CN103441498B - Power utilization adjustment method based on power utilization characteristic data - Google Patents

Power utilization adjustment method based on power utilization characteristic data Download PDF

Info

Publication number
CN103441498B
CN103441498B CN201310419116.4A CN201310419116A CN103441498B CN 103441498 B CN103441498 B CN 103441498B CN 201310419116 A CN201310419116 A CN 201310419116A CN 103441498 B CN103441498 B CN 103441498B
Authority
CN
China
Prior art keywords
characteristic data
instruction
electrical characteristic
power
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310419116.4A
Other languages
Chinese (zh)
Other versions
CN103441498A (en
Inventor
刘建明
赵丙镇
韩璐
罗卓伟
徐光年
冯悦鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Information and Telecommunication Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310419116.4A priority Critical patent/CN103441498B/en
Publication of CN103441498A publication Critical patent/CN103441498A/en
Application granted granted Critical
Publication of CN103441498B publication Critical patent/CN103441498B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a power utilization adjustment method based on power utilization characteristic data. The power utilization adjustment method comprises the following steps of: obtaining the power utilization characteristic data of a user, wherein the power utilization characteristic data comprise production frequency and transformer capacity or power rate; and giving out a power utilization adjustment instruction according to the power utilization characteristic data. The power utilization adjustment method has the advantages that the accurate power utilization adjustment instruction is given out by obtaining the power utilization characteristic data of the user, such as production frequency and transformer capacity or power rate instead of utilizing the experience of technicians, and analyzing and judging the power utilization characteristic data of the user, and the technical problem of low accuracy during the adjustment and optimization of user power utilization is solved.

Description

A kind of method based on carrying out electricity consumption adjustment by electrical characteristic data
Technical field
The embodiment of the present invention relates generally to power domain, especially relates to a kind of method based on carrying out electricity consumption adjustment by electrical characteristic data.
Background technology
Enterprise generally all can at substantial electric power when producing, if do not add optimization with electric process, often causes the waste of a part of electric energy, reduce the performance of enterprises, also run counter to the energy-saving and emission-reduction policy of country simultaneously.In the prior art, enterprise customer is by the experience of electrically optimized main dependence power department technical staff, or gather user power utilization average electricity price and the modes such as sequence, provide adjustment way with the user defined by electrically optimized potentiality, the accuracy of these modes is all lower.
Summary of the invention
In view of this, the object of the embodiment of the present invention is to provide a kind of method based on carrying out electricity consumption adjustment by electrical characteristic data, to improve accuracy when carrying out electricity consumption adjusting and optimizing to user.
The embodiment of the invention discloses a kind of method based on carrying out electricity consumption adjustment by electrical characteristic data, described method comprises:
Obtain the use electrical characteristic data of user, described electrical characteristic data comprises produces order of classes or grades at school, transformer capacity or power rate;
According to described electrical characteristic data, send electricity consumption adjustment instruction.
Preferably, when described electrical characteristic data comprises production order of classes or grades at school, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
Judge whether described production order of classes or grades at school is less than three, if so, then:
Obtain best peak-to-valley ratio energy data of the same trade,
According to the described same industry best peak-to-valley ratio energy data, send the instruction of adjustment current power ratio.
Preferably, the use electrical characteristic data of described acquisition user, comprising:
Obtain the load P of i-th hour iwith average load on the same day ;
According to following formula
&alpha; = 1 0 &le; T &le; k 1 2 k 1 < T &le; k 2 3 k 2 < T &le; 24
Determine to produce duration T, and determine to produce order of classes or grades at school α, wherein k according to production duration T 1, k 2represent the period dividing and produce order of classes or grades at school.
Preferably, the best peak-to-valley ratio of the described same industry data can comprise the ratio of best peak of the same trade, flat, paddy period power consumption.
Preferably, when described electrical characteristic data comprises transformer capacity, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
According to described transformer capacity, obtain the electrical capacity charge of user;
Judge whether described electrical capacity charge is greater than assign thresholds, if so, then:
Send and declare requirement instruction, or send the instruction of reduction transformer capacity.
Preferably, described in send declare requirement instruction, comprising:
Obtain the peak capacity in past fixed time section;
Using described peak capacity as declaring requirement, sending and declaring requirement instruction.
Preferably, when described electrical characteristic data comprises power rate, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
Obtain power factor (PF) appraisal standards;
Judge that whether described power rate is lower than described power factor (PF) appraisal standards, if so, then:
Obtain the electricity charge of user's power rate and pay historical data;
According to described historical data, submit the power rate electricity charge if do not need before, then send the instruction of maintenance reactive-load compensation equipment, if when submitting the power rate electricity charge always, then sending and reactive-load compensation equipment instruction is installed.
The embodiment of the invention also discloses a kind of electricity consumption adjustment System, described system comprises:
Use electrical characteristic data acquiring unit, for obtaining the use electrical characteristic data of user, described electrical characteristic data comprises produces order of classes or grades at school, transformer capacity or power rate;
Adjustment indicating member, for according to described electrical characteristic data, sends electricity consumption adjustment instruction.
Preferably, when described electrical characteristic data comprises production order of classes or grades at school, described adjustment indicating member comprises:
Produce order of classes or grades at school judgment sub-unit, for judging whether described production order of classes or grades at school is less than three, if then trigger electricity consumption ratio adjustment instruction subelement;
Electricity consumption ratio adjustment instruction subelement, for obtaining best peak-to-valley ratio energy data of the same trade, according to the described same industry best peak-to-valley ratio energy data, sends the instruction of adjustment current power ratio.
Preferably, described electrical characteristic data acquiring unit comprises:
Load obtaining subelement, for obtaining the load P of i-th hour iwith average load on the same day ;
Computation subunit, for according to following formula
&alpha; = 1 0 &le; T &le; k 1 2 k 1 < T &le; k 2 3 k 2 < T &le; 24
Determine to produce duration T, and determine to produce order of classes or grades at school α, wherein k according to production duration T 1, k 2represent the period dividing and produce order of classes or grades at school.
Preferably, the best peak-to-valley ratio of the described same industry data can comprise the ratio of best peak of the same trade, flat, paddy period power consumption.
Preferably, when described electrical characteristic data comprises transformer capacity, described electrical characteristic data acquiring unit comprises:
Electrical capacity charge obtains subelement, for according to described transformer capacity, obtains the electrical capacity charge of user;
Electrical capacity charge judgment sub-unit, for judging whether described electrical capacity charge is greater than assign thresholds, if so, then triggers and declare requirement instruction subelement, or Trigger transformers capacity reducing instruction subelement;
Declaring requirement instruction subelement, declaring requirement instruction for sending;
Transformer capacity reduces instruction subelement, reduces transformer capacity instruction for sending.
Preferably, declare requirement instruction subelement described in comprise:
Peak capacity obtains subelement, for the peak capacity of obtaining in fixed time section;
First instruction sends subelement, for using described peak capacity as declaring requirement, sending and declaring requirement instruction.
Preferably, when described electrical characteristic data comprises power rate, described electrical characteristic data acquiring unit comprises:
Appraisal standards obtain subelement, for obtaining power factor (PF) appraisal standards;
Power rate judgment sub-unit, for judging that whether described power rate is lower than described power factor (PF) appraisal standards, if so, then triggering the second instruction and sending subelement;
Second instruction sends subelement, pays historical data, according to described historical data for obtaining the electricity charge of user's power rate, the power rate electricity charge are submitted if do not need before, then send the instruction of maintenance reactive-load compensation equipment, if when submitting the power rate electricity charge always, then sending and reactive-load compensation equipment instruction is installed.
The embodiment of the present invention does not recycle the experience of technical staff, but obtain the use electrical characteristic data of user, comprise and produce order of classes or grades at school, transformer capacity or power rate, and by analyzing by electrical characteristic data user, send the adjustment of electricity consumption accurately instruction, the technical problem that when solving user power utilization adjusting and optimizing in prior art, accuracy is not high.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart that the embodiment of the present invention one method is described;
Fig. 2 is the flow chart that the embodiment of the present invention two method is described;
Fig. 3 is the flow chart that the embodiment of the present invention three method is described;
Fig. 4 is the flow chart that the embodiment of the present invention four method is described.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
In order to complete understanding the present invention, refer to numerous concrete details in the following detailed description, but it should be appreciated by those skilled in the art that the present invention can realize without the need to these details.In other embodiments, be not described in detail known method, process, assembly and circuit, in order to avoid unnecessarily cause embodiment fuzzy.
Embodiment one
Fig. 1 is the flow chart of the embodiment of the present invention one method.Present embodiment discloses a kind of method based on carrying out electricity consumption adjustment by electrical characteristic data, described method comprises:
The use electrical characteristic data of S101, acquisition user, described electrical characteristic data comprises produces order of classes or grades at school, transformer capacity or power rate.
It is easily understood that user involved in the present invention refers to enterprise customer, electricity consumption refers to commercial power.The use electrical characteristic data obtaining user is a key point of the present invention.In order to evaluate electricity consumption user accurately, the present invention breaks away from and originally carries out with subjective experience the mode investigated or undertaken the mode such as studying by gathering user power utilization average electricity price, but from the composition of the commercial power electricity charge as cutting point.The commercial power electricity charge are generally made up of three parts, namely electrical capacity charge (according to the fixed capacity of transformer and the electricity charge calculated), power cost are (according to the electricity charge that the number of degrees of actual electricity consumption calculate, also can be described as the electricity electricity charge) and the power rate adjustment electricity charge (the abbreviation power tune electricity charge, power rate can be understood as actual power factor, and power adjusts the electricity charge to be the electricity charge of additionally collecting when power rate is less than certain thresholding).Average electricity price refers to the mean value of each several part electricity charge sum divided by total electricity consumption.Invention introduces this concept of user power utilization characteristic, in order to know the electricity consumption situation of user, described electrical characteristic data specifically can comprise produces order of classes or grades at school, transformer capacity, power rate or other parameters.
S102, according to described electrical characteristic data, send electricity consumption adjustment instruction.The use electrical feature of user is embodied by electrical characteristic data, and known user with just analyzing the possible direction of user optimization electricity consumption after electrical feature, send electricity consumption adjustment indication information targetedly, improve the accuracy of electricity consumption adjusting and optimizing, user is made to optimize its power mode as much as possible, avoid the waste of electric energy, also can improve the performance of enterprises.
Embodiment two
Fig. 2 is the flow chart of the embodiment of the present invention two method.The present embodiment, based on embodiment one, is the further refinement done embodiment one.
When described electrical characteristic data comprises production order of classes or grades at school, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
S201, judge whether described production order of classes or grades at school is less than three, if so, then:
S202, obtaining best peak-to-valley ratio of the same trade can data,
S203, can data according to the best peak-to-valley ratio of the described same industry, send the instruction of adjustment current power ratio.
Produce order of classes or grades at school popular say namely one day several classes fall.If work in three shifts, then the time representing one day is all occupied full, and cannot optimize, and produces order of classes or grades at school when being less than three, then possess the potentiality of optimization.
Preferably in the present embodiment, the use electrical characteristic data of described acquisition user, comprising:
Obtain the load P of i-th hour iwith average load on the same day ;
According to following formula
&alpha; = 1 0 &le; T &le; k 1 2 k 1 < T &le; k 2 3 k 2 < T &le; 24
Determine to produce duration T, and determine to produce order of classes or grades at school α, wherein k according to production duration T 1, k 2represent the period dividing and produce order of classes or grades at school. expression rounds, Λ represent get little.
Preferably, the best peak-to-valley ratio of the described same industry data can comprise the ratio of best peak of the same trade, flat, paddy period power consumption.
Power cost after adjustment calculates by following formula
C E = E P H &times; P P H + E P M &times; P P M + E P L &times; P P L
In formula, C efor power cost, peak, flat, paddy period power consumption respectively, unit kWh, be respectively peak, flat, paddy period electricity price, unit kWh/ unit.Or also can be calculated as follows
C E = ( k H &times; P P H + k M &times; P P M + k L &times; P P L ) &times; E T
In formula, E tfor total electricity consumption, k h, k m, k lbe respectively peak, flat, paddy period power consumption proportion in total electricity consumption.
Embodiment three
Fig. 3 is the flow chart of the embodiment of the present invention three method.The present embodiment, based on embodiment one, is the further refinement done embodiment one.
When described electrical characteristic data comprises transformer capacity, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
S301, according to described transformer capacity, obtain the electrical capacity charge of user;
S302, judge whether described electrical capacity charge is greater than assign thresholds, if so, then:
S303, send declare requirement instruction, or send reduce transformer capacity instruction.
If transformer capacity-load ratio is lower, then needs transformer to subtract appearance or adjust and report requirement.Such as calculate its annual peak load amount, declare according to annual peak load.Therefore preferred:
Described sending declares requirement instruction, comprising:
Obtain the peak capacity in past fixed time section;
Using described peak capacity as declaring requirement, sending and declaring requirement instruction.
The account form of electrical capacity charge is as follows:
C C = P C 1 &times; T C P C 2 &times; T r + P C 3 &times; ( T h - T r )
In formula, C cfor electrical capacity charge, P c1for basic capacity expense (unit price), T cfor transformer capacity; P c2for the electricity charge (unit price) during report requirement, T rfor reporting imaginary quantity value; P c3rejection penalty during for exceeding imaginary quantity, T hfor monthly transformer capacity peak.
If user did not declare by requirement in the past, after so declaring by requirement after it, the electrical capacity charge S that can save cfor:
S C=P C1×T C-P C2×T r
P c1for basic capacity expense (unit price), T cfor transformer capacity, P c2for the ore-hosting rock series (unit price) of report requirement part, T rfor reporting requirement value.
Certain requirement T rarbitrarily can not report, the constraint of following condition need be subject to:
0.3T C≤T r≤0.8T C
Embodiment four
Fig. 4 is the flow chart of the embodiment of the present invention four method.The present embodiment, based on embodiment one, is the further refinement done embodiment one.
When described electrical characteristic data comprises power rate, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
S401, acquisition power factor (PF) appraisal standards;
S402, judge that whether described power rate is lower than described power factor (PF) appraisal standards, if so, then:
Historical data is paid in S403, the electricity charge of acquisition user power rate;
S404, according to described historical data, submit the power rate electricity charge if do not need before, then send the instruction of maintenance reactive-load compensation equipment, if when submitting the power rate electricity charge always, then sending and reactive-load compensation equipment instruction is installed.In other words, when user's power rate is lower than appraisal standards, when needing to pay the power rate electricity charge, need based on the excavation to its historical data.
The account form of the power tune electricity charge is:
C F=P FN1)
In formula, C ffor power adjusts the electricity charge, P ffor power adjusts electricity charge design factor (namely not considering total electricity charge during power rate), φ nfor power factor (PF) examination coefficient, φ 1for actual power factor (i.e. power rate).
Embodiment five
The present embodiment is corresponding with said method embodiment, and disclose a kind of electricity consumption adjustment System, described system comprises:
Use electrical characteristic data acquiring unit, for obtaining the use electrical characteristic data of user, described electrical characteristic data comprises produces order of classes or grades at school, transformer capacity or power rate;
Adjustment indicating member, for according to described electrical characteristic data, sends electricity consumption adjustment instruction.
Preferably, when described electrical characteristic data comprises production order of classes or grades at school, described adjustment indicating member comprises:
Produce order of classes or grades at school judgment sub-unit, for judging whether described production order of classes or grades at school is less than three, if then trigger electricity consumption ratio adjustment instruction subelement;
Electricity consumption ratio adjustment instruction subelement, for obtaining best peak-to-valley ratio energy data of the same trade, according to the described same industry best peak-to-valley ratio energy data, sends the instruction of adjustment current power ratio.
Preferably, described electrical characteristic data acquiring unit comprises:
Load obtaining subelement, for obtaining the load P of i-th hour iwith average load P on the same day;
Computation subunit, for according to following formula
&alpha; = 1 0 &le; T &le; k 1 2 k 1 < T &le; k 2 3 k 2 < T &le; 24
Determine to produce duration T, and determine to produce order of classes or grades at school α, wherein k according to production duration T 1, k 2represent the period dividing and produce order of classes or grades at school.
Preferably, the best peak-to-valley ratio of the described same industry data can comprise the ratio of best peak of the same trade, flat, paddy period power consumption.
Preferably, when described electrical characteristic data comprises transformer capacity, described electrical characteristic data acquiring unit comprises:
Electrical capacity charge obtains subelement, for according to described transformer capacity, obtains the electrical capacity charge of user;
Electrical capacity charge judgment sub-unit, for judging whether described electrical capacity charge is greater than assign thresholds, if so, then triggers and declare requirement instruction subelement, or Trigger transformers capacity reducing instruction subelement;
Declaring requirement instruction subelement, declaring requirement instruction for sending;
Transformer capacity reduces instruction subelement, reduces transformer capacity instruction for sending.
Preferably, declare requirement instruction subelement described in comprise:
Peak capacity obtains subelement, for the peak capacity of obtaining in fixed time section;
First instruction sends subelement, for using described peak capacity as declaring requirement, sending and declaring requirement instruction.
Preferably, when described electrical characteristic data comprises power rate, described electrical characteristic data acquiring unit comprises:
Appraisal standards obtain subelement, for obtaining power factor (PF) appraisal standards;
Power rate judgment sub-unit, for judging that whether described power rate is lower than described power factor (PF) appraisal standards, if so, then triggering the second instruction and sending subelement;
Second instruction sends subelement, pays historical data, according to described historical data for obtaining the electricity charge of user's power rate, the power rate electricity charge are submitted if do not need before, then send the instruction of maintenance reactive-load compensation equipment, if when submitting the power rate electricity charge always, then sending and reactive-load compensation equipment instruction is installed
For system embodiment, because it corresponds essentially to embodiment of the method, so relevant part illustrates see the part of embodiment of the method.System embodiment described above is only schematic, the wherein said unit illustrated as separating component or can may not be and physically separates, parts as unit display can be or may not be physical location, namely can be positioned at a place, or also can be distributed in multiple network element.Some or all of module wherein can be selected according to the actual needs to realize the object of the present embodiment scheme.Those of ordinary skill in the art, when not paying creative work, are namely appreciated that and implement.
One of ordinary skill in the art will appreciate that all or part of step realized in said method execution mode is that the hardware that can carry out instruction relevant by program has come, described program can be stored in computer read/write memory medium, here the alleged storage medium obtained, as: ROM, RAM, magnetic disc, CD etc.
Also it should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operating space, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
The foregoing is only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.Apply specific case herein to have carried out lock to principle of the present invention and execution mode and state, the explanation of above embodiment just understands method of the present invention and core concept thereof for helping; Meanwhile, for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications.In sum, this description should not be construed as limitation of the present invention.All any amendments done within the spirit and principles in the present invention, equivalent replacement, improvement etc., be all included in protection scope of the present invention.

Claims (5)

1. based on a method of carrying out electricity consumption adjustment by electrical characteristic data, it is characterized in that, described method comprises:
Obtain the use electrical characteristic data of user, described electrical characteristic data comprises produces order of classes or grades at school, transformer capacity or power rate;
According to described electrical characteristic data, send electricity consumption adjustment instruction;
Wherein, when described electrical characteristic data comprises production order of classes or grades at school, described according to described electrical characteristic data, send electricity consumption adjustment instruction, comprising:
Judge whether described production order of classes or grades at school is less than three, if so, then:
Obtain best peak-to-valley ratio energy data of the same trade,
According to the described same industry best peak-to-valley ratio energy data, send the instruction of adjustment current power ratio;
Wherein, the use electrical characteristic data of described acquisition user, comprising:
Obtain the load P of i-th hour iwith average load on the same day
According to following formula
&alpha; = 1 0 &le; T &le; k 1 2 k 1 < T &le; k 2 3 k 2 < T &le; 24
Determine to produce duration T, and determine to produce order of classes or grades at school α, wherein k according to production duration T 1, k 2represent the period dividing and produce order of classes or grades at school;
Wherein, described in expression rounds, described Λ represent get little.
2. method according to claim 1, is characterized in that, the best peak-to-valley ratio of the described same industry data can comprise the ratio of best peak of the same trade, flat, paddy period power consumption.
3. method according to claim 1, is characterized in that, when described electrical characteristic data comprises transformer capacity, described according to described electrical characteristic data, sends electricity consumption adjustment instruction, comprising:
According to described transformer capacity, obtain the electrical capacity charge of user;
Judge whether described electrical capacity charge is greater than assign thresholds, if so, then:
Send and declare requirement instruction, or send the instruction of reduction transformer capacity.
4. method according to claim 3, is characterized in that, described in send declare requirement instruction, comprising:
Obtain the peak capacity in past fixed time section;
Using described peak capacity as declaring requirement, sending and declaring requirement instruction.
5. method according to claim 1, is characterized in that, when described electrical characteristic data comprises power rate, described according to described electrical characteristic data, sends electricity consumption adjustment instruction, comprising:
Obtain power factor appraisal standards;
Judge that whether described power rate is lower than described power factor appraisal standards, if so, then:
Obtain the electricity charge of user's power rate and pay historical data;
According to described historical data, submit the power rate electricity charge if do not need before, then send the instruction of maintenance reactive-load compensation equipment, if when submitting the power rate electricity charge always, then sending and reactive-load compensation equipment instruction is installed.
CN201310419116.4A 2013-09-13 2013-09-13 Power utilization adjustment method based on power utilization characteristic data Active CN103441498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310419116.4A CN103441498B (en) 2013-09-13 2013-09-13 Power utilization adjustment method based on power utilization characteristic data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310419116.4A CN103441498B (en) 2013-09-13 2013-09-13 Power utilization adjustment method based on power utilization characteristic data

Publications (2)

Publication Number Publication Date
CN103441498A CN103441498A (en) 2013-12-11
CN103441498B true CN103441498B (en) 2015-06-24

Family

ID=49695180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310419116.4A Active CN103441498B (en) 2013-09-13 2013-09-13 Power utilization adjustment method based on power utilization characteristic data

Country Status (1)

Country Link
CN (1) CN103441498B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969238A (en) * 2019-12-31 2020-04-07 安徽建筑大学 Method and device for calibrating electricity consumption data

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111340313A (en) * 2020-03-26 2020-06-26 嘉捷鑫源(北京)科技有限公司 Method, device and equipment for selecting basic electricity price charging mode and readable storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593821A (en) * 2011-12-31 2012-07-18 国网信息通信有限公司 Method and system for analyzing user load by using time information

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090265042A1 (en) * 2008-04-17 2009-10-22 Mollenkopf James D System and Method for Providing Voltage Regulation in a Power Distribution System

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593821A (en) * 2011-12-31 2012-07-18 国网信息通信有限公司 Method and system for analyzing user load by using time information

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
关于工业电力节能若干问题分析;晏松等;《安徽电力》;20080630;第25卷(第2期);第5-8页 *
智能用电能效管理系统;国网信息通信有限公司等;《CNKI中国重要会议论文全文数据库》;20130501;第337-338页 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969238A (en) * 2019-12-31 2020-04-07 安徽建筑大学 Method and device for calibrating electricity consumption data

Also Published As

Publication number Publication date
CN103441498A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
Sevilla et al. Techno-economic analysis of battery storage and curtailment in a distribution grid with high PV penetration
Cohen et al. Effects of distributed PV generation on California’s distribution system, part 2: Economic analysis
CN107194502B (en) Residential user power load prediction method
Wei et al. Non-constant learning rates in retrospective experience curve analyses and their correlation to deployment programs
CN102279297B (en) Energy management apparatus and method
US20130131880A1 (en) Power management apparatus and method
CN105279856A (en) Electricity billing method and system
Kantor et al. Economic feasibility of residential electricity storage systems in Ontario, Canada considering two policy scenarios
WO2015028944A1 (en) System and method for determining energy and ghg apportionment
CN103441498B (en) Power utilization adjustment method based on power utilization characteristic data
CN106327081A (en) Power distribution network project reliability benefit evaluation method based on total life cycle
CN109389437B (en) Pricing method and device of electricity price and terminal
Hassi et al. A compound real option approach for determining the optimal investment path for RPV-storage systems
Vu et al. Optimal design for a campus microgrid considering ESS discharging incentive and financial feasibility
Nykamp et al. Break‐even analysis for the storage of PV in power distribution grids
CN106950500B (en) A kind of capacity calculation methods of the shared battery based on battery life
CN116611711B (en) Energy storage project analysis system, method, equipment and readable storage medium
US20150127306A1 (en) Apparatus and method for creating a power consumption model and non-transitory computer readable storage medium thereof
CN110826931A (en) User-side distributed energy storage economy evaluation system
Sadovica et al. Estimating energy reduction amount in the event of demand response activation: Baseline model comparison for the Baltic states
Gupta Consumer adoption challenges to the smart grid
Frick et al. A Framework for Integrated Analysis of Distributed Energy Resources: Guide for States
Gu et al. New development in distribution network pricing for revenue recovery in the Great Britain
JP2015019543A (en) Power consumption calculation method, and power consumption calculation device
Rhode et al. The use of distributed energy resources to mitigate the negative imbalance between bulk purchase versus distribution tariffs in South Africa

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: STATE GRID INFORMATION + TELECOMMUNICATION CO., LTD.

Effective date: 20140102

Owner name: STATE GRID INFORMATION + TELECOMMUNICATION CO., LT

Effective date: 20140102

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100761 XICHENG, BEIJING TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140102

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Grid Information & Telecommunication Co.,Ltd.

Address before: 100761 Beijing Xicheng District city two, Baiguang Road

Applicant before: State Grid Information & Telecommunication Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: State Grid Information & Telecommunication Co.,Ltd.

Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee before: State Grid Corporation of China

Patentee before: State Grid Information & Telecommunication Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20230206

Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID INFORMATION & TELECOMMUNICATION BRANCH

Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: State Grid Information & Telecommunication Co.,Ltd.

TR01 Transfer of patent right