CN103448123B - A kind of preparation method of spiral stairway beam - Google Patents

A kind of preparation method of spiral stairway beam Download PDF

Info

Publication number
CN103448123B
CN103448123B CN201210168312.4A CN201210168312A CN103448123B CN 103448123 B CN103448123 B CN 103448123B CN 201210168312 A CN201210168312 A CN 201210168312A CN 103448123 B CN103448123 B CN 103448123B
Authority
CN
China
Prior art keywords
standpipe
plank
central tube
pipe box
lower wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210168312.4A
Other languages
Chinese (zh)
Other versions
CN103448123A (en
Inventor
陈兆红
Original Assignee
Ningbo Zhenhai Jiedeng Applied Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Zhenhai Jiedeng Applied Technology Research Institute filed Critical Ningbo Zhenhai Jiedeng Applied Technology Research Institute
Priority to CN201210168312.4A priority Critical patent/CN103448123B/en
Publication of CN103448123A publication Critical patent/CN103448123A/en
Application granted granted Critical
Publication of CN103448123B publication Critical patent/CN103448123B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

A kind of making apparatus of spiral stairway beam, its feature comprises dish and lower wall, be connected and fixed by central tube between described upper lower burrs, around described central tube, some standpipes are provided with between upper lower burrs, described standpipe is provided with presser device, by opening the Vidacare corp or the turning handle that are arranged on central shaft one end, can according to the distance between the size adjustment standpipe of spiral stairway beam radian and relative riser, can according to the height of sleeve pipe on spiral stairway angle adjustment standpipe, utilize the press strip of the elasticity of plank on this equipment to compress one by one after plank is layering and can be made into spiral stairway beam not only firm but also attractive in appearance, and saving of labor is material-saving again.

Description

A kind of preparation method of spiral stairway beam
Technical field
The present invention relates to a kind of stair, especially relate to a kind of preparation method of spiral stairway beam.
Background technology
Mainly steel-wood structure and the full-wood of finished product stair in the market, and the spiral bottom girder of full bimber stair screws down between employing one step about one step, combine one by one, compare like this and take a lot of work, or be sawn into one section of spiral bottom girder with large wooden unit, and every section is connected by screw tightening, doing so not only takes a lot of work also compares expense material, and joint area is relatively weak, also unsightly.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of not only saving of labor, but also the preparation method of material-saving and spiral stairway beam more attractive in appearance.
Technical scheme provided by the present invention is a kind of preparation method of spiral stairway beam, comprise central tube, the upper end of central tube is provided with dish, the lower end of central tube is provided with lower wall, between upper dish and lower wall, some standpipes are provided with around central tube, standpipe is provided with presser device, bearing is provided with in central tube, bearing is connected with central shaft, central shaft two ends are respectively arranged with the first bevel gear, central shaft wherein one end is connected with Vidacare corp through the first bevel gear end, upper dish and lower wall are respectively arranged with some elongated holes, elongated hole is arranged in radiation centered by central tube, some distances between standpipe with central tube are all equal, standpipe two ends are respectively arranged with slide block, groove is provided with between slide block and standpipe end face, the groove of standpipe upper end is stuck in the both sides of dish elongated hole, the groove of lower riser end is stuck in the both sides of lower wall elongated hole, slide block is provided with screw hole, screw rod is provided with in screw hole on slide block, the slide block that every bar screw rod all matches with it and elongated hole parallel, screw rod one end is each passed through the tube wall of central tube, end is provided with the second bevel gear, second bevel gear engages with the first bevel gear, the screw rod other end is coupling respectively on the outward flange of upper dish and lower wall, wherein at least one screw rod stretches out, and stretch out the outward flange of dish or lower wall, end is provided with handle, the presser device that standpipe is arranged is by pipe box, lead screw, press strip and nut composition, pipe box is enclosed within standpipe and also can moves axially, pipe box side is fixedly installed lead screw, lead screw is provided with press strip and nut, pipe box opposite side is provided with the screw fixed for pipe box and standpipe, the pipe box be arranged on every root standpipe is 2, press strip is provided with 2 elongated holes, the lead screw be arranged on pipe box is passed respectively and is screwed with nut from one of them elongated hole, the opposite face of upper dish and lower wall is all carved with size,
Its concrete making step is as follows:
(1) got plank according to designing requirement and Bao put down, plank thickness is between 5-15mm, and length and width can according to designing requirements;
(2) unlatching Vidacare corp or rotation are arranged on the handle on screw rod, and handle riser adjusts to the diameter required for spiral stairway beam, and the pipe box on handle riser mixes up by spiral stairway beam angle;
(3) surface adopts whole piece plank, neat for the plank joint saw for inside, plank joint dislocation as far as possible between levels, be layering to after plank and plank gluing face gluing the thickness needed, the plank adhesive tape folded is tied up temporarily, the plank tied up is moved to be pressed by press strip between two pipe boxes and is compressed by nut again, from bottom to top draw over to one's side one by one and compress, treating that the dry rear screw stair stringer of glue is made.
the invention has the advantages that: by opening the Vidacare corp or the turning handle that are arranged on central shaft one end, can according to the distance between the size adjustment standpipe of spiral stairway beam radian and relative riser, can according to the height of sleeve pipe on spiral stairway angle adjustment standpipe, utilize the press strip of the elasticity of plank on this equipment to compress one by one after plank is layering and can be made into spiral stairway beam not only firm but also attractive in appearance, and saving of labor's material-saving again.
Accompanying drawing explanation
Fig. 1 is elevational schematic view of the present invention;
Fig. 2 is the schematic top plan view that lower wall of the present invention is provided with standpipe;
Fig. 3 is upper dish schematic top plan view of the present invention.
The title of above accompanying drawing and sequence number: 1, screw rod, 2, slide block, the 3, first bevel gear, 4, the second bevel gear, 5, handle, 6, lead screw, 7, press strip, 8, pipe box, 9, standpipe, 10, central tube, 11, central shaft, 12, elongated slot, 13, upper dish, 14, lower wall, 15, Vidacare corp, 16, bearing.
Detailed description of the invention
As Fig. 1, 2, shown in 3, a kind of preparation method of spiral stairway beam, comprise central tube 10, the upper end of central tube 10 is provided with dish 13, the lower end of central tube 10 is provided with lower wall 14, between upper dish 13 lower wall 14, some standpipes 9 are provided with around central tube 10, standpipe 9 is provided with presser device, bearing 16 is provided with in central tube 10, bearing 16 is connected with central shaft 11, central shaft 11 two ends are respectively arranged with the first bevel gear 3, central shaft 11 wherein one end is connected with Vidacare corp 15 through the first bevel gear 3 end, upper dish 13, lower wall 14 is respectively arranged with some elongated holes, elongated hole is arranged in radiation centered by central tube 10, some standpipes 9 are all equal with the distance between central tube 10, standpipe 9 two ends are respectively arranged with slide block 2, groove is provided with between slide block 2 and standpipe 9 end face, the groove of standpipe 9 upper end is stuck in the both sides of dish 13 elongated hole, the groove of standpipe 9 lower end is stuck in the both sides of lower wall 14 elongated hole, slide block 2 is provided with screw hole, screw rod 1 is provided with in screw hole on slide block 2, the slide block 2 that every bar screw rod 1 all matches with it and elongated hole parallel, screw rod 1 one end is each passed through the tube wall of central tube 10, end is provided with the second bevel gear 4, second bevel gear 4 engages with the first bevel gear 3, screw rod 1 other end is coupling respectively on the outward flange of upper dish 13 and lower wall 14, screw rod 1 wherein described at least one stretches out, and stretch out the outward flange of dish 13 or lower wall 14, end is provided with handle 5, the presser device that standpipe is arranged, presser device is by pipe box 8, lead screw 6, press strip 7 and nut composition.Pipe box 8 is enclosed within standpipe 9 and also can moves axially, pipe box 8 side is fixedly installed lead screw 6, lead screw 6 is provided with press strip 7 and nut, pipe box 8 opposite side is provided with for pipe box 8 screw fixing with standpipe 9, the pipe box 8 be arranged on every root standpipe 9 is 2, press strip 7 is provided with 2 elongated holes, the lead screw 6 be arranged on pipe box 8 is passed respectively and is screwed with nut from the elongated hole described in one of them, and upper dish 13 and the opposite face of lower wall 14 are all carved with size;
By a method for above-mentioned equipment making spiral stairway beam, its concrete steps are as follows:
(1) got plank according to designing requirement and Bao put down, plank thickness is between 5-15mm, length and width can according to designing requirements, (2) open Vidacare corp 15 or rotate the handle 5 be arranged on screw rod 1, standpipe 9 on spiral stairway beam making apparatus is adjusted to the diameter required for spiral stairway beam, pipe box 8 on handle riser 9 mixes up by spiral stairway beam angle, (3) surface adopts whole piece plank, neat for the plank joint saw for inside, plank joint dislocation as far as possible between levels, be layering to after plank and plank gluing face gluing the thickness needed, the plank adhesive tape folded is tied up temporarily, the plank tied up is moved to be pressed by press strip 7 between two pipe boxes 8 and is compressed by nut again, from bottom to top draw over to one's side one by one and compress, treat that the dry rear screw stair stringer of glue is made.

Claims (1)

1. the preparation method of a spiral stairway beam, comprise central tube, the upper end of central tube is provided with dish, the lower end of central tube is provided with lower wall, between upper dish and lower wall, some standpipes are provided with around central tube, standpipe is provided with presser device, bearing is provided with in central tube, bearing is connected with central shaft, central shaft two ends are respectively arranged with the first bevel gear, central shaft wherein one end is connected with Vidacare corp through the first bevel gear end, upper dish and lower wall are respectively arranged with some elongated holes, elongated hole is arranged in radiation centered by central tube, described some standpipes are all equal with the distance between central tube, standpipe two ends are respectively arranged with slide block, groove is provided with between slide block and standpipe end face, the groove of standpipe upper end is stuck in the both sides of dish elongated hole, the groove of lower riser end is stuck in the both sides of lower wall elongated hole, slide block is provided with screw hole, screw rod is provided with in screw hole on slide block, the slide block that every bar screw rod all matches with it and elongated hole parallel, screw rod one end is each passed through the tube wall of central tube, end is provided with the second bevel gear, second bevel gear engages with the first bevel gear, the screw rod other end is coupling respectively on the outward flange of upper dish and lower wall, wherein at least one screw rod stretches out, and stretch out the outward flange of dish or lower wall, end is provided with handle, the presser device that standpipe is arranged is by pipe box, lead screw, press strip and nut composition, pipe box is enclosed within standpipe and also can moves axially, pipe box side is fixedly installed lead screw, lead screw is provided with press strip and nut, pipe box opposite side is provided with the screw fixed for pipe box and standpipe, the pipe box be arranged on every root standpipe is 2, press strip is provided with 2 elongated holes, the lead screw be arranged on pipe box is passed respectively and is screwed with nut from one of them elongated hole, the opposite face of upper dish and lower wall is all carved with size,
Its concrete making step is as follows:
(1) got plank according to designing requirement and Bao put down, plank thickness is between 5-15mm, and length and width can according to designing requirements;
(2) unlatching Vidacare corp or rotation are arranged on the handle on screw rod, and handle riser adjusts to the diameter required for spiral stairway beam, and the pipe box on handle riser mixes up by spiral stairway beam angle;
(3) surface adopts whole piece plank, neat for the plank joint saw for inside, plank joint dislocation as far as possible between levels, be layering to after plank and plank gluing face gluing the thickness needed, the plank adhesive tape folded is tied up temporarily, the plank tied up is moved to be pressed by press strip between two pipe boxes and is compressed by nut again, from bottom to top draw over to one's side one by one and compress, treating that the dry rear screw stair stringer of glue is made.
CN201210168312.4A 2012-05-28 2012-05-28 A kind of preparation method of spiral stairway beam Expired - Fee Related CN103448123B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210168312.4A CN103448123B (en) 2012-05-28 2012-05-28 A kind of preparation method of spiral stairway beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210168312.4A CN103448123B (en) 2012-05-28 2012-05-28 A kind of preparation method of spiral stairway beam

Publications (2)

Publication Number Publication Date
CN103448123A CN103448123A (en) 2013-12-18
CN103448123B true CN103448123B (en) 2015-08-26

Family

ID=49731159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210168312.4A Expired - Fee Related CN103448123B (en) 2012-05-28 2012-05-28 A kind of preparation method of spiral stairway beam

