CN103424165A - 一种高炉喷煤系统瞬时煤粉流量的测量方法 - Google Patents

一种高炉喷煤系统瞬时煤粉流量的测量方法 Download PDF

Info

Publication number
CN103424165A
CN103424165A CN2013102589711A CN201310258971A CN103424165A CN 103424165 A CN103424165 A CN 103424165A CN 2013102589711 A CN2013102589711 A CN 2013102589711A CN 201310258971 A CN201310258971 A CN 201310258971A CN 103424165 A CN103424165 A CN 103424165A
Authority
CN
China
Prior art keywords
tank
instantaneous
coal
pulverized coal
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102589711A
Other languages
English (en)
Other versions
CN103424165B (zh
Inventor
吴经纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN201310258971.1A priority Critical patent/CN103424165B/zh
Publication of CN103424165A publication Critical patent/CN103424165A/zh
Application granted granted Critical
Publication of CN103424165B publication Critical patent/CN103424165B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

本发明公开了一种高炉喷煤系统瞬时煤粉流量的测量方法,包括以下步骤:将每个喷吹罐至煤粉喷吹管道的阀门全部开启后,利用喷吹罐的称重系统采集t0时刻每个喷吹罐内的煤粉重量Wn0,以及每隔Δt时间t1,t2,…,tm采集每个喷吹罐煤粉重量Wn1,Wn2,…,Wnm,计算tm时刻每个喷吹罐流出煤粉的瞬时流量rnm;其中rnm为第n#喷吹罐流出煤粉的瞬时流量;根据每个喷吹罐流出煤粉的瞬时流量rnm,计算喷煤系统的瞬时煤粉流量

Description

一种高炉喷煤系统瞬时煤粉流量的测量方法
技术领域
本发明涉及煤粉流量测量技术领域,尤其涉及一种高炉喷煤系统瞬时煤粉流量的测量方法。 
背景技术
    在工况条件下,喷煤系统喷吹罐内煤粉重量的变化量为时间的阶跃函数,难以用来计算瞬时煤粉流量。因此,目前一般在喷煤总管或支管上设置专用的煤粉流量计以获得高炉喷煤系统瞬时煤粉流量。煤粉流量计投资成本高昂,调试维护困难,其计量精度也有限。所以,本发明提供一种不使用煤粉流量计进行高炉喷煤系统瞬时煤粉流量测量的测量方法。 
发明内容
本发明要解决的技术问题在于提供一种仅借助喷吹罐重量变化量确定高炉瞬时煤粉流量的方法,使用本方法测量高炉喷煤系统瞬时煤粉流量无需额外设置煤粉流量计。 
本发明解决其技术问题所采用的技术方案是: 
一种高炉喷煤系统瞬时煤粉流量的测量方法,包括以下步骤:
(1)将1#喷吹罐至煤粉喷吹管道的阀门全部开启后,利用喷吹罐的称重系统采集t0时刻1#喷吹罐内的煤粉重量W10
(2)每隔Δt时间t1,t2,…,tm采集1#喷吹罐煤粉重量W11, W12, … ,W1m,并计算获得一系列1#喷吹罐煤粉减少量ΔW11,ΔW12,…,ΔW1m
其中 ti=ti+1-Δt;
ΔW1i = W1i -W1(i-1);其中i=1,2,3……m;
(3)选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m
(4)根据上述步骤,计算tm时刻1#喷吹罐流出煤粉的瞬时流量rnm;其中rnm为第n#喷吹罐流出煤粉的瞬时流量;
(5)根据每个喷吹罐流出煤粉的瞬时流量rnm,计算喷煤系统的瞬时煤粉流量 
Figure RE-DEST_PATH_IMAGE001
, 
Figure 372250DEST_PATH_IMAGE002
  
按上述方案,步骤(3)中,k的取值范围为大于等于 2的整数。
按上述方案,步骤(3)中,选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m采用以下公式: 
Figure RE-DEST_PATH_IMAGE003
式中,i,k,m均为整数。i ≥ 0,k ≥ 2,i = m - k。
按上述方案,步骤(2)中,间隔时间Δt的取值范围为0.5~15秒。 
按上述方案,鉴于历史数据与当前数据时间点的间隔长短不一,其修正当前时间点数据的参考价值也有轻有重。可在计算喷吹罐流出煤粉的瞬时流量时,对不同历史数据采用线性加权值处理,那么步骤(3)中,选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m采用以下公式: 
Figure 227073DEST_PATH_IMAGE004
式中,k,m,j均为整数;m ≥ k,k ≥ 2。αβ为实数,β > 0;h为整数,k≥h≥2;
按上述方案,步骤(3)中,k的取值为5。
  
本发明产生的有益效果是:使用本方法计算获得的瞬时煤粉流量平稳准确且更新速度快,对生产控制过程具有很好的指导作用。同时,利用了喷煤系统原有的各喷吹罐的称重系统,以及各喷吹罐至煤粉喷吹管道的阀门,可不增加任何额外设备,无需设置煤粉流量计。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。 
本方法需各喷吹罐的称重系统、各喷吹罐至煤粉喷吹管道的阀门、以及高炉喷煤的控制系统 (包括PLC、DCS或其他这类控制系统) 配合实现。 
称重系统用于获取煤粉重量信号,高炉喷煤的控制系统用于控制各喷吹罐至煤粉喷吹管道的阀门的开启、关闭,并获取各喷吹罐至煤粉喷吹管道的阀门的开启、关闭状态信号。 
高炉喷煤系统通常包含2个或多个喷吹罐,此处说明以1#喷吹罐为例。 
(1) 当1#喷吹罐至煤粉喷吹管道的阀门全部开启后,采集1#喷吹罐内的煤粉重量W10。 
(2)然后,每隔Δt时间t1,t2,…,tm采集1#喷吹罐煤粉重量W11, W12, … ,W1m,并计算获得一系列1#喷吹罐煤粉减少量ΔW11,ΔW12,…,ΔW1m: 
ΔW11 = W11 - W10
ΔW12 = W12 - W11
ΔW1m = W1m - W1(m-1)
(3)选取k个ΔW计算瞬时煤粉流量。比如选取k = 5,那么,可利用ΔW11,ΔW12,…,ΔW15计算t5时刻的1#喷吹罐流出煤粉的瞬时流量r5
Figure RE-DEST_PATH_IMAGE005
对于下一个时刻t6,同样获得该时刻的ΔW6。此时,用ΔW12,ΔW13,…,ΔW16修正计算t5时刻的1#喷吹罐流出煤粉的瞬时流量r6为:
Figure 944494DEST_PATH_IMAGE006
类推不难获得时刻ti+5的r1(i+5)为:
Figure RE-DEST_PATH_IMAGE007
由此,可总结tm时刻1#喷吹罐流出煤粉的瞬时流量r1m 的计算公式为:
Figure 339703DEST_PATH_IMAGE003
式中,i,k,m均为整数。i ≥ 0,k ≥ 2,i = m - k。
也可省去中间变量i,将上式表示为如下形式: 
Figure 91758DEST_PATH_IMAGE008
式中,k,m均为整数。m ≥ k,k ≥ 2。
鉴于历史数据与当前数据时间点的间隔长短不一,其修正当前时间点数据的参考价值也有轻有重。本方法亦可在计算喷吹罐流出煤粉的瞬时流量时,对不同历史数据采用线性加权值处理。同样以1#喷吹罐为例,带加权值计算的tm时刻1#喷吹罐流出煤粉的瞬时流量r1m 的计算公式为: 
Figure 914221DEST_PATH_IMAGE004
式中,k,m,j均为整数;m ≥ k,k ≥ 2。αβ为实数,β > 0;h为整数,k≥h≥2;
 (4) 当1#喷吹罐至煤粉喷吹管道的阀门关闭后,r1m = 0;
采用上述计算方法,可同时计算tm时刻1# ~ n#喷吹罐 (n为喷煤系统中的喷吹罐数量) 流出煤粉的瞬时流量分别为r1m, r2m, … , rnm
(5)从而得到喷煤系统的瞬时煤粉流量为 
Figure 181254DEST_PATH_IMAGE002
在系统中选取合适的Δt与k值,可使该方法计算获得的瞬时煤粉流量平稳准确且更新速度快,对生产控制过程具有很好的指导作用。在本实施例中,我们选取Δt为0.5~15秒,k值为大于等于 2的整数。
同时,利用了喷煤系统原有的各喷吹罐的称重系统,以及各喷吹罐至煤粉喷吹管道的阀门,可不增加任何额外设备。 
应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。 

Claims (6)

