CN103465067B - A kind of process industry robot integrated fixture of double - Google Patents
A kind of process industry robot integrated fixture of double Download PDFInfo
- Publication number
- CN103465067B CN103465067B CN201310390733.6A CN201310390733A CN103465067B CN 103465067 B CN103465067 B CN 103465067B CN 201310390733 A CN201310390733 A CN 201310390733A CN 103465067 B CN103465067 B CN 103465067B
- Authority
- CN
- China
- Prior art keywords
- fixture
- fixed plate
- screw
- assembled
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jigs For Machine Tools (AREA)
- Automatic Assembly (AREA)
Abstract
本发明提供一种制造工业机器人用双工位整合式夹具,通过采用本发明的制造工业机器人用双工位整合式夹具,在不改变加工机床的情况下,使刀具缩短,提高加工速度。把产品的两个工序都整合到一个夹具的两个不同工位上,两个工序加工时间相近,不会导致停机去装夹产品的问题,机床利用率得到很大的提高。
The invention provides a double-station integrated fixture for manufacturing industrial robots. By adopting the double-station integrated fixture for manufacturing industrial robots of the present invention, the cutting tool is shortened and the processing speed is increased without changing the processing machine tool. The two processes of the product are integrated into two different stations of a fixture, and the processing time of the two processes is similar, which will not cause the problem of stopping the product to clamp the product, and the utilization rate of the machine tool has been greatly improved.
Description
技术领域 technical field
本发明涉及机械零件在卧式加工中应用的夹具,具体来说涉及用于在卧式加工中心上加工注塑机零件固定板时使用的夹具。 The invention relates to a fixture used in horizontal machining of mechanical parts, in particular to a fixture used for processing a fixed plate of an injection molding machine part on a horizontal machining center.
背景技术 Background technique
目前,在加工注塑机零件固定板时选用双工位的卧式加工中心。固定板有六个面,采用卧式加工中心对这六个面进行加工。如图3和图4所示,对固定板进行三维定向,横向为X向,纵向为Y向,入纸方向为Z向,固定板上在加工时涉及夹具夹持定位参考的部分包括底脚基准面A14、装配底面A15、Z向定位面A16、定位基准面A17、X向粗基准A18、X向精基准A19、装配底面B20、Z向基准面B21、Z向基准面A22、Y向基准面A23、X向粗基准B24、Z向基准面B25、Y向基准面B26、定位基准面B27、Z向基准面C28。 At present, when processing the fixed plate of injection molding machine parts, a double-station horizontal machining center is selected. The fixed plate has six faces, which are processed by a horizontal machining center. As shown in Figure 3 and Figure 4, the fixed plate is three-dimensionally oriented, the horizontal direction is X direction, the vertical direction is Y direction, and the paper feeding direction is Z direction. The part of the fixed plate that involves fixture clamping and positioning reference during processing includes the foot Reference surface A14, assembly bottom surface A15, Z-direction positioning surface A16, positioning reference surface A17, X-direction rough reference A18, X-direction fine reference A19, assembly bottom surface B20, Z-direction reference surface B21, Z-direction reference surface A22, Y-direction reference Surface A23, X-direction coarse reference B24, Z-direction reference surface B25, Y-direction reference surface B26, positioning reference surface B27, Z-direction reference surface C28.
在现有的加工过程中采用了两个工序,需两个分开的夹具,分别装夹在加工中心的两个工位的工作台上,如图5和图6所示。第一工序加工时候操作人员在另一工位上装夹二工序,由于一工序加工时间较短,二工序时间长。这样就导致二工序的装夹时间不够,出现机床停止加工等待装夹好后才能转到主轴一边去加工。这样就使机床的利用率降低,增加生产成本。另外夹具配件使用钢件加工焊接装配而成。钢件焊接和螺钉装配的夹具结构会出现变形或装配位置偏移,结构强度不高,焊接后有内部应力等现象。再有固定板在加工二工序时候产品有4个面需要加工,产品放在工作台的中心位置这样加工刀具偏长,导致加工速度慢,振刀精度尺寸不稳定。 In the existing processing process, two processes are adopted, and two separate fixtures are required, which are respectively clamped on the workbenches of the two stations of the machining center, as shown in Fig. 5 and Fig. 6 . During the processing of the first process, the operator clamps the second process at another station. Since the processing time of the first process is relatively short, the time of the second process is long. This leads to insufficient clamping time for the second process, and the machine tool stops processing and waits for the clamping to be turned to the side of the spindle for processing. This reduces the utilization rate of machine tools and increases production costs. In addition, the fixture accessories are assembled by processing and welding steel parts. The fixture structure of steel welding and screw assembly will be deformed or the assembly position will be shifted, the structural strength is not high, and there will be internal stress after welding. In addition, when the fixed plate is processed in the second process, there are 4 sides of the product that need to be processed. The product is placed in the center of the workbench so that the processing tool is too long, resulting in slow processing speed and unstable dimension of vibration tool accuracy.
发明内容 Contents of the invention
为了克服目前加工中出现的机床利用率不高,刀具偏长,加工速度慢,尺寸不稳定的不足,本发明提供了一种用于双工位卧式加工中心的夹具来加工注塑机零件固定板,这种夹具不仅能让机床使用效率提高,而且还能保证高速大吃刀量加工,并且产品的精度和品质得到保证。 In order to overcome the shortcomings of low utilization rate of machine tool, long tool, slow processing speed and unstable size in the current processing, the present invention provides a fixture for double-station horizontal machining center to process and fix parts of injection molding machine Plate, this kind of fixture can not only improve the efficiency of the machine tool, but also ensure high-speed and large-scale machining, and the accuracy and quality of the product are guaranteed.
本发明解决其技术问题所采用的技术方案是:加工机床不变,对固定板的加工工艺进行调整,调整后每个工序都只加工3个面上的尺寸。这样产品就可以不装在工作台的中心,产品需加工面在机床行程范围内尽量靠近主轴,使刀具缩短,提高加工速度。把产品的两个工序都整合到一个夹具的两个不同工位上,这样就不会出现两个工序加工时间不同导致停机去装夹产品的问题。经过这样的调整,机床的两个工作台可以分别做两种加工时间和装夹时间相近的产品,提高机床利用率。 The technical scheme adopted by the present invention to solve the technical problem is: the processing machine tool remains unchanged, the processing technology of the fixed plate is adjusted, and after the adjustment, each process only processes the dimensions on three surfaces. In this way, the product can not be installed in the center of the workbench, and the product needs to be processed as close as possible to the main shaft within the travel range of the machine tool, so that the cutting tool can be shortened and the processing speed can be increased. Integrate the two processes of the product into two different stations of a fixture, so that there will be no problem that the processing time of the two processes is different, causing the machine to stop to clamp the product. After such adjustment, the two worktables of the machine tool can respectively make two kinds of products with similar processing time and clamping time, which improves the utilization rate of the machine tool.
这种调整是通过利用本发明的制造工业机器人用双工位整合式夹具来实现的,具体来说,本发明采用的方案为: This adjustment is realized by utilizing the double-station integrated fixture for manufacturing industrial robots of the present invention. Specifically, the scheme adopted by the present invention is:
一种制造工业机器人用双工位整合式夹具,用于卧式加工注塑机固定板时对所述固定板进行夹持,其特征在于,所述制造工业机器人用双工位整合式夹具的夹具主体2包括底板和与底板整合在一起的两块立板,两块立板通过骨架组合在一起,在其中一块立板上安装有垫块1、X向调节螺钉3、Y轴支撑A4、Y轴支撑B5;在另一块立板上安装有Z向螺钉靠山6、钩型压板7、Z向支撑钉8、X向顶压螺钉9、Y向活动支撑A10、Z向顶压螺钉A11、Y向活动支撑B12、Z向顶压螺钉B13。采用本发明的制造工业机器人用双工位整合式夹具时,每块立板及其上安装的附件代表一个工位,每个工位上加工固定板的三个面,因此每个夹具上夹持两个固定板零件,因此这两个工位所加工的时间基本相同或相近。加工完成后,将两个工序对调,即可完成相应另一工序的加工,效率大大提高。 A double-station integrated fixture for manufacturing industrial robots, which is used to clamp the fixed plate when processing the fixed plate of an injection molding machine horizontally, is characterized in that the fixture for manufacturing industrial robots is a double-station integrated fixture The main body 2 includes a bottom plate and two vertical plates integrated with the bottom plate. The two vertical plates are combined through a skeleton, and a pad 1, an X-direction adjusting screw 3, a Y-axis support A4, and a Y-axis are installed on one of the vertical plates. Axial support B5; Z-direction screw backer 6, hook platen 7, Z-direction support nail 8, X-direction pressing screw 9, Y-direction movable support A10, Z-direction pressing screw A11, Y-direction are installed on another vertical plate Press the screw B13 toward the movable support B12 and the Z direction. When adopting the dual-station integrated fixture for manufacturing industrial robots of the present invention, each vertical plate and the accessories installed on it represent a station, and each station processes three faces of the fixed plate, so each fixture clamps Holds two fixed plate parts, so the processing time of these two stations is basically the same or similar. After the processing is completed, the two processes are reversed to complete the processing of the corresponding other process, and the efficiency is greatly improved.
所述夹具主体2的底板和立板可以通过任何方式整合到一起,但出于稳定性、坚固性的考虑,优选是一体成型的整体主体。 The bottom plate and the vertical plate of the fixture main body 2 can be integrated together in any way, but for the sake of stability and firmness, it is preferred to be an integrally formed integral body.
本发明的有益效果是: The beneficial effects of the present invention are:
夹具主体铸造成型,强度比钢件焊接或装配的强度好,夹具使用的非标配件和加工的尺寸都减少,大量使用标准件,提高设计和加工速度。降低夹具制造成本,减少夹具数量。使用本使用新型夹具后,机床可以加工2种产品,以前只可以加工一种产品。减少生产部门对机床分配的管理成本。加工的刀具缩短,加工速度提高,增加生产效率。 The main body of the fixture is cast and formed, and its strength is better than that of steel parts welded or assembled. The non-standard parts used in the fixture and the size of the processing are reduced, and a large number of standard parts are used to improve the design and processing speed. Reduce the cost of jig manufacturing and reduce the number of jigs. After using this new type of fixture, the machine tool can process 2 kinds of products, and only one kind of product can be processed before. Reduce administrative costs for machine allocation in the production department. The processing tool is shortened, the processing speed is increased, and the production efficiency is increased.
附图说明 Description of drawings
图1是本发明的制造工业机器人用双工位整合式夹具的第一工位的视图; Fig. 1 is the view of the first station of the dual-station integrated clamp for manufacturing industrial robots of the present invention;
图2是本发明的制造工业机器人用双工位整合式夹具的第二工位的视图; Fig. 2 is the view of the second station of the double-station integrated clamp for manufacturing industrial robots of the present invention;
图3是本发明的制造工业机器人用双工位整合式夹具所适用的注塑机固定板的一个角度的视图; Fig. 3 is the view of an angle of the fixed plate of the injection molding machine applicable to the dual-station integrated fixture for manufacturing industrial robots of the present invention;
图4是本发明的制造工业机器人用双工位整合式夹具所适用的注塑机固定板的另一角度的视图; Fig. 4 is the view of another angle of the fixed plate of the injection molding machine applicable to the dual-station integrated fixture for manufacturing industrial robots of the present invention;
图5是注塑机固定板装配在现有技术的夹具上时一个工序的视图; Fig. 5 is a view of a process when the fixed plate of the injection molding machine is assembled on the fixture of the prior art;
图6是注塑机固定板装配在现有技术的夹具上时另一工序的视图; Fig. 6 is a view of another process when the fixed plate of the injection molding machine is assembled on the fixture of the prior art;
图7是注塑机固定板装配在本发明的制造工业机器人用双工位整合式夹具上时的视图。 Fig. 7 is a view when the fixed plate of the injection molding machine is assembled on the dual-station integrated fixture for manufacturing industrial robots of the present invention.
在图中:1垫块;2夹具主体;3X向调节螺钉;4Y轴支撑A;5Y轴支撑B;6Z向螺钉靠山;7钩型压板;8Z向支撑钉;9X向顶压螺钉;10Y向活动支撑A;11Z向顶压螺钉A;12Y向活动支撑B;13Z向顶压螺钉B;14底脚基准面A;15装配底面A;16Z向定位面A;17定位基准面A;18X向粗基准A;19X向精基准A;20装配底面B;21Z向基准面B;22Z向基准面A;23Y向基准面A;24X向粗基准B;25Z向基准面B;26Y向基准面B;27定位基准面B;28Z向基准面C。 In the figure: 1 spacer; 2 fixture main body; 3X-direction adjustment screw; 4Y-axis support A; 5Y-axis support B; 6Z-direction screw backing; Movable support A; 11 Z direction pressing screw A; 12 Y direction movable support B; 13 Z direction pressing screw B; 14 Base reference plane A; 15 Assembly bottom surface A; Rough datum A; 19X to fine datum A; 20 assembly bottom B; 21Z to datum B; 22Z to datum A; 23Y to datum A; 24X to rough datum B; 25Z to datum B; 26Y to datum B ; 27 Locate the datum plane B; 28 Z to the datum plane C.
具体实施方式 detailed description
下面将结合附图进一步详细描述本发明。 The present invention will be further described in detail below in conjunction with the accompanying drawings.
首先参见图3和图4,示出了注塑机固定板的结构,对其进行三维定向,横向为X向,纵向为Y向,入纸方向为Z向,固定板上在加工时涉及夹具夹持定位参考的部分包括底脚基准面A14、装配底面A15、Z向定位面A16、定位基准面A17、X向粗基准A18、X向精基准A19、装配底面B20、Z向基准面B21、Z向基准面A22、Y向基准面A23、X向粗基准B24、Z向基准面B25、Y向基准面B26、定位基准面B27、Z向基准面C28。 First refer to Figure 3 and Figure 4, which show the structure of the fixed plate of the injection molding machine, which is three-dimensionally oriented, the horizontal direction is the X direction, the longitudinal direction is the Y direction, and the paper feeding direction is the Z direction. The fixed plate involves fixtures during processing. The part that holds the positioning reference includes foot reference plane A14, assembly bottom plane A15, Z-direction positioning plane A16, positioning plane A17, X-direction coarse datum A18, X-direction fine datum A19, assembly bottom plane B20, Z-direction datum plane B21, Z To the reference plane A22, Y-direction reference plane A23, X-direction rough reference plane B24, Z-direction reference plane B25, Y-direction reference plane B26, positioning reference plane B27, Z-direction reference plane C28.
再参见图5和图6,示出了现有技术的夹具装夹固定板的情形。如图中所见,这种装夹方式使得加工过程中,两个工序的加工时间不一致,加工的刀具偏长,导致加工速度慢,振刀精度尺寸不稳定。 Referring to Fig. 5 and Fig. 6 again, it shows the situation that the fixture clamps the fixed plate in the prior art. As can be seen in the figure, this clamping method makes the processing time of the two processes inconsistent during the processing process, and the processed tool is too long, resulting in slow processing speed and unstable tool vibration accuracy.
图1和图2示出了本发明的制造工业机器人用双工位整合式夹具。如图中所示,本发明的制造工业机器人用双工位整合式夹具的夹具主体2包括底板和与底板整合在一起的两块立板,两块立板通过骨架组合在一起。这种整合可以采用任何适合方式,例如采用螺栓、卡桩等进行装配,但优选采用铸造一体成型,使得强度与稳定性大大提高。 Fig. 1 and Fig. 2 show the dual-station integrated fixture for manufacturing industrial robots of the present invention. As shown in the figure, the fixture body 2 of the dual-station integrated fixture for manufacturing industrial robots of the present invention includes a bottom plate and two vertical plates integrated with the bottom plate, and the two vertical plates are combined through a skeleton. This integration can be assembled in any suitable way, such as bolts, stakes, etc., but it is preferably integrally formed by casting, so that the strength and stability are greatly improved.
夹具主体2的每块立板代表一个工位,每个工位对应一个相应工序。具体来说,一个工位上安装有垫块1、X向调节螺钉3、Y轴支撑A4、Y轴支撑B5。其中垫块1用螺钉装配在夹具主体上,起到定位固定Z向的作用;X向调节螺钉3在夹具主体2上的螺纹孔中,与固定板的X向粗基准B24靠住起到X向的顶压夹紧作用;Y轴支撑A4与X向精基准19配合定位固定板;Y轴支撑B5与X向精基准19配合定位固定板。从而在这个工位固定一个工序。 Each vertical plate of the fixture main body 2 represents a station, and each station corresponds to a corresponding process. Specifically, a pad 1, an X-direction adjusting screw 3, a Y-axis support A4, and a Y-axis support B5 are installed on a station. Among them, the spacer 1 is assembled on the main body of the fixture with screws, which plays the role of positioning and fixing the Z direction; the X-direction adjusting screw 3 is in the threaded hole on the main body of the fixture 2, and the X-direction coarse reference B24 of the fixed plate is leaned against to play the role of X-direction. Clamping action in the top pressure direction; Y-axis support A4 cooperates with the X-direction fine reference 19 to position the fixed plate; Y-axis support B5 cooperates with the X-direction fine reference 19 to position the fixed plate. Thereby a process is fixed at this station.
在另一个工位上安装有Z向螺钉靠山6、钩型压板7、Z向支撑钉8、X向顶压螺钉9、Y向活动支撑A10、Z向顶压螺钉A11、Y向活动支撑B12、Z向顶压螺钉B13。其中Z向螺钉靠山6靠住Z向基准C28面上,定位固定板的Z向;钩型压板7装配在夹具主体2上,起夹紧产品作用;Z向支撑钉8靠住Z向基准面A22上,粗定位固定Z向;X向顶压螺钉9顶压在X向粗基准A18上,定位X向;Y向活动支撑A10装配在夹具主体上,浮动支撑装配底面A15;Z向顶压螺钉A11顶压在Z向定位面A16进行夹紧固定;Y向活动支撑B12装配在夹具主体上,装配底面B20;Z向顶压螺钉B13顶压在Z向基准面B21进行夹紧固定。由此固定另一工序。 Installed on another station are Z-direction screw backer 6, hook-type pressure plate 7, Z-direction support nail 8, X-direction pressing screw 9, Y-direction movable support A10, Z-direction pressing screw A11, Y-direction movable support B12 , Press the screw B13 in the Z direction. Among them, the Z-direction screw backer 6 leans against the Z-direction datum C28 surface to position the Z-direction of the fixed plate; the hook-type pressure plate 7 is assembled on the fixture main body 2 to clamp the product; the Z-direction support nail 8 leans against the Z-direction datum plane On A22, rough positioning fixes the Z direction; X-direction pressing screw 9 presses on the X-direction rough datum A18 to position the X-direction; Y-direction movable support A10 is assembled on the main body of the fixture, and the floating support is assembled on the bottom surface A15; Z-direction pressing The screw A11 presses against the Z-direction positioning surface A16 for clamping and fixing; the Y-direction movable support B12 is assembled on the fixture body and the bottom surface B20; the Z-direction pressing screw B13 presses against the Z-direction reference plane B21 for clamping and fixing. Another process is thereby fixed.
参见图7,示出了本发明的夹具上装夹两个工序的固定板的示意图。由图可见,每个夹具上夹持两个固定板零件,每个工位上加工固定板的三个面,因此这两个工位所加工的时间基本相同或相近。加工完成后,将两个工序对调,即可完成相应另一工序的加工,效率大大提高。 Referring to FIG. 7 , it shows a schematic view of the fixing plate for the two processes of clamping on the fixture of the present invention. It can be seen from the figure that each fixture clamps two fixed plate parts, and each station processes three surfaces of the fixed plate, so the processing time of these two stations is basically the same or similar. After the processing is completed, the two processes are reversed to complete the processing of the corresponding other process, and the efficiency is greatly improved.
上面结合附图对本发明的实施方式作了详细的说明,但是本发明不限于上述实施方式,在所属技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下做出各种变化。 The embodiment of the present invention has been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiment, within the scope of knowledge possessed by those of ordinary skill in the art, it can also be done without departing from the gist of the present invention. Various changes.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310390733.6A CN103465067B (en) | 2013-09-02 | 2013-09-02 | A kind of process industry robot integrated fixture of double |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310390733.6A CN103465067B (en) | 2013-09-02 | 2013-09-02 | A kind of process industry robot integrated fixture of double |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103465067A CN103465067A (en) | 2013-12-25 |
| CN103465067B true CN103465067B (en) | 2016-07-06 |
Family
ID=49790231
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310390733.6A Active CN103465067B (en) | 2013-09-02 | 2013-09-02 | A kind of process industry robot integrated fixture of double |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103465067B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105499949B (en) * | 2015-12-24 | 2018-01-09 | 惠尔信机械(泰兴)有限公司 | A kind of 3 megawatt wind driven generator group base clamping toolings |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200988141Y (en) * | 2006-12-30 | 2007-12-12 | 比亚迪股份有限公司 | Hand operate clamp |
| CN101817148A (en) * | 2010-04-16 | 2010-09-01 | 南车戚墅堰机车有限公司 | Connecting rod vertical machining device |
| CN103111886A (en) * | 2011-11-16 | 2013-05-22 | 博创机械股份有限公司 | Special processing device of injection machine moulding board |
| CN203527028U (en) * | 2013-09-02 | 2014-04-09 | 安徽涌诚机械有限公司 | Double-station integrated clamp for manufacturing industrial robot |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ATE432142T1 (en) * | 2005-09-21 | 2009-06-15 | Tool Internat Ag F | Clamping device for clamping workpieces |
-
2013
- 2013-09-02 CN CN201310390733.6A patent/CN103465067B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200988141Y (en) * | 2006-12-30 | 2007-12-12 | 比亚迪股份有限公司 | Hand operate clamp |
| CN101817148A (en) * | 2010-04-16 | 2010-09-01 | 南车戚墅堰机车有限公司 | Connecting rod vertical machining device |
| CN103111886A (en) * | 2011-11-16 | 2013-05-22 | 博创机械股份有限公司 | Special processing device of injection machine moulding board |
| CN203527028U (en) * | 2013-09-02 | 2014-04-09 | 安徽涌诚机械有限公司 | Double-station integrated clamp for manufacturing industrial robot |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103465067A (en) | 2013-12-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202752897U (en) | Machining fixture for parallel holes and coaxial holes | |
| CN105538003A (en) | Multi-station bar material cutting fixture workbench for wire sawing machine tool | |
| CN203019089U (en) | Moving lathe end beam boring mill clamp | |
| CN203418324U (en) | Multifunction clamp | |
| CN105619117A (en) | Milling clamp for thin-wall shifting forks | |
| CN204053583U (en) | A kind of axis products clamping device | |
| CN204748105U (en) | Walk an adjustable jigs thread for lathe | |
| CN203509647U (en) | Numerical control milling machine clamp for milling chamfers of bottom plates | |
| CN109015017A (en) | A kind of numerically-controlled machine tool electric-controlled type shaped piece universal location device | |
| CN103465067B (en) | A kind of process industry robot integrated fixture of double | |
| CN210938261U (en) | A control arm type workpiece fixture with station traceability function | |
| CN204818831U (en) | A location frock for processing of car mould | |
| CN206382904U (en) | A kind of lathe positioning fixture | |
| CN203527028U (en) | Double-station integrated clamp for manufacturing industrial robot | |
| CN201988958U (en) | High-speed five-shaft machining tooling for impeller | |
| CN108145467A (en) | A kind of multistation work piece fixture | |
| CN204183280U (en) | A kind of Y type balance valve body mesopore fixture for processing device | |
| CN203061946U (en) | Machine tool for slotting | |
| CN209095020U (en) | A kind of CNC more than one piece is integrally machined built-up jig | |
| CN202985164U (en) | Angle iron lathe clamp | |
| CN107378554A (en) | A kind of car bridge driven pulley drilling tool | |
| CN207104641U (en) | Latch hook is ground notch fixture | |
| CN207710351U (en) | A kind of positioning tool | |
| CN207189213U (en) | A kind of car bridge driven pulley drilling tool | |
| CN109227168A (en) | A kind of explosion-proof covering board universal jig and fixture system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A two position integrated fixture for manufacturing industrial robots Effective date of registration: 20220715 Granted publication date: 20160706 Pledgee: Industrial and Commercial Bank of China Limited Guangde sub branch Pledgor: ANHUI YONGCHENG MACHINERY Co.,Ltd. Registration number: Y2022980010523 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230920 Granted publication date: 20160706 Pledgee: Industrial and Commercial Bank of China Limited Guangde sub branch Pledgor: ANHUI YONGCHENG MACHINERY Co.,Ltd. Registration number: Y2022980010523 |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 242200 Anhui Province Xuanzhou City Guangde City Economic Development Zone Taichi Avenue 635.NO Patentee after: Anhui Yongcheng Machinery Co.,Ltd. Country or region after: China Address before: 242200 Guangde Economic Development Zone, Xuancheng, Anhui Patentee before: ANHUI YONGCHENG MACHINERY Co.,Ltd. Country or region before: China |