CN1034344A - 循环节水冲灰场 - Google Patents

循环节水冲灰场 Download PDF

Info

Publication number
CN1034344A
CN1034344A CN 88101965 CN88101965A CN1034344A CN 1034344 A CN1034344 A CN 1034344A CN 88101965 CN88101965 CN 88101965 CN 88101965 A CN88101965 A CN 88101965A CN 1034344 A CN1034344 A CN 1034344A
Authority
CN
China
Prior art keywords
water
ash
field
flushing
towards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 88101965
Other languages
English (en)
Inventor
王永泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 88101965 priority Critical patent/CN1034344A/zh
Publication of CN1034344A publication Critical patent/CN1034344A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

循环节水冲灰场,是火力发电厂的水力除灰的冲 灰场。本发明是把天然地下水库(注),人为的移置到 灰场中;并设置一些集水和提水设施、回水管路,而形 成了冲灰用水的循环利用。解决了一次性冲灰耗水 量大。对地下水源污染、及冲灰费用高的问题。并降 低了发电成本、节约了水资源、有一定经济效益和社 会效益。

Description

所属技术领域:电力(火力发电厂的冲灰场)
对该发明的理解:本发明是火力发电厂水力冲灰场中,从未出现过的新方式。它不仅适用于火力发电厂的水力冲灰,而且适用于多数管道运输(水力)粉、粒状物料的场地。
实施本发明的目的:使冲灰用水循环使用。降低发电成本,节约用水,减少冲灰水对大地的污染。
循环节水冲灰场的结构及工作原理:(结合参看附图)
循环节水冲灰场的结构:
在普通冲灰场的底部和壁部,设置防渗层(如图中1)。即在普通冲灰场的底部和壁部,铺一层比较纯的粘土。用水渗透压实,防渗层的厚度不得低于30cm。在自然条件具备的地方,冲灰场底部的防渗层,可用自然粘土层代替,为了提高防渗效果,防渗层也可用水泥、塑料薄膜及其他材料铺设。
在冲灰场的底部,防渗层的上面,铺设储水层(如图中(2))。就是在防渗层的上面,铺一层粗沙,沙层的厚度不少于60cm。在低洼处的集水沟附近,沙层厚度应大于80cm。沙子的粒度应在2mm以上,并不含细沙。无粗沙者可用粒度相近的粗煤灰,或其他透水性良好的材料代之。储水层的作用:一是储存从灰层(如图中(3))中渗漏下来的水;二是通过沙间空隙向集水沟,源源不断的供水。在选料和施工中,应牢牢把握这两项目的。
在储水层中,开挖集水沟(如图中(4))。就是在冲灰场的低洼地带,挖深度为1.5m以上,宽度为2m以上横截面为梯形的沟,沟的底、壁有防渗层。沟内用粒度为2cm以上的石子填满。并高出沟面呈圆弧形。石子的上面盖一层窗纱,作用是隔沙滤水形成滤水网。为降低工程造价,石子也可用粒度相近的,炉灰渣或其他材料取代。集水沟在冲灰场中的布局,应视灰场中的地形而定、可以是环形,也可以纵横交叉。总之应该是四通八达,以利集结整个炭场的水为目的。
在集水沟的最低处设置集水井(如图中(6))。集水井应设在冲灰场最低处集水沟中,或集水沟的交叉点处。其结构与一般铁管井相同,但要求井管直径应在1m左右。井管的进水孔和滤水网(如图中(7)),要有良好透水性,井底要座落在有足够体积的水泥基础上(如图中(8))以防井管倾倒,进水部位的周围要用粒度为10cm以上的河卵石(如图中(9))填满,卵石填充范围的直径不得小于4m。卵石的上面应用滤水网复盖。滤水网的上面用粗沙复盖,集水井的上口,应高于灰场的最高冲灰面。并在集水井上,安装集水泵(如图中(10))和回水管路(如图中(11))直通回水母管。(如图中(12))为保证冬季的正常输水,回水管路和回水母管都应设在地面的1m以下。集水井应根据冲灰场的地势和回水量设多个。
灰场底与集水沟,集水沟与集水井,应当是依次渐低,坡度不应小于2‰。以利于水的顺利集结。
循环节水冲灰场的工作原理:
当灰浆通过冲灰管(如图中(13))冲入灰场后,水很快的下渗进入储水层,而煤灰则被隔离在储水层的上面。当集水沟内充满了水,集水井内的水位达到一定的高度时,便可启动集水泵,把水通过回水管和回水母管送回电厂,这样便实现了冲灰用水的循环。在正常运行中定期的补充一些水,就可以保证冲灰用水的循环使用。如果防渗层没问题的话,补充水量不超过冲灰量的2倍(按体积计算)。
主要优点和积极效果:实施本发明与普通冲灰场相比,可节约冲灰用水百分之八十以上,以发电容量为70万千瓦的邢台发电厂为例,粗略计算比较如下:
使用普通灰场的水的费用    使用循环节水冲灰场
日冲灰量:1500吨    日冲灰量:1500吨
灰水比例:1∶20    灰水比例:1∶20
日耗水量:1500×20=30000吨    日耗水量:1500×2=3000吨
水资源费:(每吨1角)3000元/日    水资源费:300元/日
灰水污染费:(每吨8分)2400元/日    灰水污染费:100元/日
日总合水费:3000+2400=5400元    日总合水费:100+300=400元
通过以上的粗略计算,实施本发明每天节约水费5000元,每年可节约180万元以上,每千度电可降低成本0.3元左右。每年可节水近1千万吨。
实施本发明的最佳方式:储水层用的粗沙和集水沟用的石子,若当地取才不便或价格昂贵的话,可在冲灰管出口安装滚筒筛子,筛选粒度合适的粗灰代替。

Claims (1)

  1. 循环节水冲灰场,是火力发电厂中的水力冲灰场地,该发明是把地下水库,人为的移置到普通灰场而形成的。改普通冲灰水一次性使用为循环使用。解决了普通灰场耗水量大,冲灰费用高,灰水对大地污染严重的问题。
    特征:
    1、在普通灰场的底部和壁部铺设防渗层。在防渗层的上面,铺一层粗沙,形成储水层。这样就构成了地下水库。
    2、在储水层中,设置集水沟。在集水沟中,设置集水井,在集水井上安装集水泵及回水管路,实现冲灰水循环使用。
    本发明仅在火力发电厂的水力冲灰中,要求专利保护权。
CN 88101965 1988-04-12 1988-04-12 循环节水冲灰场 Pending CN1034344A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 88101965 CN1034344A (zh) 1988-04-12 1988-04-12 循环节水冲灰场

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 88101965 CN1034344A (zh) 1988-04-12 1988-04-12 循环节水冲灰场

Publications (1)

Publication Number Publication Date
CN1034344A true CN1034344A (zh) 1989-08-02

Family

ID=4831959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 88101965 Pending CN1034344A (zh) 1988-04-12 1988-04-12 循环节水冲灰场

Country Status (1)

Country Link
CN (1) CN1034344A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767302A (zh) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 一种分布式地下水库及其建造方法
CN102865103A (zh) * 2012-04-28 2013-01-09 中国神华能源股份有限公司 一种矿井地下水的分布式利用方法
CN108612152A (zh) * 2017-01-17 2018-10-02 河南万江新能源开发有限公司 人工增强暗渠浅层地热方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102865103A (zh) * 2012-04-28 2013-01-09 中国神华能源股份有限公司 一种矿井地下水的分布式利用方法
CN102865103B (zh) * 2012-04-28 2014-02-26 中国神华能源股份有限公司 一种矿井地下水的分布式利用方法
CN102767302A (zh) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 一种分布式地下水库及其建造方法
CN108612152A (zh) * 2017-01-17 2018-10-02 河南万江新能源开发有限公司 人工增强暗渠浅层地热方法

Similar Documents

Publication Publication Date Title
CN103953008A (zh) 一种适用于尾矿库的改进型混合坝
CN1948639A (zh) 一种自流式地下水库的取水廊道
CN213867863U (zh) 一种基于废弃矿山的一般工业固体废物贮存、处置场结构
CN104695386A (zh) 用于沟水处理的挡排结构以及挡排方法
CN103147614A (zh) 多层结构水池及其构建方法
CN110984063B (zh) 一种人工沟渠排水沙滩减淤系统
CN113605492A (zh) 一种露天矿水资源立体式保护利用方法
CN211472699U (zh) 多泥沙河流新型渗管取水结构
CN212477620U (zh) 一种深厚覆盖层上修筑重力坝的结构
Deng Ground reservoir: a new pattern of groundwater utilization in arid north-west China-a case study in Tailan River basin
CN113027522A (zh) 一种煤矿疏水同层回灌方法
CN1034344A (zh) 循环节水冲灰场
Baurne “Trap-dams”: artificial subsurface storage of water
CN100567649C (zh) 一种库底填埋废渣的结构
CN214363322U (zh) 一种波浪型景观过水面板堆石坝
CN201704090U (zh) 傍河取水人工渗滤系统
CN212153269U (zh) 一种快速制造安装的河道景观水面减淤设备
CN113700124A (zh) 一种泄水降压的地下抗浮水池及其泄水降压方法
CN208563267U (zh) 一种土石坝压坡体排水结构
CN113202062A (zh) 一种用于沟道型弃渣场施工期及运行期的排洪方法
CN112982611A (zh) 一种干法赤泥堆场及其布置方法
CN206941749U (zh) 雨水收集回收利用系统
CN220827849U (zh) 山区农村生活饮水复合式供水系统
CN215629907U (zh) 一种高压旋喷桩兼做边坡支护桩基结构
CN218757276U (zh) 一种用于城市河道的防渗结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination