CN103437497A - 钢管混凝土完全组合柱及制造工艺 - Google Patents
钢管混凝土完全组合柱及制造工艺 Download PDFInfo
- Publication number
- CN103437497A CN103437497A CN2013103072030A CN201310307203A CN103437497A CN 103437497 A CN103437497 A CN 103437497A CN 2013103072030 A CN2013103072030 A CN 2013103072030A CN 201310307203 A CN201310307203 A CN 201310307203A CN 103437497 A CN103437497 A CN 103437497A
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel pipe
- steel tube
- steel
- complete combination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310307203.0A CN103437497B (zh) | 2013-07-18 | 2013-07-18 | 钢管混凝土完全组合柱及制造工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310307203.0A CN103437497B (zh) | 2013-07-18 | 2013-07-18 | 钢管混凝土完全组合柱及制造工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103437497A true CN103437497A (zh) | 2013-12-11 |
CN103437497B CN103437497B (zh) | 2016-08-31 |
Family
ID=49691205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310307203.0A Active CN103437497B (zh) | 2013-07-18 | 2013-07-18 | 钢管混凝土完全组合柱及制造工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103437497B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107882211A (zh) * | 2017-12-15 | 2018-04-06 | 赵建敏 | 建筑用约束组合墙结构 |
CN108104369A (zh) * | 2017-12-15 | 2018-06-01 | 刘明辉 | 建筑用约束组合柱结构 |
CN117127755A (zh) * | 2023-09-25 | 2023-11-28 | 中南大学 | 仿竹外约束支撑管混凝土柱 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86106474A (zh) * | 1986-09-26 | 1987-04-22 | 黑龙江省建筑设计院新技术研究所 | 预应力钢管混凝土柱 |
CN1057874A (zh) * | 1991-05-24 | 1992-01-15 | 钟莉 | 贮能钢管混凝土的制作方法及其构件 |
JP4813125B2 (ja) * | 2005-08-15 | 2011-11-09 | 鹿島建設株式会社 | 鋼板コンクリート造部材および鋼板コンクリート造建造物 |
CN202659250U (zh) * | 2012-07-10 | 2013-01-09 | 山东大学 | 一种新型插入式预应力灌浆钢管混凝土节点 |
CN203412195U (zh) * | 2013-07-18 | 2014-01-29 | 杭州博数土木工程技术有限公司 | 钢管混凝土完全组合柱 |
-
2013
- 2013-07-18 CN CN201310307203.0A patent/CN103437497B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86106474A (zh) * | 1986-09-26 | 1987-04-22 | 黑龙江省建筑设计院新技术研究所 | 预应力钢管混凝土柱 |
CN1057874A (zh) * | 1991-05-24 | 1992-01-15 | 钟莉 | 贮能钢管混凝土的制作方法及其构件 |
JP4813125B2 (ja) * | 2005-08-15 | 2011-11-09 | 鹿島建設株式会社 | 鋼板コンクリート造部材および鋼板コンクリート造建造物 |
CN202659250U (zh) * | 2012-07-10 | 2013-01-09 | 山东大学 | 一种新型插入式预应力灌浆钢管混凝土节点 |
CN203412195U (zh) * | 2013-07-18 | 2014-01-29 | 杭州博数土木工程技术有限公司 | 钢管混凝土完全组合柱 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107882211A (zh) * | 2017-12-15 | 2018-04-06 | 赵建敏 | 建筑用约束组合墙结构 |
CN108104369A (zh) * | 2017-12-15 | 2018-06-01 | 刘明辉 | 建筑用约束组合柱结构 |
CN117127755A (zh) * | 2023-09-25 | 2023-11-28 | 中南大学 | 仿竹外约束支撑管混凝土柱 |
Also Published As
Publication number | Publication date |
---|---|
CN103437497B (zh) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203412195U (zh) | 钢管混凝土完全组合柱 | |
EP2076642A1 (en) | Polymeric concrete for wind generators towers or other large structural applications | |
CN103437497A (zh) | 钢管混凝土完全组合柱及制造工艺 | |
CN104929117A (zh) | 一种混凝土杆身复合锚杆及其施工方法 | |
Marshall et al. | Bond enhancement for sandwich shell ice wall | |
CN107288030A (zh) | 制作圆柱形混凝土墩柱的方法 | |
CN207988359U (zh) | 钢管混凝土高压成型装置及钢管混凝土 | |
RU2679172C1 (ru) | Способ изготовления набивной сваи и устройство для его осуществления | |
CN103422615B (zh) | 钢管混凝土完全组合梁及制造工艺 | |
KR101240581B1 (ko) | 십자형 정착판지지판을 이용한 단부지지체, 이를 구비한 프리스트레스트 강합성빔 및 프리스트레스트 강합성빔 시공방법 | |
CN203403603U (zh) | 钢管混凝土完全组合梁 | |
CN203783600U (zh) | 一种公路隧道衬砌表面粘钢加固装置 | |
CN113914546B (zh) | 一种装配式叠合梁板结构及其施工方法 | |
CN113026796B (zh) | 风力发电塔基础环基础加固结构及方法 | |
CN114277786A (zh) | 高强混凝土承载体、压力型抗浮桩及构建方法 | |
CN107288029A (zh) | 制作方柱形混凝土墩柱的方法 | |
CN212021104U (zh) | 一种建筑用模具梁 | |
KR100617475B1 (ko) | 합성말뚝을 구성하는 고강도 중공콘크리트 말뚝의 덮개판구조 및 시공방법 | |
CN110258290A (zh) | Frp管海水珊瑚骨料混凝土拱桥结构及其建造方法 | |
CN101649651B (zh) | 刚度可控型钢与混凝土组合连接件及其使用方法 | |
CN111764310B (zh) | 一种独柱墩大悬臂盖梁加固结构及施工方法 | |
CN110605776B (zh) | 一种建筑用模具梁及制备方法 | |
CN205776164U (zh) | 一种耐腐蚀空心方桩 | |
CN217580118U (zh) | 一种防开裂的预应力混凝土管桩 | |
CN102635127A (zh) | 一种夹层式环肋圆柱壳结构及其工艺方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD. Free format text: FORMER OWNER: HANGZHOU BOSHU CIVIL ENGINEERING TECHNOLOGY CO., LTD. Effective date: 20141128 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 311215 HANGZHOU, ZHEJIANG PROVINCE TO: 311200 HANGZHOU, ZHEJIANG PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141128 Address after: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou Applicant after: Hangzhou Li Yang Steel Structure Co., Ltd. Address before: Hangzhou City, Zhejiang province 311215 Xiaoshan economic and Technological Development Zone, North Building 2 room 1711 Ning'an Applicant before: Hangzhou Boshu Civil Engineering Technology Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: ZHEJIANG CTB CORRUGATED STEEL WEB CO., LTD. Free format text: FORMER OWNER: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD. Effective date: 20150228 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 311200 HANGZHOU, ZHEJIANG PROVINCE TO: 314422 HANGZHOU, ZHEJIANG PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150228 Address after: 314422, No. 168-2, village, town, Hangzhou, Xiaoshan District, Zhejiang Applicant after: Zhejiang CTB Corrugated Steel Web Co., Ltd. Address before: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou Applicant before: Hangzhou Li Yang Steel Structure Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |