CN103401228B - 一种不对称短路电流的抑制方法 - Google Patents
一种不对称短路电流的抑制方法 Download PDFInfo
- Publication number
- CN103401228B CN103401228B CN201310325526.2A CN201310325526A CN103401228B CN 103401228 B CN103401228 B CN 103401228B CN 201310325526 A CN201310325526 A CN 201310325526A CN 103401228 B CN103401228 B CN 103401228B
- Authority
- CN
- China
- Prior art keywords
- short circuit
- circuit current
- current
- turn
- phase short
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000012795 verification Methods 0.000 claims abstract description 7
- 238000005457 optimization Methods 0.000 claims description 2
- 241000219000 Populus Species 0.000 description 5
- 230000007935 neutral effect Effects 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 240000000161 Lagerstroemia indica Species 0.000 description 1
- 235000000283 Lagerstroemia parviflora Nutrition 0.000 description 1
- BQCADISMDOOEFD-UHFFFAOYSA-N Silver Chemical compound [Ag] BQCADISMDOOEFD-UHFFFAOYSA-N 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 229910052709 silver Inorganic materials 0.000 description 1
- 239000004332 silver Substances 0.000 description 1
Abstract
本发明涉及一种不对称短路电流的抑制方法,用于抑制500kV/220kV电网系统中500kV站的220kV母线单相短路电流,所述500kV/220kV电网系统包括N个变压器站,该方法包括以下步骤:1)判断500kV站的220kV母线是否是3/2接线方式,是则转向步骤3),否则转向步骤2);2)修正单相短路电流的校核方式为:单相短路电流=总的单相短路电流-最小分支单相短路电流;3)优化减少变压器站接地点。与现有技术相比,本发明可有效抑制单相短路电流,使电网系统运行更加安全可靠。
Description
技术领域
本发明涉及输变电技术领域,尤其是涉及一种基于主变接地点选取的电网不对称短路电流的抑制方法。
背景技术
目前,上海500kV电网单相短路电流大都超过三相短路电流,主要是由于直流换流变的接地方式以及220kV降压变绕组接线方式所引起,为了解决该问题采用的方法是通过直流换流变加装中性点小电抗或是500kV电厂升压变加装中性点小电抗。但是,该方法只能对附近500kV站点单相短路电流产生影响,影响范围较为有限,500kV大多数厂站的单相短路电流仍然大于三相短路电流。而且部分500kV站的220kV母线采用的是双母双分段结构,其站内电流分布与3/2接线不尽相同,这就使得过往对于220kV单相短路电流校核方式无法精确反映流过220kV开关的最大单相短路电流,因此,为了有效抑制单相短路电流,提高电网运行方式安排的灵活性,有必要对220kV单相短路电流校核方式以及抑制方法进行修正。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种不对称短路电流的抑制方法。
本发明的目的可以通过以下技术方案来实现:一种不对称短路电流的抑制方法,用于抑制500kV/220kV电网系统中500kV站的220kV母线单相短路电流,所述500kV/220kV电网系统包括N个变压器站,其特征在于,该方法包括以下步骤:
1)判断500kV站的220kV母线是否是3/2接线方式,是则转向步骤3),否则转向步骤2);
2)修正单相短路电流的校核方式:修正后的单相短路电流=总的单相短路电流-最小分支单相短路电流;
3)优化减少变压器站接地点。
步骤3)所述优化减少变压器站接地点包括以下步骤:
301)系统初始化,设定i=0;
302)更新i=i+1,判断i是否大于N,是则结束,否则取消系统第i个变压器站接地;
303)校核系统过电压是否达标,是则转向步骤305),否则转向步骤304);
304)恢复第i个变压器站接地,转向步骤302);
305)校核零序保护是否达标,是则转向步骤302),否标则转向步骤304)。
步骤303)所述的校核系统过电压是否达标指判断第i个变压器站的零序短路阻抗与正序短路阻抗的比值是否小于3,是则达标,否则不达标。
在超高压系统中,当R<<X时,单相短路时健全相电压计算公式为:
式中,Up为故障前故障点相电压,α为接地系数,X1为故障点正序短路阻抗,X0为故障点零序短路阻抗。
当X0/X1=3时,α=1.25Up=0.72Ue,其中Ue为线电压,所以不管是全部变压器还是部分变压器中性点直接接地或经过阻抗接地,只要该系统处处满足X0/X1≤3,即能满足单相接地时健全相电压不超过0.8倍线电压这一条件,均属于有效接地系统。
步骤305)所述的校核零序保护是否达标指判断第i个变压器站母线单相短路故障时,各分支3I0最小值是否满足零序保护的启动条件,是则达标,否则不达标。
所述3I0指短路时正序电流、负序电流和零序电流的和。
与现有技术相比,本发明可有效抑制单相短路电流,使电网系统运行更加安全可靠。
具体实施方式
下面结合具体实施例对本发明进行详细说明。
由于直流换流变的接地方式以及220kV降压变绕组接线方式的要求,使得上海电网越来越多的500kV站即使加装中性点小电抗,其220kV母线单相短路电流仍超过三相短路电流。而部分500kV站的220kV母线采用的是双母双分段结构,其站内电流分布与3/2接线不尽相同,因此,为更精确地反映流过220kV开关的最大单相短路电流,提高电网运行方式安排的灵活性,有必要对220kV单相短路电流校核方式进行修正。
若220kV母线采用的是非3/2结构,那么当母线发生单相短路时,由于相连线路或主变地接连跳开,流过220kV开关的最大单相短路电流就是最大分支单相短路电流,因此母线故障并不是短路电流最大的情况。当220kV线路出口发生单相短路时,总的短路电流为流过线路两侧开关的短路电流之和,则线路出口侧开关流过的短路电流即为总的短路电流减去该线路的分支短路电流。因此,对于采用非3/2接线的220kV母线,其单相短路电流校核方式建议修正为:单相短路电流=总的单相短路电流-最小分支单相短路电流。
采取上述修正方案后,上海各500kV站的220kV母线单相短路电流水平如表1所示。由表可见,各220kV母线单相短路电流下降幅度约在0.2~0.5kA不等。
表12012年上海220kV母线单相短路电流修正前后比较
单位:kA
220kV母线 | 单相短路电流 | 修正后的单相短路电流 |
黄渡 | 39.9 | 39.6 |
南桥 | 46.8 | 46.5 |
杨高 | 40.4 | 40.1 |
泗泾 | 44.4 | 44.1 |
杨行 | 48.9 | 48.9 |
顾路 | 50.9 | 50.9 |
徐行I母 | 45.7 | 45.7 |
徐行II母 | 31.6 | 31.6 |
远东 | 44.7 | 44.2 |
亭卫 | 39.8 | 39.6 |
练塘 | 26.0 | 25.9 |
新余 | 25.9 | 25.6 |
2012年上海各500kV站的220kV母线短路电流水平以及零序短路阻抗与正序短路阻抗之比如表2所示。
表2上海各500kV站的220kV母线短路电流水平及零序短路阻抗与正序短路阻抗之比
单位:kA
厂站 | 三相 | 单相 | X0/X1 |
杨行 | 49.0 | 48.9 | 1.01 |
顾路 | 46.3 | 50.9 | 0.73 |
杨高 | 44.6 | 40.4 | 1.31 |
黄渡 | 37.9 | 39.9 | 0.84 |
南桥 | 41.7 | 46.8 | 0.69 |
泗泾 | 43.5 | 44.4 | 0.93 |
徐行12 | 46.8 | 45.7 | 1.06 |
徐行34 | 34.9 | 31.6 | 1.31 |
远东 | 38.8 | 44.7 | 0.59 |
亭卫 | 33.3 | 39.8 | 0.50 |
练塘 | 21.4 | 26.0 | 0.47 |
新余 | 22.1 | 25.9 | 0.56 |
由表可见,上海所有500kV站的220kV母线单相短路电流基本都超过三相短路电流,其中顾路单相短路电流超过50kA,且顾路主变已加装中性点小电抗,因此需考虑采取另外的手段来限制其单相短路电流超标。通过表中还可以发现,上海大多数220kV母线零序短路阻抗与正序短路阻抗值比小于1,这也是220kV站单相短路电流普遍超过三相的原因。
为了减小单相短路电流,就必须增大系统零序短路阻抗,一个可行的办法就是减少系统接地点,而减少系统接地点会带来过电压问题,并对零序保护产生影响,因此减少系统接地点时须同时对过电压以及零序保护进行校核。
在超高压系统中,当R<<X时,单相短路时健全相电压计算公式为:
式中,Up为故障前故障点相电压,α为接地系数,X1为故障点正序短路阻抗,X0为故障点零序短路阻抗。
当X0/X1=3时,α=1.25Up=0.72Ue,其中Ue为线电压,所以不管是全部变压器还是部分变压器中性点直接接地或经过阻抗接地,只要该系统处处满足X0/X1≤3,即能满足单相接地时健全相电压不超过0.8倍线电压这一条件,均属于有效接地系统。
因此,建议取消巨峰、洲海、杨厂Z2、杨厂F的接地点,顾路220kV单相短路电流可减小至49.3kA。同时220kV主变接地点优化后,各站X′0/X1均小于3(如表3所示),仍然属于有效接地系统。
对零序保护校核同样可以发现,接地点优化后,顾路分区各站母线单相短路故障时(接地阻抗200Ω)各分支3I0最小值仅有少部分站略微减小,基本能满足零序保护的3I0启动条件(如表3所示),所以原则上可通过减少主变接地点降低顾路220kV单相短路电流,具体实施可行性仍需保护部门进行详细校核。
表3顾路分区220kV各站正序、零序短路阻抗比值以及母线单相短路故障时(接地阻抗200Ω)各分支3I0最小值
单位:pu/A
厂站 | X1 | X0 | X0/X1 | Min(3I0) | X0’ | X0’/X1 | min(3I0’) |
顾路 | 0.00537 | 0.00397 | 0.74 | 9.2 | 0.00461 | 0.86 | 10.2 |
王港 | 0.00605 | 0.00537 | 0.89 | 12.3 | 0.00631 | 1.04 | 13.2 |
张桥 | 0.00621 | 0.00477 | 0.77 | 31.1 | 0.00542 | 0.87 | 34.2 |
巨峰 | 0.00585 | 0.00482 | 0.82 | 27.3 | 0.00552 | 0.94 | 30.1 |
唐镇_Z | 0.00897 | 0.01142 | 1.27 | 303.1 | 0.01314 | 1.46 | 302.2 |
龙东_F | 0.01106 | 0.01261 | 1.14 | 92.4 | 0.01306 | 1.18 | 94.7 |
