CN103481364A - Preparation method of high-intensity thin-wall square pile - Google Patents

Preparation method of high-intensity thin-wall square pile Download PDF

Info

Publication number
CN103481364A
CN103481364A CN201310420305.3A CN201310420305A CN103481364A CN 103481364 A CN103481364 A CN 103481364A CN 201310420305 A CN201310420305 A CN 201310420305A CN 103481364 A CN103481364 A CN 103481364A
Authority
CN
China
Prior art keywords
vacuum
vacuum chamber
time
turns
per minute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310420305.3A
Other languages
Chinese (zh)
Other versions
CN103481364B (en
Inventor
叶香雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyungang Lianda Pipe Pile Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310420305.3A priority Critical patent/CN103481364B/en
Publication of CN103481364A publication Critical patent/CN103481364A/en
Application granted granted Critical
Publication of CN103481364B publication Critical patent/CN103481364B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a preparation method of a high-intensity thin-wall square pile. The method includes preparing materials which comprise 11-13% of pulverized coal, 9-11% of cement, 24-26% of sand, 5-7% of steel fiber and 45-50% of water; (2), manufacturing a steel wire framework; (3), setting a form board; (4), adding the materials for the first time; (5), vacuumizing for the first time; (6) adding the materials for the second time; (7) vacuumizing for the second time; (8) curing with steam; (9) demoulding; (10) curing with hot water.

Description

The preparation method of high intensity thinner tube square pile
Technical field
The present invention relates to building material field, particularly a kind of preparation method of high intensity thinner tube square pile.
Background technology
The high intensity thinner tube square pile is rested after making, the problems such as fine fisssure usually appear during resting, trace it to its cause is because cement, fully after aquation, producing certain expansion, if expansion stable period is shifted to an earlier date, obviously can obviously reduce the mass defect of square pile.In addition, the part square pile can not reach requirement because packing causes intensity not, and the packing and the impermeability that how to improve square pile are also the problems that will solve in square pile manufacturing process.
Summary of the invention
For the deficiencies in the prior art, the object of the present invention is to provide a kind of preparation method of high intensity thinner tube square pile.
Preparation process comprises:
(1) batching
Raw material choose cement, flyash, sand, steel fibre, water.Proportioning is as follows: the flyash consumption is 11%~13%, and cement consumption is 9%~11%, and the sand consumption is 24%~26%, and steel fibre is 5%~7%, and water consumption is 45%~50%.
Add in raw material of the present invention that steel fibre can improve that it is shock-resistant greatly, endurance and anti-seismic performance, make it also there is larger remaining support force after reaching failing load.
(2) make steel-wire carcass
(3) install template
Adopt special-purpose rigid template.Vacuum chamber base plate inboard arranges filter cloth, the vacuum chamber base plate adopts the steel plate of 6-8mm thickness, the vacuum chamber base plate arranges the water outlet circular hole, the water outlet Circularhole diameter is 6-8mm, water outlet circular hole setting space is 150-200mm, between vacuum chamber base plate and vacuum chamber cover plate, ribbed stiffener is set, ribbed stiffener adopts channel bar, the channel bar height is 30-40mm, the vacuum chamber cover plate adopts the steel plate of 6-8mm thickness, vacuum chamber cover plate arranged outside suction nozzle, and the suction nozzle diameter is 8-12mm, the suction nozzle both sides arrange the angle steel rest, and filter cloth and vacuum chamber base plate sealing part adopt the rubber seal sealing.
(4) feed intake for the first time
Stake mould low-speed running 3~5min, per minute kind 120 turns, middling speed running 2~3min, per minute kind 200 turns.4~the 5min that runs up, per minute kind 300 turns.Feed intake for the first time and want evenly, THICKNESS CONTROL is at 3cm, strikes off laitance after centrifugal.
(5) application of vacuum for the first time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 5/min, and vacuum adopts 750~760mm mercury column.
In the vacuum dehydration process, because of the differential pressure action that negative pressure of vacuum produces, compound produces volume contraction, forms more fine and close structure, and its physical and mechanical property also obtains corresponding improvement.
In addition, the present invention replaces part of cement using flyash as active mixture, but the maximum characteristics of flyash are that hydration rate is slow, and the time that produces intensity is more late.And the present invention is directed to this characteristics, and adopt application of vacuum, to improve exactly the early strength of square pile, reach the purpose of saving cement.
(6) feed intake for the second time
Stake mould low-speed running 2~3min, per minute kind 140 turns, middling speed running 3~4min, per minute kind 280 turns.10~the 12min that runs up, per minute kind 400 turns.
Owing to having adopted, feed intake for twice, in square pile, the through hole major part is cut off, and the anti-permeability performance of square pile significantly improves.Twice feeding method is very significant to the impermeability that improves square pile.
(7) application of vacuum for the second time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 10/min, and vacuum adopts 730~740mm mercury column.
Suitably reduce vacuum in vacuum chamber during application of vacuum for the second time, this is that vacuum is conducive to the movement of particles of aggregates after reducing, thereby reaches the closely knit uniform effect of mixture because mobility after the mixture dehydration reduces.
(8) steam curing
The steam curing temperature is 50 ℃~55 ℃, and the time is 1h.
(9) demoulding
After reaching 8~12MPa, square pile intensity carries out the demoulding.
(10) hot water maintenance
The hot water maintenance divides two stages, and the first stage, normal temperature is warming up to 90 ℃, keeps 1.5h constant temperature; Second stage, carry out maintenance by 90 ℃ of fast coolings to 45 ℃~50 ℃.
In the situation that demoulding strength is suitable, water supports that temperature is more high more is conducive to the abundant aquation of cement and the quickening of reaction speed, thereby makes expansion stable period in advance.
The made square pile of the present invention has advantages of that mechanical property is good, impervious strong, has application prospect preferably.
The accompanying drawing explanation
The two-sided envelope mould of Fig. 1 open type schematic diagram.
Accompanying drawing sign: 1, filter cloth, 2, the vacuum chamber base plate, 3, ribbed stiffener, 4, the vacuum chamber cover plate, 5, suction nozzle, 6, the angle steel rest, 7, rubber seal.
The specific embodiment
Below in conjunction with accompanying drawing, the present embodiment is described in detail.
The present embodiment preparation process comprises:
(1) batching
Raw material choose cement, flyash, sand, steel fibre, water.Proportioning is as follows: the flyash consumption is 11%~13%, and cement consumption is 9%~11%, and the sand consumption is 24%~26%, and steel fibre is 5%~7%, and water consumption is 45%~50%.
(2) make steel-wire carcass
(3) install template
Adopt special-purpose rigid template.Rigid template comprises filter cloth 1, vacuum chamber base plate 2, ribbed stiffener 3, vacuum chamber cover plate 4, suction nozzle 5, angle steel rest 6, rubber seal 7, vacuum chamber base plate 2 inboards arrange filter cloth 1, vacuum chamber base plate 2 adopts the steel plate of 8mm thickness, vacuum chamber base plate 2 arranges the water outlet circular hole, the water outlet Circularhole diameter is 8mm, water outlet circular hole setting space is 180mm, between vacuum chamber base plate 2 and vacuum chamber cover plate 4, ribbed stiffener 3 is set, ribbed stiffener 3 adopts channel bar, the channel bar height is 35mm, vacuum chamber cover plate 4 adopts the steel plate of 8mm thickness, vacuum chamber cover plate 4 arranged outside suction nozzles 5, suction nozzle 5 diameters are 10mm, suction nozzle 5 both sides arrange angle steel rest 6, filter cloth 1 and vacuum chamber base plate 2 sealing parts adopt rubber seal 7 sealings.
(4) feed intake for the first time
Stake mould low-speed running 3~5min, per minute kind 120 turns, middling speed running 2~3min, per minute kind 200 turns.4~the 5min that runs up, per minute kind 300 turns.Feed intake for the first time and want evenly, THICKNESS CONTROL is at 3cm, strikes off laitance after centrifugal.
(5) application of vacuum for the first time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 5/min, and vacuum adopts 750~760mm mercury column.
(6) feed intake for the second time
Stake mould low-speed running 2~3min, per minute kind 140 turns, middling speed running 3~4min, per minute kind 280 turns.10~the 12min that runs up, per minute kind 400 turns.
(7) application of vacuum for the second time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 10/min, and vacuum adopts 730~740mm mercury column.
(8) steam curing
The steam curing temperature is 50 ℃~55 ℃, and the time is 1h.
(9) demoulding
After reaching 8~12MPa, square pile intensity carries out the demoulding.
(10) hot water maintenance
The hot water maintenance divides two stages, and the first stage, normal temperature is warming up to 90 ℃, keeps 1.5h constant temperature; Second stage, carry out maintenance by 90 ℃ of fast coolings to 45 ℃~50 ℃.

Claims (1)

1. the preparation method of a high intensity thinner tube square pile is characterized in that preparation process comprises:
(1) batching
Raw material choose cement, flyash, sand, steel fibre, water; Proportioning is as follows: the flyash consumption is 11%~13%, and cement consumption is 9%~11%, and the sand consumption is 24%~26%, and steel fibre is 5%~7%, and water consumption is 45%~50%;
(2) make steel-wire carcass
(3) install template
Adopt special-purpose rigid template; Vacuum chamber base plate inboard arranges filter cloth, the vacuum chamber base plate adopts the steel plate of 6-8mm thickness, the vacuum chamber base plate arranges the water outlet circular hole, the water outlet Circularhole diameter is 6-8mm, water outlet circular hole setting space is 150-200mm, between vacuum chamber base plate and vacuum chamber cover plate, ribbed stiffener is set, ribbed stiffener adopts channel bar, the channel bar height is 30-40mm, the vacuum chamber cover plate adopts the steel plate of 6-8mm thickness, vacuum chamber cover plate arranged outside suction nozzle, and the suction nozzle diameter is 8-12mm, the suction nozzle both sides arrange the angle steel rest, and filter cloth and vacuum chamber base plate sealing part adopt the rubber gasket sealing;
(4) feed intake for the first time
Stake mould low-speed running 3~5min, per minute kind 120 turns, middling speed running 2~3min, per minute kind 200 turns; 4~the 5min that runs up, per minute kind 300 turns; Feed intake for the first time and want evenly, THICKNESS CONTROL is at 3cm, strikes off laitance after centrifugal;
(5) application of vacuum for the first time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 5/min, and vacuum adopts 750~760mm mercury column;
(6) feed intake for the second time
Stake mould low-speed running 2~3min, per minute kind 140 turns, middling speed running 3~4min, per minute kind 280 turns; 10~the 12min that runs up, per minute kind 400 turns;
(7) application of vacuum for the second time
Start vavuum pump after compound is centrifugal and carry out application of vacuum, vacuum processing time is 10/min, and vacuum adopts 730~740mm mercury column;
(8) steam curing
The steam curing temperature is 50 ℃~55 ℃, and the time is 1h;
(9) demoulding
After reaching 8~12MPa, square pile intensity carries out the demoulding;
(10) hot water maintenance
The hot water maintenance divides two stages, and the first stage, normal temperature is warming up to 90 ℃, keeps 1.5h constant temperature; Second stage, carry out maintenance by 90 ℃ of fast coolings to 45 ℃~50 ℃.
CN201310420305.3A 2013-09-10 2013-09-10 The preparation method of high-intensity thin-wall square pile Active CN103481364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310420305.3A CN103481364B (en) 2013-09-10 2013-09-10 The preparation method of high-intensity thin-wall square pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310420305.3A CN103481364B (en) 2013-09-10 2013-09-10 The preparation method of high-intensity thin-wall square pile

Publications (2)

Publication Number Publication Date
CN103481364A true CN103481364A (en) 2014-01-01
CN103481364B CN103481364B (en) 2016-01-20

Family

ID=49822130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310420305.3A Active CN103481364B (en) 2013-09-10 2013-09-10 The preparation method of high-intensity thin-wall square pile

Country Status (1)

