CN103433309B - Device for controlling and simulating cooling rate of high-speed Steyr air cooling line - Google Patents

Device for controlling and simulating cooling rate of high-speed Steyr air cooling line Download PDF

Info

Publication number
CN103433309B
CN103433309B CN201310363294.XA CN201310363294A CN103433309B CN 103433309 B CN103433309 B CN 103433309B CN 201310363294 A CN201310363294 A CN 201310363294A CN 103433309 B CN103433309 B CN 103433309B
Authority
CN
China
Prior art keywords
water
cooling
interlayer
inlet pipe
cooling rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310363294.XA
Other languages
Chinese (zh)
Other versions
CN103433309A (en
Inventor
罗志俊
王丽萍
李舒笳
晁月林
王猛
王立峰
马跃
佟倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Group Co Ltd
Original Assignee
Shougang Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp filed Critical Shougang Corp
Priority to CN201310363294.XA priority Critical patent/CN103433309B/en
Publication of CN103433309A publication Critical patent/CN103433309A/en
Application granted granted Critical
Publication of CN103433309B publication Critical patent/CN103433309B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

The invention discloses a device for controlling and simulating the cooling rate of a high-speed Steyr air cooling line and belongs to the technical field of material cooling control equipment. The device for controlling and simulating the cooling rate of the high-speed Steyr air cooling line comprises an inner layer, an outer layer, a circulating water interlayer, a water inlet pipe, a water outlet pipe, a partition board, a heating device, a water pump, a flowmeter and a pressure gauge, wherein the inner layer and the outer layer are connected through the bottom partition board to form the circulating water interlayer, the bottom partition board is connected with the inner layer and the outer layer in a welding mode, the bottom partition board is in a shape of an L, no partition board is arranged on the lateral wall of the left side of the inner layer and the outer layer, and the partition board is arranged on the lateral wall of the right side of the inner layer and the outer layer; water in a water tank is led into the interlayer via the water inlet pipe through the water pump, the flowmeter and the pressure gauge, then the water is discharged into the water tank through the water outlet pipe, and then a circulating circuit is formed. The device for controlling and simulating the cooling rate of the high-speed Steyr air cooling line has the advantages that the steel plate cooling rate can be accurately controlled to be within the range of 3-40 DEG C / s, and simulation of the cooling condition of the Steyr air cooling line in a pilot plant test is achieved.

Description

A kind of device of control simulation height line Stanermo wind-cooling linear cooling rate
Technical field
The invention belongs to material control-cooling equipment technical field, in particular, provide a kind of device of control simulation height line Stanermo wind-cooling linear cooling rate.For laboratory's wire rod new varieties research and development, process optimization and basic research, simulate high line Stanermo wind-cooling linear cooling condition, the control device of low cooling rate (3 ~ 40 DEG C/s) can be realized.
Background technology
Wire production is justifying-oval groove high speed rolling, and after weaving silk, on Stanermo wind-cooling linear, structural transformation control is carried out in cooling.At present, there is no wire rod middle simulated test testing machine both at home and abroad.Wire rod developing new product variety obtains the difficult point that structure property accurately becomes laboratory's research and development, current each steel mill and scientific research institutions' pilot scale many employings 2 roller plate mill.And plate mill adopts water cooling box cooling, cooling capacity at least reaches 50 ~ 200 DEG C/s.And wire rod produces on high line Stanermo wind-cooling linear, the maximum cooling rate of blower fan can reach 20 DEG C/s, and cooling rate scope is at 3 ~ 20 DEG C/s.Adopt water cooling box cannot realize the development requires of variety of Wire Rod, become the difficult point of laboratory's exploitation.Variety of Wire Rod such as cold-heading steel grade produces 8.8 grades and above high-level bolt, and traditional processing technology all adopts modified (quenching+tempering) to process, and causes that environmental pollution is serious, process procedure is complicated and cost is higher.The F+M of the hot rolling of active research exploitation both at home and abroad at present dual phase steel, substitutes modifier treatment.Only cancel modifier treatment one, the cost-saving 800-1000 unit of ton steel, hot-rolled dual-phase steel becomes one of direction of high-strength steel development.And develop double-phase cold heading steel kind, need component system design, composition adjustment and optimization, it is vital for obtaining performance and duplex structure's ratio accurately, is the key of dual phase steel exploitation.For another example the steel grade of the forced air cooling such as steel strand wires, steel cord carries out alloying component optimization, needs to obtain cooling rate accurately, and controls sorbite rate and pearlite colony size.Accurately cannot control the restraining factors that cooling rate becomes the research and development of variety of Wire Rod laboratory.
Because domestic and international pilot plant test room all adopts 2 roller mills+water cooling box controlled cooling model, cooling capacity can reach 50 ~ 200 DEG C/s.The cold process of double-phase cold heading steel control can only adopt sub-sectional cooling to control duplex structure, and sub-sectional cooling schematic diagram is as Fig. 1.Sub-sectional cooling there will be pearlite or bainite middle temperature transformation tissue in constant temperature process, cannot realize duplex structure and control.
Summary of the invention
The object of the present invention is to provide a kind of device of control simulation height line Stanermo wind-cooling linear cooling rate, overcome the shortcoming that water cooling box cooling rate is excessive, at the uniform velocity cool within the scope of accurate control 3 ~ 40 DEG C/s cooling rate, achieve the air-cooled ability of accurate simulation height line stelmor.
The present invention includes internal layer 1, skin 2, interlayer 3, water inlet pipe 4, outlet pipe 5, dividing plate 6, heater 7, water pump 8, flowmeter 9, Pressure gauge 10.Internal layer 1 and outer 2 is connected to form circulating water sandwich 3 by increasing dividing plate 6 in bottom, the dividing plate 6 increased in bottom respectively with internal layer 1 and outer 2 by being welded to connect. increase in bottom dividing plate 6l-shaped, sidewall non-inductive windings on the left of internal layer 1 and outer 2, right sidewall has dividing plate.By water pump 8, flowmeter 9 and Pressure gauge 10 by the water of tank 11 via water inlet pipe 4, introduce in interlayer 3, then be discharged to tank 11 by outlet pipe 5, form closed circuit.Deposit at the uniform velocity cooling fluid in internal layer 1, bottom outer 2, heater 7 is installed.
By water pump 8, flowmeter 9 and Pressure gauge 10, by the water of tank 11 via water inlet pipe 4, introduce in interlayer 3, after interlayer 3 piles water, switch off the pump 8, water inlet pipe 4 and outlet pipe 5, formed and close water bath.Adopt heater 7 to add heat-seal water bath temperature, realize controlling at the uniform velocity coolant temperature by convection current and heat transfer by heat conduction mode, realize controlling steel plate at the uniform velocity cooling fluid cooling rate within the scope of 3 ~ 7 DEG C/s.
At the high line of simulation, when needs steel plate cooling velocity is within the scope of 7 ~ 40 DEG C/s, according to the cooling rate curve known (see Fig. 4) that different-thickness or diameter steel plate/line obtain under difference at the uniform velocity coolant temperature, at the uniform velocity coolant temperature should be less than or equal to 50 DEG C.Now, open water pump 8, by the water of tank 11, by flowmeter 9 and Pressure gauge 10, via water inlet pipe 4, introduce in interlayer 3, then be discharged to tank 11 by outlet pipe 5.Described at the uniform velocity coolant temperature controls, and is to be realized by the flow of flowmeter 9 and Pressure gauge 10 controlled circulation water and pressure, needs to select corresponding flow and pressure according to the needs of steel grade in test process.
Simulation high line, when needs steel plate cooling velocity is within the scope of 3 ~ 7 DEG C/s, according to Fig. 4, need control at the uniform velocity coolant temperature higher than 50 DEG C.Now, switch off the pump 8, water inlet pipe 4 and outlet pipe 5, formed and close water bath, open heater 7.Described at the uniform velocity coolant temperature controls, and is control heater 7 by attemperating unit 12, heats closed water bath, and transfers heat at the uniform velocity cooling fluid by convection current and heat transfer by heat conduction mode and realize.
The invention has the advantages that, use this device accurately can control steel plate cooling rate within the scope of 3 ~ 40 DEG C/s, realize the high line Stanermo wind-cooling linear cooling condition of simulation.
Accompanying drawing explanation
Fig. 1 is pilot scale water cooling box sub-sectional cooling and contrive equipment continuous cooling curve schematic diagram.Can find, dual phase steel adopts water cooling box sub-sectional cooling process easily to occur the middle temperature transformation such as pearlite, bainite tissue, and contrive equipment can obtain good duplex structure.
Fig. 2 is pilot scale heating furnace, milling train and at the uniform velocity cooling controller schematic diagram.
Fig. 3 is the device schematic diagram of simulating high line Stanermo wind-cooling linear cooling rate.Wherein, internal layer 1, skin 2, interlayer 3, water inlet pipe 4, outlet pipe 5, dividing plate 6, heater 7, water pump 8, flowmeter 9, Pressure gauge 10, tank 11, attemperating unit 12.
Fig. 4 is the cooling rate curve that different-thickness or diameter steel plate/line obtain under difference at the uniform velocity coolant temperature.
Detailed description of the invention
Embodiment 1
The present invention includes internal layer 1, skin 2, interlayer 3, water inlet pipe 4, outlet pipe 5, dividing plate 6, water pump 8, flowmeter 9, Pressure gauge 10, tank 11.Internal layer 1 and outer 2 is connected to form circulating water sandwich 3 by increasing dividing plate 6 in bottom, the dividing plate 6 increased in bottom respectively with internal layer 1 and outer 2 by being welded to connect.Dividing plate 6 l-shaped increased in bottom, sidewall non-inductive windings on the left of internal layer 1 and outer 2, right sidewall has dividing plate.By water pump 8, flowmeter 9 and Pressure gauge 10, by the water of tank 11 via water inlet pipe 4, introduce in interlayer 3, then be discharged to tank 11 by outlet pipe 5, form closed circuit.Deposit at the uniform velocity cooling fluid in internal layer 1, bottom outer 2, heater 7 is installed.
When simulating cooling rate within the scope of high line Stanermo wind-cooling linear 7 ~ 40 DEG C/s, open water pump 8, by the water of tank 11, by flowmeter 9 and Pressure gauge 10, via water inlet pipe 4, introduce in interlayer 3, then be discharged to tank 11 by outlet pipe 5.Described at the uniform velocity coolant temperature controls, and is to be realized by the flow of flowmeter 9 and Pressure gauge 10 controlled circulation water and pressure, needs to select corresponding flow and pressure according to the needs of steel grade in test process.
Embodiment 2
The present invention includes internal layer 1, skin 2, interlayer 3, water inlet pipe 4, outlet pipe 5, dividing plate 6, heater 7, water pump 8, flowmeter 9, Pressure gauge 10, tank 11, attemperating unit 12.Internal layer 1 and outer 2 is connected to form circulating water sandwich 3 by increasing dividing plate 6 in bottom, the dividing plate 6 increased in bottom respectively with internal layer 1 and outer 2 by being welded to connect.Dividing plate 6 l-shaped increased in bottom, sidewall non-inductive windings on the left of internal layer 1 and outer 2, right sidewall has dividing plate.By water pump 8, flowmeter 9 and Pressure gauge 10, by the water of tank 11 via water inlet pipe 4, introduce in interlayer 3, after interlayer 3 piles water, switch off the pump 8, water inlet pipe 4 and outlet pipe 5, formed and close water bath.Deposit at the uniform velocity cooling fluid in internal layer 1, bottom outer 2, heater 7 is installed.
When simulating cooling rate within the scope of high line Stanermo wind-cooling linear 3 ~ 7 DEG C/s, switch off the pump 8, water inlet pipe 4 and outlet pipe 5, formed and close water bath, open heater 7.Described at the uniform velocity coolant temperature controls, and is control heater 7 by attemperating unit 12, heats closed water bath, and transfers heat at the uniform velocity cooling fluid by convection current and heat transfer by heat conduction mode and realize.

Claims (3)

1. the device of a control simulation height line Stanermo wind-cooling linear cooling rate, it is characterized in that, internal layer (1), outer (2), interlayer (3), water inlet pipe (4), outlet pipe (5), dividing plate (6), heater (7), water pump (8), flowmeter (9), Pressure gauge (10);
Internal layer (1) and outer (2) are connected to form interlayer (3) by increasing dividing plate (6) in bottom, the dividing plate (6) increased in bottom respectively with internal layer (1) and skin (2) by being welded to connect; Dividing plate (6) l-shaped increased in bottom, at internal layer (1) and outer (2) left side sidewall non-inductive windings, right sidewall has dividing plate; By water pump (8), flowmeter (9) and Pressure gauge (10) by the water of tank (11) via water inlet pipe (4), introduce in interlayer (3), be discharged to tank (11) by outlet pipe (5) again, form closed circuit;
By water pump (8), flowmeter (9) and Pressure gauge (10), by the water of tank (11) via water inlet pipe (4), introduce in interlayer (3), after interlayer (3) piles water, switch off the pump (8), water inlet pipe (4) and outlet pipe (5), formed and close water bath; In internal layer (1), deposit at the uniform velocity cooling fluid, in outer (2) bottom, heater (7) is installed; Adopt heater (7) to add heat-seal water bath temperature, realize controlling at the uniform velocity coolant temperature by convection current and heat transfer by heat conduction mode, realize controlling steel plate at the uniform velocity cooling fluid cooling rate within the scope of 3 ~ 7 DEG C/s.
2. device according to claim 1, it is characterized in that, when simulating cooling rate within the scope of high line Stanermo wind-cooling linear 7 ~ 40 DEG C/s, open water pump (8), by the water of tank (11), by flowmeter (9) and Pressure gauge (10), via water inlet pipe (4), introduce in interlayer (3), then be discharged to tank (11) by outlet pipe (5); At the uniform velocity coolant temperature controls, and is to be realized by the flow of flowmeter (9) and Pressure gauge (10) controlled circulation water and pressure.
3. device according to claim 1 and 2, it is characterized in that, when simulating cooling rate within the scope of high line Stanermo wind-cooling linear 3 ~ 7 DEG C/s, switch off the pump (8), water inlet pipe (4) and outlet pipe (5), formed and close water bath, open heater (7); At the uniform velocity coolant temperature controls to be control heater (7) by attemperating unit (12), heats, and transfer heat at the uniform velocity cooling fluid by convection current and heat transfer by heat conduction mode and realize closed water bath.
CN201310363294.XA 2013-08-20 2013-08-20 Device for controlling and simulating cooling rate of high-speed Steyr air cooling line Active CN103433309B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310363294.XA CN103433309B (en) 2013-08-20 2013-08-20 Device for controlling and simulating cooling rate of high-speed Steyr air cooling line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310363294.XA CN103433309B (en) 2013-08-20 2013-08-20 Device for controlling and simulating cooling rate of high-speed Steyr air cooling line

Publications (2)

Publication Number Publication Date
CN103433309A CN103433309A (en) 2013-12-11
CN103433309B true CN103433309B (en) 2015-07-15

Family

ID=49687074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310363294.XA Active CN103433309B (en) 2013-08-20 2013-08-20 Device for controlling and simulating cooling rate of high-speed Steyr air cooling line

Country Status (1)

Country Link
CN (1) CN103433309B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104550262A (en) * 2014-12-15 2015-04-29 首钢总公司 Method for controlling simulation of cooling speed of high-speed wire Stelmor air cooling line
RU2607869C1 (en) * 2015-08-27 2017-01-20 Публичное акционерное общество "Северский трубный завод" Method of cooling metal sample in blower apparatus

