CN103425454B - Mobilecrane remote information display packing and system - Google Patents

Mobilecrane remote information display packing and system Download PDF

Info

Publication number
CN103425454B
CN103425454B CN201310409344.3A CN201310409344A CN103425454B CN 103425454 B CN103425454 B CN 103425454B CN 201310409344 A CN201310409344 A CN 201310409344A CN 103425454 B CN103425454 B CN 103425454B
Authority
CN
China
Prior art keywords
feedback
information
time
data
effectively
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310409344.3A
Other languages
Chinese (zh)
Other versions
CN103425454A (en
Inventor
单增海
赵忠祥
赵欢
朱长建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Heavy Machinery Co Ltd
Original Assignee
Xuzhou Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Heavy Machinery Co Ltd filed Critical Xuzhou Heavy Machinery Co Ltd
Priority to CN201310409344.3A priority Critical patent/CN103425454B/en
Publication of CN103425454A publication Critical patent/CN103425454A/en
Application granted granted Critical
Publication of CN103425454B publication Critical patent/CN103425454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of mobilecrane remote information display packing and system, method includes: remote monitoring platform obtains the Mean Time Between Replacement that project data information corresponding Times of Feedback, feedback time length and same login user are checked;Obtain effective Feedback number of times according to Times of Feedback and data classification Dynamic gene, and effectively check the time according to feedback time length and Mean Time Between Replacement and the acquisition of the gravity factor;According to the display parameters sortnig that effective Feedback number of times is corresponding with effectively checking time acquisition, it is directly proportional to effective Feedback number of times, is inversely proportional to the effectively time of checking;Display parameters sortnig is ranked up operation, and generates data sorting information, data sorting information pushing is shown client to information, in order to information display client shows.Compared to the mode of existing display latest data or the artificial mode updating display information, the present invention can make the user of log-on message display client obtain data message more timely and effectively.

Description

Mobilecrane remote information display packing and system
Technical field
The present invention relates to engineering machinery communication field, particularly relate to a kind of mobilecrane long-range Method for information display and system.
Background technology
Mobilecrane have transfer work place motility, be widely applied to petrochemical industry, The various industries such as metallurgy, building, wind-powered electricity generation, the user of crane is by the state-owned individuality that transfers to, at present Individual consumer accounts for 80%.Being widely used for crane, production firm needs selling vehicle Situation be tracked, and when breaking down, reduce fault parameter, grasp car in time simultaneously Information, it is simple to preferably services client.These are required to be arranged on mobilecrane Remote terminal sends vehicle parameter data by certain time to the remote monitoring center of production firm (longitude and latitude residing for such as vehicle, the data etc. collected by various sensors and bus).With This simultaneously, client is also required to there is the vehicle of oneself certain monitoring.
The reception of data and display are the emphasis that remote monitoring center completes a series of monitoring work. Along with the use of system, time integral and client increase, the data meeting that remote monitoring center receives More and more, the data base of such monitoring system can be the hugest, and a difficult problem occurs the most therewith, example As how these information filtered, how extracted valid data, how from mass data More effectively utilize data, how in the face of different estate crowd reasonably shows client in information Display datas etc., solve these difficult problems, and the system that could farthest play receives the valency of data Value.Wherein, the rational exhibition information of different estate crowd faced by is the most straight of data value utilization Connecing also is final link, and the whether reasonable different crowd that will dominate that information is shown is to remotely monitoring The degree of recognition of system and the value of data and service efficiency, therefore, the display mode of information It it is the problem needing in long distance control system construction to consider emphatically.
The information that the remote monitoring center of these large-scale engineering machinery series products uses at present shows Mode is the most single, is most commonly used that the display mode using latest data, i.e. system are only The data message of up-to-date reception is shown in client, it is not intended that the data message of up-to-date reception The problem such as content and importance, this may show a lot of information lacking practicality, reduce The degree of concern of user and the degree of recognition.It addition, also use specific information rotation to show Mode, the information that will show is previously set, the most artificial go to update aobvious Show information, but this mode cannot guarantee information ageing, be also not necessarily user and close most The content of the heart.
Summary of the invention
The purpose of the present invention is to propose to a kind of mobilecrane remote information display packing and be System, it is possible to increase promptness that the information of mobilecrane shows and effectiveness.
For achieving the above object, the invention provides a kind of mobilecrane remote information to show Method, including:
Remote monitoring platform obtains described in Times of Feedback corresponding to project data information, current distance The feedback time length of the up-to-date feedback time of project data information and information show in client same Login user checks the Mean Time Between Replacement of data sorting information;
Described remote monitoring platform according to described Times of Feedback and preset data classification adjust because of Son obtains effective Feedback number of times, and according to described feedback time length and described Mean Time Between Replacement And the default gravity factor corresponding with described project data information obtains and effectively checks the time;
Described remote monitoring platform is according to described effective Feedback number of times and described effectively checks the time Obtain the display parameters sortnig that described project data information is corresponding, described display parameters sortnig and institute State effective Feedback number of times to be directly proportional, be inversely proportional to the described effectively time of checking;
The display parameters sortnig that all project data information are corresponding is entered by described remote monitoring platform Row sorting operation, generates data by more much higher project data information of described display parameters sortnig Sequencing information, and described data sorting information pushing is given the letter logging in described remote monitoring platform Breath display client, in order to described data sorting information is shown by described information display client Show.
Further, the value of described default data classification Dynamic gene between zero and one, Described remote monitoring platform obtains according to described Times of Feedback and the data classification Dynamic gene preset The operation of effective Feedback number of times is particularly as follows: described remote monitoring platform is by described Times of Feedback Taking described default data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence.
Further, described according to described feedback time length and described Mean Time Between Replacement and The default gravity factor corresponding with described project data information obtains the operation tool effectively checking the time Body is: described remote monitoring platform is by during to described feedback time length and described equispaced Between sue for peace, and based on summed result take the described default gravity factor be index calculate correspondence have Effect checks the time.
Further, described according to described feedback time length and described Mean Time Between Replacement and The default gravity factor corresponding with described project data information obtains the operation tool effectively checking the time Body is: described remote monitoring platform by respectively to described feedback time length and described average between It is index that interval takes the described default gravity factor, then carries out suing for peace and calculate effectively looking into of correspondence See the time.
Further, described remote monitoring platform according to described effective Feedback number of times and described effectively Check the time obtain described project data information corresponding display parameters sortnig operation particularly as follows: Described remote monitoring platform is by calculating described effective Feedback number of times and described effectively checking the time Ratio obtains the display parameters sortnig that described project data information is corresponding.
For achieving the above object, the invention provides a kind of mobilecrane remote information to show System, including: remote monitoring platform and information display client;Described information display client Data sorting information for pushing described remote monitoring platform shows;Described long-range prison Control platform specifically includes:
Initial parameter obtain module, for obtain Times of Feedback corresponding to project data information, when The feedback time length of the up-to-date feedback time of project data information described in front distance and information display visitor On the end of family, same login user checks the Mean Time Between Replacement of data sorting information;
Actual parameter obtains module, for adjusting according to described Times of Feedback and the data classification preset Integral divisor obtains effective Feedback number of times, and according to described feedback time length and described equispaced Time and the default gravity factor corresponding with described project data information obtain effectively checks the time;
Parameters sortnig obtains module, for according to described effective Feedback number of times with described effectively check Time obtains the display parameters sortnig that described project data information is corresponding, described display parameters sortnig It is directly proportional to described effective Feedback number of times, is inversely proportional to the described effectively time of checking;
Data message order module, for the display sequence ginseng corresponding to all project data information Number is ranked up operation;
Sequencing information generation module, for by more much higher engineering number of described display parameters sortnig It is believed that breath generates data sorting information;
Sequencing information pushing module, for giving login described far described data sorting information pushing The information display client of range monitoring platform.
Further, the value of described default data classification Dynamic gene between zero and one, Described actual parameter obtains module and includes:
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
First effectively checks time calculating unit, for by described feedback time length and institute State Mean Time Between Replacement summation, and to take the described default gravity factor based on summed result be index Calculate corresponding effectively checking the time.
Further, the value of described default data classification Dynamic gene between zero and one, Described actual parameter obtains module and includes:
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
Second effectively checks time calculating unit, for by respectively to described feedback time length Taking the described default gravity factor with described Mean Time Between Replacement is index, then carries out suing for peace calculating Corresponding effectively checks the time.
Further, described parameters sortnig obtains module specifically for described the most anti-by calculating With described, feedback number of times effectively checks that the ratio of time is to obtain corresponding the showing of described project data information Show parameters sortnig.
Further, also include: remote monitoring terminal, be arranged in mobilecrane, use In project data information is fed back to described remote monitoring platform.
Based on technique scheme, the remote monitoring platform of the present invention is anti-by project data information Feedback number of times, the feedback time length of the up-to-date feedback time of current distance project data information, and In information display client, same login user checks that the Mean Time Between Replacement of data sorting information is made For Consideration, these three factor corresponds respectively to temporal freshness, feeds back quantity How many and user is to three aspects such as the degrees of attentiveness of this project data information, it is possible to embody Three features that data important in construction machinery industry are typically concerned about, pass through effective Feedback Number of times, effectively check that the calculating of time is directly proportional to obtain effective Feedback number of times, and effectively check The display parameters sortnig that time is inversely proportional to, then based on display parameters sortnig, project data information is entered Row sequence, the generation of data sorting information and propelling movement, compared to existing display latest data Mode or the artificial mode updating display information, the present invention can make log-on message display visitor The user of family end obtains data message more timely and effectively.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the application A part, the schematic description and description of the present invention is used for explaining the present invention, not structure Become inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow process of an embodiment of mobilecrane remote information display packing of the present invention Schematic diagram.
Fig. 2 is the structure of an embodiment of mobilecrane remote information display system of the present invention Schematic diagram.
Fig. 3 is the knot of another embodiment of mobilecrane remote information display system of the present invention Structure schematic diagram.
Detailed description of the invention
Below by drawings and Examples, technical scheme is done and further retouches in detail State.
In the long distance control system of construction machinery industry, user is more concerned with some important numbers According to acquisition, and in construction machinery industry, the feature of significant data can be summarized as three, That is:
1) up-to-date on the time;
2) feed back in quantity most;
3) user is concerned about the most on importance.
In other words, significant data is mainly reflected in temporal freshness, feeds back quantity How many and user is to three aspects such as the degrees of attentiveness of this project data information, and the most existing Long distance control system display latest data mode actually only considered one of them feature, And have ignored feedback quantity number and user to sides such as the degrees of attentiveness of this project data information Face, this allows for the engineering that client demonstrates that some insignificant information or user are less concerned about Data message, and another kind of existing long distance control system thinks heavy by artificial more new settings person The information wanted, then be just difficult to ensure that the ageing of information, and be also not necessarily user most concerned about Problem.
It is directed to the defect of existing two kinds of long distance control systems, in conjunction with in construction machinery industry The feature of significant data, three aspects that significant data is embodied by the present invention are believed with project data The display of breath combines, thus forms the solution being more suitable for construction machinery industry.
As it is shown in figure 1, be an enforcement of mobilecrane remote information display packing of the present invention The schematic flow sheet of example.In the present embodiment, mobilecrane remote information display packing bag Include:
Step 101, remote monitoring platform obtain Times of Feedback corresponding to project data information, when The feedback time length of the up-to-date feedback time of project data information described in front distance and information display visitor On the end of family, same login user checks the Mean Time Between Replacement of data sorting information;
Step 102, described remote monitoring platform divide according to described Times of Feedback and default data Class Dynamic gene obtain effective Feedback number of times, and according to described feedback time length and described averagely Interval time and the default gravity factor corresponding with described project data information obtain effectively checks Time;
Step 103, described remote monitoring platform according to described effective Feedback number of times and described effectively Checking that the time obtains the display parameters sortnig that described project data information is corresponding, described display is sorted Parameter is directly proportional to described effective Feedback number of times, is inversely proportional to the described effectively time of checking;
The display row that step 104, described remote monitoring platform are corresponding to all project data information Order parameter is ranked up operation, by more much higher project data information of described display parameters sortnig Generate data sorting information;
Described data sorting information pushing is given and is logged in institute by step 105, described remote monitoring platform State the information display client of remote monitoring platform, in order to described information display client is to described Data sorting information shows.
In a step 101, remote monitoring platform is by the long-range monitoring from mobilecrane The project data information of terminal feedback can count the Times of Feedback that this project data information is corresponding, And calculate correspondence by the up-to-date feedback time of current time and this project data information Feedback time length, and look into when user logs in remote monitoring platform by information display client Seeing data sorting information, remote monitoring platform can also be to same login in information display client User checks that the Mean Time Between Replacement of data sorting information is added up.
In a step 102, preset data classification Dynamic gene value preferably 0 and 1 it Between, and remote monitoring platform can be by Times of Feedback takes default data classification Dynamic gene Index calculates the effective Feedback coefficient of correspondence.Wherein data classification Dynamic gene is mainly used in adjusting Whole various project data information gap on Times of Feedback, if various project data information Times of Feedback difference is bigger, then classifying Dynamic gene by the data taking 0~1 can as index To reduce the gap of the effective Feedback number of times of the various project data information calculated.
In a step 102, obtained by calculating effectively check the time time, remotely monitoring is flat Platform by suing for peace feedback time length and Mean Time Between Replacement, and can take based on summed result Presetting the gravity factor is that index calculates effectively checking the time of correspondence.Here gravity is because of daughter Existing is the strength this project data information pulled down, can important according to project data information Degree arranges the different gravity factors to different project data information, and the gravity factor is the least, Then represent that this project data information is the most important.
When calculating effectively checks the time, it would however also be possible to employ another kind of calculation, i.e. by dividing Other described feedback time length and described Mean Time Between Replacement are taken the described default gravity factor for refer to Number, then carry out suing for peace and calculate effectively checking the time of correspondence.
In step 103, remote monitoring platform can be by calculating effective Feedback number of times with effective Check that the ratio of time is to obtain the display parameters sortnig that project data information is corresponding.
Below as a example by the display of the fault message in project data information, the display of fault message It is up-to-date that parameters sortnig S can pass through the Times of Feedback P of fault message, current distance fault message In feedback time length T of feedback time and information display client, same login user checks number Calculate according to the Mean Time Between Replacement T1 of sequencing information and draw, name a formula example Son helps to illustrate:
S = P q ( T + T 1 ) G
Wherein, q is data classification Dynamic gene, is used for regulating various fault message in feedback time Gap on number;G is the gravity factor, can come to different according to the significance level of fault message Fault message arranges the different gravity factors, and the gravity factor is the least, then it represents that this fault message is more Important;PqFor the effective Feedback number of times calculated, eliminated by data classification Dynamic gene Various fault messages significant difference on Times of Feedback;(T+T1)GEffectively look into for calculate See the time.This formula has embodied three factors of the significant data of construction machinery industry, and And display parameters sortnig S and effective Feedback number of times P can be embodiedqProportional relation, and with have Effect checks the time (T+T1)GInverse relation.
From above-mentioned formula it can be seen that in the case of P, q, T1, G etc. are indeclinable, as Really feedback time length T of the up-to-date feedback time of this fault message of current distance is the longest, and this is described Individual information is the oldest, then it is the least as the probability of significant data, and by this formula The value of the display parameters sortnig S calculated is the least, and corresponding sequence is the most rearward.Assume In the case of q, T, T1, G etc. are indeclinable, if the Times of Feedback P that fault message is corresponding The most, represent that this fault message occurs than more frequently, then its as significant data can Can property the highest, then the value of the display parameters sortnig S calculated by this formula is got over Greatly, corresponding sequence is the most forward.It addition, G-value may select the change speed that may decide that sequence Degree, if G takes bigger value, then can make display parameters sortnig S significantly decline, Ke Yigen The value of different G is set according to the difference of the significance level of fault message.
One of ordinary skill in the art will appreciate that: realize the whole of said method embodiment or portion Can be completed by the hardware that programmed instruction is relevant step by step, aforesaid program can be stored in In one computer read/write memory medium, this program upon execution, performs to include that said method is real Execute the step of example;And aforesaid storage medium includes: ROM, RAM, magnetic disc or CD Etc. the various media that can store program code.
As in figure 2 it is shown, be an enforcement of mobilecrane remote information display system of the present invention The structural representation of example.In the present embodiment, mobilecrane remote information display system bag Include remote monitoring platform 1 and information display client 2.
The data sorting information that information display client 2 is responsible for pushing remote monitoring platform 1 is entered Row display.Remote monitoring platform 1 specifically includes: initial parameter obtains module 11, actual parameter Obtain module 12, parameters sortnig obtains module 13, data message order module 14, sequence letter Breath generation module 15 and sequencing information pushing module 16.
Initial parameter obtain module 11 be responsible for obtaining Times of Feedback corresponding to project data information, Feedback time length and the information of the up-to-date feedback time of project data information described in current distance show In client, same login user checks the Mean Time Between Replacement of data sorting information.
Actual parameter obtains module 12 to be responsible for classifying according to described Times of Feedback and the data preset Dynamic gene obtain effective Feedback number of times, and according to described feedback time length and described average between Interval and the default gravity factor corresponding with described project data information obtain when effectively checking Between.
Parameters sortnig obtains module 13 to be responsible for according to described effective Feedback number of times and described effectively looks into Time of seeing obtains the display parameters sortnig that described project data information is corresponding, described display sequence ginseng Number is directly proportional to described effective Feedback number of times, is inversely proportional to the described effectively time of checking.
Data message order module 14 is responsible for the display sequence corresponding to all project data information Parameter is ranked up operation.Sequencing information generation module 15 is responsible for by described display parameters sortnig relatively Much higher project data information generates data sorting information.Sequencing information pushing module 16 is responsible for Described data sorting information pushing is given the information display client logging in described remote monitoring platform 2。
In another embodiment, preset data classification Dynamic gene value between zero and one, Actual parameter obtains module and may include that
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
First effectively checks time calculating unit, for by described feedback time length and institute State Mean Time Between Replacement summation, and to take the described default gravity factor based on summed result be index Calculate corresponding effectively checking the time.
In another embodiment, the value of described default data classification Dynamic gene is 0 and 1 Between, actual parameter obtains module and can also include:
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
Second effectively checks time calculating unit, for by respectively to described feedback time length Taking the described default gravity factor with described Mean Time Between Replacement is index, then carries out suing for peace calculating Corresponding effectively checks the time.
In another embodiment, described parameters sortnig acquisition module can also be specifically for by meter Calculate described effective Feedback number of times and described effectively check that the ratio of time is to obtain described project data The display parameters sortnig that information is corresponding.
As it is shown on figure 3, be another reality of mobilecrane remote information display system of the present invention Execute the structural representation of example.Compared with a upper embodiment, the present embodiment also includes remotely monitoring end End 3, is arranged in mobilecrane.This remote monitoring terminal 3 is responsible for believing project data Breath feeds back to remote monitoring platform 1.
By the explanation of above-described embodiment, the remote monitoring platform of the present invention is by project data information Times of Feedback, the feedback time length of the up-to-date feedback time of current distance project data information, And when in information display client, same login user checks the equispaced of data sorting information Between correspond respectively to temporal freshness, feedback coefficient as Consideration, these three factor Amount number and user to three aspects such as the degrees of attentiveness of this project data information, it is possible to body Reveal three features that data important in construction machinery industry are typically concerned about, by effectively Times of Feedback, effectively check that the calculating of time is directly proportional to obtain effective Feedback number of times, and effectively The display parameters sortnig that the time of checking is inversely proportional to, then based on display parameters sortnig, project data is believed Breath is ranked up, the generation of data sorting information and propelling movement, up-to-date compared to existing display The mode of data or the artificial mode updating display information, the present invention can make log-on message show Show that the user of client obtains data message more timely and effectively.
Finally should be noted that: above example only in order to technical scheme to be described and Non-to its restriction;Although the present invention being described in detail with reference to preferred embodiment, affiliated The those of ordinary skill in field is it is understood that still can enter the detailed description of the invention of the present invention Row is revised or portion of techniques feature is carried out equivalent;Without deviating from technical solution of the present invention Spirit, it all should be contained in the middle of the technical scheme scope that the present invention is claimed.

Claims (10)

1. a mobilecrane remote information display packing, including:
Remote monitoring platform is by the work of the remote monitoring terminal feedback from mobilecrane Journey data message statistics obtains the Times of Feedback that this project data information is corresponding, and by time current Between and the up-to-date feedback time of this project data information calculate engineering described in acquisition current distance The feedback time length of the up-to-date feedback time of data message, and statistics acquisition information display client On end, same login user checks the Mean Time Between Replacement of data sorting information;
Described remote monitoring platform according to described Times of Feedback and preset data classification adjust because of Son obtains effective Feedback number of times, and according to described feedback time length and described Mean Time Between Replacement And the default gravity factor corresponding with described project data information obtains and effectively checks the time;
Described remote monitoring platform is according to described effective Feedback number of times and described effectively checks the time Obtain the display parameters sortnig that described project data information is corresponding, described display parameters sortnig and institute State effective Feedback number of times to be directly proportional, be inversely proportional to the described effectively time of checking;
The display parameters sortnig that all project data information are corresponding is entered by described remote monitoring platform Row sorting operation, generates data by more much higher project data information of described display parameters sortnig Sequencing information, and described data sorting information pushing is given the letter logging in described remote monitoring platform Breath display client, in order to described data sorting information is shown by described information display client Show.
Mobilecrane remote information display packing the most according to claim 1, its Described in preset data classification Dynamic gene value between zero and one, described long-range monitoring Platform obtains effective Feedback number of times according to described Times of Feedback and the data classification Dynamic gene preset Operation particularly as follows: described remote monitoring platform is described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence.
Mobilecrane remote information display packing the most according to claim 1, its Described according to described feedback time length and described Mean Time Between Replacement and with described engineering number It is believed that the default gravity factor corresponding to breath obtain effectively check the time operation particularly as follows: described far Range monitoring platform is by suing for peace to described feedback time length and described Mean Time Between Replacement, and base Taking the described default gravity factor in summed result is that index calculates effectively checking the time of correspondence.
Mobilecrane remote information display packing the most according to claim 1, its Described according to described feedback time length and described Mean Time Between Replacement and with described engineering number It is believed that the default gravity factor corresponding to breath obtain effectively check the time operation particularly as follows: described far Range monitoring platform is described by taking described feedback time length and described Mean Time Between Replacement respectively Presetting the gravity factor is index, then carries out suing for peace and calculate effectively checking the time of correspondence.
Mobilecrane remote information display packing the most according to claim 1, its Described in remote monitoring platform according to described effective Feedback number of times and described effectively check that the time obtains The operation of the display parameters sortnig that described project data information is corresponding is particularly as follows: described long-range monitoring Effective Feedback number of times described in platforms through calculation and described effectively check that the ratio of time is to obtain State the display parameters sortnig that project data information is corresponding.
6. a mobilecrane remote information display system, including: remote monitoring platform Client is shown with information;Described information display client is for pushing away described remote monitoring platform The data sorting information sent shows;Described remote monitoring platform specifically includes:
Initial parameter obtains module, for by the remote monitoring terminal from mobilecrane The project data Information Statistics of feedback obtain the Times of Feedback that this project data information is corresponding, and lead to Cross the up-to-date feedback time of current time and this project data information to calculate acquisition current distance The feedback time length of the described up-to-date feedback time of project data information, and statistics acquisition information In display client, same login user checks the Mean Time Between Replacement of data sorting information;
Actual parameter obtains module, for adjusting according to described Times of Feedback and the data classification preset Integral divisor obtains effective Feedback number of times, and according to described feedback time length and described equispaced Time and the default gravity factor corresponding with described project data information obtain effectively checks the time;
Parameters sortnig obtains module, for according to described effective Feedback number of times with described effectively check Time obtains the display parameters sortnig that described project data information is corresponding, described display parameters sortnig It is directly proportional to described effective Feedback number of times, is inversely proportional to the described effectively time of checking;
Data message order module, for the display sequence ginseng corresponding to all project data information Number is ranked up operation;
Sequencing information generation module, for by more much higher engineering number of described display parameters sortnig It is believed that breath generates data sorting information;
Sequencing information pushing module, for giving login described far described data sorting information pushing The information display client of range monitoring platform.
Mobilecrane remote information display system the most according to claim 6, its In, the value of described default data classification Dynamic gene between zero and one, described effective ginseng Number obtains module and includes:
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
First effectively checks time calculating unit, for by described feedback time length and institute State Mean Time Between Replacement summation, and to take the described default gravity factor based on summed result be index Calculate corresponding effectively checking the time.
Mobilecrane remote information display system the most according to claim 6, its In, the value of described default data classification Dynamic gene between zero and one, described effective ginseng Number obtains module and includes:
Effective Feedback coefficient calculation unit, for described default by taking described Times of Feedback Data classification Dynamic gene is the effective Feedback coefficient that index calculates correspondence;
Second effectively checks time calculating unit, for by respectively to described feedback time length Taking the described default gravity factor with described Mean Time Between Replacement is index, then carries out suing for peace calculating Corresponding effectively checks the time.
Mobilecrane remote information display system the most according to claim 6, its In, described parameters sortnig obtains module specifically for by calculating described effective Feedback number of times and institute State the ratio effectively checking the time to obtain the display parameters sortnig that described project data information is corresponding.
Mobilecrane remote information display system the most according to claim 6, its In, also include: remote monitoring terminal, be arranged in mobilecrane, for by engineering number It is believed that breath feeds back to described remote monitoring platform.
CN201310409344.3A 2013-09-11 2013-09-11 Mobilecrane remote information display packing and system Active CN103425454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310409344.3A CN103425454B (en) 2013-09-11 2013-09-11 Mobilecrane remote information display packing and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310409344.3A CN103425454B (en) 2013-09-11 2013-09-11 Mobilecrane remote information display packing and system

Publications (2)

Publication Number Publication Date
CN103425454A CN103425454A (en) 2013-12-04
CN103425454B true CN103425454B (en) 2016-10-05

Family

ID=49650263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310409344.3A Active CN103425454B (en) 2013-09-11 2013-09-11 Mobilecrane remote information display packing and system

Country Status (1)

Country Link
CN (1) CN103425454B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850934A (en) * 2010-05-31 2010-10-06 大连美恒时代科技有限公司 Information management system of crane
CN202143104U (en) * 2011-07-07 2012-02-08 秦皇岛天业通联重工股份有限公司 Remote monitoring system, terminal and monitoring center for engineering mechanical equipment
CN102495549A (en) * 2011-11-22 2012-06-13 中联重科股份有限公司 Remote maintenance decision system of engineering machinery and method thereof
CN202587028U (en) * 2012-04-26 2012-12-05 杭州德昌隆软件有限公司 Engineering calculation system
CN102833118A (en) * 2012-09-25 2012-12-19 北京奇虎科技有限公司 Remote maintenance system and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6747677B2 (en) * 2001-05-30 2004-06-08 Oracle International Corporation Display system and method for displaying change time information relating to data stored on a database

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850934A (en) * 2010-05-31 2010-10-06 大连美恒时代科技有限公司 Information management system of crane
CN202143104U (en) * 2011-07-07 2012-02-08 秦皇岛天业通联重工股份有限公司 Remote monitoring system, terminal and monitoring center for engineering mechanical equipment
CN102495549A (en) * 2011-11-22 2012-06-13 中联重科股份有限公司 Remote maintenance decision system of engineering machinery and method thereof
CN202587028U (en) * 2012-04-26 2012-12-05 杭州德昌隆软件有限公司 Engineering calculation system
CN102833118A (en) * 2012-09-25 2012-12-19 北京奇虎科技有限公司 Remote maintenance system and method

Also Published As

Publication number Publication date
CN103425454A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN103412911B (en) The method for monitoring performance of Database Systems and device
CN109300310A (en) A kind of vehicle flowrate prediction technique and device
DE112014003774T5 (en) Determination of reserve estimates for a deposit
CN109508830B (en) Method for predicting space-time dynamic load of electric automobile
CN109559008A (en) Construction monitoring method, apparatus and system
CN107038604A (en) The methods of exhibiting and device of product object number of users
CN107145595A (en) A kind of mass data aggregation display method based on map
CN107293182A (en) A kind of vehicle teaching method, system and terminal device based on VR
CN107025288A (en) Distributed data digging method and system
CN113516903A (en) Intelligent mine scene oriented digital twin evolution mechanism and method
CN107590570A (en) A kind of bearing power Forecasting Methodology and system
LeSage et al. Using spatial contiguity as Bayesian prior information in regional forecasting models
CN104933664A (en) Passenger ticket data visualization method
CN107958020A (en) It is a kind of based on cluster electric network data processing and data visualization method
CN113163353A (en) Intelligent health service system of power supply vehicle and data transmission method thereof
CN104598449A (en) Preference-based clustering
CN108388237A (en) A kind of method for diagnosing faults, device, equipment and the medium of discrete manufacturing equipment
CN103425454B (en) Mobilecrane remote information display packing and system
CN108073996A (en) Urban energy panorama interactive mode big data platform management system and method
CN109345139B (en) Airport group efficiency and policy evaluation method based on system dynamics
US8487930B2 (en) Process monitoring using multivariate data
CN108108839A (en) Grid information system equipment state method for early warning based on reverse Fuzzy Level Analytic Approach
CN207704481U (en) Urban energy panorama interactive mode big data platform manages system
Badiru Half-life of learning curves for information technology project management
CN103034579B (en) The Automatic analysis method and system of figure O&M operation validity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 221000 Jiangsu city of Xuzhou Province Economic and Technological Development Zone of High Road No. 68

Patentee after: Xuzhou Heavy Machinery Co., Ltd.

Address before: 221004 No. 165 Copper Mountain Road, Jiangsu, Xuzhou

Patentee before: Xuzhou Heavy Machinery Co., Ltd.