1. 一种高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,包括以下步骤:
(1)将1#喷吹罐至煤粉喷吹管道的阀门全部开启后,利用喷吹罐的称重系统采集t0时刻1#喷吹罐内的煤粉重量W10;t0为初始时间;
(2)每隔Δt时间t1,t2,…,tm采集1#喷吹罐煤粉重量W11, W12, … ,W1m,并计算获得一系列1#喷吹罐煤粉减少量ΔW11,ΔW12,…,ΔW1m
其中 ti=ti+1-Δt;
ΔW1i = W1i -W1(i-1);其中i=1,2,3……m;
(3)选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m;k为整数;
(4)重复上述步骤,计算tm时刻n#喷吹罐流出煤粉的瞬时流量rnm;其中rnm为第n#喷吹罐流出煤粉的瞬时流量;
(5)根据每个喷吹罐流出煤粉的瞬时流量rnm,计算喷煤系统的瞬时煤粉流量                                               
Figure DEST_PATH_IMAGE002
, 
Figure DEST_PATH_IMAGE004
2.根据权利要求1所述的高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,步骤(3)中,k的取值范围为大于等于 2的整数。
3.根据权利要求1所述的高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,步骤(3)中,选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m采用以下公式:
式中,i,k,m均为整数;i ≥ 0,k ≥ 2,i = m - k。
4.根据权利要求1所述的高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,步骤(3)中,选取k个ΔW1i计算tm时刻1#喷吹罐流出煤粉的瞬时流量r1m亦可采用以下公式:
Figure DEST_PATH_IMAGE008
式中,k,m均为整数;m ≥ k,k ≥ 2,αβ为实数,β > 0。
5.根据权利要求1所述的高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,步骤(2)中,间隔时间Δt的取值范围为0.5~15秒。
6.根据权利要求3或4中任一所述的高炉喷煤系统瞬时煤粉流量的测量方法,其特征在于,步骤(3)中,k的取值为5。
CN201310258971.1A 2013-06-26 2013-06-26 一种高炉喷煤系统瞬时煤粉流量的测量方法 Active CN103424165B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310258971.1A CN103424165B (zh) 2013-06-26 2013-06-26 一种高炉喷煤系统瞬时煤粉流量的测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310258971.1A CN103424165B (zh) 2013-06-26 2013-06-26 一种高炉喷煤系统瞬时煤粉流量的测量方法

Publications (2)

Publication Number Publication Date
CN103424165A true CN103424165A (zh) 2013-12-04
CN103424165B CN103424165B (zh) 2015-09-02

Family

ID=49649258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310258971.1A Active CN103424165B (zh) 2013-06-26 2013-06-26 一种高炉喷煤系统瞬时煤粉流量的测量方法

Country Status (1)

Country Link
CN (1) CN103424165B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898257A (zh) * 2014-03-26 2014-07-02 济钢集团有限公司 一种高炉煤粉喷吹量的控制方法
CN104017924A (zh) * 2014-06-27 2014-09-03 济钢集团有限公司 一种高炉喷煤系统喷煤量的计量方法
CN109580983A (zh) * 2018-12-17 2019-04-05 苏州宇量电池有限公司 一种锂离子电池浆料的过筛流速测定方法
CN115522005A (zh) * 2022-10-08 2022-12-27 重庆钢铁股份有限公司 一种采用喷吹罐罐称计量及控制的喷煤系统及方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87203796U (zh) * 1987-03-20 1988-02-17 冶金工业部钢铁研究总院 高炉串联罐硬联接喷吹煤粉装置
CN1042382A (zh) * 1988-11-01 1990-05-23 武汉钢铁公司 高炉用喷吹煤粉自动控制装置
US5285735A (en) * 1991-07-16 1994-02-15 Diamond Engineering Co., Ltd. Control apparatus for injection quantity of pulverized coal to blast furnace
CN1110785A (zh) * 1994-07-19 1995-10-25 曾征 管道粉体流量检测方法
CN101498554A (zh) * 2009-03-12 2009-08-05 北京首钢自动化信息技术有限公司 高炉串罐自动喷煤控制系统及方法
CN101921886A (zh) * 2010-08-05 2010-12-22 中冶南方工程技术有限公司 高炉喷煤喷吹速率控制方法
CN102477467A (zh) * 2010-11-29 2012-05-30 宝山钢铁股份有限公司 一种高炉喷煤系统喷煤量的确定方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87203796U (zh) * 1987-03-20 1988-02-17 冶金工业部钢铁研究总院 高炉串联罐硬联接喷吹煤粉装置
CN1042382A (zh) * 1988-11-01 1990-05-23 武汉钢铁公司 高炉用喷吹煤粉自动控制装置
US5285735A (en) * 1991-07-16 1994-02-15 Diamond Engineering Co., Ltd. Control apparatus for injection quantity of pulverized coal to blast furnace
CN1110785A (zh) * 1994-07-19 1995-10-25 曾征 管道粉体流量检测方法
CN101498554A (zh) * 2009-03-12 2009-08-05 北京首钢自动化信息技术有限公司 高炉串罐自动喷煤控制系统及方法
CN101921886A (zh) * 2010-08-05 2010-12-22 中冶南方工程技术有限公司 高炉喷煤喷吹速率控制方法
CN102477467A (zh) * 2010-11-29 2012-05-30 宝山钢铁股份有限公司 一种高炉喷煤系统喷煤量的确定方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘克显等: "高炉煤粉喷吹控制系统述评", 《东北大学学报(自然科学版)》, vol. 22, no. 3, 1 June 2001 (2001-06-01), pages 253 - 256 *
张发勇,朱超甫: "高炉喷煤量控制模型的建模方法研究", 《机械工程与自动化》, no. 6, 15 December 2007 (2007-12-15), pages 28 - 30 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898257A (zh) * 2014-03-26 2014-07-02 济钢集团有限公司 一种高炉煤粉喷吹量的控制方法
CN103898257B (zh) * 2014-03-26 2015-11-11 济钢集团有限公司 一种高炉煤粉喷吹量的控制方法
CN104017924A (zh) * 2014-06-27 2014-09-03 济钢集团有限公司 一种高炉喷煤系统喷煤量的计量方法
CN104017924B (zh) * 2014-06-27 2015-11-11 济钢集团有限公司 一种高炉喷煤系统喷煤量的计量方法
CN109580983A (zh) * 2018-12-17 2019-04-05 苏州宇量电池有限公司 一种锂离子电池浆料的过筛流速测定方法
CN115522005A (zh) * 2022-10-08 2022-12-27 重庆钢铁股份有限公司 一种采用喷吹罐罐称计量及控制的喷煤系统及方法

Also Published As

Publication number Publication date
CN103424165B (zh) 2015-09-02

Similar Documents

Publication Publication Date Title
CN103424165A (zh) 一种高炉喷煤系统瞬时煤粉流量的测量方法
CN201955279U (zh) 水工混凝土冲蚀试验装置
CN104674748B (zh) 一种梯级水电站群弃水概率量化方法
CN204058500U (zh) 高炉雷达探尺测量系统
CN104805242A (zh) 无料钟炉顶料流调节阀自学习控制方法
CN103791960B (zh) 一种还原炉流量精确测量的方法
CN107679317A (zh) 一种一维明渠水动力模型泵站内边界的处理方法
CN207082011U (zh) 一种基于模糊控制的分输调压系统
CN207908020U (zh) 一种天然气大流量实流检定次级标准装置
CN110298575A (zh) 一种水足迹可持续性评价方法
CN203320615U (zh) 小扬程补气式水击防护设施
CN102426079A (zh) 采用方向规对空间站泄漏检测的模拟系统及方法
CN203432659U (zh) 一种高炉喷煤系统瞬时煤粉流量的测量装置
CN103846165A (zh) 一种选矿药剂的添加方法及装置
CN103898257B (zh) 一种高炉煤粉喷吹量的控制方法
CN203732139U (zh) 多标准容器并联的pVTt法气体流量检测装置
CN105804027A (zh) 高坝减缓低温水的生态流量临时泄放结构
CN203965420U (zh) 一种水处理剂缓蚀性能评定装置
CN204740055U (zh) 储液罐蒸发率测量装置
CN205259148U (zh) 鱼道进口集中补水系统
CN201902661U (zh) 一种控制阀
CN104404184B (zh) 高炉软水密闭循环系统的预估补水控制方法
CN217986646U (zh) 一种带转子流量计精确分配回潮水的真空回潮机回潮系统
CN103740875B (zh) 一种高炉喷吹装置及喷吹方法
CN204988600U (zh) 一种静压恒流连续喷吹测量装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant