CN103453268B - Fast-assembling spacing compensates high-pressure rigid process pipe connection set - Google Patents

Fast-assembling spacing compensates high-pressure rigid process pipe connection set Download PDF

Info

Publication number
CN103453268B
CN103453268B CN201310427485.8A CN201310427485A CN103453268B CN 103453268 B CN103453268 B CN 103453268B CN 201310427485 A CN201310427485 A CN 201310427485A CN 103453268 B CN103453268 B CN 103453268B
Authority
CN
China
Prior art keywords
ninth
heavenly stems
movable elbow
oil movable
straight tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310427485.8A
Other languages
Chinese (zh)
Other versions
CN103453268A (en
Inventor
吕新农
赵永明
王新河
王跃文
米红学
刘延龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201310427485.8A priority Critical patent/CN103453268B/en
Publication of CN103453268A publication Critical patent/CN103453268A/en
Application granted granted Critical
Publication of CN103453268B publication Critical patent/CN103453268B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

<b> the present invention relates to manufacturing equipment line connection device technical field, be that a kind of fast-assembling spacing compensates high-pressure rigid process pipe connection set, its </b><bGreatT.Gre aT.GT comprises left oil movable elbow in the ninth of the ten Heavenly Stems, right oil movable elbow in the ninth of the ten Heavenly Stems and straight tube; Left one end of oil movable elbow in the ninth of the ten Heavenly Stems and the left end of straight tube are fixedly installed togather, right one end of oil movable elbow in the ninth of the ten Heavenly Stems and the right-hand member of straight tube are fixedly installed togather, be installed with the left oily ninth of the ten Heavenly Stems at the other end of left oil movable elbow in the ninth of the ten Heavenly Stems, be installed with the right oily ninth of the ten Heavenly Stems at the other end of right oil movable elbow in the ninth of the ten Heavenly Stems.Reasonable and compact in structure of the present invention, easy to use, install fast simple, Security is high, eliminates the extruding correction work during pipeline disalignment caused due to equipment Foundations problem simultaneously, makes complexes can quick mounting going into operation.</b>

Description

Fast-assembling spacing compensates high-pressure rigid process pipe connection set
Technical field
the present invention relates to manufacturing equipment line connection device technical field, is that a kind of fast-assembling spacing compensates high-pressure rigid process pipe connection set.
Background technique
rigidity process pipelines many employings flange pipeline of general erection unit, when installing before going into operation, if can compensator be adopted when pipeline is low pressure, if must spacing install when line pressure is higher, this has just had very high requirement to the coaxality of pipeline two end interface, such as install a DN50 flange pipeline and at least need 1 hour, installation process is complicated and easily because alignment error causes revealing, and seriously constrains device and goes into operation and carry out.
Summary of the invention
the invention provides a kind of fast-assembling spacing and compensate high-pressure rigid process pipe connection set, overcome the deficiency of above-mentioned prior art, it effectively can solve high pressure line and install complicated and easily because alignment error causes revealing, seriously constrains device and to go into operation the problem of carrying out.
technological scheme of the present invention is realized by following measures: a kind of fast-assembling spacing compensates high-pressure rigid process pipe connection set, comprises left oil movable elbow in the ninth of the ten Heavenly Stems, right oil movable elbow in the ninth of the ten Heavenly Stems and straight tube; Left one end of oil movable elbow in the ninth of the ten Heavenly Stems and the left end of straight tube are fixedly installed togather, right one end of oil movable elbow in the ninth of the ten Heavenly Stems and the right-hand member of straight tube are fixedly installed togather, be installed with the left oily ninth of the ten Heavenly Stems at the other end of left oil movable elbow in the ninth of the ten Heavenly Stems, be installed with the right oily ninth of the ten Heavenly Stems at the other end of right oil movable elbow in the ninth of the ten Heavenly Stems.
here is the further optimization and/or improvements to foregoing invention technological scheme:
above-mentioned left oil movable elbow in the ninth of the ten Heavenly Stems and right oil movable elbow in the ninth of the ten Heavenly Stems are respectively S type oil movable elbow in the ninth of the ten Heavenly Stems.
the above-mentioned left bottom righthand side of oil movable elbow in the ninth of the ten Heavenly Stems and the left end of straight tube are fixedly installed togather, and the right lower-left end of oil movable elbow in the ninth of the ten Heavenly Stems and the right-hand member of straight tube are fixedly installed togather.
reasonable and compact in structure of the present invention, easy to use, install fast simple, Security is high, eliminates the extruding correction work during pipeline disalignment caused due to equipment Foundations problem simultaneously, makes complexes can quick mounting going into operation.
Accompanying drawing explanation
accompanying drawing 1 is the main TV structure schematic diagram of preferred embodiment.
coding in accompanying drawing is respectively: 1 is left oil movable elbow in the ninth of the ten Heavenly Stems, and 2 is right oil movable elbow in the ninth of the ten Heavenly Stems, and 3 is straight tube, and 4 is the left oily ninth of the ten Heavenly Stems, and 5 is the right oily ninth of the ten Heavenly Stems.
Embodiment
the present invention by the restriction of following embodiment, can not determine concrete mode of execution according to technological scheme of the present invention and actual conditions.
in the present invention, for convenience of description, the description of the relative position relation of each parts is all be described according to the Butut mode of Figure of description 1, as: the position relationship of upper and lower, left and right etc. determines according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the invention will be further described:
as shown in Figure 1, this fast-assembling spacing compensation high-pressure rigid process pipe connection set comprises left oil movable elbow in the ninth of the ten Heavenly Stems 1, right oil movable elbow in the ninth of the ten Heavenly Stems 2 and straight tube 3; Left one end of oil movable elbow in the ninth of the ten Heavenly Stems 1 and the left end of straight tube 3 are fixedly installed togather, right one end of oil movable elbow in the ninth of the ten Heavenly Stems 2 and the right-hand member of straight tube 3 are fixedly installed togather, be installed with the left oily ninth of the ten Heavenly Stems 4 at the other end of left oil movable elbow in the ninth of the ten Heavenly Stems 1, be installed with the right oily ninth of the ten Heavenly Stems 5 at the other end of right oil movable elbow in the ninth of the ten Heavenly Stems 2.Straight tube 3, left oil movable elbow in the ninth of the ten Heavenly Stems 1 and right oil movable elbow in the ninth of the ten Heavenly Stems 2 is utilized to form the rigid connection structure of process pipelines, all process pipelines all adopt same size, same type high pressure line, pipeline name mark long unified (as 5000mm), straight tube 3 is adopted to be connected fast with left oil movable elbow in the ninth of the ten Heavenly Stems 1 and right oil movable elbow in the ninth of the ten Heavenly Stems 2, by the change of left oil movable elbow 1 in the ninth of the ten Heavenly Stems and right oil movable elbow 2 in ninth of the ten Heavenly Stems spatial position, maximum adjustment distance be ± 50mm, and pipeline pastes ground layout, do not laminate, intersect; Under normal state of the present invention, pipeline 1 people of DN50 completes in 10 minutes and unloads fortune, assembling, debugging; Eliminate the extruding correction work during pipeline disalignment caused due to equipment Foundations problem simultaneously; The present invention install fast simple, Security is high, makes complexes can quick mounting going into operation.
according to actual needs, high-pressure rigid process pipe connection set can be compensated to above-mentioned fast-assembling spacing and makes further optimization and/or improvements:
as shown in Figure 1, left oil movable elbow in the ninth of the ten Heavenly Stems 1 and right oil movable elbow in the ninth of the ten Heavenly Stems 2 are respectively S type oil movable elbow in the ninth of the ten Heavenly Stems.
as shown in Figure 1, the left bottom righthand side of oil movable elbow in the ninth of the ten Heavenly Stems 1 and the left end of straight tube 3 are fixedly installed togather, and the right lower-left end of oil movable elbow in the ninth of the ten Heavenly Stems 2 and the right-hand member of straight tube 3 are fixedly installed togather.The rigid connection structure of process pipelines is formed with the straight tube 3 of union anatomical connectivity and left oil movable elbow in the ninth of the ten Heavenly Stems 1, right oil movable elbow in the ninth of the ten Heavenly Stems 2.
above technical characteristics constitutes most preferred embodiment of the present invention, and it has stronger adaptability and best implementation result, can increase and decrease non-essential technical characteristics according to actual needs, meet the demand of different situations.

Claims (1)

1. fast-assembling spacing compensates a high-pressure rigid process pipe connection set, it is characterized in that comprising left oil movable elbow in the ninth of the ten Heavenly Stems, right oil movable elbow in the ninth of the ten Heavenly Stems and straight tube; Left one end of oil movable elbow in the ninth of the ten Heavenly Stems and the left end of straight tube are fixedly installed togather, right one end of oil movable elbow in the ninth of the ten Heavenly Stems and the right-hand member of straight tube are fixedly installed togather, be installed with the left oily ninth of the ten Heavenly Stems at the other end of left oil movable elbow in the ninth of the ten Heavenly Stems, be installed with the right oily ninth of the ten Heavenly Stems at the other end of right oil movable elbow in the ninth of the ten Heavenly Stems; Wherein: left oil movable elbow in the ninth of the ten Heavenly Stems and right oil movable elbow in the ninth of the ten Heavenly Stems are respectively S type oil movable elbow in the ninth of the ten Heavenly Stems, and the left bottom righthand side of oil movable elbow in the ninth of the ten Heavenly Stems and the left end of straight tube are fixedly installed togather, and the right lower-left end of oil movable elbow in the ninth of the ten Heavenly Stems and the right-hand member of straight tube are fixedly installed togather.
CN201310427485.8A 2013-09-18 2013-09-18 Fast-assembling spacing compensates high-pressure rigid process pipe connection set Active CN103453268B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310427485.8A CN103453268B (en) 2013-09-18 2013-09-18 Fast-assembling spacing compensates high-pressure rigid process pipe connection set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310427485.8A CN103453268B (en) 2013-09-18 2013-09-18 Fast-assembling spacing compensates high-pressure rigid process pipe connection set

Publications (2)

Publication Number Publication Date
CN103453268A CN103453268A (en) 2013-12-18
CN103453268B true CN103453268B (en) 2015-12-23

Family

ID=49735950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310427485.8A Active CN103453268B (en) 2013-09-18 2013-09-18 Fast-assembling spacing compensates high-pressure rigid process pipe connection set

Country Status (1)

Country Link
CN (1) CN103453268B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2450195A (en) * 1946-09-21 1948-09-28 William H Grantham Adjustable pipe fitting assembly
CN201242012Y (en) * 2008-06-30 2009-05-20 陈早明 Abrasion-proof bent tube with adjustable connecting components
CN201827575U (en) * 2010-10-22 2011-05-11 杨俊� High-pressure movable elbow
CN102853195A (en) * 2012-10-07 2013-01-02 安阳市荣诚石油矿山机械有限公司 High-pressure movable elbow
CN203517129U (en) * 2013-09-18 2014-04-02 中国石油集团西部钻探工程有限公司 Quick fixed-distance high-pressure-compensation rigid process pipeline connection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2450195A (en) * 1946-09-21 1948-09-28 William H Grantham Adjustable pipe fitting assembly
CN201242012Y (en) * 2008-06-30 2009-05-20 陈早明 Abrasion-proof bent tube with adjustable connecting components
CN201827575U (en) * 2010-10-22 2011-05-11 杨俊� High-pressure movable elbow
CN102853195A (en) * 2012-10-07 2013-01-02 安阳市荣诚石油矿山机械有限公司 High-pressure movable elbow
CN203517129U (en) * 2013-09-18 2014-04-02 中国石油集团西部钻探工程有限公司 Quick fixed-distance high-pressure-compensation rigid process pipeline connection device

Also Published As

Publication number Publication date
CN103453268A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103644379A (en) Pipe fitting base
CN201434753Y (en) Pressure testing tool for self sealed pipe joints
CN102398164B (en) For the fixed head of screw hole clamp of small flange of exhaust pipe drill
CN103453268B (en) Fast-assembling spacing compensates high-pressure rigid process pipe connection set
CN203517129U (en) Quick fixed-distance high-pressure-compensation rigid process pipeline connection device
CN202646981U (en) Universal flange plate connected with transformer fuel outlet valve
CN102840197A (en) Mechanical assembly block with baffle plate
CN102808821A (en) Porous mechanical connecting base
CN204913184U (en) Parallel flange is organized frock fast
CN204947292U (en) Combined transformer connection bus
CN204099801U (en) T-shaped three-dimensional six connections for bbreather pipe
CN204082740U (en) A kind of automatic liquid pressure valve
CN204267869U (en) A kind of wire rod fixture
CN203519090U (en) Flowmeter temperature and pressure compensation device capable of being mounted online
CN202659640U (en) Limiting rod
CN204099799U (en) T-shaped three-dimensional five-way pipe joint
CN202936162U (en) Four-way connector assembly used for connection of door frame pipeline and accessory of forklift
CN203146060U (en) Oil scale sleeve of engine
CN201661791U (en) Pipe quick-connection piston cylinder
CN202811656U (en) Hydraulic operating box
CN203571212U (en) Installation structure for pipeline vertical bend
CN203202490U (en) Three-way tube base for monomer hydraulic prop
CN203477654U (en) Novel welding structure for oil tube
CN204756218U (en) Rubber connector with regulatory function
CN204984314U (en) Mud manifold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant