CN103390213A - Product tool management method and system - Google Patents

Product tool management method and system Download PDF

Info

Publication number
CN103390213A
CN103390213A CN2013102707686A CN201310270768A CN103390213A CN 103390213 A CN103390213 A CN 103390213A CN 2013102707686 A CN2013102707686 A CN 2013102707686A CN 201310270768 A CN201310270768 A CN 201310270768A CN 103390213 A CN103390213 A CN 103390213A
Authority
CN
China
Prior art keywords
test
tool
engineer
instrument
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102707686A
Other languages
Chinese (zh)
Inventor
康伟
朱永球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CELLON COMMUNICATION TECHNOLOGY (SHENZHEN) CO LTD
Original Assignee
CELLON COMMUNICATION TECHNOLOGY (SHENZHEN) CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CELLON COMMUNICATION TECHNOLOGY (SHENZHEN) CO LTD filed Critical CELLON COMMUNICATION TECHNOLOGY (SHENZHEN) CO LTD
Priority to CN2013102707686A priority Critical patent/CN103390213A/en
Publication of CN103390213A publication Critical patent/CN103390213A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a product tool management method and system. The management method comprises receiving project configuration information and tool project configuration information after an administrator logs in; receiving a tool name selected by a development engineer after the development engineer logs in, receiving and storing project names corresponding to the tool name, and storing tool contents into an FTP (File Transfer Protocol) directory; downloading all the tool contents corresponding to identifications of a test engineer from the FTP directory after the test engineer logs in; after the test is finished, receiving a test result input by the test engineer, sending the test result to the corresponding development engineer, when the test passes and after a project leader logs in, displaying all the tool names corresponding to the corresponding project name, and downloading all the tool contents corresponding to the corresponding project name from a storage path in the FTP directory. By means of the implementation of the product tool management method and system, information disclosure and production accidents can be prevented, and management and query can be easier.

Description

A kind of management method of product instrument and system
Technical field
The present invention relates to product too development and production field, especially relate to a kind of management method and system of product instrument.
Background technology
Engineering department of existing factory management product instrument adopts the mode of share directory, product instrument newly developed is placed under share directory, the tester downloads the product tool content under share directory, after testing, the project leader of notice factory uses the product instrument of latest edition to produce.There is potential safety hazard in this kind share directory mode, and the people that directory permission arranged is addressable all instruments, and message safety can not get ensureing.
And, engineering department of existing factory management product instrument version adopts the mode of mail, and the developer will product instrument newly developed sends to the tester with the form of mail, after the tester tests, issue the project leader of factory with the form of mail, to use this version product instrument.This kind lettergram mode Items in order responsible official in time checks and accepts mail, otherwise likely can cause and misuse the legacy version instrument, thereby makes factory products instrument version updating cause not in time industrial accident.
In addition, engineering department of existing factory management product instrument version adopts the mode of document, product instrument and corresponding version that projects need to be used are manually recorded with the form of document, when project starts to produce, document and corresponding product instrument are issued factory's use.This kind document mode needs manual maintenance product instrument version, easily makes mistakes, not manageability and inquiry.
Summary of the invention
The technical problem to be solved in the present invention is,, for the above-mentioned defect of prior art, provides a kind of management method and system of more excellent product instrument.
The technical solution adopted for the present invention to solve the technical problems is: construct a kind of management method of product instrument, comprising:
A. after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, described project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, and described tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue;
B. after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve the corresponding project name of the selected and described instrument title of this Developmental Engineer, and, the tool content of having developed is saved in described FTP catalogue by the corresponding path of depositing of selected instrument title;
C. after Test Engineer login, according to download request, described download request comprises this Test Engineer's sign, and corresponding from described FTP catalogue deposited path and downloaded described Test Engineer and identify corresponding all tool contents; And, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result, and test by the time perform step D;
D. after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, described download request comprises corresponding project name, and corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from described FTP catalogue.
In the management method of product instrument of the present invention, between described step B and described step C, also comprise:
E. after keeper login, shows that described step B preserves in described FTP catalogue the corresponding project name of tool content, and after keeper's audit, the auditing result of receiving management person's input, pass through if examine, and performs step C; , if audit is not passed through, re-execute step B.
In the management method of product instrument of the present invention, described step B also comprises:
After Developmental Engineer's login, also receive and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs;
Described step D also comprises: the version number and the update content that show corresponding all tool contents of corresponding project name.
In the management method of product instrument of the present invention, described step B also comprises: after in described tool content is saved to described FTP catalogue, sends audit to the keeper and remind;
Described step e also comprises:, if audit is passed through, to corresponding Test Engineer, send test and remind, then perform step C;
Described step C also comprises:, if test is passed through, to the respective item responsible official, send the tool content update notifying, then perform step D.
In the management method of product instrument of the present invention,
In described step B, the mode by mail sends audit to the keeper and reminds;
In described step e, the mode by mail sends test to corresponding Test Engineer and reminds;
In described step C, the mode by mail sends test result to corresponding Developmental Engineer, and the mode by mail sends the tool content update notifying to the respective item responsible official.
The present invention also constructs a kind of management system of product instrument, comprising:
Configuration module, be used for after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, described project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, and described tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue;
Upper transmission module, be used for after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve the corresponding project name of the selected and described instrument title of this Developmental Engineer, and, the tool content of having developed is saved in described FTP catalogue by the corresponding path of depositing of selected instrument title;
Test module, be used for after Test Engineer's login, and according to download request, described download request comprises this Test Engineer's sign, and corresponding from described FTP catalogue deposited path and downloaded described Test Engineer and identify corresponding all tool contents; And, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result;
Inquiry and download module, be used for when test is passed through, after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, described download request comprises corresponding project name, and corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from described FTP catalogue.
In the management system of product instrument of the present invention, also comprise:
Auditing module, be used for after keeper's login, shows that described upper transmission module preserves in described FTP catalogue the corresponding project name of tool content, and after keeper's audit, the auditing result that receiving management person inputs.
In the management system of product instrument of the present invention, described upper transmission module also is used for also receiving and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs after Developmental Engineer's login;
Described inquiry and download module also are used for showing version number and the update content of corresponding all tool contents of corresponding project name.
In the management system of product instrument of the present invention,
Described upper transmission module also is used for sending audit to the keeper and reminding after described tool content is saved to described FTP catalogue;
Pass through if described auditing module also is used for audit, to corresponding Test Engineer, send test and remind;
Pass through if described test module also is used for test, to the respective item responsible official, send the tool content update notifying.
In the management system of product instrument of the present invention,
On described in transmission module, the mode by mail sends audit to the keeper and reminds;
In described auditing module, the mode by mail sends test to corresponding Test Engineer and reminds;
In described test module, the mode by mail sends test result to corresponding Developmental Engineer, and the mode by mail sends the tool content update notifying to the respective item responsible official.
Implement technical scheme of the present invention, compared to existing technology, have the following advantages:
1. the Test Engineer only can download the tool content of the project that this Test Engineer oneself is responsible for, and therefore compares the mode of share directory, can prevent that information from revealing;
2. after the Developmental Engineer completes the tool content of redaction, this tool content is deposited in the FTP catalogue according to respective paths, after slip-stick artist to be tested test is completed and is passed through, the project leader of factory can download this tool content according to respective paths, therefore, compare the load mode of mail, can prevent that product instrument version from causing industrial accident with mistake;
3. project configuration information and tool configuration information are that the keeper is configured in system, compare and manually record product instrument title and the tool content that each project need to be used, and are difficult for makeing mistakes, more manageable and inquiry.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples, in accompanying drawing:
Fig. 1 is the process flow diagram of the management method embodiment one of product instrument of the present invention;
Fig. 2 is the process flow diagram of the management method embodiment two of product instrument of the present invention;
Fig. 3 is the logical diagram of the management system embodiment one of product instrument of the present invention;
Fig. 4 is the logical diagram of the management system embodiment one of product instrument of the present invention.
Embodiment
Fig. 1 is the process flow diagram of the management method embodiment one of product instrument of the present invention, at first explanation is, product instrument involved in the present invention refers to the software product instrument, because a software product instrument generally all can experience a plurality of versions on stream, therefore factory need to effectively manage each version of each product instrument, so that can use the tool content of latest edition.And, also should be noted that keeper, Developmental Engineer, Test Engineer, project leader all allocate different authorities in advance in system, its concrete authority content can be consulted hereinafter.The management method of this product instrument comprises:
A. after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, described project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, and described tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue.In this step, Test Engineer sign can be Test Engineer's name, user name, job number or other has the sign of uniqueness.In addition, the FTP catalogue for example can be divided by tool types;
B. after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve the corresponding project name of the selected and described instrument title of this Developmental Engineer, and, the tool content of having developed is saved in described FTP catalogue by the corresponding path of depositing of selected instrument title.In this step, if this Developmental Engineer has completed the product instrument of a latest edition, can at first select the instrument title (in steps A, the keeper configures) of this product instrument on system interface, then the project name of selecting this instrument title to be suitable for has carried out related with tool configuration information the project configuration information in steps A like this.Simultaneously, when the selection tool title, also corresponding this tool content (annex) stored path in the FTP catalogue of having taken out of, then can deposit the tool content of latest edition in the FTP catalogue in by the above-mentioned path of depositing;
C. after Test Engineer login, according to download request, described download request comprises this Test Engineer's sign, and corresponding from described FTP catalogue deposited path and downloaded described Test Engineer and identify corresponding all tool contents; And, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result, and,, if test is passed through, perform step D.In this step, also should be noted that after Test Engineer's login, also can check that this Test Engineer identifies corresponding all instrument titles, that is, and the instrument title of all versions of all items that this Test Engineer was responsible for.In addition, also it should be noted that, if test is passed through, corresponding Developmental Engineer's product tool content typing success is described; , if test is not passed through, can return corresponding Developmental Engineer and re-start exploitation;
D. after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, described download request comprises corresponding project name, corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from described FTP catalogue, then, can carry out the project construction according to the tool content of downloading.
Fig. 2 is the process flow diagram of the management method embodiment two of product instrument of the present invention, and this embodiment compares the embodiment one shown in figure one, and difference is only between step B and step C, also to comprise:
E. after keeper login, shows the corresponding project name of tool content in the described FTP catalogue that described step B preserves, and after keeper's audit, the auditing result of receiving management person's input, pass through if examine, and performs step C; , if audit is not passed through, re-execute step B.
On the basis of above-described embodiment, step B also comprises: after Developmental Engineer's login, also receive and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs.Correspondingly, step D also comprises: show version number and the update content of corresponding all tool contents of corresponding project name, like this, the tool content that the project leader of factory can more clearly understand redaction is compared the variation of last version tool content.
On the basis of above-described embodiment, step B also comprises: after in described tool content is saved to described FTP catalogue, sends audit to the keeper and remind, preferably, can send by the mode of mail audit and remind; Step e also comprises:, if audit is passed through, to corresponding Test Engineer, send test and remind, preferably, can send by the mode of mail test and remind, then perform step C; Step C also comprises:, if test is passed through, to the respective item responsible official, send the tool content update notifying, preferably, can send update notifying by the mode of mail, then perform step D.In addition, in step C, can send test result to corresponding Developmental Engineer by the mode of mail.
Fig. 3 is the logical diagram of the management system embodiment one of product instrument of the present invention, the management system of this product instrument comprises the configuration module 10 that connects successively, upper transmission module 20, test module 30 and inquiry and download module 40, wherein, configuration module 10 is used for after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue, upper transmission module 20 is used for after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve this Developmental Engineer selected with the corresponding project name of instrument title, and, the tool content of having developed is saved in the FTP catalogue by the corresponding path of depositing of selected instrument title, and, preferably, also receive and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs, test module 30 is used for after Test Engineer's login, and according to download request, download request comprises this Test Engineer's sign, and corresponding from the FTP catalogue deposited path and downloaded the Test Engineer and identify corresponding all tool contents, and, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result, inquiry and download module 40 are used for when test is passed through, after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, download request comprises corresponding project name, and corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from the FTP catalogue, and, preferably, the version number and the update content that also show corresponding all tool contents of corresponding project name.
Fig. 4 is the logical diagram of the management system embodiment two of product instrument of the present invention, this embodiment compares embodiment shown in Figure 3, this management system also comprises auditing module 50, uploaded the tool content of redaction as the Developmental Engineer after, this auditing module 50 is used for after keeper's login, the corresponding project name of tool content that in demonstration, transmission module 20 is preserved in the FTP catalogue, and after keeper's audit, the auditing result of receiving management person's input, if audit is passed through, enter test module 30,, if audit is not passed through, reenter transmission module 20.
On the basis of above-described embodiment, upper transmission module 20 also is used for sending audit to the keeper and reminding after tool content is saved to the FTP catalogue; Pass through if auditing module 50 also is used for audit, to corresponding Test Engineer, send test and remind; Pass through if test module 30 also is used for test, to the respective item responsible official, send the tool content update notifying.Preferably, above various promptings can send by the mode of mail, that is, upper transmission module 20 sends the audit prompting by the mode of mail to the keeper; Auditing module 50 sends the test prompting by the mode of mail to corresponding Test Engineer; Test module 30 sends test result by the mode of mail to corresponding Developmental Engineer, and the mode by mail sends the tool content update notifying to the respective item responsible official.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various changes, combination and variation.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in claim scope of the present invention.

Claims (10)

1. the management method of a product instrument, is characterized in that, comprising:
A. after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, described project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, and described tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue;
B. after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve the corresponding project name of the selected and described instrument title of this Developmental Engineer, and, the tool content of having developed is saved in described FTP catalogue by the corresponding path of depositing of selected instrument title;
C. after Test Engineer login, according to download request, described download request comprises this Test Engineer's sign, and corresponding from described FTP catalogue deposited path and downloaded described Test Engineer and identify corresponding all tool contents; And, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result, and test by the time perform step D;
D. after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, described download request comprises corresponding project name, and corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from described FTP catalogue.
2. the management method of product instrument according to claim 1, is characterized in that, between described step B and described step C, also comprises:
E. after keeper login, shows that described step B preserves in described FTP catalogue the corresponding project name of tool content, and after keeper's audit, the auditing result of receiving management person's input, pass through if examine, and performs step C; , if audit is not passed through, re-execute step B.
3. the management method of product instrument according to claim 1, is characterized in that, described step B also comprises:
After Developmental Engineer's login, also receive and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs;
Described step D also comprises: the version number and the update content that show corresponding all tool contents of corresponding project name.
4. the management method of product instrument according to claim 2, is characterized in that,
Described step B also comprises: after in described tool content is saved to described FTP catalogue, sends audit to the keeper and remind;
Described step e also comprises:, if audit is passed through, to corresponding Test Engineer, send test and remind, then perform step C;
Described step C also comprises:, if test is passed through, to the respective item responsible official, send the tool content update notifying, then perform step D.
5. the management method of product instrument according to claim 4, is characterized in that,
In described step B, the mode by mail sends audit to the keeper and reminds;
In described step e, the mode by mail sends test to corresponding Test Engineer and reminds;
In described step C, the mode by mail sends test result to corresponding Developmental Engineer, and the mode by mail sends the tool content update notifying to the respective item responsible official.
6. the management system of a product instrument, is characterized in that, comprising:
Configuration module, be used for after keeper's login, receive project configuration information and the tool configuration information of this keeper's input, described project configuration information comprises a plurality of project names and the corresponding Test Engineer's sign of each project name, and described tool configuration information comprises a plurality of instrument titles and the corresponding tool content of each instrument title corresponding path of depositing in the FTP catalogue;
Upper transmission module, be used for after Developmental Engineer's login, receive the selected instrument title of this Developmental Engineer, and receive and preserve the corresponding project name of the selected and described instrument title of this Developmental Engineer, and, the tool content of having developed is saved in described FTP catalogue by the corresponding path of depositing of selected instrument title;
Test module, be used for after Test Engineer's login, and according to download request, described download request comprises this Test Engineer's sign, and corresponding from described FTP catalogue deposited path and downloaded described Test Engineer and identify corresponding all tool contents; And, after the Test Engineer has tested the tool content of downloading, receive the test result of Test Engineer's input, and to corresponding Developmental Engineer, send test result;
Inquiry and download module, be used for when test is passed through, after project leader's login, show corresponding all the instrument titles of corresponding project name, and according to download request, described download request comprises corresponding project name, and corresponding all tool contents of corresponding project name are downloaded in the corresponding path of depositing from described FTP catalogue.
7. the management system of product instrument according to claim 6, is characterized in that, also comprises:
Auditing module, be used for after keeper's login, shows that described upper transmission module preserves in described FTP catalogue the corresponding project name of tool content, and after keeper's audit, the auditing result that receiving management person inputs.
8. the management system of product instrument according to claim 6, is characterized in that, described upper transmission module also is used for also receiving and preserve the corresponding version number of corresponding tool content and update content that this Developmental Engineer inputs after Developmental Engineer's login;
Described inquiry and download module also are used for showing version number and the update content of corresponding all tool contents of corresponding project name.
9. the management system of product instrument according to claim 7, is characterized in that,
Described upper transmission module also is used for sending audit to the keeper and reminding after described tool content is saved to described FTP catalogue;
Pass through if described auditing module also is used for audit, to corresponding Test Engineer, send test and remind;
Pass through if described test module also is used for test, to the respective item responsible official, send the tool content update notifying.
10. the management system of product instrument according to claim 9, is characterized in that,
On described in transmission module, the mode by mail sends audit to the keeper and reminds;
In described auditing module, the mode by mail sends test to corresponding Test Engineer and reminds;
In described test module, the mode by mail sends test result to corresponding Developmental Engineer, and the mode by mail sends the tool content update notifying to the respective item responsible official.
CN2013102707686A 2013-06-28 2013-06-28 Product tool management method and system Pending CN103390213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102707686A CN103390213A (en) 2013-06-28 2013-06-28 Product tool management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102707686A CN103390213A (en) 2013-06-28 2013-06-28 Product tool management method and system

Publications (1)

Publication Number Publication Date
CN103390213A true CN103390213A (en) 2013-11-13

Family

ID=49534477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102707686A Pending CN103390213A (en) 2013-06-28 2013-06-28 Product tool management method and system

Country Status (1)

Country Link
CN (1) CN103390213A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110291547A (en) * 2017-02-13 2019-09-27 实耐宝公司 The automation tools data automated in the asset management system generate
CN115526460A (en) * 2022-09-09 2022-12-27 珠海安士佳电子有限公司 Intelligent production test system for security monitoring camera

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101021788A (en) * 2007-03-28 2007-08-22 成都金山互动娱乐科技有限公司 Edition management mode in network game development
JP2007265364A (en) * 2006-03-30 2007-10-11 Nec Corp Project management system and project management method
CN101814026A (en) * 2010-01-11 2010-08-25 北京世纪高通科技有限公司 Software development system and method
CN102710753A (en) * 2012-05-15 2012-10-03 华为技术有限公司 Method, device and system for publishing Internet application

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007265364A (en) * 2006-03-30 2007-10-11 Nec Corp Project management system and project management method
CN101021788A (en) * 2007-03-28 2007-08-22 成都金山互动娱乐科技有限公司 Edition management mode in network game development
CN101814026A (en) * 2010-01-11 2010-08-25 北京世纪高通科技有限公司 Software development system and method
CN102710753A (en) * 2012-05-15 2012-10-03 华为技术有限公司 Method, device and system for publishing Internet application

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110291547A (en) * 2017-02-13 2019-09-27 实耐宝公司 The automation tools data automated in the asset management system generate
CN110291547B (en) * 2017-02-13 2024-03-08 实耐宝公司 Automated tool data generation in an automated asset management system
CN115526460A (en) * 2022-09-09 2022-12-27 珠海安士佳电子有限公司 Intelligent production test system for security monitoring camera
CN115526460B (en) * 2022-09-09 2024-04-09 珠海安士佳电子有限公司 Intelligent production test system for security monitoring cameras

Similar Documents

Publication Publication Date Title
CN110378593A (en) Communications status about the application for closing rule policy update
CN107077361A (en) Configuration conversion for application deployment
CN106164859A (en) Equipment strategy manager
CN103455338A (en) Method and device for acquiring data
US11836655B2 (en) Project management devices, systems and methods
CN105915343A (en) Registered user off line activation method and system
CN104021188A (en) Mobile flight dynamic subscription method
CN103390213A (en) Product tool management method and system
CN106020904A (en) Graphical user interface displaying method and device
JP6325876B2 (en) Work management device, school lunch management device, school lunch management method, and school lunch management program
CN108885444A (en) Apparatus for management of information, approaches to IM and information management system
JP2005508555A (en) User location information registration / search method and system
US10073869B2 (en) Validating migration data by using multiple migrations
US20130317878A1 (en) Systems, Methods, and Apparatuses for Creating, Linking and Discovering Navigation Maps for Analyzing Data
CN111966725A (en) Data acquisition method and device applied between internal network and external network and electronic equipment
CN106713030A (en) Software source management method based on safety management and control and software function management system
JP6508101B2 (en) Task management apparatus and program
JP4831152B2 (en) Destination information management system, communication terminal device, and destination information management program
Morris et al. A partnership framework for geospatial data preservation in North Carolina
Wolf et al. Best Practices in Data Management at Ocean Networks Canada: a Citizen Scientist case study
Ham et al. Evaluation of Data Catalog Software for Hanford Site Environmental Datasets
CN116523471B (en) Information generation method, apparatus, electronic device and computer readable medium
Prentza et al. Testing Methodology for the TOOP Pilots
JP2007241632A (en) Process management system, problem task management method and program
CN106611396A (en) Bus card downloading management method, service platform and terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131113