CN103452122B - Steel strand anchor installation device and connection member thereof - Google Patents

Steel strand anchor installation device and connection member thereof Download PDF

Info

Publication number
CN103452122B
CN103452122B CN201310375417.1A CN201310375417A CN103452122B CN 103452122 B CN103452122 B CN 103452122B CN 201310375417 A CN201310375417 A CN 201310375417A CN 103452122 B CN103452122 B CN 103452122B
Authority
CN
China
Prior art keywords
anchorage
profile steel
steel
welded
connection member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310375417.1A
Other languages
Chinese (zh)
Other versions
CN103452122A (en
Inventor
高尔荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou AMOLE Experimental Equipment Co., Ltd
Original Assignee
Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd filed Critical Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd
Priority to CN201310375417.1A priority Critical patent/CN103452122B/en
Publication of CN103452122A publication Critical patent/CN103452122A/en
Application granted granted Critical
Publication of CN103452122B publication Critical patent/CN103452122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses steel strand anchor installation device and connection member thereof, this connection member includes H profile steel B, the left end face of H profile steel B is cross section and is welded with connecting plate, connecting plate central authorities are provided with the anchorage perforate for housing anchorage, anchorage perforate is formed around bolt hole B, the its right end face of H profile steel B is cross section and is welded with adpting flange C, on the left of the web of H profile steel B, depression forms the anchorage fluting for housing anchorage, respectively has multiple connecting hole C before and after H profile steel B in wing plates on two sides.The technical program easy accessibility, can be used repeatedly, and reaches to save construction cost, the purpose of convenient construction.

Description

Steel strand anchor installation device and connection member thereof
Technical field
The present invention relates to the steel strand anchor installation device of a kind of pattern foundation pit supporting structure inner support system, particularly relate to steel The connection member of twisted wire anchorage installation device.
Background technology
In Soft Soil Foundation Pit engineering, armored concrete or steel pipe support supporting construction, in order to reduce foundation ditch Deformation, increases stability, and the most conventional method is: increase reinforced concrete fortifield village purlin size in the street, increase The quantity of steel pipe support, reduces spacing etc..But this will be greatly increased the consumption of construction material, decrease base Effective construction space in hole.Due to the steel support structure used at present, mainly make with single shaped steel or steel pipe For support beam, it is formed without effectively connecting between every root type steel or steel pipe, it is impossible to work as combining structure, So their support rigidity is relatively low, the power that can bear is relatively limited, for the foundation ditch that span is bigger, Existing steel shotcrete support is used to be difficult to control to its deformation.These support members are owing to being much all by site operation Require to make, there is no the size for connection of specification, it is impossible to reach to exchange between all parts and general purpose, After causing foundation pit construction to complete, most of support members all become expendable consumed product, it is impossible to reuse.
After the most conventional pattern foundation pit supporting structure completes, without prestress application technique, or increase support member, it is impossible to Support system improves the integral rigidity of support system further after being completed.
Summary of the invention
The present invention is directed to above-mentioned the deficiencies in the prior art, for assembled pattern foundation pit supporting structure inner support system Fish belly sill tension structure provides the steel of a kind of stable high intensity stretch-draw to twist when tension steel strand Shi Hanzhang Line anchorage installation device and connection member thereof, rational in infrastructure, easy accessibility, can be used repeatedly, reach Save construction cost, the purpose of convenient construction.
The technical scheme is that and be achieved in that:
The connection member of steel strand anchor installation device, including H profile steel B, the left end face of H profile steel B is horizontal Tangent plane is also welded with connecting plate, and connecting plate central authorities are provided with the anchorage perforate for housing anchorage, and anchorage is opened Hole is formed around bolt hole B, and its right end face of H profile steel B is cross section and is welded with adpting flange C, H On the left of the web of shaped steel B, depression forms the anchorage fluting for housing anchorage, wing plates on two sides before and after H profile steel B On respectively have multiple connecting hole C.
Steel strand anchor installation device, including connection member as above.
Due to the fact that and have employed above technical scheme, open for assembled pattern foundation pit supporting structure inner support system fish belly sill Pull-up structure provides a kind of stable high intensity tension ground tackle erecting device when stretch-draw applies stress.Steel strand wires warp Cross fish belly sill to penetrate from threading elongated hole, then after guide channel with the tension ground tackle being arranged on anchorage substrate even Connect, steel strand wires are pressed pulling force by tensioning equipment, after certain numerical value, anchorage is locked.In order to Anchorage substrate side also realizes continuing to connect, and is provided with connection member, and connection member is with anchorage substrate bolt even Connecing, be so contained in connection member by anchorage, connection member can be enclosed parts with other and is connected.The present invention Parts are standard size parts, and easy accessibility can realize the matching requirements of plurality of specifications foundation ditch, can repeatedly weigh Multiple utilization, reaches to save the purpose of construction cost.Use that this set standard component assembles in a specific way interior Support system, meet prestressed in the case of, bigger construction space, convenient construction can be saved.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the upward view of Fig. 1;
Fig. 4 is the A-A sectional view of Fig. 1;
Fig. 5 is the B-B sectional view of Fig. 1;
Fig. 6 is the structural representation of adpting flange B;
Fig. 7 is the structural representation of anchorage substrate.
Detailed description of the invention
Below in conjunction with the accompanying drawings the detailed description of the invention of the present invention is made a detailed explanation.
Embodiment 1:
The steel strand anchor installation device of pattern foundation pit supporting structure inner support system as shown in Figure 1, including anchorage seat and Connection member.
Described anchorage seat includes H profile steel A3, and the left end face of H profile steel A3 is cross section the company of being welded with Acting flange A1, its right end face of H profile steel A3 is cross section and is welded with anchorage substrate 11, such as Fig. 7 Shown in, anchorage substrate 11 central authorities are provided with the anchorage installation hole 112 for installing anchorage, anchorage installation hole 112 It is formed around four bolt hole A111;As shown in Figure 1 and Figure 2, the front side wing plate of H profile steel A3 is provided with two 33, three baffle plates 7 of individual threading elongated hole and an adpting flange B8, two threading elongated holes 33 are located side by side at H The both sides of the web of shaped steel A3, three baffle plates 7 and adpting flange B8 respectively with the front side of H profile steel A3 The front vertical of wing plate is also welded and fixed, and three baffle plates 7 be arrangeding in parallel lay respectively at two threading elongated holes 33 Centre and upper and lower both sides, adpting flange B8 be positioned at three baffle plates 7 right side and with three baffle plate 7 vertical weldings Connecing fixing, the length of three baffle plates 7 is all longer than the length of threading elongated hole 33, on the front side wing plate of H profile steel A3 Have multiple connecting hole A32, multiple connecting hole A32 on the right side of adpting flange B8 and be divided into upper and lower one_to_one corresponding Two rows arranged, are 100mm with arranging two adjacent connecting hole A32 spacing, a diameter of 28mm of connecting hole A32; As it is shown on figure 3, have multiple connecting hole B34, six connecting hole B34 on the rear side wing plate of H profile steel A3 it is One group, six the connecting hole B34 often organized are divided into two rows and upper and lower one_to_one corresponding is arranged, phase up and down The pitch of holes of two adjacent connecting hole B34 is 200mm, and the pitch of holes of two connecting hole B34 that left and right is adjacent is A diameter of 28mm of 100mm, connecting hole B34;As Figure 1 and Figure 4, in the grooves on two sides of H profile steel A3 Being respectively provided with two kicker baffles 9, two kicker baffles 9 are positioned at the right side of threading elongated hole 33, kicker baffle 9 Vertical with the web of H profile steel A3 and wing plates on two sides and be welded and fixed, kicker baffle 9 has pilot hole, two Be provided with between individual kicker baffle 9 corresponding with pilot hole before and after two arc-shaped guide plates 10, two arcs are led All vertical with the web of H profile steel A3 to plate 10 and be welded and fixed, the two ends of two arc-shaped guide plates 10 are respectively It is welded and fixed with two kicker baffles 9, is the formation of between such pilot hole and two arc-shaped guide plates 10 supplying The curved channel 101(arcuate guide structure that steel strand wires pass through).
As shown in Figure 1, shown in Figure 5, described connection member includes H profile steel B12, the left end face of H profile steel B12 For cross section and be welded with connecting plate 17, connecting plate 17 central authorities are provided with the anchorage perforate for housing anchorage 171, anchorage perforate 171 is formed around four bolt hole B172, and connecting plate 17 and anchorage substrate 11 pass through spiral shell Tethering and connect fixing, its right end face of H profile steel B12 is cross section and is welded with adpting flange C13, H type On the left of the web of steel B12, depression forms the anchorage fluting 121 for housing anchorage, before and after H profile steel B12 two Respectively having four connecting hole C on side wing, four rectangular corners of connecting hole C are distributed, the long 200mm of this rectangle, The wide a diameter of 28mm of 100mm, connecting hole C.
Wherein, described adpting flange A1, adpting flange B8 are identical with adpting flange C13 physical dimension, such as figure Shown in 6, adpting flange B8 having four flange holes 81, four square corners of flange hole 81 are distributed, This square length of side is 200mm, a diameter of 28mm of flange hole 81.
In the present embodiment, in the grooves on two sides of described H profile steel A3, it is equipped with flange support angle plate 2, flange support angle The both sides of plate 2 are vertical with the web of adpting flange A1 and H profile steel A3 respectively and are welded and fixed.Described H type Being equipped with shackle plate 4 in the grooves on two sides of steel A3, shackle plate 4 hangs down with web and the wing plates on two sides of H profile steel A3 Direct join is welded and fixed, and shackle plate 4 has lifting hole(eyelet).Multiple osculum is had on the web of described H profile steel A3 31.Web reinforcing plate 5, web reinforcing plate are all close to be welded with in the both sides of the web of described H profile steel A3 The position of 5 and threading elongated hole 33 adapt and are positioned at the inner side of threading elongated hole 33, the length of web reinforcing plate 5 One to the twice for threading elongated hole 33;Wing plate reinforcing plate 6 it is equipped with in the grooves on two sides of described H profile steel A3 With multiple wing plate gripper shoes 15, the front side wing plate of wing plate reinforcing plate 6 and H profile steel A3 is close to be welded and fixed, the wing The position of plate reinforcing plate 6 and threading elongated hole 33 adapt and are positioned at the outside of threading elongated hole 33, and wing plate is strengthened One to the twice of a length of threading elongated hole 33 of plate 6, the position of wing plate gripper shoe 15 and threading elongated hole 33 phase Adapt to and be positioned at the outside of threading elongated hole 33, the two ends of wing plate gripper shoe 15 respectively with wing plate reinforcing plate 6 and H The rear side wing plate of shaped steel A3 is vertical and is welded and fixed.It is provided with and H profile steel between two described kicker baffles 9 The guiding reinforcing plate 16 that the web of A3 is parallel, guides before in reinforcing plate 16 and two arc-shaped guide plates 10 The outside vertical of one is also welded and fixed, and guides reinforcing plate 16 two ends vertical also with two kicker baffles 9 respectively It is welded and fixed, between web and the guiding reinforcing plate 16 of H profile steel A3, is provided with multiple deep floor, multiple reinforcements Floor be positioned in two arc-shaped guide plates 10 before before one, the two ends of deep floor respectively with H type The web of steel A3 and guiding reinforcing plate 16 vertically and are welded and fixed.In the grooves on two sides of described H profile steel A3 all Being provided with substrate reinforcing plate 14, substrate reinforcing plate 14 is parallel with the web of H profile steel A3 and is positioned at H profile steel A3 The outside of wing plate, substrate reinforcing plate 14 is vertical with the wing plates on two sides of anchorage substrate 11 and H profile steel A3 respectively And be welded and fixed.
The present embodiment Base body is H profile steel, and there are standard flange connecting plate and anchorage substrate in H profile steel two ends, on The most all have standard connecting hole, above H profile steel center, weld a stop block structure, have standard adpting flange with Enclose purlin to connect.3 pieces of block reinforcing plates are welded on the outer surface of H profile steel, form two stopper slots, at groove Two threading elongated holes (steel strand) are opened on the surface of bottom H profile steel.Be welded with below threading elongated hole two with wear The reinforcement angle steel of 1.5 times of length of string holes, is used for strengthening.At distance through wires hole 150mm, arc is set and leads To structure (arc-shaped guide plate and reinforcement structure), at distance arc-shaped guide plate about 500mm, weld anchorage base Plate, and it is corresponding with anchorage to arrange installing hole.Flange Standard fitted position is 200 × 200mm, and through-hole diameter is 28mm.H steel front surface has two row's pilot holes, and spacing is 100mm, and rear surface pilot hole two trestle column is 200mm, A diameter of 28mm, pitch of holes is 100mm, and six holes are a small group, and the spacing between group is 200mm, 12 Big group of individual Kong Weiyi, the spacing between big group is 400mm.It is provided with osculum on perpendicular rib in the middle of H profile steel, with Just in rain weather or band water construction environment, reach the purpose of draining, reduce the corrosion of these parts.
It is emphasized that: be the most only presently preferred embodiments of the present invention, not the present invention is made any Pro forma restriction, any simple modification that above example is made by every technical spirit according to the present invention, Equivalent variations and modification, all still fall within the range of technical solution of the present invention.

