CN103455606A - Large database creating and data managing method - Google Patents

Large database creating and data managing method Download PDF

Info

Publication number
CN103455606A
CN103455606A CN201310396199XA CN201310396199A CN103455606A CN 103455606 A CN103455606 A CN 103455606A CN 201310396199X A CN201310396199X A CN 201310396199XA CN 201310396199 A CN201310396199 A CN 201310396199A CN 103455606 A CN103455606 A CN 103455606A
Authority
CN
China
Prior art keywords
subarray
term
storage
initial
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310396199XA
Other languages
Chinese (zh)
Other versions
CN103455606B (en
Inventor
何云坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310396199.XA priority Critical patent/CN103455606B/en
Publication of CN103455606A publication Critical patent/CN103455606A/en
Priority to PCT/CN2014/085673 priority patent/WO2015032297A1/en
Application granted granted Critical
Publication of CN103455606B publication Critical patent/CN103455606B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2471Distributed queries

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computational Linguistics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Software Systems (AREA)
  • Mathematical Physics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention provides a large database creating and data managing method. The large database creating and data managing method comprises the following steps of firstly establishing M sub database storage modules, wherein each sub database storage module has a name storage unit for storing names of the sub database storage modules, and M is a positive integer; carrying out data storage and data updating in each sub database storage module, and carrying out data query and data display according to the storage contents of N sub database storage modules of the M sub database storage modules, whereinN is a positive integer not larger than M. The large database creating and data managing method disclosed by the invention facilitates a user to quickly carry out big data processing and judgment of value efficiency and equilibrium, so as to carry out selection decision and behavior optimization.

Description

A kind of large database concept creates and data managing method
Technical field
The present invention relates to technical field of data processing, be specifically related to a kind of large database concept and create and data managing method.
Background technology
Although cloud computing at present and large data technique have the method for fast processing and application mass data, but take owing to lacking that to be worth efficiency be criterion " purification " technology, make the value of large data lower, between data organically correlativity can not get appropriate fully presenting of conforming to the law of value, the support of clairvoyance and expection decision-making capability can not be provided to the user.In addition, the data presentation mode complexity in each database, be unfavorable for that the user checks.
Therefore, need to seek a kind of database initialize and data managing method, that realizes that the members of society preference meets and various value indexs are integrated presents, rationally and more quickly correction error, in order to realize the reliable measurement to economic worth and social progress, it is a very significant problem.
Summary of the invention
In order to overcome the defect existed in above-mentioned prior art, the purpose of this invention is to provide a kind of large database concept and create and data managing method, be conducive to the user and be worth quickly and accurately judge and balanced the judge.
In order to realize above-mentioned purpose of the present invention, the invention provides a kind of large database concept creates and data managing method, model M subdata base memory module, each subdata base memory module has the name storage unit, for storing the title of described subdata base memory module, described M is positive integer, carry out data storage and Data Update in each subdata base memory module, and carry out data query and data demonstration according to the content of storing in N subdata base memory module in M subdata base memory module, described N is the positive integer that is not more than M, concrete steps are as follows:
S1, the data storage,
S11, the direct correlation coupling scheme storage subarray between the initial time point storage subarray of the initial information storage array in each subdata base memory module of storer, initial element term storage subarray, initial environment storage subarray, initial element and the coupling of initial elements correlation form in local state storage subarray respectively storage period just time starting point, initial element term, initially need environmental factor, the direct correlation coupling scheme between initial element and the coupling of initial elements correlation considered to form local state;
The end of term time point storage subarray of the end of term information storage array in each subdata base memory module of described storer, end of term element term storage subarray, end of term environment storage subarray, direct correlation coupling scheme storage subarray between end of term element and end of term elements correlation coupling form in local state storage subarray stores respectively end of term end time, end of term element term, the environmental factor that the end of term need to be considered, direct correlation coupling scheme between end of term element and end of term elements correlation coupling form local state,
Described each subdata base memory module also has initial use value name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray, initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray and end of term monetary measurement data storage subarray, described initial use value name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray are respectively used to just use value title of storage period, initial monetary measurement title, end of term use value title and end of term monetary measurement title, the memory address of described initial information storage array is corresponding one by one with the memory address that memory address and the initial monetary measurement data of initial use value data storage subarray are stored subarray respectively, the memory address of described end of term information storage a period of time array is corresponding one by one with the memory address that memory address and the end of term monetary measurement data of end of term use value data storage subarray are stored subarray respectively,
Described each subdata base memory module also have initial economic worth gather the name storage subarray and with its subarray of initial economic worth combined data storage one to one, also have end of term economic worth gather the name storage subarray and with its one to one end of term economic worth data gather the storage subarray, described initial economic worth gather name storage subarray and end of term economic worth gather the name storage subarray be respectively used to storage period just economic value gather title and end of term economic worth gathers title, the memory address of described initial economic worth combined data storage subarray is corresponding one by one with the memory address of initial monetary measurement name storage subarray, the memory address of described end of term economic worth combined data storage subarray is corresponding one by one with the memory address of end of term monetary measurement name storage subarray,
During described each subdata base memory module also has payment information gather the name storage subarray and with its one to one during payment information combined data storage subarray, during described, payment information gathers the name storage subarray and gathers title for the memory period payment information, described during the memory address of storage unit of payment information combined data storage submatrix corresponding one by one with the memory address of initial information storage array; During each the storage unit of payment information combined data storage subarray for the memory address of the initial information storage array storage unit of storing its correspondence corresponding all during the payment information stored of the storage unit of information content storage subarray gather;
Information content storage subarray during described each subdata base memory module also has, described during information content storage subarray each storage unit memory address with and only corresponding one by one with the combination of the memory address of the memory address of an initial information storage array storage unit and an end of term information storage array storage unit;
During described each subdata base memory module also has production information gather the name storage subarray and with its one to one during production information combined data storage subarray, during described, production information gathers the name storage subarray and gathers title for the memory period production information, during described, the memory address of production information combined data storage subarray is corresponding one by one with the memory address of end of term information storage array storage unit, during each the storage unit of production information combined data storage subarray for the memory address of storing its corresponding end of term information storage array storage unit corresponding all during the storage unit of the information content storage subarray production information of storing gather,
Described each subdata base memory module also has aggregate data storage subarray, the memory address of described aggregate data storage subarray with during production information gather the memory address of store subarray and during payment information gather the combination of the memory address of storing subarray, and initial economic worth data gather combination that the memory address of storing subarray and end of term economic worth data gather the memory address of storing subarray correspondence one by one;
S12: the user by human-computer interaction interface respectively to described initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray, end of term monetary measurement data storage subarray and during input storage content storage in the memory address of information content storage subarray;
S2, Data Update,
Controller gathers the content of initial monetary measurement data storage subarray storage, according to the corresponding relation of the memory address of initial economic worth combined data storage subarray and the memory address of initial monetary measurement name storage subarray, the described content that gathers is stored into to corresponding initial economic worth combined data and stores in the storage unit of subarray
Controller gathers the content of end of term monetary measurement data storage subarray storage, corresponding relation according to memory address with the memory address of end of term monetary measurement name storage subarray of end of term economic worth combined data storage subarray, be stored into corresponding end of term economic worth combined data by described combined data and store in the storage unit of subarray;
Controller the memory address of each initial information storage array storage unit is corresponding during the payment information stored in the memory address of information content storage subarray gather, according to during the corresponding relation of memory address and the memory address of initial information storage array of storage unit of payment information combined data storage submatrix, by described combined data be stored into corresponding during the payment information combined data store in the storage unit of submatrix;
Controller the memory address of each end of term information storage array storage unit is corresponding during the production information of storing in the memory address of information content storage subarray gather, and according to during production information gather the memory address of storing subarray and the corresponding relation of the memory address of end of term information storage array storage unit search with described end of term information storage array storage unit corresponding during production information gather the memory address of storing subarray, by described gather content be stored into described during production information gather the memory address of storing subarray;
Controller according to the memory address of aggregate data storage subarray with during production information gather the memory address of store subarray with during payment information gather the corresponding relation of the combination of the memory address of storing subarray, and gather according to the memory address of aggregate data storage subarray and initial economic worth data the corresponding relation that the memory address of storing subarray and end of term economic worth data gather the combination of the memory address of storing subarray, during will be corresponding with the memory address of aggregate data storage subarray, production information gathers the content of storing in storage subarray memory address and gathers, and pay during the memory address of aggregate data storage subarray during described is corresponding and gather the content of storing in the memory address of store subarray and gather, upgrade the interior storage content of memory address of aggregate data storage subarray during described,
Will the end of term economic worth data corresponding with the memory address of aggregate data storage subarray gather the content of storing in the memory address of store subarray and deduct the initial economic worth data corresponding with the memory address of described aggregate data storage subarray and gather the content of storing in the memory address of store subarray, upgrade the interior storage content of memory address that during described, aggregate data is stored subarray;
S3, data query: when controller when receiving the inquiry request of inputting by human-computer interaction interface, the classification of storing in the name storage unit of M subdata base memory module of controller scanning, select N subdata base memory module of N classification coupling to be inquired about, described inquiry request comprises initial start time, end of term end time, the title of module, element term, need the environmental factor of considering, direct correlation coupling scheme between element, the elements correlation coupling forms local state, store information for arbitrary group of information content memory block during this time, initial economic worth gathers title and data, end of term economic worth gathers title and data, payment information gathers title and data during this time, production information gathers title and data during this time, aggregate data during this time, and the combination of these inquiry request information,
Controller by each subdata base memory module during memory address and the memory address of initial information storage array storage unit and the combination corresponding relation of end of term information storage array storage unit of each storage unit of information content storage subarray, the corresponding relation of the memory address of the memory address of the memory address of initial information storage array and initial use value storage subarray and initial monetary measurement storage subarray, and the corresponding relation of the memory address of the memory address of the memory address of end of term information storage array and end of term use value storage subarray and end of term monetary measurement storage subarray search with described inquiry request corresponding during the storage content of information content memory block, initial use value, initial monetary measurement, end of term use value, end of term monetary measurement and corresponding summary information,
S4, data show: described controller instruction human-computer interaction interface is shown query contents.
In a kind of preferred implementation of the present invention, the storage unit of described initial element term storage subarray is identical with the quantity of the storage unit of described end of term element term storage subarray, the storage unit of described initial environment storage subarray is identical with the quantity of the storage unit of described end of term environment storage subarray, the quantity of storage unit that the storage unit of direct correlation coupling scheme between described initial element storage subarray and the direct correlation coupling scheme between end of term element are stored subarray is identical, the storage unit that described initial elements correlation coupling forms local state storage subarray is identical with the quantity of the storage unit of end of term elements correlation coupling formation local state storage subarray.