Country Status (1)

Country Link
CN (1) CN103448123B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1724013U (en) * 1955-10-17 1956-06-14 Handschuhfabrik Helmut Roessle GLOVE.
US3879026A (en) * 1973-01-22 1975-04-22 Jr James B Lappin Universal work holders for assembling curved laminated units
FR2519051A1 (en) * 1981-12-29 1983-07-01 Andree Claude Spiral staircase for building - comprises wooden steps secured to helical beam by threaded bolts
US4918799A (en) * 1989-04-10 1990-04-24 Louis Benedetti Method and apparatus for forming stringers for free-standing circular staircases
WO1994025233A1 (en) * 1993-05-05 1994-11-10 Fankhauser, Sally, Gabriele Process for bonding wooden elements arranged in layers
CN201099982Y (en) * 2007-06-26 2008-08-13 谭正华 Rotating arc stairway joist assembly model
CN202763977U (en) * 2012-05-28 2013-03-06 宁波市镇海捷登应用技术研究所 Manufacturing equipment for spiral stair beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1724013U (en) * 1955-10-17 1956-06-14 Handschuhfabrik Helmut Roessle GLOVE.
US3879026A (en) * 1973-01-22 1975-04-22 Jr James B Lappin Universal work holders for assembling curved laminated units
FR2519051A1 (en) * 1981-12-29 1983-07-01 Andree Claude Spiral staircase for building - comprises wooden steps secured to helical beam by threaded bolts
US4918799A (en) * 1989-04-10 1990-04-24 Louis Benedetti Method and apparatus for forming stringers for free-standing circular staircases
WO1994025233A1 (en) * 1993-05-05 1994-11-10 Fankhauser, Sally, Gabriele Process for bonding wooden elements arranged in layers
CN201099982Y (en) * 2007-06-26 2008-08-13 谭正华 Rotating arc stairway joist assembly model
CN202763977U (en) * 2012-05-28 2013-03-06 宁波市镇海捷登应用技术研究所 Manufacturing equipment for spiral stair beam

Also Published As

Publication number Publication date
CN103448123A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN207127935U (en) A kind of plastic pipe high efficiency cutter device
CN207296471U (en) A kind of anti-dumping inclined construction engineering column
CN201776807U (en) Batten edge gluer
CN204225424U (en) A kind of framework wood flooring
CN103448123B (en) A kind of preparation method of spiral stairway beam
CN205976306U (en) Heat preservation decorative board mounting structure
CN214136478U (en) Bed plate gluing machine
CN202763977U (en) Manufacturing equipment for spiral stair beam
CN206326701U (en) A kind of finger-jointed plate automatic feeding
CN203738935U (en) Pressing mechanism for board splicing and forming
CN106625912A (en) Splicing device for integrated type block boards
US20210269246A1 (en) Portable linear transformer for laminated gypsum boards
CN204456792U (en) Claying board
CN202271421U (en) Raw material splicing device
CN204163337U (en) Lower concealed moulds limit wooden floor
CN203569837U (en) Sliding and clamping type stone dry hanging structure with edge grooves
CN103603477A (en) Side-groove sliding clamp type stone dry-hanging structure
CN205058404U (en) A split type splicing mechanism for plastic mould
CN206201134U (en) A kind of timber processing shaping equipment
CN206717653U (en) A kind of edging device based on timber machining type
CN202913594U (en) Double angle type fixing and installing structure of interior decoration plaque and furniture plaque
CN207260899U (en) A kind of height-adjustable Combined wooden door
CN205697448U (en) A kind of section assembling formula bathroom cabinet
CN219190551U (en) Corner strip pasting device for wood board processing
CN204418607U (en) A kind of claying board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhao Yue

Inventor before: Chen Zhaohong

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170817

Address after: 063000, Hebei, Leting County, Leting province Tangshan City town Mao community Mao Mao Building 61, 3, 302

Patentee after: Zhao Yue

Address before: 315200 Zhejiang province Zhenhai District of Ningbo City Zhen Luo Road No. 638

Patentee before: Ningbo City Zhenhai Jiedeng Applied Technology Research Institute

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20180528

CF01 Termination of patent right due to non-payment of annual fee