The rare earth feed liquid metering and conveying device of rare-earth extracting tank
Technical field
The invention belongs to the accessory technical field of rare earth extraction device, be specifically related to a kind of rare earth feed liquid metering and conveying device of rare-earth extracting tank, be arranged on the outer wall of rare-earth extracting tank, for the material by after the extraction of previous stage extraction tank, introduce the extraction of next stage extraction tank.
Background technology
The e Foerderanlage of in prior art, the material of previous stage extraction tank extraction being introduced to next stage extraction tank continuation extraction consists of header tank, magnetic drive pump and tediously long pipeline, during use, first the material of previous stage extraction tank extraction is introduced to header tank, more by the road the material in header tank is introduced to extraction tank under the state of controlling flow under the work of magnetic drive pump.Although this structure can meet the conveying requirement of the material between extraction tank, there is following shortcoming: one, used device is many, causes Rare Earth Production vendor equipment acquisition cost to increase; Its two, because needs take the space, production scene, thereby not abundant situation often is difficult to reasonable disposition for the production plant space; Its three, maintenance of the equipment trouble and maintenance cost are large; Its four, because there is higher Leakage probability in tediously long pipeline, thereby not only investigate time-consumingly, and easily cause the material waste.
For above-mentioned prior art, the applicant has done lasting exploration, finally finds a way to resolve the problem, and is taking the production plant in the applicant plant area under the secrecy provision to carry out simulation test, and Bearing performance has gone out beyond thought technique effect.
Summary of the invention
Task of the present invention is to provide a kind of and contributes to significantly to save the equipment purchasing cost, be conducive to avoid taking site space, be of value to and facilitate operation and maintenance and the rare earth feed liquid metering and conveying device of being convenient to significantly to reduce Leakage probability and avoiding the rare-earth extracting tank of material waste is arranged.
Task of the present invention completes like this, a kind of rare earth feed liquid metering and conveying device of rare-earth extracting tank, described rare-earth extracting tank comprises the extraction tank cell body, described rare earth feed liquid e Foerderanlage comprises a batch meter, this batch meter is followed in described extraction tank cell body, be provided with a blow-down pipe communicated with the batch meter chamber of batch meter at the top of this batch meter, offer a material outlet communicated with the batch meter chamber in the bottom of batch meter, on corresponding to this material outlet and be positioned at outside the batch meter chamber and connected a material fairlead, be equipped with liquid-outlet valve on the pipeline of this material fairlead, under batch meter use state, a side outward forms a transparent window, short transverse at this transparent window is provided with the metering scale mark, one material inlet tube, one end of this material inlet tube is fixedly connected with the top of described batch meter and communicates with the batch meter chamber, and the other end of material inlet tube is fixedly connected with described extraction tank cell body, and communicate with the cell body chamber of extraction tank cell body, wherein, be equipped with the feed control valve on the pipeline of material inlet tube, one material output tube and a upflow tube, one end of upflow tube is fixedly connected with the top of batch meter and communicates with the batch meter chamber, and the other end is connected with an end of material output tube, the other end of material output tube is connected with adjacent rare-earth extracting tank, and described material fairlead is connected with the material output tube.
In a specific embodiment of the present invention, also be provided with check valve on the pipeline of described material inlet tube, the position of this check valve on the pipeline of material inlet tube is between described feed control valve and extraction tank cell body.
In another specific embodiment of the present invention, described metering scale mark is the gage mark that is upgraded to measure unit.
Technical scheme provided by the invention has following technique effect with respect to prior art: one, due to the device without using header tank and magnetic drive pump and so on, thereby can significantly save the equipment purchasing cost of Rare Earth Production manufacturer; Its two, due to the batch meter small volume, thereby can not take the space of Workplace; Its three, due to terminal with compact integral structure, thereby both contributed to convenient the use, be conducive to again safeguard; Its four, owing to without resembling prior art, using tediously long pipeline, thereby can avoid leaking and prevent the material waste.
The accompanying drawing explanation
Fig. 1 is the embodiments of the invention structure iron.
Embodiment
Refer to Fig. 1, provided the extraction tank cell body 1 as the structural system of rare-earth extracting tank, on extraction tank cell body 1 and be provided with the cell body viewing window 11 of the endoceliac material situation of groove for observing extraction tank cell body 1 along the short transverse of extraction tank cell body 1.
Batch meter 2, material inlet tube 3, material output tube 4 and the upflow tube 5 of the structural system that belongs to the rare earth feed liquid metering and conveying device have been provided, batch meter 2 is followed in extraction tank cell body 1, why title is followed, and is because batch meter 2 is positioned between material inlet tube 3, material output tube 4 and upflow tube 5.Be equipped with one at the top of batch meter 2 and be driven to extraneous blow-down pipe 22 for the air in the batch meter chamber 21 by batch meter 2, offer a material outlet 23 that draw for the material by batch meter chamber 21 and that communicate with batch meter chamber 21 in the bottom of batch meter 2, on corresponding to this material outlet 23 and be positioned at outside batch meter chamber 21 and connected a material fairlead 24, be connected in series with a liquid-outlet valve 241 on the pipeline of this material fairlead 24, form a transparent window 25 is arranged in batch meter 2 side outward under the use state, short transverse at this transparent window 25 is provided with metering scale mark 251, metering scale mark 251 is the gage marks that are upgraded to measure unit.One end of material inlet tube 3 is that the left end of location status shown in Fig. 1 is fixedly connected with the top on the right side of batch meter 2, and communicate with batch meter chamber 21, and the other end of material inlet tube 3 (right-hand member) is fixedly connected with extraction tank cell body 1, and communicate with the cell body chamber of extraction tank cell body 1, be equipped with a feed control valve 31 on the pipeline of this material inlet tube 3.One end (upper end) of upflow tube 5 is fixed with the top in the left side of batch meter 2 and communicates with batch meter chamber 21, and the other end (lower end) is connected with an end (diagram left end) of material output tube 4, the other end of material output tube 4 (diagram right-hand member) and adjacent being connected with the next stage rare-earth extracting tank.Aforesaid material fairlead 24 is connected with material output tube 4.
Preferably, connected a check valve 32 on the pipeline of aforesaid material inlet tube 3, this check valve 32 position on the pipeline of material inlet tube 3 is between feed control valve 31 and extraction tank cell body 1.
Before using the present invention, at first batch meter 2 is measured to adjusting, specifically: first close liquid-outlet valve 241, and open feed control valve 31, by material inlet tube 3 to batch meter chamber 21 interior introducing material, when material reaches predetermined metering scale mark for example when 2 liters (2L), close again feed control valve 31, then open liquid-outlet valve 241 and adjust the opening degree of liquid-outlet valve 241 according to processing requirement, with the measuring unit time that in the time, for example the 2L material in batch meter chamber 21 flows to end, thereby flow and the desired flow of technique of determining per minute match, finally open again feed control valve 31, enter into the interior material in batch meter chamber 21 successively through opened condition and liquid-outlet valve 241 that opening degree has been set up, material fairlead 24 and material output tube 4, by material output tube 4, material is introduced to the next stage rare-earth extracting tank and continue extraction.When the material liquid level in batch meter chamber 21 is too high, by upflow tube 5, overflow to material output tube 4.
Above-mentioned explanation by the applicant is known, and technical scheme provided by the invention has made up the shortcoming in the prior art dexterously, has successfully completed the invention task, has cashed the described technique effect of applicant fully, thereby to can yet be regarded as be a ultimate attainment technical scheme.