CN103401713B - The system and method that a kind of software is issued - Google Patents

The system and method that a kind of software is issued Download PDF

Info

Publication number
CN103401713B
CN103401713B CN201310329806.0A CN201310329806A CN103401713B CN 103401713 B CN103401713 B CN 103401713B CN 201310329806 A CN201310329806 A CN 201310329806A CN 103401713 B CN103401713 B CN 103401713B
Authority
CN
China
Prior art keywords
upgrading
redaction
upgrade server
end user
testing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310329806.0A
Other languages
Chinese (zh)
Other versions
CN103401713A (en
Inventor
赵邑新
何得勇
刘新颜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Le Earth Life Science And Technology Investment Co ltd
Yue Yun Technology Beijing Co ltd
Original Assignee
BEIJING SHINEHEALTH TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING SHINEHEALTH TECHNOLOGY Co Ltd filed Critical BEIJING SHINEHEALTH TECHNOLOGY Co Ltd
Priority to CN201310329806.0A priority Critical patent/CN103401713B/en
Publication of CN103401713A publication Critical patent/CN103401713A/en
Application granted granted Critical
Publication of CN103401713B publication Critical patent/CN103401713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stored Programmes (AREA)

Abstract

The application provides a kind of software delivery system, comprising: upgrade server, one or more testing equipment of communicating by letter with this upgrade server and one or more end user device; Wherein, upgrade server is disposed the application file of redaction, is described corresponding to the upgrading of testing equipment and end user device; End user device is set up associated with testing equipment by the application file of corresponding upgrading description and redaction.

Description

The system and method that a kind of software is issued
Technical field
The present invention relates to computer software technical field, particularly, relate to one and effectively carry out on a large scaleThe system and method that software is issued and/or upgraded.
Background technology
At present, the driver of large number quipments and application program are issued by network and are upgraded, concreteComprise: cell-phone customer terminal carries out edition upgrading by internet, the application on computer is entered by internetRow edition upgrading, even the operating system on computer is upgraded by internet. Accordingly, needOn server, issue these redactions, for corresponding equipment, these redactions are downloaded and upgraded.
The number of devices of upgrading due to needs is very huge, and for example, a popular mobile phone application is issuedWhen redaction, have several ten million or even more than one hundred million mobile phone terminals to download and upgrade. If operationSystem has been issued a new patch, and having equally more than one hundred million computers of 1,000,000,000 even gone up can be affected.And self physical parameter of distinct device and network environment can be very different, can be complete to same applicationBecome upgrading in time to bring great challenge.
On the other hand, in order to meet market demand, the complexity of software improves constantly, and the construction cycle is continuousShorten, proposed challenge for correctness and the validity of released version. Once the version of issuing exists and asksTopic, will cause heavy losses may to user and software supplier.
Test is a kind of effective ways of finding the problem in software realization, conventionally can be at close beta environmentIn and on the internet or in production environment, build testing server and test. But these modes existSignificant limitation, first, the transmission situation of the appearance of some problem and the loading condition of server, networkAnd the environment for use of subscriber equipment is relevant, the actual use of the situation that above-mentioned means of testing is simulated and userInconsistent, the version of therefore issuing can expose the problem not occurring in test in actual use, but isTime evening, wait for that software vendor provides a redaction just may repair. In serious situation,In-problem version can cause the work of a large number of users equipment undesired, cannot upgrade even next timeCannot normally start.
Secondly,, if carry out separately close beta or network environment test, need enough testing timesWith the corresponding hardware environment of configuration, but there is no in actual use such testing time at present; And,Configure such hardware environment and need to expend a large amount of hardware resources and cost.
In Chinese invention patent application 200610112576.2, disclose a kind of realization of terminal batch upgradingMethod, the method is applicable to comprise the terminal staging system of a terminal, management server, the method bagDraw together: at least one version file server is set in terminal staging system, for provide a description file andUpgrade file; Described terminal connection management server, and carry out version literary composition by management server for terminalVersion server corresponding to connection breaking in part configuration road, obtains edition upgrading information; Upgrade and inform literLevel result. This system and method uses more hardware configuration, and does not realize and verify timely and riseLevel, ageing poor.
Summary of the invention
For overcoming existing defect, the present invention proposes the system and method that software is issued.
According to an aspect of the present invention, propose a kind of software delivery system, having comprised: upgrade server,One or more testing equipment and one or more terminal use that communicate by letter with this upgrade server establishStandby; Wherein, upgrade server dispose redaction application file, corresponding to testing equipment and terminal useThe upgrading of equipment is described; End user device and testing equipment are by corresponding upgrading description and redactionApplication file is set up associated.
According to a further aspect in the invention, propose a kind of method that software is issued, having comprised: step 1, portionAdministration upgrade server, testing equipment and one or more end user device, upgrade server is disposedThe application file of redaction and describing for the upgrading of testing equipment and end user device; Step 2, wholeEnd user device is set up associated with testing equipment by the application file of corresponding upgrading description and redaction;First step 3, testing equipment describe according to corresponding upgrading the application file of having tested redaction, afterwardsEnd user device could be described the download upgrading of carrying out redaction according to the upgrading of its correspondence.
The present invention has designed a kind of can survey consistent with the actual service condition height of user in the situation thatTest is demonstrate,proved, and strict control redaction, for user's impact, is carried out on a large scale effectively thereby realize simultaneouslySoftware is issued and upgrading.
Brief description of the drawings
Fig. 1 is the structure chart of software delivery system;
Fig. 2 is the applicating flow chart of software distribution method;
Fig. 3 is the overview flow chart of software distribution method.
As shown in the figure, in order clearly to realize the structure of embodiments of the invention, marked in the drawings specificStructure and device, but this is only for signal needs, and is not intended to limit the invention to this ad hoc structure, deviceIn environment, according to specific needs, those of ordinary skill in the art can carry out these devices and environmentAdjust or amendment, the adjustment of carrying out or amendment are still included in the scope of accompanying claim.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, one provided by the invention is carried out to extensive software effectivelyThe system and method for issuing and/or upgrade is described in detail.
In the following description, will multiple different aspects of the present invention be described, but, in this areaThose of ordinary skill, can only utilize some or all structure of the present invention or flow process realExecute the present invention. For the definition of explaining, set forth specific number, configuration and order, but veryObviously, in the situation that there is no these specific detail, also can implement the present invention. In other cases, forDo not obscure the present invention, will no longer be described in detail for some well-known features.
In the first embodiment of the application, provide the delivery system of software as shown in Figure 1, as shown in Figure 1System architecture diagram, this system comprises the testing equipment that upgrade server is communicated by letter with this upgrade serverAnd one or more end user device. Wherein, upgrade server dispose redaction application file,Upgrading corresponding to testing equipment and end user device is described. End user device and testing equipment are passed throughCorresponding upgrading description and the application file of redaction are set up associated.
Wherein, the application file of upgrade server deploy redaction. This upgrade server can multiplexingly be disposedUpgrade server in public server or production environment on the internet, like this except saving independent frameIf the cost of server, can also make the process of testing authentication and environment be equal to as far as possible client's realityUse scenes. Certainly, also can set up separately upgrade server in the situation of enough hardware resources, separatelyOn the upgrade server association of setting up server on the internet or access this network environment.
Wherein, dispose two or more upgradings describe at upgrade server, these upgradings are described and are all pointed to thisThe same redaction of application, can avoid like this difference between beta version and released version and usingIn the actual use in family, have problems.
Wherein, before test completes, describe 2 for empty corresponding to the upgrading of end user device. TerminalWhen this upgrading of application access on subscriber equipment is described, can be apprised of and not have new version can supply to download, riseLevel.
Wherein, the equipment that is associated with upgrade server comprises for tester's testing equipment and actual usingThe end user device that family is used is all provided with the legacy version of this application on two kind equipments. Application basisA switch (or setting) decides, and which upgrading of going to access on upgrade server is described. DefaultIn situation, switch is set as access and describes 2 corresponding to the upgrading of end user device.
Certainly, tester can be set as switch access and describe 1 corresponding to the upgrading of testing equipment. ChangeBecome switch arrange can conduct interviews restriction and protection, such as by the mode of password, make to only have surveyExamination personnel can use this switch, and domestic consumer can not change its setting.
On the other hand, even if this switch is not conducted interviews and is limited and protection, if domestic consumer changes soThe setting of this switch, also only can make this user download in advance the redaction that not yet completes test. Pass throughIncrease the means such as prompting, warning message, can further reduce user and download the new edition that not yet completes testThis possibility and impact.
Preferably, when end user device is associated with upgrade server, by the device parameter of self, network ringsBorder parameter and current version information send to upgrade server, by upgrade server, this information are transmitted toTesting equipment. This testing equipment is simulated this end user device, describes 1, the survey of upgrading corresponding to upgradingExamination. After testing equipment test is passed through, allow end user device to describe 2 by upgrading and download redactionApplication file.
Wherein, can periodic triggers for switch setting, manual triggering, application start or touch while exitingSend out etc.
Further, on upgrade server, can dispose multiple upgradings describe (upgrading describes 1,2 ... k),Corresponding switch and setting are provided in application, make multiple test sides can be according to predetermined order to newlyVersion is worked in coordination with test. For example, test side 1 is by switch is set, and access upgrading describes 1, to new editionOriginally download and test, after content measurement completes and passes through, test side 2 is by switch is set, accessUpgrading describes 2, continues row version to download and test. Until all test sides complete after test, generalThe default setting of k(application just can be described by upgrading in general family), download and use redaction.
Wherein, on upgrade server, can dispose multiple redactions, by changing the setting of switch, justCan different redactions be downloaded and be tested. Certainly, the application of upgrading description and redaction canBe deployed on different servers. Wherein, native system can support redaction to download the scheduling of upgrading, exampleAs block out, time zone, realize load balancing, reduce for network, server and user's impact.
According to a second embodiment of the present invention, a kind of method that provides software to issue, wherein the method comprises:Step 1, deployment upgrade server, testing equipment and one or more end user device, upgrading clothesBusiness device is disposed the application file of redaction and is described for the upgrading of testing equipment and end user device;Step 2, end user device and testing equipment are built by corresponding upgrading description and the application file of redactionVertical associated; First step 3, testing equipment describe according to corresponding upgrading the practical writing of having tested redactionPart, end user device could be described the download upgrading of carrying out redaction according to the upgrading of its correspondence afterwards.
Wherein, in step 1, the application file of upgrade server deploy redaction. This upgrade server canAffix one's name to the upgrade server in public server or production environment on the internet with multiplexing unit, like this exceptSave the cost that sets up separately server, can also make the process of testing authentication and environment be equal to as far as possibleClient's actual use scenes. Certainly, also can set up separately upgrading clothes in the situation of enough hardware resourcesBusiness device, on the upgrade server association of setting up separately server on the internet or access this network ringsBorder.
Wherein, in step 1, dispose two or more upgradings describe at upgrade server, these upgradings are retouchedState the same redaction of all pointing to this application, can avoid like this between beta version and released versionDifference and having problems in the actual use of user.
Wherein, in step 3, before test completes, describe 2 corresponding to the upgrading of end user device and beEmpty. When this upgrading of the application access on end user device is described, can be apprised of does not have the new version canFor downloading, upgrading.
Wherein, in step 2, the equipment that is associated with upgrade server comprises for tester's test to be establishedThe end user device standby and actual user uses is all provided with the legacy version of this application on two kind equipments.
Wherein, in step 3, redaction application decides according to a switch (or setting), goes accessWhich upgrading on upgrade server is described. In default situation, switch is set as access and uses corresponding to terminalThe upgrading of family equipment describes 2.
Wherein, in step 3, tester can be set as switch the upgrading of access corresponding to testing equipmentDescribe 1. Change switch arrange can conduct interviews restriction and protection, such as by the mode of password, makeMust only have tester can use this switch, and domestic consumer can not change its setting.
On the other hand, even if this switch is not conducted interviews and is limited and protection, if domestic consumer changes soThe setting of this switch, also only can make this user download in advance the redaction that not yet completes test. Pass throughIncrease the means such as prompting, warning message, can further reduce user and download the new edition that not yet completes testThis possibility and impact.
Wherein, in step 3, when end user device is associated with upgrade server, by the device parameter of self,Network environment parameter and current version information send to upgrade server, by upgrade server by this informationBe transmitted to testing equipment. This testing equipment is simulated this end user device, describes 1 corresponding to upgrading, carries outUpgrading test. After testing equipment test is passed through, allow end user device to describe 2 by upgrading and downloadThe application file of redaction.
Wherein, can periodic triggers for switch setting, manual triggering, application start or touch while exitingSend out etc.
Wherein, in step 2, on upgrade server, can dispose multiple upgradings and describe (upgrading description1,2 ... k), in application, provide corresponding switch and setting, make multiple test sides can be according toPredetermined order is worked in coordination with test to redaction. For example, test side 1 is by switch is set, and access risesLevel describes 1, and redaction is downloaded and tested, and after content measurement completes and passes through, test side 2 passes throughSwitch is set, and access upgrading describes 2, continues row version to download and test. Until all test sidesComplete after test, the default setting of k(application just can be described by upgrading by domestic consumer), download and makeUse redaction.
Wherein, on upgrade server, can dispose multiple redactions, by changing the setting of switch, just canSo that different redactions is downloaded and to be tested.
Wherein, as shown in Figure 2, equipment obtains switch setting to the relevant flow process of this method, establishes according to switchPut and determine upgrading description, obtaining upgrading description and resolving this upgrading and describe, on inquiry upgrade serverVersion file, is knowing have redaction in the situation that, downloads and installs.
This flow process can start under multiple condition, such as periodic triggers, and manual triggering, application startOr trigger while exiting etc.
At upgrade server end, the flow process of system as shown in Figure 3, is first disposed the application of redaction, portionAdministration is described for the upgrading of testing equipment, after test is passed through, disposes the liter for end user deviceLevel is described. If test is not passed through, test always or adjust test.
Finally it should be noted that above embodiment only in order to describe technical scheme of the present invention instead of to thisTechnical method limits, the present invention in application, can extend to other amendment, variation, application andEmbodiment, and therefore think that all such amendments, variation, application, embodiment are of the present inventionIn spirit and teachings.

Claims (11)

1. a software delivery system, comprising:
Upgrade server,
One or more testing equipment of communicating by letter with this upgrade server and one or more terminal are usedFamily equipment;
Wherein, upgrade server dispose redaction application file, establish corresponding to testing equipment and terminal useStandby upgrading is described, and the application file that all points to described redaction is described in described upgrading; End user deviceSet up associated with testing equipment by the application file of corresponding upgrading description and redaction;
At testing equipment and end user device deploy switch, decide the upgrading on access upgrade serverThe order of describing;
Before test completes, be described as sky corresponding to the upgrading of end user device;
First testing equipment describes the application file of having tested redaction, terminal afterwards according to corresponding upgradingSubscriber equipment could be described the download upgrading of carrying out redaction according to the upgrading of its correspondence.
2. software delivery system according to claim 1, wherein, upgrade server multiplexing unit is deployed inPublic server on internet; Wherein, dispose corresponding to multiple testing equipments and end at upgrade serverThe upgrading of end user device is described.
3. software delivery system according to claim 1, wherein, described switch can determine accessThe restrict access that upgrading on upgrade server is described or access protection.
4. software delivery system according to claim 1, wherein, end user device is associated with literWhen level server, the device parameter of self, network environment parameter and current version information are sent to literLevel server, is transmitted to testing equipment by upgrade server by this information; This testing equipment is simulated this terminalSubscriber equipment, carries out upgrading test.
5. software delivery system according to claim 1 is wherein, many in upgrade server deployIndividual upgrading is described, and corresponding switch and setting are provided in application, makes multiple test sides according to being scheduled toOrder is worked in coordination with test to redaction.
6. software delivery system according to claim 1, wherein, upgrade server deploy is multipleRedaction, by changing the setting of switch, downloads and tests different redactions; Upgrading is describedOn different servers, support redaction to download the scheduling of upgrading with the application deployment of redaction.
7. the method that software is issued, comprising:
Step 1, deployment upgrade server, testing equipment and one or more end user device, riseThe application file of level server disposition redaction and retouching for the upgrading of testing equipment and end user deviceState, the application file, testing equipment and the end user device that all point to described redaction are described in described upgradingDeploy switch, the order that decides the upgrading on access upgrade server to describe;
Step 2, end user device and testing equipment are by corresponding upgrading description and the practical writing of redactionPart is set up associated, before test completes, is described as sky corresponding to the upgrading of end user device;
First step 3, testing equipment describe according to corresponding upgrading the application file of having tested redaction,End user device could be described the download upgrading of carrying out redaction according to the upgrading of its correspondence afterwards.
8. the method that software according to claim 7 is issued, wherein, in step 1, described switchRestrict access or access protection are described in the upgrading that can determine to access on upgrade server.
9. the method that software according to claim 7 is issued, wherein, in step 2, terminal useWhen equipment is associated with upgrade server, by the device parameter of self, network environment parameter and current versionInformation sends to upgrade server, by upgrade server, this information is transmitted to testing equipment; This test is establishedStandby this end user device of simulation, carries out upgrading test.
10. the method that software according to claim 7 is issued, wherein, in step 1, at upgrading clothesThe multiple upgradings of business device deploy are described, and corresponding switch and setting are provided in application, make multiple testsSide works in coordination with test according to predetermined order to redaction.
The method that 11. softwares according to claim 7 are issued, wherein, in step 3, terminal useWhen equipment is associated with upgrade server, by the device parameter of self, network environment parameter and current versionInformation sends to upgrade server, by upgrade server, this information is transmitted to testing equipment; This test is establishedStandby this end user device of simulation, carries out upgrading test.
CN201310329806.0A 2013-07-31 2013-07-31 The system and method that a kind of software is issued Active CN103401713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310329806.0A CN103401713B (en) 2013-07-31 2013-07-31 The system and method that a kind of software is issued

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310329806.0A CN103401713B (en) 2013-07-31 2013-07-31 The system and method that a kind of software is issued

Publications (2)

Publication Number Publication Date
CN103401713A CN103401713A (en) 2013-11-20
CN103401713B true CN103401713B (en) 2016-05-25

Family

ID=49565244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310329806.0A Active CN103401713B (en) 2013-07-31 2013-07-31 The system and method that a kind of software is issued

Country Status (1)

Country Link
CN (1) CN103401713B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105700898A (en) * 2014-11-25 2016-06-22 中兴通讯股份有限公司 Upgrading file production method and apparatus as well as upgrading file acquisition method and apparatus
CN105592436A (en) * 2014-12-26 2016-05-18 中国银联股份有限公司 Method and system for upgrading application in user equipment
CN104811979B (en) * 2015-04-16 2016-08-17 努比亚技术有限公司 Method for testing pressure based on FOTA upgrading and device
CN107577478A (en) * 2017-09-08 2018-01-12 湖南快乐阳光互动娱乐传媒有限公司 A kind of cell phone software loading method and system
EP3502875A1 (en) * 2017-12-22 2019-06-26 Siemens Aktiengesellschaft Seamless and safe upgrade of software intensive systems during operation
CN108243254B (en) * 2018-01-17 2020-09-25 平安科技(深圳)有限公司 Electronic device, method for releasing application upgrading version and storage medium
CN110297749B (en) * 2018-03-22 2022-12-13 福建天泉教育科技有限公司 Method and terminal for testing new function
CN109347695A (en) * 2018-09-18 2019-02-15 上海移远通信技术股份有限公司 A kind of upgrade testing system and method
CN111124907A (en) * 2019-12-18 2020-05-08 北京智明星通科技股份有限公司 Mobile phone game testing method and device and server

