A kind of floor assemble method
Technical field
The present invention relates to floor assemble method.
Background technology
Each floor of splicing in prior art all needs setscrew to fix, and installs fixing complicated; In addition, do not arrange corresponding Edge-sealing assembly after floor splicing in prior art, slab integral is firm not in this wise.
Summary of the invention
Technical problem to be solved by this invention is just to provide a kind of floor assemble method, facilitates the installation on floor to fix, and guarantees the firmness of ground slab integral simultaneously.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: a kind of floor assemble method, this floor comprises and is arranged in parallel within several strip floor holders ground, described floor holder is equipped with some floor bodies side by side, described floor body and floor holder square crossing are arranged, holder end, described floor is provided with edge sealing hook fixed floor body, described floor holder is provided with floor fastener fixed floor body between two adjacent floor bodies, rear end, floor connects with body of wall, the left and right sides, floor is provided with edge sealing, ground front edge of board is sealed by some adjacent end to end end sockets, it is characterized in that the assemble method on this floor comprises the steps:
Step 1, lays a row floor holder on the ground;
Step 2, fixes edge sealing hook at floor holder one side;
Step 3, links up with fixing by first row floor body and edge sealing;
Step 4, floor holder is fixed floor fastener inside first row floor body, and floor body is fixed with floor fastener simultaneously;
Step 5, by secondary series floor body with fix with floor fastener;
Step 6, according to step 4 and 5 mode installing floor board fastener and floor body successively, and last row floor body reserved;
Step 7, fixes edge sealing hook at another side of floor holder;
Step 8, installs last row floor body, first fixes inside floor body with floor fastener;
Step 9, by last row floor body depress, outside floor body with and edge sealing link up with fix;
Step 10, prepares to install end socket and edge sealing;
Step 11, installs end socket and edge sealing.
Preferably, holder bottom surface, described floor and end face are provided with isosceles trapezoid groove along its length, and described isosceles trapezoid trench bottom is provided with V-shaped groove.
Preferably, described floor body two sides are provided with the rectangular groove of cross section, and described groove floor and end face are provided with semicircular catching groove, and described floor body is provided with the through grid groove of a row in the width direction.
Preferably, described edge sealing hook comprises the L-shaped hanger bulk of cross section, hook fixing hole is provided with bottom described hanger bulk, the V-arrangement that described hanger bulk side top is provided with reflexed to the inside buckles, wherein, V-arrangement buckle be snapped in floor body two sides groove in, setscrew through hook fixing hole be fixed on bottom the holder V-shaped groove of floor.
Preferably, described floor fastener comprises the fastener body of strip, both sides are projecting to the left and right along its length clip and clinching for described fastener body, described clip is positioned at bottom fastener body to be fixed with floor holder, described clinching is positioned at fastener body top and is snapped in the groove of floor body two sides, and described clip is corresponding with clinching is arranged on the fastener body left and right sides;
Preferably, described clip is rectangle, and clip center is provided with clip fixing hole, and setscrew is fixed on bottom the holder V-shaped groove of floor through clip fixing hole.
Preferably, described clinching cross section is V-arrangement, and V-arrangement bottom surface is fastened in the holder V-shaped groove of floor.
Preferably, described edge sealing comprises the edge sealing body of strip, and described edge sealing body side broad side surface is provided with the L-shaped cutting of cross section, and described cutting is inserted in the groove of floor body two sides.
Preferably, described cutting oral area is provided with chimb, and described chimb is snapped in the catching groove of groove floor.
Preferably, described edge sealing body end face and bottom surface are provided with chamfering inclined-plane back to cutting side.
The present invention is provided with edge sealing hook fixed floor body in holder end, floor, floor holder is provided with floor fastener fixed floor body between two adjacent floor bodies simultaneously, by less fixation kit, floor can be fixed like this, the installation facilitating floor is fixed, in addition, owing to carrying out edge sealing with the floor edge assembly that end socket and edge sealing form to floor edge simultaneously, thus guarantee the firmness of ground slab integral.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the invention will be further described:
Fig. 1 is floor holder perspective view;
Fig. 2 is floor holder end face structure schematic diagram;
Fig. 3 is the floor body structural representation on composition floor;
Fig. 4 is the floor body end face structure schematic diagram on composition floor;
Fig. 5 is edge sealing hook structure schematic diagram;
Fig. 6 is floor fastener structural representation;
Fig. 7 is end enclosure structure schematic diagram;
Fig. 8 is edge sealing structure schematic diagram;
Fig. 9 is edge sealing end face structure schematic diagram;
Figure 10 is floor number of assembling steps 1 schematic diagram;
Figure 11 is floor number of assembling steps 2 schematic diagram;
Figure 12 is floor number of assembling steps 3 schematic diagram;
Figure 13 is floor number of assembling steps 4 schematic diagram;
Figure 14 is floor number of assembling steps 5 schematic diagram;
Figure 15 is floor number of assembling steps 6 schematic diagram;
Figure 16 is floor number of assembling steps 7 schematic diagram;
Figure 17 is floor number of assembling steps 8 schematic diagram;
Figure 18 is floor number of assembling steps 9 schematic diagram;
Figure 19 is floor number of assembling steps 10 schematic diagram;
Figure 20 is floor number of assembling steps 11 schematic diagram.
Detailed description of the invention
Composition graphs 1 to Figure 20 illustrates the laying structure on floor 4: floor 4 is spliced by some floor bodies 40 and formed, on ground, parallel shows several strip floor holders 5, some floor bodies 40 are layed on floor holder 5 side by side, and described floor body and floor holder square crossing are arranged.Holder 5 end, described floor is provided with edge sealing and links up with 1 fixed floor body, described floor holder is provided with floor fastener 3 fixed floor body between two adjacent floor bodies, rear end, floor connects with body of wall 9, the left and right sides, floor is provided with edge sealing 6, and ground front edge of board is sealed by some adjacent end to end end sockets 7.
Floor body end face is provided with anti-slip tank 43, and described floor body two sides are provided with the rectangular groove of cross section 41, and described groove 41 bottom surface and end face are provided with semicircular catching groove 42.Floor body inside is provided with through grid groove.Described floor holder 5 comprises floor holder body 50, and floor holder 5 bottom surface and end face are provided with isosceles trapezoid groove 52 along its length, and described isosceles trapezoid trench bottom is provided with V-shaped groove 53.Two rectangular channels 51 are arranged side by side in the holder of floor.
The fixed structure at edge, floor 4 is: be provided with edge sealing in floor holder 5 end and link up with 1 fixed floor body 40, described edge sealing hook 1 comprises the L-shaped hanger bulk of cross section 10, hook fixing hole 12 is provided with bottom described hanger bulk 10, the V-arrangement that described hanger bulk side top is provided with reflexed to the inside buckles 11, wherein, V-arrangement buckles 11 and is snapped in the groove 41 of floor body two sides, and V-arrangement bottom surface is snapped in the catching groove 42 of bottom portion of groove, setscrew 2 is fixed on bottom the V-shaped groove 53 of floor holder through hook fixing hole 12.
Floor edge modular construction is: Edge-sealing assembly is made up of end socket 7 and edge sealing 6, and described end socket 7 comprises the end socket main body 70 of rectangular slat shape, which is provided with the plug inserting floor 4, and described edge sealing 6 is provided with the cutting 61 of inserting floor 4.Described edge sealing 6 comprises the edge sealing body 60 of strip, and described edge sealing body 60 side broad side surface is provided with the L-shaped cutting of cross section 61.Described cutting 61 oral area is provided with chimb 63.Described edge sealing body end face and bottom surface are provided with chamfering inclined-plane 62 back to cutting side.Described plug comprise end, end socket two ends in pairs and in the middle part of the convex shape plug 72 be set up in parallel up and down and plug in pairs and be set up in parallel up and down some to cuboid plug 71.
Fixed structure between adjacent two floor bodies 40 is: floor holder 5 is provided with floor fastener 3 fixed floor body 40 between two adjacent floor bodies.Floor fastener 3 comprises the fastener body 30 of rectangular strip, both sides are projecting to the left and right along its length clip 31 and clinching 32 for described fastener body 30, described clip 31 is positioned at bottom fastener body 30, described clinching 32 is positioned at fastener body 30 top, and described clip 31 is corresponding with clinching 32 is arranged on fastener body 30 left and right sides.Described clip 31 is rectangle, and clip center is provided with clip fixing hole 33.Described clinching 32 cross section is V-arrangement.Setscrew 2 is fixed on bottom the V-shaped groove 53 of floor holder through clip fixing hole 33, and clinching is snapped in the groove 41 of floor body two sides, and its V-arrangement bottom surface is fastened in catching groove 42.
Below in conjunction with Figure 10 to Figure 20, the assemble method on floor in the present invention 4 is explained:
Step 1, lays a row floor holder on the ground;
Step 2, fixes edge sealing hook at floor holder one side;
Step 3, links up with fixing by first row floor body and edge sealing;
Step 4, floor holder is fixed floor fastener inside first row floor body, and floor body is fixed with floor fastener simultaneously;
Step 5, by secondary series floor body with fix with floor fastener;
Step 6, according to step 4 and 5 mode installing floor board fastener and floor body successively, and last row floor body reserved;
Step 7, fixes edge sealing hook at another side of floor holder;
Step 8, installs last row floor body, first fixes inside floor body with floor fastener;
Step 9, by last row floor body depress, outside floor body with and edge sealing link up with fix;
Step 10, prepares to install end socket and edge sealing;
Step 11, installs end socket and edge sealing.