CN103482320A - Cut pipe transportation device - Google Patents

Cut pipe transportation device Download PDF

Info

Publication number
CN103482320A
CN103482320A CN201210463280.0A CN201210463280A CN103482320A CN 103482320 A CN103482320 A CN 103482320A CN 201210463280 A CN201210463280 A CN 201210463280A CN 103482320 A CN103482320 A CN 103482320A
Authority
CN
China
Prior art keywords
hopper
gig
pipe cutting
conveying arrangement
cutting conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210463280.0A
Other languages
Chinese (zh)
Inventor
史沸涛
刘佳
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
M-UNION (WUHU) Co Ltd
Original Assignee
M-UNION (WUHU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by M-UNION (WUHU) Co Ltd filed Critical M-UNION (WUHU) Co Ltd
Priority to CN201210463280.0A priority Critical patent/CN103482320A/en
Publication of CN103482320A publication Critical patent/CN103482320A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The invention discloses a cut pipe transportation device, which comprises a work bin, a crane beam and a crane, wherein a pushing mechanism is arranged on the work bin; a baffle plate is arranged at a discharge port of the work bin; a hoist is arranged on one side of the discharge port of the work bin; a plurality of hoisting claws are arranged on the hoist; a radial conveying belt is arranged on one side of the hoist; an axial transportation mechanism is arranged below the radial conveying belt; a first sensor is arranged on the axial transportation mechanism, and is positioned on one side of the radial conveying belt. According to the cut pipe transportation device, a pipe can be automatically transported to a specified position, so that the working efficiency is improved, and the production cost is lowered.

Description

A kind of Pipe Cutting conveying arrangement
Technical field
The present invention relates to tubing transportation technology field, relate in particular to a kind of Pipe Cutting conveying arrangement.
Background technology
Tubing transportation of the prior art, be to rely on manpower that the tubing cut is carried on hand barrow, then is transported to appointed place.Due to manpower, not only transport capacity is limited, reduces production efficiency, and increases enterprise's productive costs.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of high efficiency, cost-saving Pipe Cutting conveying arrangement.
For achieving the above object, the invention provides following technical scheme: a kind of Pipe Cutting conveying arrangement, comprise hopper, crane crossbeam and crane, described hopper is provided with pusher, described hopper discharging opening place is provided with baffle plate, described hopper discharging opening one side is provided with gig, described gig is provided with several material pawls, described gig one side is provided with the radial transfer band, described radial transfer band below is provided with axial transport establishment, and described axial transport establishment is provided with the sensor one that is positioned at radial transfer band one side.
Preferably, described hopper is funnel shaped, and this form can be slided tubing effectively to the hopper discharging opening.
Preferably, be provided with hopper between described gig and hopper.
Preferably, described baffle plate is provided with sensor two, when material has been sensed in sensor sense two, plays the material pawl and starts working.
Preferably, described gig top is provided with sensor three, when sensor three is sensed material, plays the material pawl and unclamps, and material is put on the radial transfer band.
Preferably, described axial transport establishment inclination certain angle, material is in the process of axially transportation, on the wooden partition of material meeting near axial transport establishment.
Preferably, described crane crossbeam is arranged on floor, is provided with the oblique pull cable wire between crane crossbeam and floor, and described crossbeam, floor and cable wire form triangular shaped.
Preferably, between described gig and radial transfer band, be provided with shell, prevented that foreign matter from having entered material pawl structure and having caused gig stuck.
Adopt the beneficial effect of above technical scheme to be: the present invention can increase work efficiency by the tubing automatic transportation to assigned address, reduces production costs.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Wherein, 1-hopper, 2-crane crossbeam, 3-crane, 4-pusher, 5-baffle plate, 6-gig, 7-play the material pawl, 8-radial transfer band, 9-axially transport establishments, 10-sensor one, 11-hopper, 12-sensor, two, 13-sensor, three, 14-floor, 15-cable wire.
The specific embodiment
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, and this embodiment only, for explaining the present invention, does not form limiting the scope of the present invention.
Describe the preferred embodiment of the present invention in detail below in conjunction with accompanying drawing 1: a kind of Pipe Cutting conveying arrangement, comprise hopper 1, crane crossbeam 2 and crane 3, described hopper 1 is provided with pusher 4, at hopper, 1 discharging opening place is provided with baffle plate 5, be provided with gig 6 in hopper 1 discharging opening one side, be provided with several material pawls 7 on gig 6, be provided with radial transfer band 8 in gig 6 one sides, be provided with axial transport establishment 9 below radial transfer band 8, axially in transport establishment 9, be provided with the sensor 1 that is positioned at radial transfer band 8 one sides, hopper 1 is funnel shaped, this form can be slided tubing effectively to hopper 1 discharging opening, be provided with hopper 11 between gig 6 and hopper 1, be provided with sensor 2 12 on baffle plate 5, when material has been sensed in sensor sense 2 12, playing material pawl 7 starts working, be provided with sensor 3 13 at gig 6 tops, when sensor 3 13 is sensed material, playing material pawl 7 unclamps, material is put on the radial transfer band to 8, axial transport establishment 9 inclination certain angles, material is in the process of axially transportation, on the wooden partition of material meeting near axial transport establishment 9, be arranged on floor 14 at crane crossbeam 2, be provided with oblique pull cable wire 15 between crane crossbeam 2 and floor 14, at crossbeam 2, floor 14 and cable wire 15 form triangular shaped, be provided with shell 15 between gig 6 and radial transfer band 8, prevented that foreign matter from having entered material pawl structure and having caused gig 6 stuck.
Adopt the beneficial effect of above technical scheme to be: the present invention can increase work efficiency by the tubing automatic transportation to assigned address, reduces production costs.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise of the invention, can also make some distortion and improvement, and these all belong to protection scope of the present invention.

