CN103390106B - 风电场风机设备可用率计算方法 - Google Patents
风电场风机设备可用率计算方法 Download PDFInfo
- Publication number
- CN103390106B CN103390106B CN201310309563.4A CN201310309563A CN103390106B CN 103390106 B CN103390106 B CN 103390106B CN 201310309563 A CN201310309563 A CN 201310309563A CN 103390106 B CN103390106 B CN 103390106B
- Authority
- CN
- China
- Prior art keywords
- available rate
- fan equipment
- computation period
- equipment
- rate computation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310309563.4A CN103390106B (zh) | 2013-07-22 | 2013-07-22 | 风电场风机设备可用率计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310309563.4A CN103390106B (zh) | 2013-07-22 | 2013-07-22 | 风电场风机设备可用率计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103390106A CN103390106A (zh) | 2013-11-13 |
CN103390106B true CN103390106B (zh) | 2016-03-30 |
Family
ID=49534375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310309563.4A Active CN103390106B (zh) | 2013-07-22 | 2013-07-22 | 风电场风机设备可用率计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103390106B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106355307A (zh) * | 2016-08-19 | 2017-01-25 | 许继集团有限公司 | 一种scada系统风电机组可利用率的计算方法 |
DE102017105165A1 (de) * | 2017-03-10 | 2018-09-13 | Wobben Properties Gmbh | Verfahren zum Bestimmen einer verfügbaren Leistung eines Windparks und zugehöriger Windpark |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6516454B1 (en) * | 1999-11-19 | 2003-02-04 | Matsushita Electric Industrial Co., Ltd. | Method of estimating time delay |
CN101414751A (zh) * | 2008-11-20 | 2009-04-22 | 北京方鸿溪科技有限公司 | 风电功率预测系统及其方法、电网系统 |
CN101667226A (zh) * | 2009-09-30 | 2010-03-10 | 华北电力大学(保定) | 风电场及机组出力损失计算方法 |
-
2013
- 2013-07-22 CN CN201310309563.4A patent/CN103390106B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6516454B1 (en) * | 1999-11-19 | 2003-02-04 | Matsushita Electric Industrial Co., Ltd. | Method of estimating time delay |
CN101414751A (zh) * | 2008-11-20 | 2009-04-22 | 北京方鸿溪科技有限公司 | 风电功率预测系统及其方法、电网系统 |
CN101667226A (zh) * | 2009-09-30 | 2010-03-10 | 华北电力大学(保定) | 风电场及机组出力损失计算方法 |
Non-Patent Citations (2)
Title |
---|
A model for preventive maintenance operations and forecasting;D.Daniel Shen等;《J Intell Manuf》;20061231;全文 * |
风力发电机可用率与容量系数的分区定义及其计算;谢建民等;《电力建设》;20010930;第22卷(第9期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103390106A (zh) | 2013-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dvorkin et al. | Uncertainty sets for wind power generation | |
AU2020399503B2 (en) | Method and apparatus for detecting yaw-to-wind abnormality, and device and storage medium thereof | |
CN110648249B (zh) | 年度电力平衡测算方法、装置及设备 | |
CN104331572A (zh) | 考虑风速和风电机组故障相关性的风电场可靠性建模方法 | |
US11835032B2 (en) | Controlling wind turbine | |
CN106251045A (zh) | 基于多种主导因素的配电网供电可靠性评估方法 | |
CN102945317B (zh) | 一种考虑软件和人为因素的继电保护装置可靠性评估方法 | |
CN103390106B (zh) | 风电场风机设备可用率计算方法 | |
CN109192338B (zh) | 一种核电机组启动过程中间量程保护定值的标定方法 | |
CN115456304A (zh) | 考虑台风影响的海上风电场可靠性指标计算方法及装置 | |
CN106523300B (zh) | 基于机舱风速仪的风电机组损失电量评估方法 | |
CN104574211A (zh) | 基于风险源的电网调度操作风险预警方法和系统 | |
Gangui et al. | The ultra-short term prediction of wind power based on chaotic time series | |
CN103984987A (zh) | 一种测风网络实时校正的arma模型风电功率超短期预测方法 | |
CN103066572A (zh) | 基于保信系统的继电保护在线监测方法与装置 | |
CN106056305A (zh) | 一种基于状态聚类的发电系统可靠性快速评估方法 | |
CN105488342A (zh) | 一种配电网升压运行项目碳减排量的核算方法 | |
CN112560227A (zh) | 一种电网调度日前计划仿真预演方法 | |
Lin et al. | Frequency modeling of wind power fluctuation and the application on power systems | |
CN101819255B (zh) | 基于非线性计算断路器的有效开断次数的方法 | |
Cheng et al. | Probabilistic wind power generation model: Derivation and applications | |
Sun et al. | A zero-failure reliability demonstration approach based on degradation data | |
CN105184411B (zh) | 一种基于最大Lyapunov指数-校正的风电功率实时预测方法 | |
CN110084445B (zh) | 一种风电机组变桨用蓄电池更换周期计算方法 | |
CN106355307A (zh) | 一种scada系统风电机组可利用率的计算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160225 Address after: 200000, 1122 deep road, Shanghai Applicant after: State Grid Shanghai Municipal Electric Power Company Applicant after: Shanghai Electric Power Industrial Co., Ltd. Applicant after: Shanghai Sunrise Power Technology Co., Ltd. Address before: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building Applicant before: Shanghai Sunrise Power Technology Co., Ltd. Applicant before: Shanghai Electric Power Industrial Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |