CN103470442A - 一种双速凸极同步水轮发电机组的转速选择方法 - Google Patents
一种双速凸极同步水轮发电机组的转速选择方法 Download PDFInfo
- Publication number
- CN103470442A CN103470442A CN2013104244890A CN201310424489A CN103470442A CN 103470442 A CN103470442 A CN 103470442A CN 2013104244890 A CN2013104244890 A CN 2013104244890A CN 201310424489 A CN201310424489 A CN 201310424489A CN 103470442 A CN103470442 A CN 103470442A
- Authority
- CN
- China
- Prior art keywords
- speed
- double
- generator unit
- model
- double speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000001360 synchronised effect Effects 0.000 title claims abstract description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 27
- 230000005611 electricity Effects 0.000 claims description 13
- 230000008676 import Effects 0.000 claims description 6
- 238000003062 neural network model Methods 0.000 claims description 3
- 238000013178 mathematical model Methods 0.000 claims 2
- 238000005457 optimization Methods 0.000 claims 2
- 238000004088 simulation Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 5
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 238000006424 Flood reaction Methods 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Hydraulic Turbines (AREA)
- Control Of Water Turbines (AREA)
- Control Of Eletrric Generators (AREA)
Abstract
本发明公开了一种双速凸极同步水轮发电机组的转速选择方法,即在给定转轮及水文过程的基础上,通过寻优的智能算法模型对双速凸极同步水轮发电机组的转速参数进行优选,同时制定水轮发电机组转速的切换工况,实现水轮发电机组年发电量最大。根据上述发明方法,可求得给定水文过程下双速凸极同步发电机组的最优双转速,以及转速的切换工况,实现双速凸极同步水轮发电机组年发电量最大的目标。
Description
技术领域
本发明涉及一种双速凸极同步发水轮发电机组的转速选择方法,即在给定转轮及水文过程的基础上,通过寻优的智能算法模型对双速凸极同步水轮发电机组的转速参数进行优选,同时制定水轮发电机组转速的切换工况,实现水轮发电机组年发电量最大的目标。
背景技术
当今,能源局势紧张。石油、煤炭等不可再生资源日益枯竭,使人们对可再生资源的依赖日益增加。这正是水电、风电、太阳能发电得以蓬勃发展的主要原因。而在诸多的可再生能源中,水电的经济性最优。然而,因受到技术及装备落后的影响水能资源未能得到充分的利用,尤其是水头变幅较大的电站,由于受发电机单一转速的限制,使得水轮机的适应水头范围难以涵盖电站的水头变化范围,从而在运行中不得不丢弃大量的水能,或者因为效率的影响,损失(3~10%)电能,当然,也伴随着振动、空蚀等不稳定现象,影响水力机组的寿命。
随着同步电机调速技术的发展,使得水能的进一步开发成为可能。尤其是凸极双速同步发电机变极技术,因其使用性能基本能满足水力发电的工况需求,同时具有运行可靠、制造成本低和制造工艺简单的特点,因此,其在水力发电中必将得到推广。然而,如何选择有效的两种转速以及如何选择转速切换工况,使得在给定的水文过程中取得最佳的经济效益,国内外还没有先例。因此,如何选择有效的两种转速以及如何选择转速切换工况,使得在给定的水文过程中取得最佳的经济效益是一项新技术,具有较大的经济潜力,也是目前亟待解决的问题。
发明内容
本发明的目的在于针对现有技术的不足,提供一种双速凸极同步发水轮发电机组的转速选择方法,使得在给定的水文过程中取得最佳的经济效益。
为实现上述目的,本发明提供以下技术方案:一种双速凸极同步发水轮发电机组的转速选择方法,即在给定转轮及水文过程的基础上,通过寻优的智能算法模型对双速凸极同步水轮发电机组的转速参数进行优选,同时制定水轮发电机组转速的切换工况,实现机组年发电量最大。具体包括如下步骤:
(1)将水轮机模型转轮综合特性曲线图导入数据库;
(2)建立准确地读全部运行参数并支持智能寻优的智能算法模型,通过数据训练,模型满足足够精度要求;
(3)导入发电站长年日径流量序列及水头数据;
(4)以发电机转速n为待求参数,综合步骤(3)导入的水文数据,建立以效率η为中间变量,以年发电量E最大为目标函数的优化模型。根据目标函数和安全稳定限制条件及发电机极对数约束条件的要求,采用优化算法,求得最优解
(5)根据求得的最优双速作水轮机运转特性曲线;
(6)由水轮机的运转特性曲线得出给定水头的效率曲线,从而确定发电机转速的切换点。
优选地,所述步骤(2)中所述智能算法模型采用具有自学习功能神经网络模型。
优选地,所述步骤(4)中所述目标函数要求为年发电量最大,所述限制条件包括吸出高度限制、导叶开度限制、最大出力限制、发电机极对数限制。
优选地,所述步骤(6)发电机转速的切换点以效率最大为目标进行制定。
本发明的有益效果在于,对于给定的水文过程,提供一种双速凸极同步水轮发电机组的转速选择方法,实现水轮发电机组年发电量最大的目标。
附图说明
图1为某电站水轮机在转速为500r/min下的运转特性曲线示意图。
图2为某电站水轮机在转速为600r/min下的运转特性曲线示意图。
图3为低水头运行时,不同水轮转速的水头效率曲线示意图。
图4为中水头运行时,不同水轮转速的水头效率曲线示意图。
图5为高水头运行时,不同水轮转速的水头效率曲线示意图。
具体实施方式
下面结合附图,对发明的实施方式进行详细描述。
本发明提出一种双速凸极同步发水轮发电机组的转速选择方法,即在给定转轮及水文过程的基础上,通过寻优的智能算法模型对双速凸极同步水轮发电机组的转速参数进行优选,同时制定水轮发电机组转速的切换工况,实现水轮发电机组年发电量最大。
从原理上来讲对于水头变幅大的水电站,水轮机选型往往找不到能满足水头变幅范围内性能优秀的合适水轮机模型转轮。因此在低、高水头运行时,在发电机的单一转速下,水轮机的单位转速n11会很偏高或偏低,模型的ηm很低,甚至会超出模型转轮的试验曲线范围,使得效率降低。如图1A点所示,水轮机(n=600r/min)在低水头22m运行时,出力400kw所对应的效率约77.5%,而在图2B点所示工况点,在相同水头和出力情况下,水轮机转速降至500r/min运行,效率约为85%,同比A点效率增加了7.5%。
为实现本发明所述目的,采用如下技术实现:双速凸极同步发水轮发电机组的转速选择方法通过采用神经网络模型和寻优搜索算法,根据导入的发电站长年日径流量序列及水头数据,求得最优解进而制定水轮发电机组转速的切换工况,其具体实施过程包括如下步骤:
(1)将水轮机模型转轮综合特性曲线图导入数据库;根据厂家提供的水轮机模型转轮综合特性曲线图,采集图中反映的η=η′(Q11,n11)关系曲线数据以及出力限制线数据,将采集的数据导入数据库;
(2)建立准确地读全部运行参数并支持智能寻优的智能算法模型,通过数据训练,使之能够反映和刻画水轮机的η=η′(Q11,n11)关系曲线,模型满足足够精度要求;
(3)导入发电站长年日径流量序列及水头数据;
(4)以发电机转速n为待求参数,综合步骤(3)导入的水文数据,建立以效率η为中间变量,以年发电量E最大为目标函数的优化模型。根据目标函数和安全稳定限制条件及发电机极对数约束条件的要求,采用优化算法,求得最优解
(5)根据求得的最优双速作水轮机运转特性曲线;
(6)由水轮机的运转特性曲线得出给定水头的效率曲线,从而确定发电机转速的切换点。
步骤(4)中,所述优化模型其数学表达式如下:
式中:
E为年发电量;
N(t)为t时刻出力;Nmax为最大出力;
η为水轮机效率;
H(t)为t时刻所对应水头;
Q(t)为t时刻所对应流量;
D1为转轮直径;
P为发电机极对数;
Hs为吸出高度;HaTs为水轮机容许吸出高度;
α为导叶开度;
上述约束条件s.t的第四式表示发电机极对数与调制波极对数之比应为整数,第五式表示水轮机吸出高度不大于水轮机的容许吸出高度,即满足空蚀条件,第六式表示水轮机导叶开度在允许值范围。
步骤(6)中发电机转速的切换点的确定,结合图3、4、5进行简单说明。
假定双速n(1)和n(2),n(1)<n(2)是两个备选转速。对给定的转速n(1)和n(2)作水轮机运转特性曲线。由水轮机的运转特性曲线得出给定的水头效率曲线,从而决定发电机转速的切换点。下面所述水头满足H1<H2<H3。
如图3所示,在低水头H1运行时,在功率相同的情况下,n(1)比n(2)的效率均高,而且使用流量减少,因此,在低水头时,采用低转速n(1)运行。
如图4所示,在中水头H2运行时,机组在出力N≤N1时,采用转速n=n(1)运行,在N1<N≤N2时,采用转速n=n(2)运行,当出力N>N2时,采用转速n=n(1)运行。
如图5所示,在高水头H3运行时,在功率相同的情况下,n(2)比n(1)的效率均高,而且使用流量减少,因此,在低水头时,采用低转速n(2)运行。
综上所述,本发明所涉及的一种双速凸极同步发水轮发电机组的转速选择方法,即在给定转轮及水文过程的基础上,通过寻优的智能算法模型对双速凸极同步发电机组的转速参数进行优选,同时制定水轮发电机组转速的切换工况,实现机组年发电量最大的目标。
Claims (4)
1.一种双速凸极同步水轮发电机组的转速选择方法,其特征在于,建立了水轮发电机组特征参数的选择与水文过程相结合的数学模型,通过数学模拟,求得最优双速,然后根据最优双速,以效率最优为原则,确定水轮发电机组转速的切换工况,实现机组年发电量最大,具体包括如下步骤:
(1)建立基于双速的水轮发电机组与水文过程相互作用的最优化数学模型;
(2)将水轮机模型转轮综合特性曲线图导入数据库;
(3)建立准确地读全部运行参数并支持智能寻优的智能算法模型,通过数据训练,模型满足足够精度要求;
(4)导入发电站长年日径流量序列及水头数据;
(5)以发电机转速n为待求参数,综合步骤(3)导入的水文数据,建立以效率η为中间变量,以年发电量E最大为目标函数的优化模型,根据目标函数和安全稳定限制条件及发电机极对数约束条件的要求,采用优化算法,求得最优解
(6)根据求得的最优双速作水轮机运转特性曲线;
(7)由水轮机的运转特性曲线得出给定水头的效率曲线,从而确定水轮发电机组转速的切换点。
2.如权利要求1所述的双速凸极同步水轮发电机组的转速选择方法,其特征在于,所述步骤(2)中所述智能算法模型采用具有自学习功能神经网络模型。
3.如权利要求1所述的双速凸极同步水轮发电机组的转速选择方法,其特征在于,所述步骤(4)中所述目标函数要求为年发电量最大,所述限制条件包括吸出高度限制、导叶开度限制、最大出力限制、发电机极对数限制。
4.如权利要求1所述的双速凸极同步水轮发电机组的转速选择方法,其特征在于,所述步骤(7)水轮发电机组转速的切换点以效率最大为目标进行制定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310424489.0A CN103470442B (zh) | 2013-09-17 | 2013-09-17 | 一种双速凸极同步水轮发电机组的转速选择方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310424489.0A CN103470442B (zh) | 2013-09-17 | 2013-09-17 | 一种双速凸极同步水轮发电机组的转速选择方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103470442A true CN103470442A (zh) | 2013-12-25 |
CN103470442B CN103470442B (zh) | 2016-08-03 |
Family
ID=49795441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310424489.0A Active CN103470442B (zh) | 2013-09-17 | 2013-09-17 | 一种双速凸极同步水轮发电机组的转速选择方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103470442B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106326540A (zh) * | 2016-08-19 | 2017-01-11 | 广州市恩莱吉能源科技有限公司 | 水电站水能动态模拟算法 |
WO2017181322A1 (en) * | 2016-04-18 | 2017-10-26 | Abb Schweiz Ag | A method, system and apparatus for operating a hydraulic turbine |
CN110083912A (zh) * | 2019-04-19 | 2019-08-02 | 湖南大学 | 年发电量最优的水力永磁发电机优化设计方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61164080A (ja) * | 1985-01-11 | 1986-07-24 | Hitachi Ltd | 可変速水車発電機器の運転方法 |
US4790135A (en) * | 1986-04-26 | 1988-12-13 | Kabushiki Kaisha Toshiba | Steady operation method for hydraulic machine operating at variable speed |
CN201155419Y (zh) * | 2008-01-18 | 2008-11-26 | 周泰经 | 电机变速环保型水轮机调速器 |
GB2476509A (en) * | 2009-12-24 | 2011-06-29 | Rolls Royce Plc | Turbine with reduced thrust coefficient at excessive speed |
CN102705151A (zh) * | 2012-06-28 | 2012-10-03 | 谢宝忠 | 一种水轮机组变速运行方法及系统 |
-
2013
- 2013-09-17 CN CN201310424489.0A patent/CN103470442B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61164080A (ja) * | 1985-01-11 | 1986-07-24 | Hitachi Ltd | 可変速水車発電機器の運転方法 |
US4790135A (en) * | 1986-04-26 | 1988-12-13 | Kabushiki Kaisha Toshiba | Steady operation method for hydraulic machine operating at variable speed |
CN201155419Y (zh) * | 2008-01-18 | 2008-11-26 | 周泰经 | 电机变速环保型水轮机调速器 |
GB2476509A (en) * | 2009-12-24 | 2011-06-29 | Rolls Royce Plc | Turbine with reduced thrust coefficient at excessive speed |
CN102705151A (zh) * | 2012-06-28 | 2012-10-03 | 谢宝忠 | 一种水轮机组变速运行方法及系统 |
Non-Patent Citations (2)
Title |
---|
李朗如 等: "变极凸极同步电机转子变极方式的分析", 《华中工学院学报》 * |
许实章: "能自起动的抽水蓄能电站用双速同步发电-电动机,第一部分--原理", 《中国电机工程学报》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017181322A1 (en) * | 2016-04-18 | 2017-10-26 | Abb Schweiz Ag | A method, system and apparatus for operating a hydraulic turbine |
US10941750B2 (en) | 2016-04-18 | 2021-03-09 | Abb Schweiz Ag | Method, system and apparatus for operating a hydraulic turbine |
CN106326540A (zh) * | 2016-08-19 | 2017-01-11 | 广州市恩莱吉能源科技有限公司 | 水电站水能动态模拟算法 |
CN110083912A (zh) * | 2019-04-19 | 2019-08-02 | 湖南大学 | 年发电量最优的水力永磁发电机优化设计方法 |
CN110083912B (zh) * | 2019-04-19 | 2023-05-26 | 湖南大学 | 年发电量最优的水力永磁发电机优化设计方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103470442B (zh) | 2016-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Delmonte et al. | Review of oscillating water column converters | |
CN103306886B (zh) | 一种水轮发电机组的全参数调节控制方法 | |
CN204626355U (zh) | 排水蓄能电站 | |
Muljadi et al. | Review of marine hydrokinetic power generation and power plant | |
Muyeen | Wind power | |
Tzen | Wind-powered desalination—principles, configurations, design, and implementation | |
CN103470442A (zh) | 一种双速凸极同步水轮发电机组的转速选择方法 | |
Weliwaththage et al. | The review of innovation in renewable energy sector in the world | |
Ehsan et al. | A proposal of implementation of ducted wind turbine integrated with solar system for reliable power generation in Bangladesh | |
Eminoglu | A new model for output power calculation of variable-speed wind turbine systems | |
CN106326540B (zh) | 水电站水能动态模拟算法 | |
CN104037806B (zh) | 一种基于风力发电机组基本模型的电力系统潮流计算方法 | |
Qian et al. | Improve wind energy penetration in an isolated power system by a stand-alone wind pumped storage hydropower plant | |
CN103644067A (zh) | 一种螺旋叶竖轴潮流水轮机 | |
CN206368767U (zh) | 多轴同心叶片自锁式涡轮机 | |
Saket et al. | Reliability evaluation of micro hydro-photo-voltaic hybrid power generation using municipal waste water | |
Gao et al. | Harnessing hydroelectric power using Savonius rotor coupled with asynchronous generator connected to grid | |
CN202121390U (zh) | 海浪发电机 | |
CN112769159B (zh) | 多能源联合发电系统 | |
Bhuyan et al. | Design of a Pelton Turbine using SOLIDWORKS for Ocean Wave Energy Harvesting in MATLAB Simulink | |
Eme et al. | Addendum of 2MW Wind Turbine to A Power with Directly-Driven Permanent Magnet Generation System | |
CN106401838A (zh) | 多轴同心叶片自锁式涡轮机 | |
Kusakana et al. | Simulation and Implementation of Micro Hydro Generation for Small Rural Loads | |
Akinyemi | Assesment of renewable energy resources and the impact of DG on power quality in distribution network | |
Mo et al. | The Selection of Operating Mode of Synchronous Motor when Pump Station is Used as Power Generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160830 Address after: Baoan District Xin'an street Shenzhen city Guangdong province 518000 Liu Xian two road (Longchang Road 10) Yeyuan Feng Industrial Area B1, B2 building B2 5 storey building 501, room 506 Patentee after: SHENZHEN ENLAIJI ENERGY TECHNOLOGY CO., LTD. Address before: 510635 room 8, building 1, 303 straight Zhanyi street, Tianhe District, Guangdong, Guangzhou Patentee before: Zheng Chengyao |