Country Link
CN (1) CN103481364B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100821272B1 (en) * 2007-08-31 2008-04-11 정영환 An apparatus and method for concrete moulding using vacuum and centrifugal method without outer mould
CN101914914A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Concrete pre-stress hollow square pile and molding method thereof
CN102343626A (en) * 2011-09-15 2012-02-08 江苏固丰管桩集团有限公司 Concrete square pile die
CN102366973A (en) * 2011-09-20 2012-03-07 国鼎(南通)管桩有限公司 Vacuum chuck de-molding device for concrete tubular pile
CN102776879A (en) * 2012-08-01 2012-11-14 天津建城基业集团有限公司 Concrete centrifugal square pile and forming mold thereof
CN202781423U (en) * 2012-06-29 2013-03-13 上海中技桩业股份有限公司 Novel centrifugal shaping mold set for concrete hollow square piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100821272B1 (en) * 2007-08-31 2008-04-11 정영환 An apparatus and method for concrete moulding using vacuum and centrifugal method without outer mould
CN101914914A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Concrete pre-stress hollow square pile and molding method thereof
CN102343626A (en) * 2011-09-15 2012-02-08 江苏固丰管桩集团有限公司 Concrete square pile die
CN102366973A (en) * 2011-09-20 2012-03-07 国鼎(南通)管桩有限公司 Vacuum chuck de-molding device for concrete tubular pile
CN202781423U (en) * 2012-06-29 2013-03-13 上海中技桩业股份有限公司 Novel centrifugal shaping mold set for concrete hollow square piles
CN102776879A (en) * 2012-08-01 2012-11-14 天津建城基业集团有限公司 Concrete centrifugal square pile and forming mold thereof

Also Published As

Publication number Publication date
CN103481364B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN202492486U (en) Nitrogen-leading deoxidization purifying device used for producing cation polyacrylamide colloid
CN101700674B (en) Quick drying method of plaster mold
CN102887675B (en) Air-added brick taking hollow glass beads as filler and method for processing air-added brick
CN106348650A (en) Production technology of resin sand-based water permeable bricks
CN103481364B (en) The preparation method of high-intensity thin-wall square pile
CN102514087B (en) Special mold for ceramic blank high-pressure slip casting process
CN101333086A (en) Method for preparing alpha semi-hydrated gypsum pulp and plaster products by desulphurizing gypsum
CN102528898A (en) High pressure grouting forming process for ceramic billet
CN203293369U (en) Novel calcium plaster producing device
CN115521127A (en) Aerated concrete and preparation method thereof
CN205771125U (en) The drawing mechanism of a kind of feed bin inflated type and control system
CN105199240A (en) Mold cleaning device for sealing gasket of drum-type washing machine and production process thereof
CN203160512U (en) Novel energy-saving environment-friendly wall brick
CN207535053U (en) A kind of building and ornament materials cement tile mold feeding device
CN102242534B (en) Overflow device of pulp molding machine
CN204753259U (en) Slip casting equipment of paper pulp moulding machine
CN101862691A (en) Vacuum quick and continuous refining equipment of wheat
CN202045721U (en) Vacuum pumping device for partition wall luffer board forming machine
CN204149462U (en) A kind of injection mould high-efficiency exhaust structure
CN111187093A (en) Non-autoclaved concrete aerated insulating brick produced by utilizing construction waste and production method thereof
CN109369093A (en) A kind of environment-friendly type concrete brick and its processing technology
CN103508718B (en) A kind of non-burning brick manufacture craft with blind hole
CN220052286U (en) Cement dosing unit
CN205997353U (en) The assembling die that a kind of suitable lining plastic composited pipe produces
CN203076303U (en) Airflow stirring device of energy-saving fluorescent powder ultrasonic cleaning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191203

Address after: 221000 No.1, Zhangjiagang East Road, Yitang Town, Pizhou City, Xuzhou City, Jiangsu Province

Patentee after: Pizhou Binhe SME Management Service Co., Ltd.

Address before: 325025, No. 26, North Sichuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Wenzhou, Zhejiang

Patentee before: Ye Xiangxiong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210204

Address after: 222111 Jinxing South Road, Daxingzhuang village, Haitou Town, Ganyu District, Lianyungang City, Jiangsu Province

Patentee after: Lianyungang Lianda Pipe Pile Engineering Co.,Ltd.

Address before: No.1, Zhangjiagang East Road, Yitang Town, Pizhou City, Xuzhou City, Jiangsu Province

Patentee before: Pizhou Binhe SME Management Service Co.,Ltd.

TR01 Transfer of patent right