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1708870A1 (en) * 1989-05-22 1992-01-30 Череповецкий Металлургический Комбинат Им.50-Летия Ссср Guide system section
WO2005076977A2 (en) * 2004-02-04 2005-08-25 Surfect Technologies, Inc. Plating apparatus and method
CN101413758A (en) * 2008-11-28 2009-04-22 河南恒星科技股份有限公司 High temperature waste hot gas recycling apparatus of steel curtain line austenite furnace
CN201439096U (en) * 2009-07-16 2010-04-21 新疆八一钢铁股份有限公司 Cold-rolling emulsion steam condensate recovery unit
CN102864793A (en) * 2012-06-15 2013-01-09 中国科学院寒区旱区环境与工程研究所 Test device for simulating permafrost region well heat insulation or heating
CN203090860U (en) * 2013-02-04 2013-07-31 厦门艾贝森电子有限公司 Mixing apparatus with heating device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1708870A1 (en) * 1989-05-22 1992-01-30 Череповецкий Металлургический Комбинат Им.50-Летия Ссср Guide system section
WO2005076977A2 (en) * 2004-02-04 2005-08-25 Surfect Technologies, Inc. Plating apparatus and method
CN101413758A (en) * 2008-11-28 2009-04-22 河南恒星科技股份有限公司 High temperature waste hot gas recycling apparatus of steel curtain line austenite furnace
CN201439096U (en) * 2009-07-16 2010-04-21 新疆八一钢铁股份有限公司 Cold-rolling emulsion steam condensate recovery unit
CN102864793A (en) * 2012-06-15 2013-01-09 中国科学院寒区旱区环境与工程研究所 Test device for simulating permafrost region well heat insulation or heating
CN203090860U (en) * 2013-02-04 2013-07-31 厦门艾贝森电子有限公司 Mixing apparatus with heating device

Also Published As

Publication number Publication date
CN103433309A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN104896572B (en) Boiler system for monitoring by using cloud server
CN106391734B (en) A kind of piece-wise step type cooling device for hot-rolled high-strength reinforcing bar
CN109023103B (en) Production method of bainite cold heading steel wire rod
CN201144263Y (en) Steel bar quenching and high temperature tempering production line
CN103433309B (en) Device for controlling and simulating cooling rate of high-speed Steyr air cooling line
CN103555913A (en) Control method for improving plasticity of bearing steel wire rod
CN103559334B (en) Modeling method and system for temperature field in laminar cooling
CN105964962B (en) Continuous casting recirculated cooling water and the process and system of strand UTILIZATION OF VESIDUAL HEAT IN
CN107955877A (en) The control method of ultra low oxygen content in roller hearth heat-treated furnace
CN203635845U (en) Forged cold-controlling device for non-quenched and tempered steel forge pieces
CN209162147U (en) A kind of cold rolled reinforcing bar annealing device
CN103740925B (en) Method for linkage production of high-toughness pipeline steel by adopting jetting and laminar cooling
CN203991658U (en) A kind of high strength cast iron production system
CN102080179A (en) Preparation method of boron-containing structural steel
CN106498139A (en) A kind of process for producing IF steel and device
CN103710529B (en) Q235 steel structure property predicating method based on ultra-fast cooling system
CN106811579B (en) Two phase stainless steel direct-on-line solid solution craft
CN203304295U (en) Seamless steel tube efficient rolling control production equipment
CN103706645B (en) The method of the intermediate blank time of staying temperature in a kind of shortening heat continuous rolling process
CN102527734B (en) Steel plate controlling and rolling method
CN205590750U (en) A quenching groove that is used for in turn thermal treatment ball of water -cooling air cooling
CN201424492Y (en) Lead quenching tank for steel wire heat treatment
Yuan et al. Control and application of cooling path after rolling for hot strip based on ultra fast cooling
CN105642679A (en) Method and device for pre-detecting steel plate shape and controlling initial temperature
CN203794943U (en) Cooling device employing collinear production of continuous annealing multiphase steel and martensitic steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee after: Shougang Group Co. Ltd.

Address before: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee before: Capital Iron & Steel General Company