Claims (8)

1. a Pipe Cutting conveying arrangement, comprise hopper, crane crossbeam and crane, it is characterized in that: described hopper is provided with pusher, described hopper discharging opening place is provided with baffle plate, described hopper discharging opening one side is provided with gig, and described gig is provided with several material pawls, and described gig one side is provided with the radial transfer band, described radial transfer band below is provided with axial transport establishment, and described axial transport establishment is provided with the sensor one that is positioned at radial transfer band one side.
2. a kind of Pipe Cutting conveying arrangement according to claim 1, it is characterized in that: described hopper is funnel shaped.
3. a kind of Pipe Cutting conveying arrangement according to claim 1, is characterized in that: between described gig and hopper, be provided with hopper.
4. a kind of Pipe Cutting conveying arrangement according to claim 3, it is characterized in that: described hopper is provided with sensor two.
5. a kind of Pipe Cutting conveying arrangement according to claim 1, it is characterized in that: described gig top is provided with sensor three.
6. a kind of Pipe Cutting conveying arrangement according to claim 1, is characterized in that: described axial transport establishment inclination certain angle.
7. a kind of Pipe Cutting conveying arrangement according to claim 1, it is characterized in that: described crane crossbeam is arranged on floor, is provided with the oblique pull cable wire between crane crossbeam and floor, and described crossbeam, floor and cable wire form triangular shaped.
8. a kind of Pipe Cutting conveying arrangement according to claim 1, is characterized in that: between described gig and radial transfer band, be provided with shell.
CN201210463280.0A 2012-11-17 2012-11-17 Cut pipe transportation device Pending CN103482320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210463280.0A CN103482320A (en) 2012-11-17 2012-11-17 Cut pipe transportation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210463280.0A CN103482320A (en) 2012-11-17 2012-11-17 Cut pipe transportation device

Publications (1)

Publication Number Publication Date
CN103482320A true CN103482320A (en) 2014-01-01

Family

ID=49823005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210463280.0A Pending CN103482320A (en) 2012-11-17 2012-11-17 Cut pipe transportation device

Country Status (1)

Country Link
CN (1) CN103482320A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139916A (en) * 2020-01-18 2020-05-12 广州坚磊建设有限公司 Direct-buried section reinforced concrete drainage pipeline installation construction process