高东 | 0.00635 | 0.00662 | 1.04 | 164.1 | 0.00719 | 1.13 | 164.5 |
洲海 | 0.00607 | 0.00506 | 0.83 | 31.2 | 0.00559 | 0.92 | 34.6 |
外一 | 0.00579 | 0.00497 | 0.86 | 47.1 | 0.00549 | 0.95 | 47.5 |
银山 | 0.00677 | 0.00501 | 0.74 | 26.5 | 0.00548 | 0.81 | 29.3 |
罗山_1 | 0.00989 | 0.01199 | 1.21 | 65.9 | 0.01243 | 1.26 | 67.5 |
源深_Z | 0.01024 | 0.01214 | 1.19 | 240.5 | 0.01258 | 1.23 | 238.8 |
紫薇 | 0.01223 | 0.01356 | 1.11 | 561.3 | 0.014 | 1.14 | 559.0 |
锦绣86 | 0.00764 | 0.00571 | 0.75 | 662.9 | 0.00617 | 0.81 | 662.9 |
锦绣87 | 0.0075 | 0.0072 | 0.96 | 661.8 | 0.00767 | 1.02 | 661.8 |
东昌71 | 0.01162 | 0.01335 | 1.15 | 660.5 | 0.0138 | 1.19 | 660.5 |
东昌88 | 0.00944 | 0.00668 | 0.71 | 661.3 | 0.00714 | 0.76 | 661.3 |
广场73 | 0.01299 | 0.01362 | 1.05 | 659.9 | 0.01406 | 1.08 | 659.9 |
杨厂Z1 | 0.00886 | 0.00984 | 1.11 | 556.6 | 0.01023 | 1.15 | 601.8 |
杨厂Z2 | 0.00886 | 0.0105 | 1.19 | 603.9 | 0.01092 | 1.23 | 662.0 |
森林_F | 0.00844 | 0.00632 | 0.75 | 565.0 | 0.00676 | 0.80 | 556.4 |
2012年上海电网只有杨行220kV母线两相接地短路比三相及单相短路电流大0.5kA,其余均小于三相及单相短路电流,由于两相接地短路电流过大也是由系统零序短路阻抗过小引起,因此可考虑采取与限制单相短路电流相同的措施,即减少220kV主变接地点来解决。
Claims (3)
1.一种不对称短路电流的抑制方法,用于抑制500kV/220kV电网系统中500kV站的220kV母线单相短路电流,所述500kV/220kV电网系统包括N个变压器站,其特征在于,该方法包括以下步骤:
1)判断500kV站的220kV母线是否是3/2接线方式,是则转向步骤3),否则转向步骤2);
2)修正单相短路电流的校核方式:修正后的单相短路电流=总的单相短路电流-最小分支单相短路电流;
3)优化减少变压器站接地点;
步骤3)所述优化减少变压器站接地点包括以下步骤:
301)电网系统初始化,设定i=0;
302)更新i=i+1,判断i是否大于N,是则结束,否则取消电网系统第i个变压器站接地;
303)校核电网系统过电压是否达标,是则转向步骤305),否则转向步骤304);
304)恢复第i个变压器站接地,转向步骤302);
305)校核零序保护是否达标,是则转向步骤302),否则转向步骤304)。
2.根据权利要求1所述的一种不对称短路电流的抑制方法,其特征在于,步骤303)所述的校核电网系统过电压是否达标指判断第i个变压器站的零序短路阻抗与正序短路阻抗的比值是否小于3,是则达标,否则不达标。
3.根据权利要求1所述的一种不对称短路电流的抑制方法,其特征在于,步骤305)所述的校核零序保护是否达标指判断第i个变压器站母线单相短路故障时,各分支3I0最小值是否满足零序保护的启动条件,是则达标,否则不达标;所述3I0指短路时正序电流、负序电流和零序电流的和。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310325526.2A CN103401228B (zh) | 2013-07-30 | 2013-07-30 | 一种不对称短路电流的抑制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310325526.2A CN103401228B (zh) | 2013-07-30 | 2013-07-30 | 一种不对称短路电流的抑制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103401228A CN103401228A (zh) | 2013-11-20 |
CN103401228B true CN103401228B (zh) | 2016-03-23 |
Family
ID=49564801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310325526.2A Active CN103401228B (zh) | 2013-07-30 | 2013-07-30 | 一种不对称短路电流的抑制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103401228B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107579521B (zh) * | 2017-10-19 | 2019-08-13 | 广西电网有限责任公司电力科学研究院 | 一种面向对象的PSD-SCCP500kV主变分支短路电流分析方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101350514A (zh) * | 2008-08-25 | 2009-01-21 | 常立柱 | 一种限流消弧分励脱扣型接地短路保护装置 |
CN102035197A (zh) * | 2011-01-06 | 2011-04-27 | 山东大学 | 一种三相电流限制装置及方法 |
CN103219719A (zh) * | 2013-03-21 | 2013-07-24 | 国家电网公司 | 一种利用线路出串运行限制短路电流的分析方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7024320B2 (en) * | 2004-07-29 | 2006-04-04 | The Boeing Company | Method and system for determining the position of a short circuit in a branched wiring system |
-
2013
- 2013-07-30 CN CN201310325526.2A patent/CN103401228B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101350514A (zh) * | 2008-08-25 | 2009-01-21 | 常立柱 | 一种限流消弧分励脱扣型接地短路保护装置 |
CN102035197A (zh) * | 2011-01-06 | 2011-04-27 | 山东大学 | 一种三相电流限制装置及方法 |
CN103219719A (zh) * | 2013-03-21 | 2013-07-24 | 国家电网公司 | 一种利用线路出串运行限制短路电流的分析方法 |
Non-Patent Citations (1)
Title |
---|
10kV配电网小电阻接地系统单相短路故障及其保护研究;朱亮;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑 (月刊 )》;20130615(第6期);1-51 * |
Also Published As
Publication number | Publication date |
---|---|
CN103401228A (zh) | 2013-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107611943B (zh) | 小电阻接地系统馈线自适应零序电流保护方法 | |
Liu et al. | Survey of technologies of line commutated converter based high voltage direct current transmission in China | |
AU2018295937A1 (en) | Safe operation method for voltage reduction and arc suppression of ground fault phase of non-effective grounding system | |
CN102361321B (zh) | 110/220kV变压器中性点经小电抗接地的装置及其动模仿真方法 | |
CN105024348A (zh) | YNd5变压器纵联差动保护d侧电流相位补偿方法 | |
CN105552861B (zh) | 自适应电流保护算法 | |
CN104767195A (zh) | 超高压自耦变压器中性点小抗接地时小抗阻值选择的方法 | |
CN105277773A (zh) | 一种完整计算变电站入地短路电流的方法 | |
KR101907951B1 (ko) | Hvdc 시스템 및 그의 제어 방법 | |
CN104535883A (zh) | 一种基于全系统接地故障信息的小电流接地选线方法 | |
CN104392287A (zh) | 一种500kV/220kV受端电网分区方法 | |
CN105207184B (zh) | 一种用于中性点经电阻接地系统的零序方向元件 | |
CN103401228B (zh) | 一种不对称短路电流的抑制方法 | |
CN202206121U (zh) | 一种500kV/10kV站用变压器保护装置 | |
CN107255765B (zh) | 一种谐振接地系统单相接地故障区段定位方法 | |
CN109327007B (zh) | 基于站域信息的同塔多回线零序补偿系数整定装置与方法 | |
CN110912102A (zh) | 基于零相转移的低压供电网漏电故障保护方法 | |
CN107968384B (zh) | 一种同杆多回路零序电流保护方法及装置 | |
Ratnadeep et al. | Fault level analysis of power distribution system | |
CN205029332U (zh) | 一种多侧电源供电的110kV中性点经电阻接地系统 | |
CN203911251U (zh) | 一种新型出线方式的核电厂gis高压配电装置 | |
KR102298211B1 (ko) | 방향성 지락과전류 계전기와 거리계전기를 이용한 분산 전원이 연계된 계통의 보호 장치 | |
CN103839657B (zh) | 一种用于变压器的中性点与外壳双接地系统 | |
Guo et al. | Study and application of switching operation of 10kV lines ring network in urban power distribution network | |
CN103457188A (zh) | 一种变电站站用电设计的优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |