CN103455885B - The computing method of a kind of automatic editing parts factory stamping parts quantity - Google Patents

The computing method of a kind of automatic editing parts factory stamping parts quantity Download PDF

Info

Publication number
CN103455885B
CN103455885B CN201310394612.9A CN201310394612A CN103455885B CN 103455885 B CN103455885 B CN 103455885B CN 201310394612 A CN201310394612 A CN 201310394612A CN 103455885 B CN103455885 B CN 103455885B
Authority
CN
China
Prior art keywords
stamping machine
parts
established
punching press
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310394612.9A
Other languages
Chinese (zh)
Other versions
CN103455885A (en
Inventor
韩勇
段瑞
刘利
全宏伟
李寿君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANTAI BAOJING STEEL PROCESSING CO Ltd
Original Assignee
YANTAI BAOJING STEEL PROCESSING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI BAOJING STEEL PROCESSING CO Ltd filed Critical YANTAI BAOJING STEEL PROCESSING CO Ltd
Priority to CN201310394612.9A priority Critical patent/CN103455885B/en
Publication of CN103455885A publication Critical patent/CN103455885A/en
Application granted granted Critical
Publication of CN103455885B publication Critical patent/CN103455885B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses the computing method of a kind of automatic editing parts factory stamping parts quantity, it is according to the stroke quantity of part, during presser, weld parts plan, stamping machine characteristic, the key elements such as punching press interim stock, establish punching press production capacity respectively maximum, man-hour is minimum, the production optimization model under service condition optimized by stamping machine, help parts factory client by the punching press analysis of manufacturing capability, safeguard from manual account, change into model calculation scheduling, automatic compiling often plants the processing situation of part and the situation that feeds intake, the flexible management of the class's of realization product plan, improve science and the enforceability of production schedule layout, improve production efficiency, achieve post optimum management.

Description

The computing method of a kind of automatic editing parts factory stamping parts quantity
Technical field:
The present invention relates to the computing method of auto part making plant automatic editing punching production plan, particularly relate to the computing method of a kind of automatic editing parts factory stamping parts quantity.
Background technology:
In the actual production process of auto part making plant, the processing technology of different parts is different, and (such as A part is 3 strokes, needs successively upper 3 stamping machines to process; B part is 5 strokes, needs successively upper 5 stamping machines to process); Meanwhile, the time variance of the different part of punching production is comparatively large, and under the prerequisite how welding planned production pulls together under meeting, according to the press feature of self, carry out punching press scheduling better, be a puzzlement staff planners' difficult problem always.Current auto parts and components original equipment manufacturer is mainly with manual mode layout punching press plan, and whole process efficiency is low, when welding plan changes, is difficult to the change according to next procedure and adjusts.Therefore one is needed based on welding plan, punching press interim stock and the punching press production capacity formatting model in different part punching man-hour, on the basis that day punching press production capacity is analyzed, automatic compiling often plants the Machining Sequencing of part and the quantity that feeds intake, the flexible management of the class's of realization product plan, improves science and the enforceability of production schedule layout.
Summary of the invention:
The object of the invention is to overcome the deficiency of above-mentioned prior art and the processing situation that provides a kind of automatic compiling often to plant part and feed intake situation, the flexible management of the class's of realization product plan, improve the science of production schedule layout, improve production efficiency, achieve the computing method of the automatic editing parts factory stamping parts quantity of post optimum management.
Object of the present invention can be reached by following measure: the computing method of a kind of automatic editing parts factory stamping parts quantity, comprise the following step that can be performed by computing machine:
(1) establish total s kind part, front m kind is finding, and large or little stamping machine can be used to process, and rear s-m kind is large part, and large stamping machine can only be used to process; Consider that whether size stamping machine is sufficient, if inadequate, large stamping machine can be used to produce finding;
(2) the stroke quantity of various part is established to be respectively x i, i=1,2 ..., s;
(3) each stroke of various part is established to be respectively t averaging time used i, i=1,2 ..., s;
(4) welding plan is established to need the quantity of various part to be respectively w i, i=1,2 ..., s;
(5) 0-1 variable a is established i, i=1,2 ..., s;
(1)
(6) the punching press interim stock of various part is established to be respectively c i, i=1,2 ..., s;
(7) set various part day inlet amount as day i, i=1,2 ..., s;
(8) set the punching press analysis of manufacturing capability cycle as my god;
(9) each number of parts of final production is established to be respectively h i, i=1,2 ..., s;
(10) T.T. of setting effectively work every day as ;
(11) different model is selected according to different demand:
When considering that punching press production capacity is maximum, then utilize as drag;
(2)
When considering that man-hour is minimum, then utilize as drag;
(3)
When considering stamping machine quantity, little stamping machine, the greatly quantity of stamping machine is needed to be respectively m in part, s-m, part is sorted, front m might as well be established to use little stamping machine and be numbered i, rear s-m uses large stamping machine and is numbered j, will use large stamping machine, then utilize as drag when little stamping machine is not enough;
(4)
(12) actual punching production situation every day is exported;
(13) punching press production capacity state is calculated , wherein, be then normal production, when then point out feed;
(14) terminate to calculate.
The present invention can produce following good effect compared with the prior art: the present invention is according to the stroke quantity of part, during presser, weld parts plan, stamping machine characteristic, the key elements such as punching press interim stock, establish punching press production capacity respectively maximum, man-hour is minimum, the production optimization model under service condition optimized by stamping machine, help parts factory client by the punching press analysis of manufacturing capability, safeguard from manual account, change into model calculation scheduling, automatic compiling often plants the processing situation of part and the situation that feeds intake, the flexible management of the class's of realization product plan, improve science and the enforceability of production schedule layout, parts factory staff planners are liberated originally because of the time of manual operation and service interaction 80%, very large help is brought to the post optimum management of client inside.
Accompanying drawing illustrates:
Fig. 1 is the general frame of the present invention;
Fig. 2 is process flow diagram of the present invention.
Embodiment: specific description is in detail carried out further to the specific embodiment of the present invention below in conjunction with accompanying drawing:
Embodiment 1:
(1) establish and have 6 kinds of parts, first three is planted as finding and available large or little stamping machine processing, can only process, numbering i=1 respectively, 2 for latter three kinds for large part with large stamping machine ..., 6, wherein size stamping machine quantity is sufficient;
(2) the stroke quantity x of 6 kinds of parts is established 1,x 2, x 3, x 4, x 5,x 6be respectively 3,4,4,5,2,3;
(3) t averaging time that 6 kinds of each strokes of part are used is established 1,t 2, t 3, t 4, t 5,t 6be respectively 8,5.5,7,6,6,9 seconds;
(4) the quantity w of welding plan needs 6 kinds of parts is established 1,w 2, w 3, w 4, w 5,w 6be respectively 0,1000,0,900,300,0;
(5) 0-1 variable a is established 1,a 2, a 3, a 4, a 5,a 6be followed successively by 0,1,0,1,1,0;
(6) set the punching press interim stock of 6 kinds of parts as c 1,c 2, c 3, c 4, c 5,c 6be respectively 100,200,100,300,0,0;
(7) set 6 kinds of parts day inlet amount as 1, 2, 3, 4, 5, 6be respectively 0,0,20,0,9,0;
(8) the punching press analysis of manufacturing capability cycle is established it is 5 days;
(9) set each number of parts of final production as h i, i=1,2 ..., 6;
(10) T.T. that all stamping machines effectively works every day is established be 11 hours, namely 39600 seconds;
(11) when considering that punching press production capacity is maximum, then utilize as drag;
(2)
(12) under the prerequisite making full use of effective time, in order to make punching press production capacity larger, the 2nd can be produced, 4,5 kinds of parts are respectively 800,600,333, even expect maximum punching press production capacity, the 2nd can be produced, 4, many production the 5th kind of part after 5 kinds of parts, and 33 can have been produced more;
(13) punching press production capacity state is calculated , for the 5th kind of part, its u 5
=8.4>2 thus without charging, can normally produce;
(14) terminate to calculate.
Embodiment 2:
(1) establish and have 6 kinds of parts, first three is planted as finding and available large or little stamping machine processing, can only process, numbering i=1 respectively, 2 for latter three kinds for large part with large stamping machine ..., 6, the quantity of factory's size stamping machine is sufficient;
(2) the stroke quantity x of 6 kinds of parts is established 1,x 2, x 3, x 4, x 5,x 6be respectively 3,4,4,5,2,3;
(3) t averaging time that 6 kinds of each strokes of part are used is established 1,t 2, t 3, t 4, t 5,t 6be respectively 8,5.5,7,6,6,9 seconds;
(4) the quantity w of welding plan needs 6 kinds of parts is established 1,w 2, w 3, w 4, w 5,w 6be respectively 0,1000,0,900,300,0;
(5) 0-1 variable a is established 1,a 2, a 3, a 4, a 5,a 6be followed successively by 0,1,0,1,1,0;
(6) set the punching press interim stock of 6 kinds of parts as c 1,c 2, c 3, c 4, c 5,c 6be respectively 100,200,100,300,0,0;
(7) set 6 kinds of parts day inlet amount as 1, 2, 3, 4, 5, 6be respectively 0,0,20,0,9,0;
(8) the punching press analysis of manufacturing capability cycle is established it is 5 days;
(9) each number of parts of final production is h i, i=1,2 ..., 6;
(10) T.T. that all stamping machines effectively works every day is established be 11 hours, namely 39600 seconds;
(11) when considering that man-hour is minimum, then utilize as drag;
(3)
(12) illustrate and can to finish the work in the time of one day, the time used is 39200s simultaneously, and the time can saving 400s is used for considering next punching press plan or other things;
(13) punching press production capacity state is calculated , for the 5th kind of part, wherein
U 5=1.8<2, thus need charging;
(14) terminate to calculate.
Embodiment 3:
(1) establish and have 6 kinds of parts, first three is planted as finding and can be processed by large or little stamping machine, and latter three kinds can only use large stamping machine process for large part, numbering i=1 respectively, and 2 ..., 6, little stamping machine deficiency, adopts large stamping machine to replace;
(2) the stroke quantity x of 6 kinds of parts is established 1,x 2, x 3, x 4, x 5,x 6be respectively 3,4,4,5,2,3;
(3) t averaging time that 6 kinds of each strokes of part are used is established 1,t 2, t 3, t 4, t 5,t 6be respectively 8,5.5,7,6,6,9 seconds;
(4) the quantity w of welding plan needs 6 kinds of parts is established 1,w 2, w 3, w 4, w 5,w 6be respectively 0,1000,0,900,300,0;
(5) 0-1 variable a is established 1,a 2, a 3, a 4, a 5,a 6be followed successively by 0,1,0,1,1,0;
(6) set the punching press interim stock of 6 kinds of parts as c 1,c 2, c 3, c 4, c 5,c 6be respectively 100,200,100,300,0,0;
(7) set 6 kinds of parts day inlet amount as 1, 2, 3, 4, 5, 6be respectively 0,0,20,0,9,0;
(8) the punching press analysis of manufacturing capability cycle is established it is 5 days;
(9) set each number of parts of final production as h i, i=1,2 ..., 6;
(10) T.T. that all stamping machines effectively works every day is established be 11 hours, namely 39600 seconds;
(11) establish a front m part to use little stamping machine to process, a rear s-m part uses large stamping machine to process, and will use large stamping machine, then utilize model when little stamping machine is not enough;
(4)
(12) final production the 2nd, 4, in 5, part difference 800,600,333, similar with example 1, even expects maximum punching press production capacity, can produce the 2nd, 4, many production the 5th kind of part after 5 kinds of parts, and can produce 33 more;
(13) punching press production capacity state is calculated , for the 5th kind of part, wherein
U 5=8.4>2 thus without charging, can normally produce;
(14) terminate to calculate.
Can be found out by above 3 examples, based on welding plan, punching press interim stock and the punching press production capacity formatting model in different part punching man-hour, parts factory client is helped to safeguard from manual account, change into model calculation scheduling, improve the science of plan layout, liberate parts factory staff planners originally because of the time of manual operation and service interaction 80%, very large help has been brought to the post optimum management of client inside.
Above embodiment is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that the common engineering technical personnel in this area make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determine.

Claims (1)

1. computing method for automatic editing parts factory stamping parts quantity, comprise the following step that can be performed by computing machine:
(1) establish total s kind part, front m kind is finding, and large or little stamping machine can be used to process, and rear s-m kind is large part, and large stamping machine can only be used to process; Consider that whether size stamping machine is sufficient, if inadequate, large stamping machine can be used to produce finding;
(2) the stroke quantity of various part is established to be respectively x i, i=1,2 ..., s;
(3) each stroke of various part is established to be respectively t averaging time used i, i=1,2 ..., s;
(4) welding plan is established to need the quantity of various part to be respectively w i, i=1,2 ..., s;
(5) 0-1 variable a is established i, i=1,2 ..., s;
(1)
(6) the punching press interim stock of various part is established to be respectively c i, i=1,2 ..., s;
(7) set various part day inlet amount as day i, i=1,2 ..., s;
(8) set the punching press analysis of manufacturing capability cycle as my god;
(9) each number of parts of final production is established to be respectively h i, i=1,2 ..., s;
(10) T.T. of setting effectively work every day as ;
(11) different model is selected according to different demand:
When considering that punching press production capacity is maximum, then utilize as drag;
(2)
When considering that man-hour is minimum, then utilize as drag;
(3)
When considering stamping machine quantity, little stamping machine, the greatly quantity of stamping machine is needed to be respectively m in part, s-m, part is sorted, front m might as well be established to use little stamping machine and be numbered i, rear s-m uses large stamping machine and is numbered j, will use large stamping machine, then utilize as drag when little stamping machine is not enough;
(4)
(12) actual punching production situation every day is exported;
(13) punching press production capacity state is calculated , wherein, be then normal production, when then point out feed;
(14) terminate to calculate.
CN201310394612.9A 2013-09-04 2013-09-04 The computing method of a kind of automatic editing parts factory stamping parts quantity Expired - Fee Related CN103455885B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310394612.9A CN103455885B (en) 2013-09-04 2013-09-04 The computing method of a kind of automatic editing parts factory stamping parts quantity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310394612.9A CN103455885B (en) 2013-09-04 2013-09-04 The computing method of a kind of automatic editing parts factory stamping parts quantity

Publications (2)

Publication Number Publication Date
CN103455885A CN103455885A (en) 2013-12-18
CN103455885B true CN103455885B (en) 2016-03-02

Family

ID=49738223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310394612.9A Expired - Fee Related CN103455885B (en) 2013-09-04 2013-09-04 The computing method of a kind of automatic editing parts factory stamping parts quantity

Country Status (1)

Country Link
CN (1) CN103455885B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303347A (en) * 2015-10-26 2016-02-03 烟台宝井钢材加工有限公司 Decoiling line planning method
CN110659762A (en) * 2018-06-29 2020-01-07 天津宝钢钢材配送有限公司 Stamping scheduling planning method based on industrial 4.0 transverse integrated distribution mode
CN110659763A (en) * 2018-06-30 2020-01-07 天津宝钢钢材配送有限公司 Automatic stamping scheduling method for automobile host factory
CN110717139A (en) * 2019-09-26 2020-01-21 一汽轿车股份有限公司 Method for calculating stamping area volume ratio
CN117994778B (en) * 2024-04-07 2024-06-14 吉林大学 Stamping part automatic counting and classifying method based on point cloud data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556486A (en) * 2003-12-31 2004-12-22 冶金自动化研究设计院 Integrated iron and steel enterprise production process on line planning and controlling system and method
WO2005002792A1 (en) * 2003-07-04 2005-01-13 Mitsubishi Denki Kabushiki Kaisha Automatic programming method and device
CN101329573A (en) * 2008-07-25 2008-12-24 东北大学 Automatic production optimizing method and system of cold rolling sulfuric acid refining and roller milling integral unit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005002792A1 (en) * 2003-07-04 2005-01-13 Mitsubishi Denki Kabushiki Kaisha Automatic programming method and device
CN1556486A (en) * 2003-12-31 2004-12-22 冶金自动化研究设计院 Integrated iron and steel enterprise production process on line planning and controlling system and method
CN101329573A (en) * 2008-07-25 2008-12-24 东北大学 Automatic production optimizing method and system of cold rolling sulfuric acid refining and roller milling integral unit

Also Published As

Publication number Publication date
CN103455885A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103455885B (en) The computing method of a kind of automatic editing parts factory stamping parts quantity
CN107193258B (en) Numerical control processing technology route and cutting parameter integrated optimization method towards energy consumption
CN203197527U (en) Socket automatic assembling machine
CN103631220B (en) Punching robot production control system
CN111290358B (en) Product energy-saving scheduling optimization method for flexible manufacturing system
CN104259839A (en) Automatic screw machine based on visual identification and screw installation method thereof
CN102651116A (en) Power load data refining method
MXPA04009380A (en) System and method to build project management processes.
WO2011139935A3 (en) Reference model for production plants and related system and method
CN106064380A (en) A kind of welding robot control system
CN109683555A (en) A kind of furniture design production system
CN206912699U (en) A kind of intelligent fixture vision control system
CN204721170U (en) A kind of Automatic stator production line
CN203197526U (en) Automatic assembling machine
CN102207980A (en) Data exchange method based on extensive makeup language (XML) and database (DB), and data adapter
CN108723628A (en) The planing method of hexagonal bracket mouth steel node weld assemble sequence
Gola et al. RMS–system of the future or new trend in science?
CN103455853B (en) The procreative collaboration operational method of the multistage part of a kind of multistage supplier
CN101850564B (en) Numerical control surging and punching control method
CN105303284A (en) Size optimization method for large-scale customization of garments
CN206613921U (en) Button assembly fixture
CN102831279B (en) Automatic calculation system and method of electroplating technological parameters of diamond products based on CAD (computer-aided design)
CN107135941A (en) A kind of quick breeding cotton advantage three is the method for combination
CN205303547U (en) Lid behind battery
CN105243221B (en) Rocket bay section connects frame circumferential direction rivet hole arrangement position generation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20190904