CN103469067A - Production method of precise and long-service mold steel - Google Patents

Production method of precise and long-service mold steel Download PDF

Info

Publication number
CN103469067A
CN103469067A CN 201310426850 CN201310426850A CN103469067A CN 103469067 A CN103469067 A CN 103469067A CN 201310426850 CN201310426850 CN 201310426850 CN 201310426850 A CN201310426850 A CN 201310426850A CN 103469067 A CN103469067 A CN 103469067A
Authority
CN
China
Prior art keywords
production method
steel
service
long
esr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201310426850
Other languages
Chinese (zh)
Inventor
马严俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201310426850 priority Critical patent/CN103469067A/en
Publication of CN103469067A publication Critical patent/CN103469067A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forging (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The invention discloses a production method of precise and long-service mold steel. The production method comprises the following steps: taking waste steel materials, smelting in an electric-arc furnace, testing, casting a steel ingot, carrying heat treatment, remelting electroslags, ingoting the electroslags, slowly cooling, annealing, sawing, heating, forging, obtaining a module of the mold steel, carrying out heat treatment and obtaining a finished product. The production method disclosed by the invention has the advantages that 2-3 types of new materials for the mold with precision, complexity and long service and a novel surface hardening technology with high wear resistance and corrosion resistance are created, and the service life can be prolonged by one time.

Description

The production method of accurate long-service die steel
Technical field
The present invention relates to a kind of production method of accurate complex long-service die steel.
Background technology
Modern industry, mould is leading.The height of mould industry level has become one of important symbol of weighing national production level.This target product is precision, complexity, long-life high-end moulding stock and goods thereof.Be mainly used in high-performance hammer forging die, high speed machine forging die, transfer mold, cold hot extrusion mould, punching die, drawing die, high-sped progressive die and all kinds of anti-corrosion, wear-resistant, minute surface injection mould etc.
Mould-forming process is as boosting productivity, and reduces material and consumption, reduces product cost, improves the quality of products and the important means of competitive power, more and more is subject to the attention of each industrial sector.Approximately 70,000,000,000 dollars of mould industry annual value of production in the world at present.China's mould output value in 2007 surpasses 80,000,000,000 yuan, become continue U.S., day after the third-largest die production state, but the while China be also the country of net importation mould maximum, particularly accurate complex long-service die steel, almost completely dependence on import in the world.
Summary of the invention
The deficiency of manufacturing for precision, complexity, long lifetime, high-end injection mold, cold-work die and hot-work die, the object of the present invention is to provide a kind of production method of accurate long-service die steel, it is the method that adopts moulding stock general character basic technology, mould fabrication of new materials and material engineering platform construction to combine, production application mould novel material and change the moulding stock technological process of production and the processing quality control techniques, make the moulding stock quality reach pure, even, structure refinement and die size is refined and the purpose of high-performance and low-cost.
Technical scheme of the present invention is achieved in the following ways: the production method of accurate long-service die steel comprises the following steps: scrap iron and steel material → electric arc furnace smelting → chemical examination → teeming → thermal treatment → esr → ESR ingot → slow cooling → annealing → sawing → heat → forge → die steel module → thermal treatment → finished product.
Described electric arc furnace smelting is: get C1.0 ± 0.1%, Si 0.85 ± 0.1%, Mn 1.0 ± 0.1%, Mo 4.0 ± 0.1%, W 1.6 ± 0.1%, V 1.95 ± 0.1%, P≤0.023%, S≤0.003%, all the other are iron; Be molten into molten steel successively in the intermediate frequency smelting furnace;
Described esr is: enter refining period after the chemical composition of molten steel is qualified, the time, refining temperature was at 1580 ℃ at 20-25 minutes--and 1600 ℃;
The present invention, formulate out 2~3 kinds of accurate complex long-service die use novel materials and novel high wear-resistant, anti-corrosion surface hardening technology.Can double work-ing life.
Embodiment
Embodiment 1:
The production method of accurate long-service die steel, comprise the following steps: scrap iron and steel material → electric arc furnace smelting → chemical examination → teeming → thermal treatment → esr → ESR ingot → slow cooling → annealing → sawing → heat → forge → die steel module → thermal treatment → finished product.Electric arc furnace smelting is: get C1.0 ± 0.1%, Si 0.85 ± 0.1%, Mn 1.0 ± 0.1%, Mo 4.0 ± 0.1%, W 1.6 ± 0.1%, V 1.95 ± 0.1%, P≤0.023%, S≤0.003%, all the other are iron; Be molten into molten steel successively in the intermediate frequency smelting furnace; Esr is: enter refining period after the chemical composition of molten steel is qualified, the time, refining temperature was at 1580 ℃ at 20-25 minutes--and 1600 ℃;
Embodiment 2:
The production method of accurate long-service die steel, comprise the following steps: just refine → LF of scrap iron and steel material → EBF refining → VD vacuum deaeration → chemical examination → cast molding → electroslag moulding → (ingot casting thermal treatment) → Heating Steel Ingots → forging → forging postheat treatment → annealing → semi-finishing → module carrying out flaw detection → thermal treatment → machining → finished product.

Claims (3)

1. the production method of accurate long-service die steel comprises the following steps: it is characterized in that:
Scrap iron and steel material → electric arc furnace smelting → chemical examination → teeming → thermal treatment → esr → ESR ingot → slow cooling → annealing → sawing → heat → forge → die steel module → thermal treatment → finished product.
2. the production method of accurate long-service die steel according to claim 1, it is characterized in that: described electric arc furnace smelting is: get C1.0 ± 0.1%, Si 0.85 ± 0.1%, Mn 1.0 ± 0.1%, Mo 4.0 ± 0.1%, W 1.6 ± 0.1%, V 1.95 ± 0.1%, P≤0.023%, S≤0.003%, all the other are iron; Be molten into molten steel successively in the intermediate frequency smelting furnace.
3. the production method of accurate long-service die steel according to claim 1, it is characterized in that: described esr is: enter refining period after the chemical composition of molten steel is qualified, the time, refining temperature was at 1580 ℃ at 20-25 minutes--and 1600 ℃.
CN 201310426850 2013-09-18 2013-09-18 Production method of precise and long-service mold steel Pending CN103469067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201310426850 CN103469067A (en) 2013-09-18 2013-09-18 Production method of precise and long-service mold steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201310426850 CN103469067A (en) 2013-09-18 2013-09-18 Production method of precise and long-service mold steel

Publications (1)

Publication Number Publication Date
CN103469067A true CN103469067A (en) 2013-12-25

Family

ID=49794104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201310426850 Pending CN103469067A (en) 2013-09-18 2013-09-18 Production method of precise and long-service mold steel

Country Status (1)

Country Link
CN (1) CN103469067A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560563A (en) * 2020-06-02 2020-08-21 舞阳钢铁有限责任公司 Production method of electroslag type hot-working die steel plate
CN111647713A (en) * 2020-04-29 2020-09-11 樟树市兴隆高新材料有限公司 Electroslag treatment system for die steel production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111647713A (en) * 2020-04-29 2020-09-11 樟树市兴隆高新材料有限公司 Electroslag treatment system for die steel production
CN111560563A (en) * 2020-06-02 2020-08-21 舞阳钢铁有限责任公司 Production method of electroslag type hot-working die steel plate

Similar Documents

Publication Publication Date Title
CN103014534B (en) Cast hot work die steel and processing method thereof
CN103898415B (en) A kind of modified version Cr8 Steel Roll and preparation method thereof
CN103397267A (en) Cold roll for rolling lithium battery guard plate and manufacturing method thereof
CN103981451B (en) Hot-rolled tempering type Mo-free plastic die steel plate and manufacturing method thereof
CN104178694A (en) Long-service life hot work die steel
CN105112802B (en) A kind of method for preparing wear-resistant plastic mould
CN101967608A (en) Nitrogen-containing corrosion-resistance plastic die steel and preparation process thereof
CN109468544B (en) High-carbon high-chromium cold-work die steel and preparation method thereof
CN103834872A (en) Die steel with high-wearing resistance
CN104745954A (en) Alloy steel and manufacturing method thereof
CN104611642A (en) Production method of NAK80 high-grade mirror surface plastic rubber mold material for mobile phone mold
CN104131202A (en) Short-process preparation method for 6061aluminum alloy die forging
CN103469067A (en) Production method of precise and long-service mold steel
KR101250852B1 (en) Beryllium-cooper alloy plunger tip of die-casting machine and manufacturing method thereof
CN108165831A (en) A kind of high temperature alloy dummy block and preparation method thereof
CN104152809B (en) A kind of alloy plug
CN104646955A (en) Method for preparing 20CrNi4 piercing plug
CN102909527A (en) Technological process for performing continuous casting-rolling formation on 42CrMo steel ring piece
CN104637640A (en) Processing technology of iron-chromium-aluminum resistance wire
CN103741071A (en) Die steel and preparation method thereof
CN105220056A (en) A kind of manufacture method of mould for plastics
CN103602926A (en) Stainless steel, stainless steel tool, and manufacturing method of the stainless steel tool
CN110819862A (en) Manufacturing process of magnesium alloy motor shell
CN107523762A (en) Die steel material and manufacturing process thereof
CN103614591A (en) Copper material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131225