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009589A (en) * 2006-01-26 2007-08-01 腾讯科技(深圳)有限公司 A method and system for software upgrade
CN101132573A (en) * 2006-08-23 2008-02-27 中兴通讯股份有限公司 Method for implementing terminal batch upgrading
CN102143523A (en) * 2010-11-18 2011-08-03 华为技术有限公司 Service delivery platform and application testing method based on service delivery platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040015950A1 (en) * 2001-05-10 2004-01-22 International Business Machines Corporation Application service provider upgrades
US7191435B2 (en) * 2002-06-07 2007-03-13 Sun Microsystems, Inc. Method and system for optimizing software upgrades

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009589A (en) * 2006-01-26 2007-08-01 腾讯科技(深圳)有限公司 A method and system for software upgrade
CN101132573A (en) * 2006-08-23 2008-02-27 中兴通讯股份有限公司 Method for implementing terminal batch upgrading
CN102143523A (en) * 2010-11-18 2011-08-03 华为技术有限公司 Service delivery platform and application testing method based on service delivery platform

Also Published As

Publication number Publication date
CN103401713A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN103401713B (en) The system and method that a kind of software is issued
CN108234475B (en) Account management method, electronic equipment and computer storage medium
EP4093075A1 (en) System and methods to store, retrieve, manage, augment and monitor applications on appliances
CN106878334A (en) The automatically dispose system and method for cloud
CN103152392B (en) Installation kit supplying method, acquisition methods, equipment and system
CN104378342A (en) Multi-account verification method, device and system
US20120192263A1 (en) Access gateway and method for providing cloud storage service
CN105389263A (en) Method, system and equipment for monitoring application software permissions
CN103476002A (en) Method and device for data interaction
CN102541596A (en) Operating system upgrading method and device
CN102752137A (en) Device and method for actively setting network parameters of virtual machine
CN103713918A (en) Software appliance installation systems and methods
CN106464519A (en) Adapter and adapter upgrade method
US20130183948A1 (en) Application Store System and Development Method Using the Application Store System
CN110011875B (en) Dial testing method, device, equipment and computer readable storage medium
CN104994060A (en) Method and device for providing verification for user login
WO2018033094A1 (en) Rich communication suite release platform, method and system for version update, and mobile terminal
CN101765133B (en) Performance test method for testing wireless access point connected to wireless terminals and performance test system thereof
CN102970342A (en) Automatic update method of embedded terminal based on over the air (OTA) technology
CN103136478A (en) Terminal application safety management method and system
CN105653326A (en) System and method for batch Linux system installation and detection
CN105528205A (en) Update control method and update control system
CN103516851B (en) A kind of wireless product cloud test platform system
CN103716400A (en) Method and system for achieving mobile working based on virtual machine
CN102164179A (en) Method and system for arranging terminal application based on network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100086 block A 1202 and 1203, unit A, Zhichun Road 7, Zhichun Road, Haidian District

Patentee after: Yue Yun Technology (Beijing) Co.,Ltd.

Address before: 100086, Beijing, Zhichun Road, Haidian District No. 113 silver net center, block A, 1802

Patentee before: BEIJING SHINEHEALTH TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180108

Address after: 518000 A11 201, Kwai Chung Life Science Industrial Park, Dapeng New District, Shenzhen, Guangdong

Patentee after: Shenzhen Le earth life science and Technology Investment Co.,Ltd.

Address before: 100086 block A 1202 and 1203, unit A, Zhichun Road 7, Zhichun Road, Haidian District

Patentee before: Yue Yun Technology (Beijing) Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A System and Method for Software Release

Granted publication date: 20160525

Pledgee: Agricultural Bank of China Limited Shenzhen Pingshan Branch

Pledgor: Shenzhen Le earth life science and Technology Investment Co.,Ltd.

Registration number: Y2024980002007