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS521855A (en) * 1975-06-24 1977-01-08 Hitachi Metals Ltd Steel pipes store vonveyor
JPH05727A (en) * 1991-01-22 1993-01-08 Toshiba Eng & Constr Co Ltd Pipe conveying device having multistage rack
JPH10181833A (en) * 1996-12-26 1998-07-07 Nippon Steel Corp Transverse feed and front filling device of large opening steel pipe
CN2658130Y (en) * 2003-11-15 2004-11-24 顾启富 Portable combined crane
CN201325832Y (en) * 2008-12-26 2009-10-14 陈晓娇 A self-balanced crane tower
CN201472996U (en) * 2009-07-30 2010-05-19 王洪军 Metal round bar material automatic lifting mechanism
CN201628480U (en) * 2010-01-29 2010-11-10 俞小元 Metal ingot feeding mechanism
CN201971419U (en) * 2011-01-07 2011-09-14 江苏恒源特种干粉制造有限公司 Vertical transporting mechanism for dry powder preparation field
CN202296151U (en) * 2011-10-19 2012-07-04 湖州富升炭业有限公司 Mechanical hand
CN102554850A (en) * 2010-12-07 2012-07-11 苏州紫冠自动化设备有限公司 Tube quantity control device and control method
CN202967403U (en) * 2012-11-17 2013-06-05 镁联科技(芜湖)有限公司 Cut pipe transportation device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS521855A (en) * 1975-06-24 1977-01-08 Hitachi Metals Ltd Steel pipes store vonveyor
JPH05727A (en) * 1991-01-22 1993-01-08 Toshiba Eng & Constr Co Ltd Pipe conveying device having multistage rack
JPH10181833A (en) * 1996-12-26 1998-07-07 Nippon Steel Corp Transverse feed and front filling device of large opening steel pipe
CN2658130Y (en) * 2003-11-15 2004-11-24 顾启富 Portable combined crane
CN201325832Y (en) * 2008-12-26 2009-10-14 陈晓娇 A self-balanced crane tower
CN201472996U (en) * 2009-07-30 2010-05-19 王洪军 Metal round bar material automatic lifting mechanism
CN201628480U (en) * 2010-01-29 2010-11-10 俞小元 Metal ingot feeding mechanism
CN102554850A (en) * 2010-12-07 2012-07-11 苏州紫冠自动化设备有限公司 Tube quantity control device and control method
CN201971419U (en) * 2011-01-07 2011-09-14 江苏恒源特种干粉制造有限公司 Vertical transporting mechanism for dry powder preparation field
CN202296151U (en) * 2011-10-19 2012-07-04 湖州富升炭业有限公司 Mechanical hand
CN202967403U (en) * 2012-11-17 2013-06-05 镁联科技(芜湖)有限公司 Cut pipe transportation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139916A (en) * 2020-01-18 2020-05-12 广州坚磊建设有限公司 Direct-buried section reinforced concrete drainage pipeline installation construction process

Similar Documents

Publication Publication Date Title
CN202967403U (en) Cut pipe transportation device
CN103482320A (en) Cut pipe transportation device
CN202781348U (en) Waste collection and transport unit
CN103302073A (en) Suction dust removal device at grain discharging pit
CN107662823A (en) A kind of ore dressing plant concentrate discharge storage system and method
CN204400112U (en) A kind of Chinese medicine automatic charging unit
CN203887972U (en) Floor slotted line automatic assembly line
CN206358809U (en) A kind of waste collection systems in carton factory multilayer workshop
CN207476240U (en) Sugarcane processor and sugarcane harvesting system
CN202767544U (en) Protective cover for transporting of building blocks
CN202321596U (en) Battery sequential arrangement conveying device
CN202219154U (en) TPA (Tissue Plasmogen Activator) feed device
CN204096579U (en) The belt conveyer that a kind of anti-feeding is scattered
CN204660877U (en) A kind of petroleum coke is collected and conveying device
CN204847332U (en) Transmission platform of unloading
CN203728938U (en) Anode trailer loading and unloading station
CN204448558U (en) A kind of sieving machine
CN202590538U (en) Ash-transporting system for sintering machine head dust precipitator
CN201777676U (en) Belt transmission device for iron ore concentrate
CN204957848U (en) Making wine unprocessed food grains spiral unloader
CN203136582U (en) Grain warehousing device of combine-harvester
CN205328070U (en) Corn material material loading processing equipment
CN202924336U (en) Sand shakeout bucket for steel-casting foundry sand bin
CN205148669U (en) Polyester chip production facility
CN207451424U (en) Tide mould sand load mechanism Moving plate product transports special tooling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140101