 | 2020-10-02 | 北京嘀嘀无限科技发展有限公司 | 排队时间确定方法、装置、服务器和计算机可读存储介质 |
CN107748696A (zh) * | 2017-09-20 | 2018-03-02 | 上海壹账通金融科技有限公司 | 一种任务调度的方法及终端设备 |
CN107678843A (zh) * | 2017-09-20 | 2018-02-09 | 电子科技大学 | 一种采用多级反馈队列的进程调度方法 |
CN107748696B (zh) * | 2017-09-20 | 2020-05-01 | 深圳壹账通智能科技有限公司 | 一种任务调度的方法及终端设备 |
CN107678843B (zh) * | 2017-09-20 | 2020-12-29 | 电子科技大学 | 一种采用多级反馈队列的进程调度方法 |
CN108595254B (zh) * | 2018-03-09 | 2022-02-22 | 北京永洪商智科技有限公司 | 一种查询调度方法 |
CN108595254A (zh) * | 2018-03-09 | 2018-09-28 | 北京永洪商智科技有限公司 | 一种查询调度方法 |
CN109211159B (zh) * | 2018-09-28 | 2021-01-15 | 北京国金源富科技有限公司 | 一种计量器具检定任务调度方法及装置 |
CN109211159A (zh) * | 2018-09-28 | 2019-01-15 | 北京国金源富科技有限公司 | 一种计量器具检定任务调度方法及装置 |
CN111178650A (zh) * | 2018-11-12 | 2020-05-19 | 程宇章 | 一种任务交互方法、装置及终端 |
CN111382921A (zh) * | 2018-12-29 | 2020-07-07 | 福建金风科技有限公司 | 海上风力发电机组的任务匹配方法、存储介质及计算装置 |
CN110188023A (zh) * | 2019-05-21 | 2019-08-30 | 联想(北京)有限公司 | 资源健康检查方法和资源健康检查装置 |
CN110188023B (zh) * | 2019-05-21 | 2021-09-14 | 联想(北京)有限公司 | 资源健康检查方法和资源健康检查装置 |
CN110196775A (zh) * | 2019-05-30 | 2019-09-03 | 苏州浪潮智能科技有限公司 | 一种计算任务处理方法、装置、设备以及可读存储介质 |
US11422856B2 (en) * | 2019-06-28 | 2022-08-23 | Paypal, Inc. | Adaptive program task scheduling to blocking and non-blocking queues |
CN110348818A (zh) * | 2019-07-17 | 2019-10-18 | 博仕瀚道(上海)信息科技有限公司 | 一种流程引擎的流程智能处理方法及系统 |
CN110348818B (zh) * | 2019-07-17 | 2024-01-19 | 博仕瀚道(上海)信息科技有限公司 | 一种流程引擎的流程智能处理方法及系统 |
CN110689258A (zh) * | 2019-09-25 | 2020-01-14 | 重庆戴普思科技有限公司 | 一种车辆维修任务调度方法及系统 |
CN111143049B (zh) * | 2019-12-27 | 2023-09-05 | 中国银行股份有限公司 | 一种文件批量处理方法及装置 |
CN111143049A (zh) * | 2019-12-27 | 2020-05-12 | 中国银行股份有限公司 | 一种文件批量处理方法及装置 |
CN112000703A (zh) * | 2020-10-27 | 2020-11-27 | 港胜技术服务(深圳)有限公司 | 数据入库处理方法、装置、计算机设备和存储介质 |
CN112000703B (zh) * | 2020-10-27 | 2021-02-05 | 港胜技术服务(深圳)有限公司 | 数据入库处理方法、装置、计算机设备和存储介质 |
CN112486644A (zh) * | 2020-11-27 | 2021-03-12 | 北京百度网讯科技有限公司 | 用于生成信息的方法、装置、设备以及存储介质 |
CN112988362A (zh) * | 2021-05-14 | 2021-06-18 | 南京蓝洋智能科技有限公司 | 一种任务处理方法、装置、电子设备及存储介质 |
CN113051063B (zh) * | 2021-06-02 | 2021-09-17 | 北京轻松筹信息技术有限公司 | 分布式任务的任务调度方法、装置及电子设备 |
CN113051063A (zh) * | 2021-06-02 | 2021-06-29 | 北京轻松筹信息技术有限公司 | 分布式任务的任务调度方法、装置及电子设备 |
WO2022257435A1 (zh) * | 2021-06-11 | 2022-12-15 | 深圳前海微众银行股份有限公司 | 一种批量任务处理方法、装置、计算设备及存储介质 |
WO2024012280A1 (zh) * | 2022-07-11 | 2024-01-18 | 上海寒武纪信息科技有限公司 | 用于任务调度的方法、设备、板卡及其计算机可读存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103488691A (zh) | 任务调度装置和任务调度方法 | |
CN107491885B (zh) | 一种用于钢贸金融业务的风控平台及风险控制管理方法 | |
CN105281981B (zh) | 网络服务的数据流量监控方法和装置 | |
CN107690616A (zh) | 受限的存储器环境中的流式传输联接 | |
CN110083528A (zh) | 测试任务的分配方法、装置、计算机设备及存储介质 | |
WO2022016808A1 (zh) | 一种kubernetes集群资源动态调整方法及电子设备 | |
CN109743356B (zh) | 工业互联网数据采集方法及装置、可读存储介质和终端 | |
CN116166405B (zh) | 异构场景下的神经网络任务调度策略确定方法及装置 | |
CN108298397A (zh) | 一种基于电梯物联网的电梯维保监测方法及监管平台 | |
CN110633880A (zh) | 一种确定自动导引运输车配置数量的方法和装置 | |
CN109088747A (zh) | 云计算系统中资源的管理方法和装置 | |
CN110896357A (zh) | 流量预测方法、装置和计算机可读存储介质 | |
CN115150471B (zh) | 数据处理方法、装置、设备、存储介质及程序产品 | |
CN110796591B (zh) | 一种gpu卡的使用方法及相关设备 | |
CN104820616A (zh) | 一种任务调度的方法及装置 | |
CN115202847A (zh) | 任务的调度方法和装置 | |
CN104571931A (zh) | 基于系统资源的i/o请求合并调度系统与方法 | |
CN105139122B (zh) | 程序运行时长的统计方法及系统 | |
CN110069565A (zh) | 一种分布式数据库数据批量处理的方法及装置 | |
Zhou et al. | AHPA: adaptive horizontal pod autoscaling systems on alibaba cloud container service for kubernetes | |
CN110991519A (zh) | 一种智能开关状态分析调整方法及系统 | |
US9176560B2 (en) | Use and state based power management | |
CN112003900B (zh) | 实现分布式系统中高负载场景下服务高可用的方法、系统 | |
CN104394198A (zh) | 一种基于esb的全局调度方法 | |
Huang et al. | Learning-aided stochastic network optimization with imperfect state prediction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160127 Address after: 100094 Beijing City, North Road, Haidian District, No. 68, building 2, floor 2 Applicant after: You Pu Information Technology Co., Ltd of UFSOFT Address before: 100094 Beijing city Haidian District North Road No. 68, UFIDA Software Park Applicant before: UFIDA Software Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140101 |
|
RJ01 | Rejection of invention patent application after publication |