CN103384081A - Device and method for controlling generator and mains supply to supply power to loads - Google Patents
Device and method for controlling generator and mains supply to supply power to loads Download PDFInfo
- Publication number
- CN103384081A CN103384081A CN 201310258510 CN201310258510A CN103384081A CN 103384081 A CN103384081 A CN 103384081A CN 201310258510 CN201310258510 CN 201310258510 CN 201310258510 A CN201310258510 A CN 201310258510A CN 103384081 A CN103384081 A CN 103384081A
- Authority
- CN
- China
- Prior art keywords
- generator
- control module
- load
- control
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Stand-By Power Supply Arrangements (AREA)
Abstract
The invention relates to a device for controlling a generator and the mains supply to supply power to loads. One end of a first detection module is connected with the output end of a first switching group. The other end of the first detection module is connected with a control module. The first switching group is connected with an input port of the mains supply and further connected with the control module. A second detection module is connected with the control module. One end of the generator is connected with the control module. One end of a second switching group is connected with the generator. The first switching group and the second switching group are connected with all the loads respectively. The second switching group is further connected with the control module. The second switching group is controlled by the control module to make a switch, which receives an order, of the second switching group be switched on / off. According to the device for controlling the generator and the mains supply to supply the power to the loads, the mains grid and the generator are utilized reasonably, the mains grid is prevented from being impacted by too much equipment operation, and therefore the mains grid is prevented from breaking down; meanwhile, the generator is used for supplying the power to the loads which are disconnected with the mains supply so as to meet the operation requirement of the loads; in this way, the mains supply and the generator supply the power to the loads in a reasonable distribution mode, and the safe operation of the mains supply and the loads is ensured.
Description
Technical field
The present invention relates to a kind of power supply technique field, particularly a kind ofly control control device and the method that generator and civil power power to the load.
Background technology
At present in prior art, a kind of electric supply installation that is applied to the base station can realize that automatic generation after commercial power interruption, duplicate supply change automatically, it comprises the generating set that is connected with diverter switch, the diverter switch opposite side is connected with the mains electricity input end mouth, the output of diverter switch is connected with base station communication equipment, this diverter switch is the self-starting diverter switch, is connected with the generator control module that is connected with generating set on it, and the generator control module is used for controlling the startup of generating set and closing.Adopt this electric supply installation can automatically detect the disconnected of civil power or logical, and starter-generator when civil power cuts off the power supply correspondingly, and close generator when civil power is normal, be in time the base station communication power devices safely.But this technical scheme is only determined the startup of generator or closes according to the disconnected or logical of civil power, may cause generator start frequently and close in the larger occasion of city's electro-mechanical wave, and all drop into whole loads at every turn, and then cause the problem of impacting generating equipment than great start-up current.In addition, when the quantity of load running increases, cause civil power can't satisfy load request to the power supply of load, gently cause load impaired, cause the utility grid paralysis when serious.
Summary of the invention
for above-mentioned technical problem, the technical issues that need to address of the present invention are to provide a kind of control device and method that generator and civil power power to the load of controlling, the present invention rationally utilizes utility grid and generator, avoid load impacted by electrical network and cause damage, and avoid the equipment operation too much utility grid to be impacted, make the electrical network paralysis, utilize simultaneously generator to power to the load that is cut off mains supply, operation demand with proof load, the load of reasonable distribution civil power and generator institute is powered like this, guarantee the safe operation of civil power and load.
The technical scheme that realizes the object of the invention is as follows:
Control the control device that generator and civil power power to the load, comprise control module; Mains electricity input end mouth, first detection module, the first switches set, generator, second switch group, the second detection module;
Described first detection module one end connects the first switches set output, other end link control module, and first detection module is sent to control module with the city's electric parameter information that detects;
The first switches set is connected with the mains electricity input end mouth, and the first switches set also is connected with control module, and the first controlled module controls of switches set disconnects the switch that wherein receives order;
Described the second detection module is connected with control module, and the second detection module detects the whether in running order of each load, and testing result is delivered to control module;
One end of generator is connected with control module, control module is according to the quantity of parameter and the operating load of current civil power, control generator and open or close, make generator separately to each load supplying, perhaps make civil power and generator respectively to the load supplying of correspondence;
Second switch group one end is connected with generator, and the second switch group all is connected with each load with the first switches set, and the second switch group also is connected with control module, and the controlled module controls of second switch group makes the switch that wherein receives order carry out closure or disconnection.
This intelligence controlling device also comprises a storage battery that is connected in generator output end, and control module powers to the load in situation controlling the mains electricity input end mouth, sends and makes the control command of generator work to charge to storage battery.
This intelligence controlling device also comprises an electric weight detection module that is connected with storage battery, and this electric weight detection module is sent to control module with the storage battery battery that obtains.
Intelligence controlling device also comprises an environment measuring module that is connected with control module.
Control the intelligence control method of generator powered, comprise the following steps:
Step S1, the switch in manual closing the first switches set make the loaded work piece of corresponding energising, and the numbering of the load of the second detection module under will be in working order is sent to control module, and control module records the numbering of these operating loads;
Step S2, first detection module detects the parameter information of civil power;
Step S3, control module judges the parameter value of information of civil power, judges that namely city's electric parameter value of information is whether in the scope that arranges;
Step S4 is if judgment result is that of step S3 is that control module further judge that according to the load of obtaining numbering the quantity of load running is whether in the scope of setting;
Step S5, if the determination result is NO for step S4, the control module starter-generator is worked, and disconnects a part of switch in the first switches set, the switch of closed second switch group, power to the load that disconnects civil power by generator simultaneously.
If the determination result is NO for step S3, control module is sent the instruction of starter-generator work, and disconnect switch closed in the first switches set, and send simultaneously the instruction that makes switch closure in the second switch group, power to the load that disconnects civil power by generator.
If judgment result is that of step S4 is that control module judges by the detection signal of electric weight detection module to storage battery whether the electric weight of storage battery is sufficient, if the determination result is NO, the control module starter-generator charges to storage battery, is to return to step S2 if judgment result is that.
Adopted such scheme, when connecting the work of civil power starting load, judge with the stable state to civil power by the parameter information (parameter information comprises voltage, electric current and frequency etc.) that detects civil power, if the overtension of civil power or too lowly all will control the first switches set by control module and disconnect, make the disconnection that is connected of load and civil power, thereby avoid civil power in the unstable state situation to load shock, damage load, and by the work of control module starter-generator, proceed power supply by generator to the load that is cut off mains supply.And when the load number that puts into operation is too much, detect by the operation quantity of the second detection module to load, after control module obtains this situation, numbering by load is cut off the load that a part connects civil power, can alleviate the burden of utility grid like this, demand to utility grid when avoiding load too much is large, the situation that the utility grid paralysis occurs, simultaneously by the work of control module starter-generator, powered to the load that is cut off mains supply by generator, with the operation demand of proof load.
In addition, intelligence controlling device of the present invention, when need not generator and power to the load, be that generator is under idle state status, the electric weight situation of the storage battery that control module provides according to the electric weight detection module, if the electric weight of storage battery is discontented, starter-generator charges to storage battery, in order to the generator under idle condition is used.
In sum, intelligence controlling device of the present invention rationally utilizes utility grid and generator, avoid load impacted by electrical network and cause damage, and avoid the equipment operation too much utility grid to be impacted, make the electrical network paralysis, utilize simultaneously generator to power to the load that is cut off mains supply, with the operation demand of proof load, the load of reasonable distribution civil power and generator institute is powered like this, guarantees the safe operation of civil power and load.
Description of drawings
Fig. 1 is the structured flowchart that the present invention controls the control device that generator and civil power power to the load.
Fig. 2 is the flow chart that the present invention controls the intelligence control method of generator powered.
Embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
With reference to Fig. 1, the present invention is a kind of controls the control device that generator and civil power power to the load, comprise control module 10, mains electricity input end mouth 20, first detection module 30, the first switches set 40, generator 50, second switch group 60, the second detection module 70, storage battery 80, electric weight detection module 90, environment measuring module 100, the below is elaborated to each part:
Mains electricity input end mouth 20 be utility grid to a wire-pressed terminal of load input AC electricity, it can connect some loads.
Described first detection module 20 1 ends connect the first switches set 30 outputs, other end link control module 10, and first detection module is sent to control module 10 with the city's electric parameter information that detects, and control module 10 is single-chip microcomputer or the control devices such as PLC or DSP.First detection module 20 is comprised of voltage detecting circuit, current detection circuit and frequency detection circuit, respectively the parameter information of voltage, electric current and the frequency of civil power is detected by these testing circuits, make control module know in time the concrete condition of civil power, according to these situations so that make the adjustment of power supply.
The first switches set 40 is connected with mains electricity input end mouth 20, the first switches set 40 also is connected with control module 10, the first switches set 40 is comprised of a plurality of auxiliary relays, the coil of these auxiliary relays is connected with the output of control module, the switch contacts of these auxiliary relays connects between load and mains electricity input end mouth, and therefore the first controlled module controls of switches set disconnects the switch that wherein receives order.In the first switches set 40, a plurality of switches are arranged, its quantity is more than or equal to the quantity of load, in the first switches set 40, each switch all is numbered, the mode of concrete numbering is that the numbering of connected load is identical, as the First load be numbered 1, the numbering that connects the switch of this load is also 1, in the control program of control module, by the numbering to load and switch, so that being made to disconnect ground, each switch controls.Yet, when certain load need to move, can only accordingly the switch that connects this load be carried out manual closing, i.e. the control of the closed uncontrolled module 10 of each switch in the first switches set 40.
The second detection module 70 is connected with control module 40, and the second detection module detects the whether in running order of each load, and testing result is delivered to control module.Whether the second detection module 70 is mainly to have operating current to flow in each load be used to knowing, if there is electric current to flow into, illustrates that load begins or in running order.Because every load all has numbering, therefore, detect each load by the second detection module 70, numbering to each load is identified, and send these information to control module, control module just can know that those loads are in running status, so that prepare for the concrete switch in subsequent control the first switches set 40.
One end of generator 50 is connected with control module 40, control module is according to the quantity of parameter and the operating load of current civil power, control generator and open or close, make generator separately to each load supplying, perhaps make civil power and generator respectively to the load supplying of correspondence.Namely when the overtension of civil power or too lowly all will control the first switches set by control module and disconnect, make the disconnection that is connected of load and civil power, thereby avoid civil power in the unstable state situation to load shock, damage load, and by the work of control module starter-generator, proceed power supply by generator to the load that is cut off mains supply.And when the load number that puts into operation is too much, detect by the operation quantity of the second detection module to load, after control module obtains this situation, numbering by load is cut off the load that a part connects civil power, can alleviate the burden of utility grid like this, demand to utility grid when avoiding load too much is large, the situation that the utility grid paralysis occurs, simultaneously by the work of control module starter-generator, powered to the load that is cut off mains supply by generator, with the operation demand of proof load.
Environment measuring module 100 is connected with control module, environment measuring module 100 after ambient temperature surpasses set point, shows that some serious situations can appear in surrounding environment for detection of the temperature of surrounding environment, for example fire, at this moment control the first switches set and second switch group and disconnect.
With reference to Fig. 2, the intelligence control method of control generator powered of the present invention comprises the following steps:
Step S1, the switch in manual closing the first switches set make the loaded work piece of corresponding energising, and the numbering of the load of the second detection module under will be in working order is sent to control module, and control module records the numbering of these operating loads;
Step S2, first detection module detects the parameter information of civil power;
Step S3, control module judges the parameter value of information of civil power, judges that namely city's electric parameter value of information is whether in the scope that arranges;
Step S31, if the determination result is NO for step S3, control module is sent the instruction of starter-generator work, and disconnects switch closed in the first switches set, send simultaneously the instruction that makes switch closure in the second switch group, power to the load that disconnects civil power by generator.
Step S4 is if judgment result is that of step S3 is that control module further judge that according to the load of obtaining numbering the quantity of load running is whether in the scope of setting;
Step S5, if the determination result is NO for step S4, the control module starter-generator is worked, and disconnects a part of switch in the first switches set, the switch of closed second switch group, power to the load that disconnects civil power by generator simultaneously.
Step S6 is if judgment result is that of step S4 is that control module is by the detection signal of electric weight detection module to storage battery, whether the electric weight that judges storage battery is sufficient, if the determination result is NO, the control module starter-generator charges to storage battery, if judgment result is that to be, return to step S2.
Identical in the control procedure of method of the present invention and effect and aforementioned intelligent control device do not given unnecessary details at this.
Claims (7)
1. control the control device that generator and civil power power to the load for one kind, it is characterized in that, comprise control module, mains electricity input end mouth, first detection module, the first switches set, generator, second switch group, the second detection module;
Described first detection module one end connects the first switches set output, other end link control module, and first detection module is sent to control module with the city's electric parameter information that detects;
The first switches set is connected with the mains electricity input end mouth, and the first switches set also is connected with control module, and the first controlled module controls of switches set disconnects the switch that wherein receives order;
Described the second detection module is connected with control module, and the second detection module detects the whether in running order of each load, and testing result is delivered to control module;
One end of generator is connected with control module, control module is according to the quantity of parameter and the operating load of current civil power, control generator and open or close, make generator separately to each load supplying, perhaps make civil power and generator respectively to the load supplying of correspondence;
Second switch group one end is connected with generator, and the second switch group all is connected with each load with the first switches set, and the second switch group also is connected with control module, and the controlled module controls of second switch group makes the switch that wherein receives order carry out closure or disconnection.
2. a kind of control device that generator and civil power power to the load of controlling according to claim 1, it is characterized in that, this intelligence controlling device also comprises a storage battery that is connected in generator output end, control module powers to the load in situation controlling the mains electricity input end mouth, sends and makes the control command of generator work to charge to storage battery.
3. a kind of control device that generator and civil power power to the load of controlling according to claim 2, it is characterized in that, this intelligence controlling device also comprises an electric weight detection module that is connected with storage battery, and this electric weight detection module is sent to control module with the storage battery battery that obtains.
4. a kind of control device that generator and civil power power to the load of controlling according to claim 1 and 2, is characterized in that, intelligence controlling device also comprises an environment measuring module that is connected with control module.
5. an intelligence control method of controlling generator powered, is characterized in that, comprises the following steps:
Step S1, the switch in manual closing the first switches set make the loaded work piece of corresponding energising, and the numbering of the load of the second detection module under will be in working order is sent to control module, and control module records the numbering of these operating loads;
Step S2, first detection module detects the parameter information of civil power;
Step S3, control module judges the parameter value of information of civil power, judges that namely city's electric parameter value of information is whether in the scope that arranges;
Step S4 is if judgment result is that of step S3 is that control module further judge that according to the load of obtaining numbering the quantity of load running is whether in the scope of setting;
Step S5, if the determination result is NO for step S4, the control module starter-generator is worked, and disconnects a part of switch in the first switches set, the switch of closed second switch group, power to the load that disconnects civil power by generator simultaneously.
6. control according to claim 5 the intelligence control method of generator powered, it is characterized in that, if the determination result is NO for step S3, control module is sent the instruction of starter-generator work, and disconnect in the first switches set closed switch, send simultaneously the instruction that makes switch closure in the second switch group, power to the load that disconnects civil power by generator.
7. control according to claim 5 the intelligence control method of generator powered, it is characterized in that, if judgment result is that of step S4 is, control module is by the detection signal of electric weight detection module to storage battery, whether the electric weight that judges storage battery is sufficient, if the determination result is NO, the control module starter-generator charges to storage battery, if judgment result is that to be, return to step S2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201310258510 CN103384081A (en) | 2013-06-25 | 2013-06-25 | Device and method for controlling generator and mains supply to supply power to loads |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201310258510 CN103384081A (en) | 2013-06-25 | 2013-06-25 | Device and method for controlling generator and mains supply to supply power to loads |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103384081A true CN103384081A (en) | 2013-11-06 |