Claims (2)

1. the connection member of steel strand anchor installation device, it is characterised in that include H profile steel B (12), H type The left end face of steel B (12) is cross section and is welded with connecting plate (17), in connecting plate (17) Centre is provided with the anchorage perforate (171) for housing anchorage, and anchorage perforate (171) is formed around bolt hole B (172), its right end face of H profile steel B (12) is cross section and is welded with adpting flange C (13), On the left of the web of H profile steel B (12), depression forms anchorage fluting (121) for housing anchorage, H profile steel Multiple connecting hole C is respectively had in wing plates on two sides before and after B (12);Anchorage substrate (11) central authorities are provided with use In the anchorage installation hole (112) of installation anchorage, connecting plate (17) and anchorage substrate (11) pass through bolt Connect fixing.
2. steel strand anchor installation device, it is characterised in that include connection member as claimed in claim 1.
CN201310375417.1A 2013-08-26 2013-08-26 Steel strand anchor installation device and connection member thereof Active CN103452122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310375417.1A CN103452122B (en) 2013-08-26 2013-08-26 Steel strand anchor installation device and connection member thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310375417.1A CN103452122B (en) 2013-08-26 2013-08-26 Steel strand anchor installation device and connection member thereof

Publications (2)

Publication Number Publication Date
CN103452122A CN103452122A (en) 2013-12-18
CN103452122B true CN103452122B (en) 2016-09-07

Family

ID=49734929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310375417.1A Active CN103452122B (en) 2013-08-26 2013-08-26 Steel strand anchor installation device and connection member thereof

Country Status (1)

Country Link
CN (1) CN103452122B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241829B (en) * 2019-07-08 2020-10-09 中信国安建工集团有限公司 Construction process of inner support of deep foundation pit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07317064A (en) * 1994-05-25 1995-12-05 Kawashiyou Lease Syst Kk Connecting fitting for h-steel with end plate
CN102839677A (en) * 2012-09-26 2012-12-26 上海新强劲工程技术有限公司 Multifunctional rectangular connecting piece for internal support of foundation pit
CN202718241U (en) * 2012-07-27 2013-02-06 山东大学 Semi-rigid steel column base connecting structure
CN203546729U (en) * 2013-08-26 2014-04-16 浙江博雷重型机床制造有限公司 Connecting component of steel strand anchorage device mounting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2434357Y (en) * 2000-07-20 2001-06-13 胡战波 Prestressed large span solid door type steel frame

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07317064A (en) * 1994-05-25 1995-12-05 Kawashiyou Lease Syst Kk Connecting fitting for h-steel with end plate
CN202718241U (en) * 2012-07-27 2013-02-06 山东大学 Semi-rigid steel column base connecting structure
CN102839677A (en) * 2012-09-26 2012-12-26 上海新强劲工程技术有限公司 Multifunctional rectangular connecting piece for internal support of foundation pit
CN203546729U (en) * 2013-08-26 2014-04-16 浙江博雷重型机床制造有限公司 Connecting component of steel strand anchorage device mounting device

Also Published As

Publication number Publication date
CN103452122A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103334378B (en) The few circulation classification stretch-draw construction method of Self-Anchored Concrete Suspension hoist cable
CN104947603A (en) Reinforced concrete girder bridge girder reinforcing structure and method
CN103967019A (en) Fish-bellied beam device for supporting foundation ditch
CN203514309U (en) Steel strand anchorage device base
CN202347525U (en) Prestress bow-shaped steel circuit purlin
CN107829444B (en) Wind turbine generator system prestressing force foundation structure
CN103452122B (en) Steel strand anchor installation device and connection member thereof
CN103510514B (en) A kind of steel strand anchorage device base
CN103452111B (en) A kind of steel strand anchor installation device and link thereof
CN103510521A (en) Connecting component
CN203514323U (en) Connection component
CN203452071U (en) Steel strand anchorage mounting device and anchorage seat thereof
CN203452073U (en) Steel strand anchorage mounting device of foundation pit supporting inner support system
CN203514311U (en) Steel strand anchor mounting device and anchor seat thereof
CN203452074U (en) Steel strand anchor installation device of supporting system in foundation pit support
CN203546729U (en) Connecting component of steel strand anchorage device mounting device
CN203452075U (en) Steel strand anchorage device installation device and connecting component thereof
CN103452110B (en) Steel stranded wire anchor gear installing device and anchor gear seat of steel stranded wire anchor gear installing device
CN203420270U (en) Fish belly sill part of foundation pit supporting and protecting inner support system
CN103452112B (en) Steel stranded wire anchor gear installing device of foundation pit supporting inner support system
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN103388336B (en) Main purline part for inner support
CN202039327U (en) Building structure of prestressed concrete sluice pier
CN103967023B (en) A kind of supporting and protection structure for the long limit of elongated rectangular shape foundation ditch
CN206418632U (en) A kind of steel plate concrete shearing wall member with tie hoop

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200616

Address after: 311101 Dajin, gejiache village, Qiaosi street, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou AMOLE Experimental Equipment Co., Ltd

Address before: 313219 Zhejiang province Huzhou city Deqing County Town Road No. 1 Chomo leidian

Patentee before: ZHEJIANG BOLEI HEAVY MACHINE TOOL MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right