CN103440323A - Method for rapidly finding maximum value of temperature of transformer substation - Google Patents

Method for rapidly finding maximum value of temperature of transformer substation Download PDF

Info

Publication number
CN103440323A
CN103440323A CN2013103912283A CN201310391228A CN103440323A CN 103440323 A CN103440323 A CN 103440323A CN 2013103912283 A CN2013103912283 A CN 2013103912283A CN 201310391228 A CN201310391228 A CN 201310391228A CN 103440323 A CN103440323 A CN 103440323A
Authority
CN
China
Prior art keywords
temperature
point
transformer station
value
extremal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103912283A
Other languages
Chinese (zh)
Inventor
米硕
尤维琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013103912283A priority Critical patent/CN103440323A/en
Publication of CN103440323A publication Critical patent/CN103440323A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The invention relates to a method for rapidly finding a maximum value of a temperature of a transformer substation, which belongs to the technical field of power dispatching monitoring. The technical scheme is as follows: the method comprises the following steps of: firstly sequencing phase-A, phase-B and phase-C temperature-measuring data of each temperature measuring point of the transformer substation; taking the maximum value as a temperature extreme value of the temperature measuring point and sequencing the temperature extreme values of all the temperature measuring points; taking the maximum value as the temperature extreme value of the transformer substation; sequencing the temperature extreme values of all the transformer substations and taking the maximum value as the maximum value of the temperature of a whole electrical power system. The method provided by the invention has the active effects that the maximum values of temperature data of all switches and connectors of the all the transformer substations can be displayed in time and accurately and an audible and visual alarm can be provided according to a set alarm limit value; a power dispatching monitoring regulation worker can only monitor one datum from monitoring hundreds of data from a background technology, so that not only is the working amount relieved greatly, but also the accuracy is high, the instantaneity is good and the practicability is very strong.