Family
ID=49491812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201310258510 Pending CN103384081A (en) | 2013-06-25 | 2013-06-25 | Device and method for controlling generator and mains supply to supply power to loads |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103384081A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104797034A (en) * | 2014-01-21 | 2015-07-22 | 深圳市海洋王照明工程有限公司 | Mobile illuminating lighthouse and controller thereof |
CN105242578A (en) * | 2015-09-29 | 2016-01-13 | 北京航天发射技术研究所 | Generating set control management monitoring method |
CN108923419A (en) * | 2018-07-11 | 2018-11-30 | 佛山市众盈电子有限公司 | It is a kind of intelligence alternating current identification with control power supply |
CN109038791A (en) * | 2017-06-12 | 2018-12-18 | 天津市中力防雷技术有限公司 | A kind of power-supply device |
CN109149763A (en) * | 2018-09-27 | 2019-01-04 | 江苏瑞昌哥尔德发电设备股份有限公司 | A kind of generating set self-starting intelligence control system |
WO2019062772A1 (en) * | 2017-09-26 | 2019-04-04 | 中兴通讯股份有限公司 | Method and apparatus for automatically switching between mains power and electric generator |
CN110086247A (en) * | 2019-05-08 | 2019-08-02 | 冯刘海 | The power supply system of data center |
CN111566888A (en) * | 2017-10-20 | 2020-08-21 | 康明斯发电机有限公司(英国) | Hybrid universal load regulator |
-
2013
- 2013-06-25 CN CN 201310258510 patent/CN103384081A/en active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104797034A (en) * | 2014-01-21 | 2015-07-22 | 深圳市海洋王照明工程有限公司 | Mobile illuminating lighthouse and controller thereof |
CN105242578A (en) * | 2015-09-29 | 2016-01-13 | 北京航天发射技术研究所 | Generating set control management monitoring method |
CN105242578B (en) * | 2015-09-29 | 2018-08-07 | 北京航天发射技术研究所 | Generator set control manages monitoring method |
CN109038791A (en) * | 2017-06-12 | 2018-12-18 | 天津市中力防雷技术有限公司 | A kind of power-supply device |
WO2019062772A1 (en) * | 2017-09-26 | 2019-04-04 | 中兴通讯股份有限公司 | Method and apparatus for automatically switching between mains power and electric generator |
CN111566888A (en) * | 2017-10-20 | 2020-08-21 | 康明斯发电机有限公司(英国) | Hybrid universal load regulator |
CN111566888B (en) * | 2017-10-20 | 2023-05-05 | 康明斯发电机有限公司(英国) | Hybrid universal load regulator |
CN108923419A (en) * | 2018-07-11 | 2018-11-30 | 佛山市众盈电子有限公司 | It is a kind of intelligence alternating current identification with control power supply |
CN109149763A (en) * | 2018-09-27 | 2019-01-04 | 江苏瑞昌哥尔德发电设备股份有限公司 | A kind of generating set self-starting intelligence control system |
CN110086247A (en) * | 2019-05-08 | 2019-08-02 | 冯刘海 | The power supply system of data center |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103384081A (en) | Device and method for controlling generator and mains supply to supply power to loads | |
CN105591460B (en) | System and method for battery management | |
US11073807B2 (en) | Method and apparatus for activation and de-activation of power conditioners in distributed resource island systems using low voltage AC | |
CN103545911B (en) | A kind of uninterruptible power system of dual input intelligent power supply | |
CN106877311B (en) | A kind of direct current photovoltaic generating system | |
AU2018227610B2 (en) | Extending black-start availability using energy storage systems | |
CN106992550B (en) | Control device and collection flow box | |
KR102299604B1 (en) | An energy storage system | |
CN108162782B (en) | Energy-saving direct current charging method | |
JP2022051909A (en) | Charge/discharge device and power supply switching system | |
CN103378720A (en) | Compressor capacity charge control device and method and compressor | |
TWI723454B (en) | Power Systems | |
CN102412608B (en) | Charging and discharging circuit for electrical system | |
CN210109280U (en) | Remote capacity checking system for storage battery of electric direct-current power supply | |
CN103683467A (en) | Independent photovoltaic power supply system with self-starting function | |
CN101441446A (en) | Power supply controller | |
JP2022067093A (en) | Power supply device terminal backup switch unit | |
JP2002044869A (en) | Power conversion device | |
CN205666679U (en) | UPS of bypass automatic switch -over type | |
JP2007288932A (en) | Charge control device of photovoltaic power generation facility | |
CN203434734U (en) | Control device controlling power generator and commercial power to power loads | |
CN104377809A (en) | Intelligent control device of communication station low-voltage distribution system | |
KR20180099279A (en) | Energy storage system including energy storage device | |
CN105490368A (en) | Auxiliary power supply redundant power supply circuit and start-stop control system of UPS | |
CN111264012A (en) | Method for black start of an energy supply device, bidirectional inverter and energy supply device having a bidirectional inverter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131106 |