CN103437731A - Transporting and mounting device for blowout preventer stack in drilling operation - Google Patents

Transporting and mounting device for blowout preventer stack in drilling operation Download PDF

Info

Publication number
CN103437731A
CN103437731A CN2013103433503A CN201310343350A CN103437731A CN 103437731 A CN103437731 A CN 103437731A CN 2013103433503 A CN2013103433503 A CN 2013103433503A CN 201310343350 A CN201310343350 A CN 201310343350A CN 103437731 A CN103437731 A CN 103437731A
Authority
CN
China
Prior art keywords
carriage
hydraulic cylinder
welded
rotating turret
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103433503A
Other languages
Chinese (zh)
Other versions
CN103437731B (en
Inventor
常玉连
樊岩松
郑永谭
张有锋
冯志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Equipment Manufacturing Co Ltd
Northeast Petroleum University
Original Assignee
CNPC Bohai Equipment Manufacturing Co Ltd
Northeast Petroleum University
China Petroleum Liaohe Equipment Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Equipment Manufacturing Co Ltd, Northeast Petroleum University, China Petroleum Liaohe Equipment Co filed Critical CNPC Bohai Equipment Manufacturing Co Ltd
Priority to CN201310343350.3A priority Critical patent/CN103437731B/en
Publication of CN103437731A publication Critical patent/CN103437731A/en
Application granted granted Critical
Publication of CN103437731B publication Critical patent/CN103437731B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the technical field of petroleum drilling, in particular to a transporting and mounting device for a blowout preventer stack in the drilling operation. The sliding and fixing equipment of the device comprises sliding and fixing plates; small track clamping seats and large track clamping seats are respectively connected to two ends of the sliding and fixing plates; a horizontal hydraulic cylinder support seat is welded on each sliding and fixing plate; a ratchet is arranged on each sliding and fixing plate; translational carts comprise translational cart base plates; the large track clamping seats are connected to two ends of the translational cart base plates; the horizontal hydraulic cylinder support seat, a bracket support seat and a lifting hydraulic cylinder support seat are welded on each translational cart base plate. According to the transporting and mounting device disclosed by the invention, the blowout preventer stack can be transported and mounted quickly, efficiently and accurately, the working efficiency is increased, the labor intensity is reduced, and the operation safety is improved. The defects of time and labor consumption, difficulty in operation and poor safety of the traditional mode of mounting the blowout preventer stack are overcome.

Description

A kind of movement erecting device of drillng operation blowout preventer set
Technical field:
The present invention relates to a kind of petroleum drilling technology field, particularly a kind of movement erecting device of drillng operation blowout preventer set.
Background technology:
Current well site of oil field present situation, installation work for blowout preventer set, especially large-scale blowout preventer set, not only consuming time but also heavy, it can only move along a direction in horizontal plane, make preventer installation position and well head installation position be difficult to centering, operating difficulties, lifting operation makes personal safety can not get ensureing.
Summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of movement erecting device of drillng operation blowout preventer set, and this device has been realized can be fast, movement efficiently and accurately and blowout preventer set is installed, and increases work efficiency, and reduces labour intensity, improves processing safety.Having overcome existing installation blowout preventer set wastes time and energy, operating difficulties, the deficiency of poor stability.
The technical solution used in the present invention is: a kind of movement erecting device of drillng operation blowout preventer set comprises two fixing, two tracks of sliding, two translation dollies, carriage, rotating turret and two leading screw platforms, slide and fixedly comprise that slip fixed head, slip fixed head two ends all are connected with the little deck of track and the large deck of track, be welded with the horizontal hydraulic cylinder bearing on the slip fixed head, ratchet is arranged on the slip fixed head, the translation dolly comprises the little car bottom plate of translation, and translation dolly base plate two ends are connected with the large deck of track, is welded with horizontal hydraulic cylinder bearing, support bracket support and lifting hydraulic cylinder bearing on the little car bottom plate of translation, carriage comprises carriage i iron and two carriage slide blocks, and carriage i iron two ends all are welded with the carriage slide block, and upper and lower hydraulic cylinder bearing is welded on the carriage i iron, is welded with carriage welding bearing on the carriage slide block, rotating turret comprises rotation frame plate and two rotating turret slide blocks, and upper and lower hydraulic cylinder bearing is welded on and rotates on frame plate, rotates the frame plate two ends and all is welded with the rotating turret slide block, rotates between frame plate and rotating turret slide block and is welded with rotating turret gusset and rotating turret reinforcement gusset, the leading screw platform comprises the leading screw pedestal, and leading screw pedestal two ends all are connected with the little deck of track and the large deck of track, and leading screw is installed on the leading screw pedestal together with the connection also of screw slider otch, on the leading screw pedestal, ratchet is installed, slide fixing, translation dolly and leading screw platform are installed in orbit, have equally distributed notch on track, ratchet can be stuck on the notch of track and lock, slide and to be connected by horizontal hydraulic cylinder between fixing and translation dolly, carriage is connected by bearing pin with support bracket support, be connected with upper and lower hydraulic cylinder between rotating turret and carriage, rotating turret coordinates by the groove mouth and can make rotating turret move up and down along carriage by upper and lower hydraulic cylinder with carriage, the lifting hydraulic cylinder lower end connects the lifting hydraulic cylinder bearing, the lifting hydraulic cylinder upper end connects carriage welding bearing, the bearing welded on screw slider is connected by bearing pin with support bar, the support bar other end is connected with carriage by bearing pin.
The invention has the beneficial effects as follows: the present invention can be fast, movement efficiently and accurately and blowout preventer set is installed, and increases work efficiency, and reduces labour intensity, improves processing safety.
The accompanying drawing explanation:
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Fig. 1 is structural representation of the present invention.
Fig. 2 is the fixing structural representation that slides.
The structural representation that Fig. 3 is the translation dolly.
The structural representation that Fig. 4 is carriage.
The structural representation that Fig. 5 is rotating turret.
The structural representation that Fig. 6 is the leading screw platform.
The structural representation that Fig. 7 is ratchet.
The specific embodiment:
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, a kind of movement erecting device of drillng operation blowout preventer set, comprise that two slips fix 1, two track 2, two translation dollies 3, carriage 4, rotating turret 5 and two leading screw platforms 7, slip is fixed 1 and is comprised slip fixed head 12, and slip fixed head 12 two ends all are connected with track lesser calorie seat 11 and the large deck 13 of track, are welded with horizontal hydraulic cylinder bearing 14 on slip fixed head 12, and ratchet 29 is arranged on slip fixed head 12, translation dolly 3 comprises translation dolly base plate 15, and translation dolly base plate 15 two ends are connected with the large deck 13 of track, are welded with horizontal hydraulic cylinder bearing 14, support bracket support 16 and lifting hydraulic cylinder bearing 17 on translation dolly base plate 15, carriage 4 comprises carriage i iron 18 and two carriage slide blocks 19, and carriage i iron 18 two ends all are welded with carriage slide block 19, and upper and lower hydraulic cylinder bearing 21 is welded on carriage i iron 18, is welded with carriage welding bearing 20 on carriage slide block 19, rotating turret 5 comprises rotation frame plate 22 and two rotating turret slide blocks 25, upper and lower hydraulic cylinder bearing 21 is welded on and rotates on frame plate 22, rotate frame plate 22 two ends and all be welded with rotating turret slide block 25, rotate between frame plate 22 and rotating turret slide block 25 and be welded with rotating turret gusset 23 and rotating turret reinforcement gusset 24, leading screw platform 7 comprises leading screw pedestal 28, and leading screw pedestal 28 two ends all are connected with track lesser calorie seat 11 and the large deck 13 of track, and leading screw 26 is installed on leading screw pedestal 28 together with screw slider 27 otch connections also, and ratchet 29 is installed on leading screw pedestal 28, slip fixes 1, translation dolly 3 and leading screw platform 7 are arranged on track 2, have equally distributed notch on track 2, ratchet 29 can be stuck on the notch of track 2 and lock, slip fix 1 with translation dolly 3 between by horizontal hydraulic cylinder 10, be connected, carriage 4 is connected by bearing pin with support bracket support 16, be connected with upper and lower hydraulic cylinder 6 between rotating turret 5 and carriage 4, rotating turret 5 coordinates by the groove mouth and can make rotating turret 5 move up and down along carriage 4 by upper and lower hydraulic cylinder 6 with carriage 4, lifting hydraulic cylinder 9 lower ends connect lifting hydraulic cylinder bearing 17, lifting hydraulic cylinder 9 upper ends connect carriage welding bearing 20, on screw slider 27, the bearing of welding is connected by bearing pin with support bar 8, support bar 8 other ends are connected with carriage 4 by bearing pin.
Be understandable that, above about specific descriptions of the present invention, only for being described, the present invention not is limited to the described technical scheme of the embodiment of the present invention, those of ordinary skill in the art is to be understood that, still can modify or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as meet, all within protection scope of the present invention.

Claims (1)

1. the movement erecting device of a drillng operation blowout preventer set, comprise two slide fixing (1), two tracks (2), two translation dollies (3), carriage (4), rotating turret (5) and two leading screw platforms (7), it is characterized in that: slide fixing (1) comprises slip fixed head (12), slip fixed head (12) two ends all are connected with the little deck of track (11) and the large deck of track (13), be welded with horizontal hydraulic cylinder bearing (14) on slip fixed head (12), ratchet (29) is arranged on slip fixed head (12), translation dolly (3) comprises the little car bottom plate of translation (15), the little car bottom plate of translation (15) two ends are connected with the large deck of track (13), are welded with horizontal hydraulic cylinder bearing (14), support bracket support (16) and lifting hydraulic cylinder bearing (17) on the little car bottom plate of translation (15), carriage (4) comprises carriage i iron (18) and two carriage slide blocks (19), carriage i iron (18) two ends all are welded with carriage slide block (19), it is upper that upper and lower hydraulic cylinder bearing (21) is welded on carriage i iron (18), is welded with carriage welding bearing (20) on carriage slide block (19), rotating turret (5) comprises rotation frame plate (22) and two rotating turret slide blocks (25), upper and lower hydraulic cylinder bearing (21) is welded on and rotates on frame plate (22), rotate frame plate (22) two ends and all be welded with rotating turret slide block (25), rotate between frame plate (22) and rotating turret slide block (25) and be welded with rotating turret gusset (23) and rotating turret reinforcement gusset (24), leading screw platform (7) comprises leading screw pedestal (28), leading screw pedestal (28) two ends all are connected with the little deck of track (11) and the large deck of track (13), it is upper that leading screw (26) is installed on leading screw pedestal (28) together with the connection also of screw slider (27) otch, and ratchet (29) is installed on leading screw pedestal (28), slide fixing (1), translation dolly (3) and leading screw platform (7) are arranged on track (2), track has equally distributed notch on (2), ratchet (29) can be stuck on the notch of track (2) and lock, slide and to be connected by horizontal hydraulic cylinder (10) between fixing (1) and translation dolly (3), carriage (4) is connected by bearing pin with support bracket support (16), be connected with upper and lower hydraulic cylinder (6) between rotating turret (5) and carriage (4), rotating turret (5) coordinates by the groove mouth with carriage (4) and passes through upper and lower hydraulic cylinder (6) can make rotating turret (5) move up and down along carriage (4), lifting hydraulic cylinder (9) lower end connects lifting hydraulic cylinder bearing (17), lifting hydraulic cylinder (9) upper end connects carriage welding bearing (20), the bearing of the upper welding of screw slider (27) is connected by bearing pin with support bar (8), support bar (8) other end is connected with carriage (4) by bearing pin.
CN201310343350.3A 2013-08-07 2013-08-07 A kind of movement erecting device of drillng operation blowout preventer set Expired - Fee Related CN103437731B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310343350.3A CN103437731B (en) 2013-08-07 2013-08-07 A kind of movement erecting device of drillng operation blowout preventer set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310343350.3A CN103437731B (en) 2013-08-07 2013-08-07 A kind of movement erecting device of drillng operation blowout preventer set

Publications (2)

Publication Number Publication Date
CN103437731A true CN103437731A (en) 2013-12-11
CN103437731B CN103437731B (en) 2016-01-20

Family

ID=49691437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310343350.3A Expired - Fee Related CN103437731B (en) 2013-08-07 2013-08-07 A kind of movement erecting device of drillng operation blowout preventer set

Country Status (1)

Country Link
CN (1) CN103437731B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924939A (en) * 2014-05-08 2014-07-16 喻书华 Quick connection device for blowout preventer in drilling tool
CN105651531A (en) * 2016-02-23 2016-06-08 上海振华重工(集团)股份有限公司 Moon pool vehicle testing platform
CN108394841A (en) * 2018-02-02 2018-08-14 宝鸡石油机械有限责任公司 Preventer group transports pressure testing function integration device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2658374Y (en) * 2003-09-29 2004-11-24 兰州兰石国民油井石油工程有限公司 Mounting device of oil-gas well blowout preventer
US20070089884A1 (en) * 2005-10-21 2007-04-26 Bart Patton Tension lift frame used as a jacking frame
CN200964809Y (en) * 2006-06-07 2007-10-24 成都美加石油机械工程有限责任公司 Blowout prevention device mounting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1709068A1 (en) * 1990-02-14 1992-01-30 Предприятие Производственного Объединения "Баррикады" Preventer control device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2658374Y (en) * 2003-09-29 2004-11-24 兰州兰石国民油井石油工程有限公司 Mounting device of oil-gas well blowout preventer
US20070089884A1 (en) * 2005-10-21 2007-04-26 Bart Patton Tension lift frame used as a jacking frame
CN200964809Y (en) * 2006-06-07 2007-10-24 成都美加石油机械工程有限责任公司 Blowout prevention device mounting device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱奇,侯勇俊: "《新型防喷器移送装置的研究与应用》", 《石油机械》, vol. 39, 1 November 2011 (2011-11-01), pages 28 - 30 *
马永刚等: "《石油钻机用防喷器装卸系统研制及应用》", 《石油矿场机械》, vol. 39, no. 12, 25 December 2010 (2010-12-25), pages 64 - 67 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924939A (en) * 2014-05-08 2014-07-16 喻书华 Quick connection device for blowout preventer in drilling tool
CN105651531A (en) * 2016-02-23 2016-06-08 上海振华重工(集团)股份有限公司 Moon pool vehicle testing platform
CN108394841A (en) * 2018-02-02 2018-08-14 宝鸡石油机械有限责任公司 Preventer group transports pressure testing function integration device

Also Published As

Publication number Publication date
CN103437731B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN102900362B (en) Narrow-machine-body full-hydraulic bolt and anchor cable drill carriage for coal mine tunnel
CN203475853U (en) Light wall board construction work vehicle
CN108301794B (en) Petroleum workover robot
CN103590763B (en) A kind of oil drilling platform preventer transport erecting device
CN104314480B (en) A kind of pipe tool erection device
CN104863528A (en) Drilling tool-lifting and height-adjustable power catwalk
CN204609762U (en) Outstanding rail rock drilling machine
CN103437731A (en) Transporting and mounting device for blowout preventer stack in drilling operation
CN107965281B (en) Offshore module drilling rig blowout preventer moving device and moving method
CN103277046B (en) Wheel type truck-mounted drilling rig
CN201769017U (en) Rail-mounted welding falsework
CN203271588U (en) Wheel type truck-mounted drilling rig
CN203835303U (en) Novel injection head goose neck following mechanism
CN203664737U (en) Automatic multihole drill
CN201280133Y (en) Carriage for rail carry and examination and repair adjustment
CN201198040Y (en) Hydraulic type rail drilling machine
CN102518396A (en) Automatic drilling machine
CN206276939U (en) A kind of upper connective plate block
CN106392131B (en) A kind of upper connective plate block
CN203626649U (en) Blowout preventer transportation and installation device for oil drilling platform
CN203905871U (en) Device for rapid replacement of BOP (blowout preventer)
CN212050214U (en) A move fortune device for rig blowout preventer BOP
CN203903818U (en) Up rotary crane suitable for factory building with low headroom
CN203362084U (en) Blowout preventer installation device of oil drilling platform
CN205186154U (en) Hydraulic pressure take a step under mine from moving formula equipment train with carrying rail ware

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180928

Address after: 300457 Tianjin Binhai New Area Binhai Service Outsourcing Industrial Park 3 Building

Co-patentee after: NORTHEAST PETROLEUM University

Patentee after: CNPC BOHAI EQUIPMENT MANUFACTURING Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Binhai Service Outsourcing Industrial Park 3 Building

Co-patentee before: CHINA PETROLEUM LIAOHE EQUIPMENT Co.

Patentee before: CNPC BOHAI EQUIPMENT MANUFACTURING Co.,Ltd.

Co-patentee before: NORTHEAST PETROLEUM University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

CF01 Termination of patent right due to non-payment of annual fee