In a kind of preferred implementation of the present invention, described initial element term is corresponding one by one with end of term element term, initial environment title is corresponding one by one with end of term environment title, direct correlation coupling scheme between initial element are corresponding one by one with the direct correlation coupling scheme between end of term element, and it is corresponding one by one with end of term elements correlation coupling formation local state that initial elements correlation coupling forms local state.
In a kind of preferred implementation of the present invention, described M subdata base memory module comprises job information memory module and equalization information memory module, described job information memory module canned data is provided by the operating personnel, in described equalization information memory module, the information source of storage is investigated canned data in the corresponding job information memory module of object in equilibrium, total amount information in the equalization information memory module, gathered by controller.
In a kind of preferred implementation of the present invention, display packing is:
Subdata base memory module name item is presented to one hurdle, upper left of quadrature form;
Initial start time is presented to the next group of subdata base memory module name item;
End of term end time is presented to the You Yilan of subdata base memory module name item;
Show respectively initial element term, environmental factor, the direct correlation coupling scheme between initial element that initial needs are considered in the left side on the lower hurdle of initial start time item and initial system element conjunction coupling forms local state, initial economic worth gathers title, the initial use value of demonstration and initial monetary measurement side by side respectively in the left side on the lower hurdle of initial start time item;
Show respectively that on the Shang hurdle, right hurdle of the end of term end time item environmental factor, the direct correlation coupling scheme between end of term element and the end of term system element conjunction coupling that end of term element term, the end of term need to consider forms local state, end of term economic worth gathers title, on the Xia hurdle, right hurdle of end of term end time item, show side by side respectively end of term use value and end of term monetary measurement;
During the lower hurdle of end of term economic worth combined data shows, payment information gathers title;
The storage area of the residing row of the initial start time of quadrature form and the formation of the residing a line quadrature of end of term end time be during information content memory block;
During under information content memory block be during production information gather memory block;
During the right side of information content memory block be during payment information gather memory block;
Aggregate data memory block during the lower right of quadrature form shows.
The invention has the beneficial effects as follows:
1. the present invention, by a large amount of scrappy information data systematizations, is more suitable for streaming and calculates and process.Carry out systematization, historization processing and present.
2. the present invention can provide job information, value information and equalization information and concern quick acquisition, transmission and the feedback of effect.Analyze in time in operation process, pass judgment on, expect, design and feed back collaborative in operation and control.Value information comprises use value information, core value information and economic worth information.Core value is a part in use value.
3. the present invention generates needed equalization information memory module by the content of operation information storage module storage, with operation information storage module and the link of equalization information memory module, gathers information extraction.Form a new valuable criterion and the rapid extraction of balanced judgement and the tupe of application data.Like this, be exactly on the basis of existing cloud and large data processing mode, designed a new tupe.
4. substitute original that cut apart, scattered database, with its value information and systematic presentation mode fast, and with other data between organic associated, thereby substitute existing financial report forms, national economy statistical report form.Clearly reflect calculating and present relation, value efficiency, the value relation between each use value of social system (comprising the reflection of members of society preference and preference structure) and economic worth.Overcome the measurement that larger defect is arranged and the reflection of existing economic worth.
5. can be for people's All Jobs process, comprise that charge book, analysis, expection decision-making, design planning and operation are collaborative and control etc., so can carry out based on this exploitation of data statistics processing and application software, the exploitation that can carry out better applying the novel management software of large data.
6. can realize the measurement of economic performance and social progress, with the incidence relation between the use value of the conjunction coupling relation between element, element property, element, system local state, core value, economic worth, realize that in database the members of society preference meets and integration and the conversion of various value indexs, especially with use value and the economic worth of core value, with and between conspiracy relation, realize the measurement to economic performance and social progress.The foundation of existing reality like this, can obtain again is the information feedback that is worth reliably efficiency and equilibrium state, with this, regulates and the optimization behavior.
7. can fully present the formation, motion, variation, development of each subject organization of social system and to the origin cause of formation of dismissing, and Subject-Human is aspect autologous tissue, the present situation of doing is portrayed, analyzes, is expected, design and conduct.
8. can more fully present and apply the direct correlation relation data between social system and natural system.
Additional aspect of the present invention and advantage part in the following description provide, and part will become obviously from the following description, or recognize by practice of the present invention.
The accompanying drawing explanation
Above-mentioned and/or additional aspect of the present invention and advantage are from obviously and easily understanding becoming the description of embodiment in conjunction with following accompanying drawing, wherein:
Fig. 1 is the process flow diagram of large database concept establishment of the present invention and data managing method;
Fig. 2 is the display packing of data in a kind of preferred implementation of the present invention.
Embodiment
Below describe embodiments of the invention in detail, the example of described embodiment is shown in the drawings, and wherein same or similar label means same or similar element or the element with identical or similar functions from start to finish.Be exemplary below by the embodiment be described with reference to the drawings, only for explaining the present invention, and can not be interpreted as limitation of the present invention.
The invention provides a kind of large database concept creates and data managing method, need to set up M subdata base memory module, each subdata base memory module has the name storage unit, for storing the title of described subdata base memory module, described M is positive integer, carry out data storage and Data Update in each subdata base memory module, and carry out data query and data demonstration according to the content of storing in N subdata base memory module in M subdata base memory module, described N is the positive integer that is not more than M, and concrete steps are as follows:
S1, the data storage,
S11, the direct correlation coupling scheme storage subarray between the initial time point storage subarray of the initial information storage array in each subdata base memory module of storer, initial element term storage subarray, initial environment storage subarray, initial element and the coupling of initial elements correlation form in local state storage subarray respectively storage period just time starting point, initial element term, initially need environmental factor, the direct correlation coupling scheme between initial element and the coupling of initial elements correlation considered to form local state;
The end of term time point storage subarray of the end of term information storage array in each subdata base memory module of described storer, end of term element term storage subarray, end of term environment storage subarray, direct correlation coupling scheme storage subarray between end of term element and end of term elements correlation coupling form in local state storage subarray stores respectively end of term end time, end of term element term, the environmental factor that the end of term need to be considered, direct correlation coupling scheme between end of term element and end of term elements correlation coupling form local state,
Described each subdata base memory module also has initial use value (element, direct correlation coupling scheme between element, environment, the elements correlation coupling forms the concrete function and significance of local state for the people) the name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray, initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray and end of term monetary measurement data storage subarray, described initial use value name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray are respectively used to just use value title of storage period, initial monetary measurement title, end of term use value title and end of term monetary measurement title, the memory address of described initial information storage array is corresponding one by one with the memory address that memory address and the initial monetary measurement data of initial use value data storage subarray are stored subarray respectively, the memory address of described end of term information storage a period of time array is corresponding one by one with the memory address that memory address and the end of term monetary measurement data of end of term use value data storage subarray are stored subarray respectively,
Described each subdata base memory module also have initial economic worth gather the name storage subarray and with its subarray of initial economic worth combined data storage one to one, also have end of term economic worth gather the name storage subarray and with its one to one end of term economic worth data gather the storage subarray, described initial economic worth gather name storage subarray and end of term economic worth gather the name storage subarray be respectively used to storage period just economic value gather title and end of term economic worth gathers title, the memory address of described initial economic worth combined data storage subarray is corresponding one by one with the memory address of initial monetary measurement name storage subarray, the memory address of described end of term economic worth combined data storage subarray is corresponding one by one with the memory address of end of term monetary measurement name storage subarray,
During described each subdata base memory module also has payment information gather the name storage subarray and with its one to one during payment information combined data storage subarray, during described, payment information gathers the name storage subarray and gathers title for the memory period payment information, described during the memory address of storage unit of payment information combined data storage submatrix corresponding one by one with the memory address of initial information storage array; During each the storage unit of payment information combined data storage subarray for the memory address of the initial information storage array storage unit of storing its correspondence corresponding all during the payment information stored of the storage unit of information content storage subarray gather;
Information content storage subarray during described each subdata base memory module also has, described during information content storage subarray each storage unit memory address with and only corresponding one by one with the combination of the memory address of the memory address of an initial information storage array storage unit and an end of term information storage array storage unit;
During described each subdata base memory module also has production information gather the name storage subarray and with its one to one during production information combined data storage subarray, during described, production information gathers the name storage subarray and gathers title for the memory period production information, during described, the memory address of production information combined data storage subarray is corresponding one by one with the memory address of end of term information storage array storage unit, during each the storage unit of production information combined data storage subarray for the memory address of storing its corresponding end of term information storage array storage unit corresponding all during the storage unit of the information content storage subarray production information of storing gather,
Described each subdata base memory module also has aggregate data storage subarray, the memory address of described aggregate data storage subarray with during production information gather the memory address of store subarray and during payment information gather the combination of the memory address of storing subarray, and initial economic worth data gather combination that the memory address of storing subarray and end of term economic worth data gather the memory address of storing subarray correspondence one by one;
S12: the user by human-computer interaction interface respectively to described initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray, end of term monetary measurement data storage subarray and during input storage content storage in the memory address of information content storage subarray;
S2, Data Update,
Controller gathers the content of initial monetary measurement data storage subarray storage, according to the corresponding relation of the memory address of initial economic worth combined data storage subarray and the memory address of initial monetary measurement name storage subarray, the described content that gathers is stored into to corresponding initial economic worth combined data and stores in the storage unit of subarray
Controller gathers the content of end of term monetary measurement data storage subarray storage, corresponding relation according to memory address with the memory address of end of term monetary measurement name storage subarray of end of term economic worth combined data storage subarray, be stored into corresponding end of term economic worth combined data by described combined data and store in the storage unit of subarray;
Controller the memory address of each initial information storage array storage unit is corresponding during the payment information stored in the memory address of information content storage subarray gather, according to during the corresponding relation of memory address and the memory address of initial information storage array of storage unit of payment information combined data storage submatrix, by described combined data be stored into corresponding during the payment information combined data store in the storage unit of submatrix;
Controller the memory address of each end of term information storage array storage unit is corresponding during the production information of storing in the memory address of information content storage subarray gather, and according to during production information gather the memory address of storing subarray and the corresponding relation of the memory address of end of term information storage array storage unit search with described end of term information storage array storage unit corresponding during production information gather the memory address of storing subarray, by described gather content be stored into described during production information gather the memory address of storing subarray;
Controller according to the memory address of aggregate data storage subarray with during production information gather the memory address of store subarray with during payment information gather the corresponding relation of the combination of the memory address of storing subarray, and gather according to the memory address of aggregate data storage subarray and initial economic worth data the corresponding relation that the memory address of storing subarray and end of term economic worth data gather the combination of the memory address of storing subarray, during will be corresponding with the memory address of aggregate data storage subarray, production information gathers the content of storing in storage subarray memory address and gathers, and pay during the memory address of aggregate data storage subarray during described is corresponding and gather the content of storing in the memory address of store subarray and gather, upgrade the interior storage content of memory address of aggregate data storage subarray during described.
Will the end of term economic worth data corresponding with the memory address of aggregate data storage subarray gather the content of storing in the memory address of store subarray and deduct the initial economic worth data corresponding with the memory address of described aggregate data storage subarray and gather the content of storing in the memory address of store subarray, upgrade the interior storage content of memory address that during described, aggregate data is stored subarray.
In the present embodiment, the name storage unit of each subdata base memory module is for storing the title of this subdata base memory module, and this title is for showing the classification of this subdata base memory module storage content.For example, name is called " enterprise's operation account ", and the job information of storing for prompting is the data message that enterprise operation is relevant.
In the present embodiment, can determine to create according to user's actual needs the quantity of subdata base memory module, and direct correlation coupling scheme storage subarray, the coupling of initial elements correlation between initial element term storage subarray, initial environment storage subarray, initial element form the quantity of the storage unit of local state storage subarray, form for the direct correlation coupling scheme between initial element term, initial environment title, initial element, the coupling of initial elements correlation the industry that local state also can be different according to the user and selected voluntarily.
In a preferred embodiment of the present invention, for example to form the business system account, storage " enterprise's operation account " in the name storage unit, the job information of storing for prompting is the data message that enterprise operation is relevant.Direct correlation coupling scheme storage subarray, the coupling of initial elements correlation between the initial element term storage subarray of initial information storage array, initial environment storage subarray, initial element in forming local state storage subarray respectively the just direct correlation coupling scheme between element term, initial environment title, initial element, the coupling of initial elements correlation of storage period form local state.
In the present embodiment, concrete initial element term can include but not limited to business system subject organization and enterprise assets and resource, concrete business system subject organization can include but not limited to stockholders' meeting, the board of directors, the supervision board, chairman of the board, general manager (GM), office, treasurer's department and at least one functional department, and enterprise assets and resource can include but not limited to financial asset (currency, security, bond), tangible assets (capital assets, starting material, at least one tangible assets).In other preferred implementation of the present invention, element term can also include but not limited to the subsystem title in system, for example, and each functional department in system " enterprise " and operating unit's title.
The environment title of concrete initial environment storage subarray storage can for but be not limited to industry environment, social environment and physical environment, concrete industry environment can include but not limited to chief competitor, position in industry, industry market share, enters barrier, exit barriers, at least one industry customer group, at least one industry supplier, industry and enterprise number, industry financial asset, industry tangible assets, industry intangible asset, industry become long status; Social environment can include but not limited to public sector, financial department, operating divisions, business enterprice sector, resident family, Economic Growth; Physical environment can include but not limited to natural resources and ecologic environment.
Direct correlation coupling scheme between concrete initial element can include but not limited to: corporate culture, system and technology and other at least one intangible assets.
Concrete initial elements correlation coupling forms the parameter that local state can include but not limited to position in industry, comfortable graceful index and other at least one explanation local states.
In forming local state storage subarray, the direct correlation coupling scheme between storage period last element title, end of term environment title, end of term element, end of term elements correlation coupling form local state respectively for direct correlation coupling scheme storage subarray between the end of term of end of term information storage array element term storage subarray, end of term environment storage subarray, end of term element, end of term elements correlation coupling.
In the present embodiment, the storage unit of initial element term storage subarray is identical with the quantity of the storage unit of described end of term element term storage subarray, the storage unit of described initial environment storage subarray is identical with the quantity of the storage unit of described end of term environment storage subarray, the quantity of storage unit that the storage unit of direct correlation coupling scheme between described initial element storage subarray and the direct correlation coupling scheme between end of term element are stored subarray is identical, the storage unit that described initial elements correlation coupling forms local state storage subarray is identical with the quantity of the storage unit of end of term elements correlation coupling formation local state storage subarray.
Initial element term is corresponding one by one with end of term element term, initial environment title is corresponding one by one with end of term environment title, direct correlation coupling scheme between initial element are corresponding one by one with the direct correlation coupling scheme between end of term element, and it is corresponding one by one with end of term elements correlation coupling formation local state that initial elements correlation coupling forms local state.The memory address of the memory address of each initial information storage array storage unit and an end of term information storage array storage unit forms a combination.
In the present embodiment, the initial economic worth that initial economic worth gathers name storage subarray storage gathers title can be determined according to actual needs, can for but be not limited to initial Right of subject assets, initially be in debt, initial owner's equity; The end of term economic worth that end of term economic worth gathers name storage subarray storage gathers title can be determined according to actual needs, can for but be not limited to that end of term Right of subject assets, the end of term are in debt, end of term owner's equity.
During this time payment information gather name storage subarray storage during payment information gather title and can be determined according to actual needs, include but not limited to use value payment, economic worth payment, payment cost and stock.
During this time production information gather name storage subarray storage during production information gather title and can be determined according to actual needs, include but not limited to use value output, production output, production cost, debt increment and produce increment.
Total amount information data during the storage of the subarray of total amount information combined data storage during this time, the aggregate data that corresponding title can generate according to reality be determined, can for but be not limited to the appreciation of fixed assets, debt increment, owner's equity increment, total payoff, total output, balance scale, production increment total amount, total payoff cost, total cost of production, economic worth efficiency (the production increment total amount that the total payoff cost is corresponding) etc.
In the present embodiment, by in arbitrary social system and subsystem thereof between all elements, environment title, element directly conjunction coupling mode, system local state for people's function and significance, use respectively two kinds of value of use value and economic worth (monetary measurement) to be measured, the functional attributes of element and element, can directly use the element term mark, its use value adds the method metering of quality standard or function or preference ordinal number by itself measurement unit (radix).As: steel, XX ton-XX standard.The system local state, the conjunction coupling mode between element, its use value adds the way metering of ordinal number greatly less by parameter name, as: ten of health index-, technical regulation-first, system-first preference etc.The economic worth monetary measurement, its error correction is used according to the system equalization state and is determined.
Information content storage subarray during also having in this memory module, in use, the user stores subarray to initial use value data respectively by human-computer interaction interface, initial monetary measurement data storage subarray, end of term use value data storage subarray, end of term monetary measurement data storage subarray is inputted initial use value, initial monetary measurement, end of term use value, end of term monetary measurement, to during the memory address of the content of storing in the memory address of input and its initial information storage array storage unit in each storage unit of information content memory block and the end of term information storage array storage unit concrete job information corresponding to content of storing.
Controller gathers the content of initial monetary measurement data storage subarray storage, according to the corresponding relation of the memory address of initial economic worth combined data storage subarray and the memory address of initial monetary measurement name storage subarray, the described content that gathers is stored into to corresponding initial economic worth combined data and stores in the storage unit of subarray.
Controller gathers the content of end of term monetary measurement data storage subarray storage, corresponding relation according to memory address with the memory address of end of term monetary measurement name storage subarray of end of term economic worth combined data storage subarray, be stored into corresponding end of term economic worth combined data by described combined data and store in the storage unit of subarray.
Controller the memory address of each initial information storage array storage unit is corresponding during the payment information stored in the memory address of information content storage subarray gather, according to during the corresponding relation of memory address and the memory address of initial information storage array of storage unit of payment information combined data storage submatrix, by described combined data be stored into corresponding during the payment information combined data store in the storage unit of submatrix.
When controller the memory address of each end of term information storage array storage unit is corresponding during storage production information in information content storage subarray storage unit gather, and according to during production information gather the memory address of storing subarray and the corresponding relation of the memory address of end of term information storage array storage unit search with described end of term information storage array storage unit corresponding during production information gather the memory address of memory block, by described storage content gather memory block described during production information gather the memory address of memory block.
Controller according to the memory address of aggregate data storage subarray with during production information gather the memory address of store subarray with during payment information gather the corresponding relation of the combination of the memory address of storing subarray, and gather according to the memory address of aggregate data storage subarray and initial economic worth data the corresponding relation that the memory address of storing subarray and end of term economic worth data gather the combination of the memory address of storing subarray, during will be corresponding with the memory address of aggregate data storage subarray, production information gathers the content of storing in storage subarray memory address and gathers, and pay during the memory address of aggregate data storage subarray during described is corresponding and gather the content of storing in the memory address of store subarray and gather, upgrade the interior storage content of memory address of aggregate data storage subarray during described.
Will the end of term economic worth data corresponding with the memory address of aggregate data storage subarray gather the content of storing in the memory address of store subarray and deduct the initial economic worth data corresponding with the memory address of described aggregate data storage subarray and gather the content of storing in the memory address of store subarray, upgrade the interior storage content of memory address that during described, aggregate data is stored subarray.As shown in Figure 2, concrete display mode is the form formed:
Subdata base memory module name item is presented to one hurdle, upper left of quadrature form;
Initial start time is presented to the next group of subdata base memory module name item;
End of term end time is presented to the You Yilan of subdata base memory module name item;
Show respectively initial element term, environmental factor, the direct correlation coupling scheme between initial element that initial needs are considered in the left side on the lower hurdle of initial start time item and initial system element conjunction coupling forms local state, initial economic worth gathers title, the initial use value of demonstration and initial monetary measurement side by side respectively in the left side on the lower hurdle of initial start time item;
Show respectively that on the Shang hurdle, right hurdle of the end of term end time item environmental factor, the direct correlation coupling scheme between end of term element and the end of term system element conjunction coupling that end of term element term, the end of term need to consider forms local state, end of term economic worth gathers title, on the Xia hurdle, right hurdle of end of term end time item, show side by side respectively end of term use value and end of term monetary measurement;
During the lower hurdle of end of term economic worth combined data shows, payment information gathers title;
The storage area of the residing row of the initial start time of quadrature form and the formation of the residing a line quadrature of end of term end time be during information content memory block;
During under information content memory block be during production information gather memory block; During the right side of information content memory block be during payment information gather memory block;
Lower right at the quadrature form shows the aggregate data memory block.
In the present embodiment, by direct conjunction coupling mode, local state between initial element, environment title, element, initial economic worth gathers title and with respect to system body people's use value and economic worth, comprise the environment (system and formation thereof) that the direct correlation relation is arranged with system, be marked at the left hurdle of quadrature form.Conjunction coupling mode, local system state, end of term economic worth between the element in the end of term in arbitrary system a certain period, environment title, element are gathered to title, and with respect to system body people's use value and economic worth, comprise the environment (system and formation thereof) that the direct correlation relation is arranged with system, be marked at the upper hurdle of quadrature form.Using during in content storage subarray the conjunction coupling mode of storage between the element of intermediate, environment title, element, local state respectively supplemental markers expire the initial stage foot couple should each title in.By the conjunction coupling mode between initial end of term element, environment title, element, local system state and with respect to the direct crosslinked relation of the quadrature of system body people's use value and economic worth, express and the systematic procedure of describing system during all.On the right hurdle of quadrature form, respectively correspondence markings and express during use value corresponding to conjunction coupling mode, local system state between all elements, environment, element pay, economic worth pays, during financial cost (abbreviation payment cost) and stock.On the lower hurdle of quadrature form, mark and express during and the conjunction coupling mode between all system elements of the end of term, environment, element, use value output that local state is the process productive target, production output, production economy cost (abbreviation production cost) that economic worth is weighed, the debt increment producing increment, occur because of power and responsibility occurs and receipt and payment realize difference.
The systematic economy in the initial end of term is worth and amounts to, and system body rights and interests assets, Right of subject debt and owner's equity are placed on respectively the Zuo Lan of quadrature form and the end on upper hurdle.Process use value Zhi Fuyu process use value output can be carried out the structure equilibrium analysis.The appreciation of fixed assets, debt increment, owner's equity increment, total payoff, total output, balance scale, production increment total amount, total payoff cost, total cost of production, economic worth efficiency correspondence markings are in the lower right of quadrature form.The total output of process and process total payoff, the construction system balance scale.Producing during this time increment, is the source of economic growth.The variation of initial end of term Right of subject assets, the variation of owner's equity, all express respectively the appreciation of fixed assets and owner's equity increment.Relation between system production cost and system payment cost, the content of expression cost accounting.Produce the relation between increment total amount and cost, express economic worth efficiency.Each row of every a line of form, have evaluation and the judgement of corresponding cost performance and Technological Economy efficiency.Embody the direct incidence relation with environmental system simultaneously.
Each is by element, environment, the elements correlation coupling scheme operation grid associated with the state parameter quadrature during this time, all payment operations of arbitrary element of mark and expression, environment, elements correlation coupling scheme and state parameter, portray job information by activity duration, job instruction, operation use value or economic worth variable, job state parameter etc.
In the present embodiment, element property can be substituted with the metering of element use value, the conjunction coupling mode between element or system local state can substitute by intangible asset.Such database more suits traditional habit in application.
By the uniqueness of activity duration, same system database phase interval is connected, all linked with one another.And, between the job information memory module of different system, note the consistance of activity duration, be convenient to split and integrate.Add the time consistency that all social system databases embody, can realize that streaming is calculated and processing.
In a kind of preferred implementation of the present invention, described M subdata base memory module comprises job information memory module and equalization information memory module, described job information memory module canned data is provided by the operating personnel, and in described equalization information memory module, the canned data of memory block derives from the memory module canned data of job information memory block.It is object that the job information memory module be take arbitrary social system, the arbitrary operation main body of arbitrary job information and manipulating object, the raw readings information (establishment and emendation that comprises structure of the law) that gathers the proprietary valuable efficiency rating of integration system main body and work under certain structure of the law rule, record gathers anyone job information with uniqueness of arbitrary time point, the basic skills and the form that with large database concept, build, build database.The data message of job information memory module has uniqueness, history and systemic.Each social system can be made the job information memory module of oneself.Be difficult to individually build according to job information the system of manufacturing information storage module, can, under the support of cloud, by the relevant associated data information of operation, generate corresponding job information memory module, as agricultural.Arbitrary job information memory module can be worth the judge of efficiency and the equilibrium of system inner structure.Between the job information memory module, also can under the support of cloud, carry out the judge of system value relation.
The job information memory module splits to be integrated.Under the support of cloud, can and understand the needs of work data information according to further extraction, select to determine the path that splits and integrate, on the basis of the data message of some job information memory modules, build and generate another job information memory module.The job information memory module, can with arbitrary needed data information link, thereby be formed with the data Storage and Processing pattern that is worth efficiency criterion.Not the data message of motion change development of the system of human beings, process in social system job information memory module.
The job information memory module also allows under the structure of the law principle, and the arbitrary data message by need to be keep secret in the account, be set as secure content, and sets level of confidentiality.
The equalization information memory module is (changeable from a certain zone, can be domestic or international) or country, the All Jobs information storage module in certain industry in, it is to investigate object that the conjunction coupling relation, system local state parameter, systematic economy of a certain element, environment, element of take is worth, production by it in the All Jobs information storage module and payment or supply and demand relation, and environmental impact factor, from the job information memory module, extract, the basic skills of using large database concept to build, build and form the equalization information memory module.For the mother system structure equilibrium across exercise subsystem, pass judgment on.When extracting, also can extract the corresponding combined data of this object.
The equalization information memory module is to split and integrate and form from the job information memory module.Can solve a certain system architecture Aggregate Equilibrium in arbitrary time, zone or system, but, finally with the national system Aggregate Equilibrium, make last judge.In national Aggregate Equilibrium, mainly contain five basis equalization information storage modules such as enterprise product, public product, labour, currency finance, system state guarantee.Comprising international finance and international trade data variable.
In addition, the needs that can also observe, analyze, expect decision-making, design and operation according to the operation main body, using the job information in a certain orthogonal square of arbitrary process or one group of orthogonal square as key message, as scientific research, electricity consumption etc., and the title in setting data storehouse and generation pass, as activity duration, industry or zone, colony etc., on the basis of job information memory module, by the fractionation under the cloud support and integration, generate and take certain indivedual job information as main job information module.Individual work information, comprise activity duration, job instruction, operation use value or economic worth variable, job state parameter etc.Can, according to operational feature, be respectively executable operations, job analysis, operation expection decision-making, design project, work in coordination with and control operation etc. again.
The corresponding data memory module separate, stored of time that controller defines each initial end of term, phase phase is connected, and each issue is independently updated, can integrate by the time, and Stream Processing, should be noted that whole time consistency.
S3, when carrying out data query, controller is when receiving the inquiry request of inputting by human-computer interaction interface, the classification of storing in the name storage unit of M subdata base memory module of controller scanning, select N subdata base memory module of N classification coupling to be inquired about, described inquiry request comprises that described inquiry request comprises initial start time, end of term end time, the title of module, element term, need the environmental factor of considering, direct correlation coupling scheme between element, the elements correlation coupling forms local state, store information for arbitrary group of information content memory block during this time, initial economic worth gathers title and data, end of term economic worth gathers title and data, payment information gathers title and data during this time, production information gathers title and data during this time, aggregate data title and data during this time, and the combination of these inquiry request information,
Controller by each subdata base memory module during memory address and the memory address of initial information storage array storage unit and the combination corresponding relation of end of term information storage array storage unit of each storage unit of information content storage subarray, the corresponding relation of the memory address of the memory address of the memory address of initial information storage array and initial use value storage subarray and initial monetary measurement storage subarray, and the corresponding relation of the memory address of the memory address of the memory address of end of term information storage array and end of term use value storage subarray and end of term monetary measurement storage subarray search with described inquiry request corresponding during the storage content of information content memory block, initial use value, initial monetary measurement, end of term use value, end of term monetary measurement and corresponding summary information,
S4, data show: described controller instruction human-computer interaction interface is shown query contents.
The present invention can have following application:
The generation of operation raw readings and social system large database concept.The all working person is according to the job duty of oneself and the actual conditions of work, comprise operation purpose, operating condition, activity duration and operation process information etc., with aforesaid database building mode, the mode of the job library that maybe can generate, fill in the raw readings of operation, press operation unit, functional department or unit, the path of entire system independently, split and be integrated into autonomous system (any independent accounting unit) job information memory module.
Take activity duration, industry, zone as splitting the integration elementary path, take the operation raw readings as the master data source, split respectively the job information memory module of the arbitrary market structure system that is integrated into industry, zone, country, the world or needs.The All Jobs information storage module is integrated, with its subdata base, take activity duration, system element and state parameter, job information etc. to establish the link as key message.Make all data of social system become valuable and balanced pass judgment on, the streaming record, calculate and process, historied, systematized database.
Be worth and pass judgment on clearly fast.People's any behavior and organization and administration, all need to be worth clearly fast judge, to feed back to behaviour decision making.In social system job information memory module, conjunction coupling mode, the system state of the initial end of term to each element, element property, element, corresponding use value and Evaluation of economic value for system body arranged, and during portraying in database the correspondence of process each row and every a line, the evaluation that the system value effect is arranged and be worth efficiency, use value can be arranged, also the economic worth efficiency rating can be arranged, can also estimate alternately.In analyzing, expecting subdata base, can also carry out many conclusions and how may pass judgment on.
The systematic economy value assessment is also fast with complete, variation of entire system total payoff, total output, balance scale, total payoff cost, total cost of production, Right of subject assets and owner's equity etc., as long as raw readings completes, the job information memory module can obtain Evaluation of economic value.From arbitrary social system to all social systems.
The system body core value, by its use value and its economic worth effect in system, the conspiracy relation between analysis personnel core value and systematic economy are worth.Can, with system body core value and economic worth and conspiracy relation state thereof, estimate arbitrary social system, especially the progress of social region and national system.
Conjunction coupling relation between system element, its use value is embodied in system, technology, Moral Culture aspect.Its economic worth effect, pass judgment on the edge effect of intangible asset.
The system local state, its use value with respect to Subject-Human is sight, vision, art, U.S., justice, the effects such as psychology, emotion, spirit such as warm, happy, safe.The contents such as politics, art, religion can be included thus, its economic worth is still passed judgment on the edge effect of intangible asset.
Integrated the judge of the social system value relation of various value evaluation.In order to carry out strategy and development path, select.Also for the consistance activity duration, pass judgment on.
Comprehensively balanced judge fast.Equilibrium is the origin cause of formation that is worth efficiency, is also the basis of measure of value.Therefore, balanced is the key factor of behavior decision with being worth efficiency the same, and Balance Evaluation and regulation and control fast are that people's behaviour decision making is necessary, and the equalization information memory module generated fast by the job information memory module can complete.The structure equilibrium subdata base that simultaneously, can use respectively as required, computable general equilibrium subdata base, balanced expection subdata base, design balanced subdata base, balanced operation is collaborative and the subdata base controlled.Can carry out computable general equilibrium to conjunction coupling mode and the system local state of arbitrary system element, element.Also can carry out computable general equilibrium with the entire system state.Can carry out balanced judge the targetedly.
Job information collective analysis and processing fast.Use the job information memory module, carry out fast focusing on of job information.Such as: power consumption.As long as the job information of electricity consumption in system is concentrated, can obtain the electricity consumption Structure and Scale, carry out thus corresponding production supply regulation and control.Job information in can the job information memory module that some are important, from job information memory module and equalization information memory module, extract separately, be integrated into the job information memory module to a certain information collective analysis, as analysis, scientific research, expection, design, operation are worked in coordination with and control, subject organization etc.
Become the upgrading direction of tupe and the cloud of large data.The tupe of the large data of a valuable criterion of large database concept must just can use again under the support of cloud, simultaneously, is again the upgrading direction of cloud.Job information memory module, equalization information memory module are applied together, formed the basic tupe of large data.Be worth fast judge, balanced judge, streaming calculating and data access.The database of take can carry out the exploitation of novel management software and data processing software as basis.The management software of exploitation Novel series, design and produce " panel board " that form human behavior.Substitute or link existing economic management account and report system.Comprise financial accounting account and form, socioeconomic statistics form, national economy account and form.
Application example of the present invention.
According to the needs of consumption, investment, production, scientific research, study, management, life, use accordingly.Below some application examples.
Consumer applications.At needs consumption or a certain series products of research consumption, can inquire about the regional equalization information memory module of certain time of this series products, in information such as the production of all these series products in this period, this zone, demand, use value, economic worths (price) all in corresponding equalization information memory module, show.And the consumer can be according to some preference, supplier or consumer spending that inquiry is understood wherein pay situation about using.And then search supplier, and the consumer data in early stage.Arbitrary commodity can be like this, and the equalization information memory module is the information data in the job information memory module to generate, and time and time period also can freely be selected.Can inquire about the analysis data in this job information memory module for own reference if wish special analysis, from the data of its analysis, obtain the corresponding information of analyzing.If how wish to obtain the following equilibrium state of this product? select a period in corresponding future, the data of corresponding expection.Design data is generally maintained secrecy, but authorized department can inquire about.If wish to understand supvr or management unit's Collaborative Control data message balanced to this, search for the Collaborative Control data of this equalization information memory module.If have own to this equalization information memory module and respective vendor or job information memory module corresponding to consumer, opinion, expection and the opinions and suggestions to working in coordination with and controlling that oneself is arranged, can be in the job information memory module of oneself, as a kind of operation, deliver analysis, expection to this equalization information memory module or job information memory module, or opinions and suggestions collaborative and that control.Others is by the job information memory module of integrating, and in the mode of work data information, inquiry obtains reference.
Investment.The equalization information memory module of the corresponding investment of search product item, country, zone, industry system job information storage module, and then the job information memory module of search relevant enterprise.By job information memory module and the equalization information memory module of expection, be worth and pass judgment on and balanced the judge.
Produce.The production operation information storage module of this product of search history, the improvement of being analyzed in its database, expecting, redesign, work in coordination with and control, or set up job information memory module and the equalization information memory module of expection simulation.Ensure and improve operation.
Scientific research.Once Scientific Research Problem or project are established, or pinpoint the problems and problem from job information memory module or its subdata base,, by this problem and problem, the corresponding job information memory module of corresponding search or equalization information memory module and subdata base thereof, can launch scientific research.
Study.The equalization information memory module of the corresponding documents and materials of search learning content and target or the job information memory module of corresponding management service department, or the job information memory module of the equalization information memory module of education product or education services mechanism.Both can determine and need which type of service, can consult related data again.The job information memory module relevant with learning content and equalization information memory module be can also directly enter, analysis, expection, board design, simulation job, the collaborative opinions and suggestions with controlling of proposition operation participated in.
Management.Any supvr, except the management operations record of filling in oneself, directly inquiry is in the face of the job information memory module of institute's management system, and corresponding subdata base, carry out the observation of job state, analyzed simultaneously, expected, design, operation coordination and controlling decision, some corresponding management operations information can be stored in the subdata base of job information memory module, comprise the information such as the data such as panel discussion and resolution, system or other technologies parameter and standard, also can be with reference to corresponding subdata base.The supvr can be take the job information memory module as " sand table ", analyzed, expected the planning decision-making, design, send job instruction commander operation, and the operation result is responsible for.
Financial company.In national system job information memory module, obtain the balance scale of financial instrument, can be in the job information memory module of financial industry, obtain each financial company and be worth the equalization information memory module, carry out the analysis of industry environment, can be in the job information memory module of oneself, find the operation state of oneself, can be in the financial structure information database, the equilibrium of research market structure, can be in certain job information subdata base of financial circles, the research financial market is dynamic, can be in the value relation database with customers or other industry, the research marketing, comprise the control of financial instrument supply scale.
Life & amusement.Carry out the search of the equalization information memory module of entertainment selection, product, program, obtain corresponding data message.
In the description of this instructions, the description of reference term " embodiment ", " some embodiment ", " example ", " concrete example " or " some examples " etc. means to be contained at least one embodiment of the present invention or example in conjunction with specific features, structure, material or the characteristics of this embodiment or example description.In this manual, the schematic statement of above-mentioned term not necessarily referred to identical embodiment or example.And the specific features of description, structure, material or characteristics can be with suitable mode combinations in any one or more embodiment or example.
Although illustrated and described embodiments of the invention, those having ordinary skill in the art will appreciate that: in the situation that do not break away from principle of the present invention and aim can be carried out multiple variation, modification, replacement and modification to these embodiment, scope of the present invention is limited by claim and equivalent thereof.

Claims (5)

1. a large database concept creates and data managing method, it is characterized in that, set up M subdata base memory module, each subdata base memory module has the name storage unit, for storing the title of described subdata base memory module, described M is positive integer, carry out data storage and Data Update in each subdata base memory module, and carry out data query and data demonstration according to the content of storing in N subdata base memory module in M subdata base memory module, described N is the positive integer that is not more than M, and concrete steps are as follows:
S1, the data storage,
S11, the direct correlation coupling scheme storage subarray between the initial time point storage subarray of the initial information storage array in each subdata base memory module of storer, initial element term storage subarray, initial environment storage subarray, initial element and the coupling of initial elements correlation form in local state storage subarray respectively storage period just time starting point, initial element term, initially need environmental factor, the direct correlation coupling scheme between initial element and the coupling of initial elements correlation considered to form local state;
The end of term time point storage subarray of the end of term information storage array in each subdata base memory module of described storer, end of term element term storage subarray, end of term environment storage subarray, direct correlation coupling scheme storage subarray between end of term element and end of term elements correlation coupling form in local state storage subarray stores respectively end of term end time, end of term element term, the environmental factor that the end of term need to be considered, direct correlation coupling scheme between end of term element and end of term elements correlation coupling form local state,
Described each subdata base memory module also has initial use value name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray, initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray and end of term monetary measurement data storage subarray, described initial use value name storage subarray, initial monetary measurement name storage subarray, end of term use value name storage subarray and end of term monetary measurement name storage subarray are respectively used to just use value title of storage period, initial monetary measurement title, end of term use value title and end of term monetary measurement title, the memory address of described initial information storage array is corresponding one by one with the memory address that memory address and the initial monetary measurement data of initial use value data storage subarray are stored subarray respectively, the memory address of described end of term information storage a period of time array is corresponding one by one with the memory address that memory address and the end of term monetary measurement data of end of term use value data storage subarray are stored subarray respectively,
Described each subdata base memory module also have initial economic worth gather the name storage subarray and with its subarray of initial economic worth combined data storage one to one, also have end of term economic worth gather the name storage subarray and with its one to one end of term economic worth data gather the storage subarray, described initial economic worth gather name storage subarray and end of term economic worth gather the name storage subarray be respectively used to storage period just economic value gather title and end of term economic worth gathers title, the memory address of described initial economic worth combined data storage subarray is corresponding one by one with the memory address of initial monetary measurement name storage subarray, the memory address of described end of term economic worth combined data storage subarray is corresponding one by one with the memory address of end of term monetary measurement name storage subarray,
During described each subdata base memory module also has payment information gather the name storage subarray and with its one to one during payment information combined data storage subarray, during described, payment information gathers the name storage subarray and gathers title for the memory period payment information, described during the memory address of storage unit of payment information combined data storage submatrix corresponding one by one with the memory address of initial information storage array; During each the storage unit of payment information combined data storage subarray for the memory address of the initial information storage array storage unit of storing its correspondence corresponding all during the payment information stored of the storage unit of information content storage subarray gather;
Information content storage subarray during described each subdata base memory module also has, described during information content storage subarray each storage unit memory address with and only corresponding one by one with the combination of the memory address of the memory address of an initial information storage array storage unit and an end of term information storage array storage unit;
During described each subdata base memory module also has production information gather the name storage subarray and with its one to one during production information combined data storage subarray, during described, production information gathers the name storage subarray and gathers title for the memory period production information, during described, the memory address of production information combined data storage subarray is corresponding one by one with the memory address of end of term information storage array storage unit, during each the storage unit of production information combined data storage subarray for the memory address of storing its corresponding end of term information storage array storage unit corresponding all during the storage unit of the information content storage subarray production information of storing gather,
Described each subdata base memory module also has aggregate data storage subarray, the memory address of described aggregate data storage subarray with during production information gather the memory address of store subarray and during payment information gather the combination of the memory address of storing subarray, and initial economic worth data gather combination that the memory address of storing subarray and end of term economic worth data gather the memory address of storing subarray correspondence one by one;
S12: the user by human-computer interaction interface respectively to described initial use value data storage subarray, initial monetary measurement data storage subarray, end of term use value data storage subarray, end of term monetary measurement data storage subarray and during input storage content storage in the memory address of information content storage subarray;
S2, Data Update,
Controller gathers the content of initial monetary measurement data storage subarray storage, according to the corresponding relation of the memory address of initial economic worth combined data storage subarray and the memory address of initial monetary measurement name storage subarray, the described content that gathers is stored into to corresponding initial economic worth combined data and stores in the storage unit of subarray
Controller gathers the content of end of term monetary measurement data storage subarray storage, corresponding relation according to memory address with the memory address of end of term monetary measurement name storage subarray of end of term economic worth combined data storage subarray, be stored into corresponding end of term economic worth combined data by described combined data and store in the storage unit of subarray;
Controller the memory address of each initial information storage array storage unit is corresponding during the payment information stored in the memory address of information content storage subarray gather, according to during the corresponding relation of memory address and the memory address of initial information storage array of storage unit of payment information combined data storage submatrix, by described combined data be stored into corresponding during the payment information combined data store in the storage unit of submatrix;
Controller the memory address of each end of term information storage array storage unit is corresponding during the production information of storing in the memory address of information content storage subarray gather, and according to during production information gather the memory address of storing subarray and the corresponding relation of the memory address of end of term information storage array storage unit search with described end of term information storage array storage unit corresponding during production information gather the memory address of storing subarray, by described gather content be stored into described during production information gather the memory address of storing subarray;
Controller according to the memory address of aggregate data storage subarray with during production information gather the memory address of store subarray with during payment information gather the corresponding relation of the combination of the memory address of storing subarray, and gather according to the memory address of aggregate data storage subarray and initial economic worth data the corresponding relation that the memory address of storing subarray and end of term economic worth data gather the combination of the memory address of storing subarray, during will be corresponding with the memory address of aggregate data storage subarray, production information gathers the content of storing in storage subarray memory address and gathers, pay during the memory address of aggregate data storage subarray during described is corresponding and gather the content of storing in the memory address of storing subarray and gather, upgrade the interior storage content of memory address of aggregate data storage subarray during described,
Will the end of term economic worth data corresponding with the memory address of aggregate data storage subarray gather the content of storing in the memory address of store subarray and deduct the initial economic worth data corresponding with the memory address of described aggregate data storage subarray and gather the content of storing in the memory address of store subarray, upgrade the interior storage content of memory address that during described, aggregate data is stored subarray;
S3, data query: when controller when receiving the inquiry request of inputting by human-computer interaction interface, the classification of storing in the name storage unit of M subdata base memory module of controller scanning, select N subdata base memory module of N classification coupling to be inquired about, described inquiry request comprises initial start time, end of term end time, the title of module, element term, need the environmental factor of considering, direct correlation coupling scheme between element, the elements correlation coupling forms local state, store information for arbitrary group of information content memory block during this time, initial economic worth gathers title and data, end of term economic worth gathers title and data, payment information gathers title and data during this time, production information gathers title and data during this time, aggregate data during this time, and the combination of these inquiry request information,
Controller by each subdata base memory module during memory address and the memory address of initial information storage array storage unit and the combination corresponding relation of end of term information storage array storage unit of each storage unit of information content storage subarray, the corresponding relation of the memory address of the memory address of the memory address of initial information storage array and initial use value storage subarray and initial monetary measurement storage subarray, and the corresponding relation of the memory address of the memory address of the memory address of end of term information storage array and end of term use value storage subarray and end of term monetary measurement storage subarray search with described inquiry request corresponding during the storage content of information content memory block, initial use value, initial monetary measurement, end of term use value, end of term monetary measurement and corresponding summary information,
S4, data show: described controller instruction human-computer interaction interface is shown query contents.
2. large database concept as claimed in claim 1 creates and data managing method, it is characterized in that, the storage unit of described initial element term storage subarray is identical with the quantity of the storage unit of described end of term element term storage subarray, the storage unit of described initial environment storage subarray is identical with the quantity of the storage unit of described end of term environment storage subarray, the quantity of storage unit that the storage unit of direct correlation coupling scheme between described initial element storage subarray and the direct correlation coupling scheme between end of term element are stored subarray is identical, the storage unit that described initial elements correlation coupling forms local state storage subarray is identical with the quantity of the storage unit of end of term elements correlation coupling formation local state storage subarray.
3. large database concept as claimed in claim 1 creates and data managing method, it is characterized in that, described initial element term is corresponding one by one with end of term element term, initial environment title is corresponding one by one with end of term environment title, direct correlation coupling scheme between initial element are corresponding one by one with the direct correlation coupling scheme between end of term element, and it is corresponding one by one with end of term elements correlation coupling formation local state that initial elements correlation coupling forms local state.
4. large database concept as claimed in claim 1 creates and data managing method, it is characterized in that, described M subdata base memory module comprises job information memory module and equalization information memory module, described job information memory module canned data is provided by the operating personnel, in described equalization information memory module, the information source of storage is investigated canned data in the corresponding job information memory module of object in equilibrium, total amount information in the equalization information memory module, gathered by controller.
5. large database concept as claimed in claim 1 creates and data managing method, it is characterized in that, described display packing is:
Subdata base memory module name item is presented to one hurdle, upper left of quadrature form;
Initial start time is presented to the next group of subdata base memory module name item;
End of term end time is presented to the You Yilan of subdata base memory module name item;
Show respectively initial element term, environmental factor, the direct correlation coupling scheme between initial element that initial needs are considered in the left side on the lower hurdle of initial start time item and initial system element conjunction coupling forms local state, initial economic worth gathers title, the initial use value of demonstration and initial monetary measurement side by side respectively in the left side on the lower hurdle of initial start time item;
Show respectively that on the Shang hurdle, right hurdle of the end of term end time item environmental factor, the direct correlation coupling scheme between end of term element and the end of term system element conjunction coupling that end of term element term, the end of term need to consider forms local state, end of term economic worth gathers title, on the Xia hurdle, right hurdle of end of term end time item, show side by side respectively end of term use value and end of term monetary measurement;
During the lower hurdle of end of term economic worth combined data shows, payment information gathers title;
The storage area of the residing row of the initial start time of quadrature form and the formation of the residing a line quadrature of end of term end time be during information content memory block;
During under information content memory block be during production information gather memory block;
During the right side of information content memory block be during payment information gather memory block;
Aggregate data memory block during the lower right of quadrature form shows.
CN201310396199.XA 2013-09-03 2013-09-03 A kind of large database concept creates and data managing method Active CN103455606B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310396199.XA CN103455606B (en) 2013-09-03 2013-09-03 A kind of large database concept creates and data managing method
PCT/CN2014/085673 WO2015032297A1 (en) 2013-09-03 2014-09-01 Method for creating large database and managing data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310396199.XA CN103455606B (en) 2013-09-03 2013-09-03 A kind of large database concept creates and data managing method

Publications (2)

Publication Number Publication Date
CN103455606A true CN103455606A (en) 2013-12-18
CN103455606B CN103455606B (en) 2016-07-06

Family

ID=49737969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310396199.XA Active CN103455606B (en) 2013-09-03 2013-09-03 A kind of large database concept creates and data managing method

Country Status (2)

Country Link
CN (1) CN103455606B (en)
WO (1) WO2015032297A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015032297A1 (en) * 2013-09-03 2015-03-12 He Yunkun Method for creating large database and managing data
CN107924417A (en) * 2015-08-26 2018-04-17 片山成仁 Data bank management device and its method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019041346A1 (en) * 2017-09-04 2019-03-07 吴佩殷 Religious regulation guarantee system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510582A (en) * 2002-12-25 2004-07-07 鸿富锦精密工业(深圳)有限公司 General ledger administration system and method
JP2012068693A (en) * 2010-09-21 2012-04-05 Mitsubishi Electric Corp Database management device, database management method, and program
CN103200338A (en) * 2013-03-25 2013-07-10 苏州洲际传书信息科技有限公司 Telephone traffic statistic method
CN103218448A (en) * 2013-04-26 2013-07-24 中国农业银行股份有限公司 Self-service report generating method, device and system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1152338C (en) * 2001-07-20 2004-06-02 华为技术有限公司 Parallel distributed-data base processing method and device
CN100561482C (en) * 2008-01-29 2009-11-18 北京北方烽火科技有限公司 A kind of implementation method of embedded system data base
CN103152393B (en) * 2013-02-05 2015-08-05 北京邮电大学 A kind of charging method of cloud computing and charge system
CN103455606B (en) * 2013-09-03 2016-07-06 何云坤 A kind of large database concept creates and data managing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510582A (en) * 2002-12-25 2004-07-07 鸿富锦精密工业(深圳)有限公司 General ledger administration system and method
JP2012068693A (en) * 2010-09-21 2012-04-05 Mitsubishi Electric Corp Database management device, database management method, and program
CN103200338A (en) * 2013-03-25 2013-07-10 苏州洲际传书信息科技有限公司 Telephone traffic statistic method
CN103218448A (en) * 2013-04-26 2013-07-24 中国农业银行股份有限公司 Self-service report generating method, device and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015032297A1 (en) * 2013-09-03 2015-03-12 He Yunkun Method for creating large database and managing data
CN107924417A (en) * 2015-08-26 2018-04-17 片山成仁 Data bank management device and its method
CN107924417B (en) * 2015-08-26 2022-04-15 片山成仁 Database management device and method thereof

Also Published As

Publication number Publication date
WO2015032297A1 (en) 2015-03-12
CN103455606B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
Wang et al. Service design blueprint approach incorporating TRIZ and service QFD for a meal ordering system: A case study
Carrillo Knowledge-based development as a new economic culture
Parr The regional economy, spatial structure and regional urban systems
Tigabu et al. Technology innovation systems and technology diffusion: Adoption of bio-digestion in an emerging innovation system in Rwanda
Messeni Petruzzelli et al. Organizational factors and technological features in the development of green innovations: Evidence from patent analysis
Hu et al. A UNISON framework for knowledge management of university–industry collaboration and an illustration
Karlsson Handbook of research on cluster theory
Bianchi Enhancing performance management and sustainable organizational growth through system-dynamics modelling
Reichstein et al. Break on through: Sources and determinants of product and process innovation among UK construction firms
Burquel et al. Benchmarking in European Higher Education: A step beyond current quality models
Ponte et al. Between mission and revenue: measuring performance in a hybrid organization
Vinodh et al. DESSAC: a decision support system for quantifying and analysing agility
Nasir et al. The influence of transformational leadership on organizational sustainability in the context of industry 4.0: Mediating role of innovative performance
Chiucchi Exploring the benefits of measuring intellectual capital. The Aimag case study
Abagissa The assessment of micro and small enterprises performance and challenges in Addis Ababa, Ethiopia
Lizarralde et al. Adaptation of the MIVES method for the strategic selection of new technologies at an R&D centre. Focus on the manufacturing sector
Yuan et al. A network prototype for integrated production-distribution planning with non-multi-functional plants
Riva et al. Digital and lean transformation in the bank and in the financial services: The experience of Unicredit Bank
CN103455606A (en) Large database creating and data managing method
Van Opstal et al. Work integration ambitions of startups in the circular economy
Bodenmann et al. Synthesis report on the state of the art on firmographics
Cano Dialectical model of marketing versus trends and fashions
Frederick et al. Industry clusters and global value chains: Analytical frameworks to study the new world of textiles
Panitz et al. Post-Brexit: Do board interlocks make banks take similar relocation decisions?
Alduraywish et al. State of the art of information systems failure managements

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant