CN103475089A - Mis-locking prevention monitoring system - Google Patents

Mis-locking prevention monitoring system Download PDF

Info

Publication number
CN103475089A
CN103475089A CN2013103627373A CN201310362737A CN103475089A CN 103475089 A CN103475089 A CN 103475089A CN 2013103627373 A CN2013103627373 A CN 2013103627373A CN 201310362737 A CN201310362737 A CN 201310362737A CN 103475089 A CN103475089 A CN 103475089A
Authority
CN
China
Prior art keywords
error
output end
intelligent
signal input
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103627373A
Other languages
Chinese (zh)
Other versions
CN103475089B (en
Inventor
毛耀红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shengtai Power System Co., Ltd
Original Assignee
NANJING SHENGTAI DIMASI POWER SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING SHENGTAI DIMASI POWER SYSTEM CO Ltd filed Critical NANJING SHENGTAI DIMASI POWER SYSTEM CO Ltd
Priority to CN201310362737.3A priority Critical patent/CN103475089B/en
Publication of CN103475089A publication Critical patent/CN103475089A/en
Application granted granted Critical
Publication of CN103475089B publication Critical patent/CN103475089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention relates to a mis-locking prevention monitoring system. Structurally, the first signal output/input ends of a monitoring system and monitoring miss operation prevention module are correspondingly connected with the first signal input/output end of an intelligent unlocking device; the second signal output/input end of the intelligent unlocking device is correspondingly connected with the first signal input/output end of an intelligent key; the second signal output/input end of the intelligent key is correspondingly connected with the first signal input/output end of a miss operation prevention lock; the second signal output/input ends of the monitoring system and monitoring miss operation prevention module are correspondingly connected with the first signal input/output end of a measuring and control device; the second signal output/input end of the measuring and control device is correspondingly connected with the second signal input/output end of the miss operation prevention lock. The mis-locking prevention monitoring system has the advantage that reliable mis-locking prevention function still can be realized through an intelligent unlocking system when the monitoring system and monitoring miss operation prevention module breaks down or is out of service because of some reason; the operation safety, stability and reliability of transformer stations are improved.

Description

A kind of monitoring anti-error locking system
Technical field
The present invention relates to a kind of monitoring anti-error locking system, belong to the electric power project engineering field.
Background technology
For the fail safe, stability and the reliability that ensure substation operation, anti-error locking system is even more important.At present, the anti-error system of electrical network mainly comprises microcomputer anti-misoperation system and computer monitoring anti-error system.Microcomputer anti-misoperation system is substituted by the computer monitoring anti-error system gradually because various defects can't meet the requirement of integrated automation converting station.The transformer substation construction of development has proposed new requirement to Substation Anti-misoperation System.According to national associated documents, transformer station should possess station level, wall, mechanical floor pressure anti mis-closedown function, when control appliance or communication system failure, must keep anti mis-closedown function, exactly when supervisory control system and the monitoring anti-error break down or because of certain reason out of service, anti-error system can also play a role, and by the unlocking management device of supervisory control system, realizes anti mis-closedown function.
Summary of the invention
What the present invention proposed is a kind of monitoring anti-error locking system, and its purpose is intended to overcome the defect of existing monitoring anti-error system, when supervisory control system with monitor and anti-errorly break down or when out of service, can't realize anti mis-closedown function because of certain reason.
Technical solution of the present invention is: outside the original monitoring anti-error locking system of supervisory control system, increase again a set of standby error-unlocking prevention system, when supervisory control system with monitoring is anti-error breaks down or because of certain reason when out of service, the error-unlocking prevention system standby by this realizes anti mis-closedown function, by the operation order requirement, sequentially unblank, this standby error-unlocking prevention system is the intelligent unlocking system, comprise Intelligent unlocking device, Intelligent key and error preventing lock, supervisory control system and monitor corresponding joining of first signal I/O end of first signal input/output end with the Intelligent unlocking device of anti-error module wherein, the secondary signal input/output end of Intelligent unlocking device and Intelligent key corresponding joining of first signal I/O end, the secondary signal input/output end of Intelligent key and corresponding the joining of first signal I/O end of error preventing lock, supervisory control system and monitor corresponding joining of first signal I/O end of secondary signal input/output end with the measure and control device of anti-error module, the secondary signal input/output end of measure and control device and corresponding the joining of secondary signal I/O end of error preventing lock.
The invention has the beneficial effects as follows: when supervisory control system with monitoring is anti-error breaks down or when out of service, by this intelligent unlocking system, still can realize reliable anti mis-closedown function because of certain reason, strengthened fail safe, stability and the reliability of substation operation.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Embodiment
The contrast accompanying drawing 1, a kind of monitoring anti-error locking system, its structure comprise supervisory control system and monitor anti-error module, intelligent unlocking device, intelligent keyand error preventing lock, supervisory control system and monitor corresponding joining of first signal I/O end of first signal input/output end with the Intelligent unlocking device of anti-error module wherein, the secondary signal input/output end of Intelligent unlocking device and Intelligent key corresponding joining of first signal I/O end, the secondary signal input/output end of Intelligent key and corresponding the joining of first signal I/O end of error preventing lock; Supervisory control system and monitor corresponding joining of first signal I/O end of secondary signal input/output end with the measure and control device of anti-error module, the secondary signal input/output end of measure and control device and corresponding the joining of secondary signal I/O end of error preventing lock.
Described supervisory control system comprises monitoring host computer, monitoring and control management software, supervisory control system network, is placed in master-control room, by measure and control device, from equipment, gathers digital quantity and analog quantity, and monitoring host computer monitors, controls transformer station's real-time running state by measure and control device.
The anti-error module of described monitoring comprises the anti-error main frame of monitoring, anti-error system software, supervisory control system network, monitor anti-error main frame be responsible for to substation equipment monitored, control and logic judgement, be provided with full station anti-misoperation locking logic, can carry out logic discrimination to every step operation, to reach the anti-error module of monitoring from digital quantity and the analog quantity of equipment collection by measure and control device, carry out the instruction of the anti-error main frame of monitoring simultaneously, by error preventing lock, realize collection and the forced blocking to manual device location information.
Described Intelligent unlocking device comprises network communication module, data exchange module, energy supply control module, described network communication module refers to by network and monitoring anti-error system and monitors anti-error module and carry out exchanges data, described data exchange module refers to carry out exchanges data by serial ports and Intelligent key, described energy supply control module adopts general charging chip, the charging of monitoring intelligent key.Described Intelligent unlocking device receives supervisory control system and monitors the operational order that anti-error module is assigned, and to Intelligent key, sends this operational order, and is the Intelligent key charging, the operation note of passback Intelligent key.
Described Intelligent key comprises MCU, communication module, logic judgment module, memory module and release mechanism, it is micro-control unit that described MCU selects general Micro Control Unit, described communication module refers to carry out information exchange by serial ports and communications adapter, described logic judgment module by the device signal of collection with issue task condition and compare, determine whether and meet unlocking condition.Described memory module adopts general serial Flash chip, described release mechanism refer to MCU by control step electric machine rotation latch release shaft to unblanking or the locked position of coupler realization is unblanked or blocking function.Described Intelligent key also comprises the intelligent wireless key, has the Intelligent key of gsm wireless data-transformation facility, adopts general GSM communication module, realizes that remote task assigns, changes and return.
Described measure and control device comprises signal acquisition module, the CPU module, human-machine interface module, power module and output module, signal acquisition module, the wall module, the CPU module, human-machine interface module, power module and output intermodule and realize information sharing by internal bus communications, described signal acquisition module is for receiving and process sampled data, described human-machine interface module has been used for parameter tuning, information shows and debugging test, described power module is responsible for switch acquisition, and be other module for power supply, described CPU module is by the internal bus summary information, completing sampled value calculates, the logic judgement, failure wave-recording, remote measurement calculating and electric energy metrical.
Described error preventing lock is for comprising transformer station's common apparatus such as net door lock, knife switch lock, ground lock.
During work, when supervisory control system and monitor that anti-error module breaks down or when out of service, switch to state on the spot because of certain reason, by this intelligent unlocking system, realize anti mis-closedown function.The anti-misoperation locking program is arranged in Intelligent key, and the staff is in strict accordance with operation order and anti-error program release.Supervisory control system and monitor anti-error module and issue operational order by Intelligent unlocking device to Intelligent key, after Intelligent key receives operational order by Intelligent unlocking device, the operation error preventing lock, carry out the logic judgement by Intelligent key, whether meet unlocking condition, error preventing lock is carried out to release or locking.For example, when substation equipment need to overhaul, now supervisory control system and the anti-error module of monitoring are out of service, but overhaul of the equipments does not affect the normal operation of intelligent unlocking system, the staff is in strict accordance with operation order and anti-error program release, still can realize reliable anti mis-closedown function by this intelligent unlocking system, ensure fail safe, stability and the reliability of substation operation.

Claims (2)

1. monitor anti-error locking system for one kind, it is characterized in that comprising supervisory control system and monitor anti-error module, Intelligent unlocking device, Intelligent key and error preventing lock, supervisory control system and monitor corresponding joining of first signal I/O end of first signal input/output end with the Intelligent unlocking device of anti-error module wherein, the secondary signal input/output end of Intelligent unlocking device and Intelligent key corresponding joining of first signal I/O end, the secondary signal input/output end of Intelligent key and corresponding the joining of first signal I/O end of error preventing lock; Supervisory control system and monitor corresponding joining of first signal I/O end of secondary signal input/output end with the measure and control device of anti-error module, the secondary signal input/output end of measure and control device and corresponding the joining of secondary signal I/O end of error preventing lock; When supervisory control system with monitoring is anti-error breaks down or when out of service, by a set of standby anti-error system, under the state of off-line, still can realize reliable anti mis-closedown function because of certain reason.
2. monitoring anti-error locking system according to claim 1, it is characterized in that described supervisory control system and monitor corresponding joining of first signal I/O end of first signal input/output end with the Intelligent unlocking device of anti-error module, guarantee transformer station in the situation that normal operation, anti mis-closedown function is by supervisory control system or monitor anti-error module real-time online and complete, when supervisory control system or monitor that anti-error module breaks down or when out of service, by Intelligent unlocking device and Intelligent key, realize anti mis-closedown function because of other reasons.
CN201310362737.3A 2013-08-20 2013-08-20 A kind of monitoring anti-error locking system Active CN103475089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310362737.3A CN103475089B (en) 2013-08-20 2013-08-20 A kind of monitoring anti-error locking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310362737.3A CN103475089B (en) 2013-08-20 2013-08-20 A kind of monitoring anti-error locking system

Publications (2)

Publication Number Publication Date
CN103475089A true CN103475089A (en) 2013-12-25
CN103475089B CN103475089B (en) 2015-12-23

Family

ID=49799830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310362737.3A Active CN103475089B (en) 2013-08-20 2013-08-20 A kind of monitoring anti-error locking system

Country Status (1)

Country Link
CN (1) CN103475089B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110148233A (en) * 2019-04-19 2019-08-20 国网上海市电力公司 It is a kind of for unlocking the system and method for substation's error-proof device
CN113708484A (en) * 2021-07-08 2021-11-26 国网浙江省电力有限公司浦江县供电公司 Anti-misoperation unlocking management and control system and method for transformer substation equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001008366A (en) * 1999-06-23 2001-01-12 Toshiba Corp Monitoring control system
CN101206963A (en) * 2007-11-30 2008-06-25 上海市电力公司超高压输变电公司 '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN101458505A (en) * 2008-12-17 2009-06-17 国电南京自动化股份有限公司 Full-station anti-mistaking closedown design method based on IEC61850 standard
CN201773432U (en) * 2010-07-20 2011-03-23 南京胜太迪玛斯电力系统有限公司 Operation key management device
CN201789343U (en) * 2010-08-25 2011-04-06 广东电网公司电力科学研究院 Online intelligent key unlocking management device for locking misoperation monitoring and preventing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001008366A (en) * 1999-06-23 2001-01-12 Toshiba Corp Monitoring control system
CN101206963A (en) * 2007-11-30 2008-06-25 上海市电力公司超高压输变电公司 '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN101458505A (en) * 2008-12-17 2009-06-17 国电南京自动化股份有限公司 Full-station anti-mistaking closedown design method based on IEC61850 standard
CN201773432U (en) * 2010-07-20 2011-03-23 南京胜太迪玛斯电力系统有限公司 Operation key management device
CN201789343U (en) * 2010-08-25 2011-04-06 广东电网公司电力科学研究院 Online intelligent key unlocking management device for locking misoperation monitoring and preventing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110148233A (en) * 2019-04-19 2019-08-20 国网上海市电力公司 It is a kind of for unlocking the system and method for substation's error-proof device
CN113708484A (en) * 2021-07-08 2021-11-26 国网浙江省电力有限公司浦江县供电公司 Anti-misoperation unlocking management and control system and method for transformer substation equipment

Also Published As

Publication number Publication date
CN103475089B (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN205665347U (en) 10kV distribution lines broken string fault detection and positioning system based on three phase voltage electric current
CN203691057U (en) Arc online monitoring and protecting system
CN103475101A (en) Misoperation-preventive locking management system of temporary ground wire of substation
CN202475014U (en) Regional electrical network integrated five-preventing system
CN103475089B (en) A kind of monitoring anti-error locking system
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN104198951A (en) Reliability validation method of 380V mobile emergency power source of nuclear power station
CN111917179B (en) Real-time online misoperation prevention system of transformer substation based on multimode internet of things
CN106532938A (en) Monitoring system for middle-and-low-voltage power distribution network
CN203366114U (en) Relay protection and secondary loop state on-line maintenance system based on SOA
CN211958263U (en) Internet of things intelligent power box and management system
CN103475104A (en) Unlocking screen for misoperation-preventive locking system of integrated automation substation
CN203406676U (en) Scheduling anti-misoperation system
CN207304116U (en) A kind of highly integrated charger controller and charger
CN113629879B (en) Portable SV/GOOSE common-network maintenance isolation device and method
CN105048293A (en) Method for monitoring secondary pressure plate compulsory locking device and state thereof
CN104850092A (en) Lock state managing system for ground lead of disconnecting link of substation
CN109599946A (en) A kind of Efficient fault diagnostic method of power distribution automation switch
CN202353316U (en) On-line anti-misoperation device for operating station
Hao et al. Design and deployment of the redundant configuration of substation automation measurement and control equipment
CN210894521U (en) Black box testing device for measuring reliability of automatic terminal
CN205986321U (en) Haul oneself willingly into protection logic and verify device
CN104333129A (en) Microgrid area protection and control integrated device and method thereof
Xiaolong et al. Research on Integrated Smart Preventing Mal-Operation System of Intelligent Substation [J]
CN209657148U (en) A kind of fault detection means of the automatically controlled PLC input terminal of drilling well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210023, Jiangsu province Nanjing Xuanwu Avenue 699-8 Xu Zhuang Software Park, the development of a District No. 7 building, 5 floor

Patentee after: Jiangsu Shengtai Power System Co., Ltd

Address before: 210023, Jiangsu province Nanjing Xuanwu Avenue 699-8 Xu Zhuang Software Park, the development of a District No. 7 building, 5 floor

Patentee before: NANJING SHENGTAI DMS POWER SYSTEMS Co.,Ltd.