Description

The method of a kind of fast finding transformer station temperature mxm.
Technical field
The present invention relates to the method for a kind of fast finding transformer station temperature mxm., belong to power scheduling monitoring technique field.
Background technology
A plurality of substation equipment states of the to the effect that monitoring of power scheduling monitoring work, carry out the mode adjustment, wherein whether excess temperature is the important indicator that affects the normal operation of equipment to equipment; Current transformer station's temp measuring system can only provide the temperature data of each point for measuring temperature of transformer station, and carries out alarm according to the temperature limit of setting, and regulation and control person can learn dangerous point when alarm signal appears in system, and takes corresponding measure; If want just to grasp dangerous point when alarm not occurring, just can only be maked an inspection tour each point for measuring temperature of each transformer station, could grasp the most dangerous point (referring to accompanying drawing one: background technology regulation and control person temperature extremal is searched process flow diagram) of whole system, the subject matter that background technology exists is: point for measuring temperature a lot, all changing at any time, the workload that regulation and control person not only makes an inspection tour is very large, and can not accurately grasp maximum temperature value, be easy to generation and judge disconnected, misoperation fault by accident.For example: transformer station's point for measuring temperature that temperature measuring equipment has been installed by five, certain company has reached 414, and the construction along with temp measuring system, point for measuring temperature also can roll up, it is very large that regulation and control person makes an inspection tour workload, and because data are close, be easy to cause visual fatigue, those skilled in the art are badly in need of a kind of brand-new method, system-wide maximum temperature value (most dangerous point) can be reflected quickly and accurately, regulation and control person's workload can be alleviated again.
Summary of the invention
The object of the invention is to provide the method for a kind of fast finding transformer station temperature mxm., not only greatly alleviated workload, and accuracy is high, real-time is good, has very strong practicality, solves the problems referred to above that background technology exists.
Technical scheme of the present invention is:
The method of a kind of fast finding transformer station temperature mxm., at first the A of each point for measuring temperature of transformer station, B, C three-phase temperature measurement data are sorted, get maximal value wherein as this point for measuring temperature temperature extremal, again all point for measuring temperature temperature extremals of transformer station are sorted, get maximal value wherein as this transformer station's temperature extremal, the point for measuring temperature temperature extremal of all transformer stations is sorted, the maximal value of getting wherein is whole electric system maximum temperature value again; The regulation and control person of power scheduling monitoring is by this maximal value, monitor at any time the most dangerous point of whole electric system, the warning limit value of whole electric system maximum temperature value and setting is compared simultaneously, over after the warning limit value, automatically send sound and light alarm, notify the related personnel to process, eliminate safe hidden trouble.Transformer station's temperature extremal is computing machine by the generation of being calculated and sort of the point for measuring temperature temperature extremal to all points for measuring temperature, and the regulation and control person of power scheduling monitoring, from hundreds of data of background technology monitoring, becomes and only monitors data.
Good effect of the present invention: the maximal value of temperature data that can show in time, exactly all switches, the joint of all transformer stations, and provide audible and visual alarm according to the alarm limit value of setting, the regulation and control person of power scheduling monitoring becomes and only monitors data from hundreds of data of background technology monitoring, not only greatly alleviated workload, and accuracy is high, real-time is good, has very strong practicality.
The accompanying drawing explanation
Fig. 1 is that background technology regulation and control person temperature extremal of the present invention is searched schematic flow sheet;
Fig. 2 is that regulation and control person's temperature extremal of the present invention is searched schematic flow sheet;
Fig. 3 is the embodiments of the invention schematic diagram.
Embodiment
Below in conjunction with accompanying drawing, by embodiment, the present invention will be further described.
The method of a kind of fast finding transformer station temperature mxm., at first the A of each point for measuring temperature of transformer station, B, C three-phase temperature measurement data are sorted, get maximal value wherein as this point for measuring temperature temperature extremal, again all point for measuring temperature temperature extremals of transformer station are sorted, get maximal value wherein as this transformer station's temperature extremal, the point for measuring temperature temperature extremal of all transformer stations is sorted, the maximal value of getting wherein is whole electric system maximum temperature value again; The regulation and control person of power scheduling monitoring is by this maximal value, monitor at any time the most dangerous point of whole electric system, the warning limit value of whole electric system maximum temperature value and setting is compared simultaneously, over after the warning limit value, automatically send sound and light alarm, notify the related personnel to process, eliminate safe hidden trouble.Transformer station's temperature extremal is computing machine by the generation of being calculated and sort of the point for measuring temperature temperature extremal to all points for measuring temperature, and the regulation and control person of power scheduling monitoring, from hundreds of data of background technology monitoring, becomes and only monitors data.
In embodiment, regulation and control person becomes and only monitors data from monitoring 414 data, not only greatly alleviated workload, and accuracy is high, real-time is good, has very strong practicality.
Referring to accompanying drawing three, the present invention divides four levels: 1. whole switches of all transformer stations, joint are all as point for measuring temperature, and point for measuring temperature A, B, C three-phase be the set temperature sensor respectively; 2. the A of each point for measuring temperature of transformer station, B, C three-phase temperature measurement data are sorted, and get maximal value wherein as this point for measuring temperature temperature extremal; 3. all point for measuring temperature temperature extremals of transformer station are sorted, got maximal value wherein as this transformer station's temperature extremal; 4. the point for measuring temperature temperature extremal of all transformer stations is sorted, the maximal value of getting wherein is whole electric system maximum temperature value; So just can in time, accurately find whole electric system maximum temperature value, being convenient to monitoring processes, the warning limit value of whole electric system maximum temperature value and setting is compared, automatically send sound and light alarm after surpassing the warning limit value, notify the related personnel to process, the regulation and control person of power scheduling monitoring, from hundreds of data of background technology monitoring, becomes and only monitors data.

Claims (2)

1. the method for a fast finding transformer station temperature mxm., it is characterized in that: at first the A of each point for measuring temperature of transformer station, B, C three-phase temperature measurement data are sorted, get maximal value wherein as this point for measuring temperature temperature extremal, again all point for measuring temperature temperature extremals of transformer station are sorted, get maximal value wherein as this transformer station's temperature extremal, the point for measuring temperature temperature extremal of all transformer stations is sorted, the maximal value of getting wherein is whole electric system maximum temperature value again; The regulation and control person of power scheduling monitoring is by this maximal value, monitor at any time the most dangerous point of whole electric system, the warning limit value of whole electric system maximum temperature value and setting is compared simultaneously, over after the warning limit value, automatically send sound and light alarm, notify the related personnel to process, eliminate safe hidden trouble.
2. the method for a kind of fast finding according to claim 1 transformer station temperature mxm., it is characterized in that: whole switches of all transformer stations, the point for measuring temperature temperature extremal of joint is all carried out data sorting, get maximal value wherein as transformer station's temperature extremal, and the warning limit value of transformer station's temperature extremal and setting is compared, automatically send sound and light alarm after surpassing the warning limit value, notify the related personnel to process, transformer station's temperature extremal is computing machine by the generation of being calculated and sort of the point for measuring temperature temperature extremal to all points for measuring temperature, the regulation and control person of power scheduling monitoring is from hundreds of data of background technology monitoring, become and only monitor data.
CN2013103912283A 2013-09-02 2013-09-02 Method for rapidly finding maximum value of temperature of transformer substation Pending CN103440323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103912283A CN103440323A (en) 2013-09-02 2013-09-02 Method for rapidly finding maximum value of temperature of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103912283A CN103440323A (en) 2013-09-02 2013-09-02 Method for rapidly finding maximum value of temperature of transformer substation

Publications (1)

Publication Number Publication Date
CN103440323A true CN103440323A (en) 2013-12-11

Family

ID=49694016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103912283A Pending CN103440323A (en) 2013-09-02 2013-09-02 Method for rapidly finding maximum value of temperature of transformer substation

Country Status (1)

Country Link
CN (1) CN103440323A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202119548U (en) * 2011-07-01 2012-01-18 昆明益通美尔防雷工程有限公司 Wireless real-time temperature measuring device for transformer substation
CN102866313A (en) * 2012-09-10 2013-01-09 山东康威通信技术股份有限公司 Power tunnel cable running state comprehensive monitoring method
CN102937675A (en) * 2012-10-22 2013-02-20 江苏省电力公司常州供电公司 Real-time data collecting and fault positioning system of power distribution network and working method thereof
CN103063252A (en) * 2012-12-27 2013-04-24 德讯科技股份有限公司 Data center running state comprehensive evaluation method based on high-density state acquisition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202119548U (en) * 2011-07-01 2012-01-18 昆明益通美尔防雷工程有限公司 Wireless real-time temperature measuring device for transformer substation
CN102866313A (en) * 2012-09-10 2013-01-09 山东康威通信技术股份有限公司 Power tunnel cable running state comprehensive monitoring method
CN102937675A (en) * 2012-10-22 2013-02-20 江苏省电力公司常州供电公司 Real-time data collecting and fault positioning system of power distribution network and working method thereof
CN103063252A (en) * 2012-12-27 2013-04-24 德讯科技股份有限公司 Data center running state comprehensive evaluation method based on high-density state acquisition

Similar Documents

Publication Publication Date Title
US10794945B2 (en) Method for detecting and locating single-phase ground fault on low current grounded power-distribution network
CN102607643B (en) Overheat fault diagnosis and early warning method for electrical equipment of traction substation of electrified railway
CN106291219B (en) Single-phase grounding/PT wire breakage fault automatic judging and alarming device and method
US20160041216A1 (en) Method and system for detecting and locating single-phase ground fault on low current grounded power-distribution network
CN204064509U (en) A kind of temperature of high-tension switch cabinet on-line monitoring system
US11474139B2 (en) Fault direction calculation during current transformer saturation
CN109831033B (en) Power supply line early warning protection equipment and segmentation monitoring early warning system
CN107145156A (en) A kind of power network method for inspecting and system based on unmanned plane
CN105093047A (en) Electric power line current-carrying capacity monitoring and early warning system
CN105300557A (en) Cable conductor temperature measuring device and method
CN111007419A (en) Transformer substation direct current system running state on-line monitoring system
CN102621402A (en) Intelligent safety helmet for controlling distance between human and electric equipment and control method for intelligent safety helmet
CN103674291A (en) Temperature monitoring system of all-insulated bus
CN106443275A (en) Method and apparatus for monitoring low-voltage distribution transformer for ship
CN102607399A (en) Method for accurately judging distance between construction machine and high-voltage charged body
CN105676157A (en) WAMS low-frequency oscillation identification function test system and WAMS low-frequency oscillation identification function test method
CN102156260B (en) System and method for evaluating status of oscillation circuit of active high-voltage direct-current switch
CN206441838U (en) Communications equipment room battery temperature control device
JP2016161302A (en) Fault localization device and method, electrical grid monitoring system, and facility plan assist system
JP2014089998A (en) Monitor system for photovoltaic power generation equipment
CN107147140B (en) A kind of DC transmission system power instruction deviation monitoring device and deviation monitoring method
CN103440323A (en) Method for rapidly finding maximum value of temperature of transformer substation
CN201555906U (en) Intelligent CT&PT on-line monitoring device
CN213957527U (en) Cable line fault positioning device
CN103779834A (en) Grid-connected access anti-reverse-flow intelligent detection method for distributed power generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211

RJ01 Rejection of invention patent application after publication