CN103372829A - Socket spanner - Google Patents

Socket spanner Download PDF

Info

Publication number
CN103372829A
CN103372829A CN2013102967113A CN201310296711A CN103372829A CN 103372829 A CN103372829 A CN 103372829A CN 2013102967113 A CN2013102967113 A CN 2013102967113A CN 201310296711 A CN201310296711 A CN 201310296711A CN 103372829 A CN103372829 A CN 103372829A
Authority
CN
China
Prior art keywords
worm gear
worm
socket
shaft
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102967113A
Other languages
Chinese (zh)
Inventor
傅岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013102967113A priority Critical patent/CN103372829A/en
Publication of CN103372829A publication Critical patent/CN103372829A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a socket spanner comprising a shell, a shaft II and a worm gear. The shaft II and the worm gear are rotatably disposed in the shell. A worm is arranged at the bottom of the shaft II, and is mutually meshed with the worm gear. A socket penetrates the shell to be fixed on the worm gear, and the axis of the socket mutually coincides with that of the worm gear. During use, the head end of the shaft II is clamped by a chuck of a piston drill, the socket is axially sleeved on a nut or a bolt head, a switch of the piston drill is pressed to drive the shaft II to rotate, the worm gear is driven to rotate by the worm, and the socket is driven to rotate to have the nut or the bolt head removed or screwed tightly. Due to the fact that the worm gear is meshed with the worm and the axis of the shaft II is mutually vertical to that of the socket, operation comfortableness and work efficiency are improved, and the problems that an open spanner is easy to slip and causes damage to the nut are solved.

Description

A kind of box spanner
Technical field
The present invention relates to a kind of hardware ﹠ tools, be specifically related to a kind of box spanner.
Background technology
In the sleeve barrel tool of using at present, the axial sleeve spanner is commonly used, and do not have at present from the box spanner that axially becomes vertical direction, but in the auto repair process, there is certain problem that does not have the operating space in the axial sleeve spanner.Because automobile manufacturing process is to hang in the engine nacelle after the engine final assembly is good to install and fix, and be to repair with regard to the car formula during maintenance, can not hang out the cabin to engine to keep in repair that only rebuilding an engine to hang out the cabin.Nowadays above very compact narrow, the limited space of its engine nacelle parts of automobile of medium and high classes, it is very difficult to disassemble bolt.Handle jacket, the dismounting of open-end wrench double offset ring spanner instrument are used at present auto repair substantially, and the disassembly process spanner needs continuously alternately, and the translation-angle low-angle repeats rotation and disassembles the loading and unloading bolt.If the operation under the obstacle is arranged, increase especially operation easier under plumbness.
Summary of the invention
The present invention is in order to overcome the deficiency of above technology, provide a kind of can be from axially becoming the box spanner of vertical direction.
The present invention overcomes the technical scheme that its technical problem adopts:
This box spanner, comprise that shell, the axle II, the rotation that rotatably are installed in the shell are installed on the worm gear in the shell, the bottom of described axle II is provided with worm screw, and described worm and wheel is intermeshing, sleeve passes shell and is fixed on the worm gear, and the axis of the axis of sleeve and worm gear overlaps.
Can change angle by any direction when realizing dismounting, also comprise the axle I, described axle I is connected and fixed by universal drive shaft and axle II.
The invention has the beneficial effects as follows: the head end of during use the chuck of power drill being clamped the axle II, afterwards sleeve is set on nut or the bolt head vertically, press afterwards the switch of power drill, its driving shaft II is rotated, thereby the axle II is rotated and is relied on the worm drive worm gear to rotate, and screws thereby make the sleeve rotation make it with nut or bolt head dismounting or install.Because the engagement of worm gear and worm screw makes the axis of axle II mutually vertical with the axis of sleeve, therefore by changing angle, so that get final product operation in the hand-held situation of power drill perpendicular to bolt or nut axis.Namely improve the comfortableness of operation, improved operating efficiency, solved again the problem of utilizing the easy slippage of open-end wrench and damaging nut.
Description of drawings
Fig. 1 is structural representation of the present invention;
Among the figure, 1. axle I 2. universal drive shafts 3. axle II 4. shells 5. worm gears 6. sleeves 7. worm screws.
The specific embodiment
The present invention will be further described below in conjunction with accompanying drawing 1.
This box spanner, comprise that shell 4, the axle II 3, the rotation that rotatably are installed in the shell 4 are installed on the worm gear 5 in the shell 4, the bottom of described axle II 3 is provided with worm screw 7, described worm screw 7 is intermeshing with worm gear 5, sleeve 6 passes shell 4 and is fixed on the worm gear 5, and the axis of the axis of sleeve 6 and worm gear 5 overlaps.During use the chuck of power drill is clamped the head end of axle II 3, afterwards sleeve 6 is set on nut or the bolt head vertically, press afterwards the switch of power drill, its driving shaft II 3 is rotated, thereby axle II 3 is rotated and is relied on worm screw 7 to drive worm gear 5 rotations, screws thereby make sleeve 6 rotations make it with nut or bolt head dismounting or install.Because the engagement of worm gear 5 and worm screw 7 makes the axis of axle II 3 mutually vertical with the axis of sleeve 6, therefore by changing angle, so that get final product operation in the hand-held situation of power drill perpendicular to bolt or nut axis.Namely improve the comfortableness of operation, improved operating efficiency, solved again the problem of utilizing the easy slippage of open-end wrench and damaging nut.
Can also comprise axle I 1, described axle I 1 is connected and fixed by universal drive shaft 2 and axle II 3.Power drill is clamped axle I 1, because universal drive shaft 2 has the effect of arbitrarily angled transmission driving torque, the direction of therefore hand-held power drill can tilt arbitrarily, with operation in the narrow and small crowded space of better use enging cabin during use.

Claims (2)

1. box spanner, it is characterized in that: comprise that shell (4), the axle II (3), the rotation that rotatably are installed in the shell (4) are installed on the worm gear (5) in the shell (4), the bottom of described axle II (3) is provided with worm screw (7), described worm screw (7) is intermeshing with worm gear (5), sleeve (6) passes shell (4) and is fixed on the worm gear (5), and the axis of the axis of sleeve (6) and worm gear (5) overlaps.
2. box spanner according to claim 1 is characterized in that: also comprise axle I (1), described axle I (1) is connected and fixed by universal drive shaft (2) and axle II (3).
CN2013102967113A 2013-07-16 2013-07-16 Socket spanner Pending CN103372829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102967113A CN103372829A (en) 2013-07-16 2013-07-16 Socket spanner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102967113A CN103372829A (en) 2013-07-16 2013-07-16 Socket spanner

Publications (1)

Publication Number Publication Date
CN103372829A true CN103372829A (en) 2013-10-30

Family

ID=49458986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102967113A Pending CN103372829A (en) 2013-07-16 2013-07-16 Socket spanner

Country Status (1)

Country Link
CN (1) CN103372829A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162044A (en) * 2015-10-22 2015-12-16 国家电网公司 Multifunctional operating tool for fastening 10kV high-voltage distribution line porcelain insulator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020005094A1 (en) * 2000-05-15 2002-01-17 Parrick Stephen F. Extendible and rectractable tool for applying torque to wheel lug nuts
CN2685008Y (en) * 2003-09-24 2005-03-16 张本贵 Socket wrench
CN2855649Y (en) * 2005-08-02 2007-01-10 徐群强 Electric spanner
CN101676071A (en) * 2008-09-19 2010-03-24 王建鹏 Socket wrench
CN203343961U (en) * 2013-07-16 2013-12-18 傅岩 Sleeve spanner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020005094A1 (en) * 2000-05-15 2002-01-17 Parrick Stephen F. Extendible and rectractable tool for applying torque to wheel lug nuts
CN2685008Y (en) * 2003-09-24 2005-03-16 张本贵 Socket wrench
CN2855649Y (en) * 2005-08-02 2007-01-10 徐群强 Electric spanner
CN101676071A (en) * 2008-09-19 2010-03-24 王建鹏 Socket wrench
CN203343961U (en) * 2013-07-16 2013-12-18 傅岩 Sleeve spanner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162044A (en) * 2015-10-22 2015-12-16 国家电网公司 Multifunctional operating tool for fastening 10kV high-voltage distribution line porcelain insulator

Similar Documents

Publication Publication Date Title
CN203317281U (en) Worm and gear wrench for mounting and demounting bolts in small spaces
CN201537891U (en) Normal axis wrench suitable for a small operation space
CN105291031A (en) Arm type rapid nut dismounting machine tool
CN208005547U (en) A kind of Chain wrench
CN106122233A (en) Pine does not take off clamp device and electric wrench thereof
CN205097106U (en) Arm -type quick nut dismouting machines
CN105415258A (en) Chain driven wrench
CN203343961U (en) Sleeve spanner
CN205889076U (en) Electricity movable sleeve spanner
CN103372829A (en) Socket spanner
CN207465092U (en) A kind of tool of automobile the turn of the screw
CN209755037U (en) Detachable nut screwing device
CN201613449U (en) Multi-head fully-screwed type mechanical wrench
CN201128355Y (en) Assembling-disassembling machine for tyre of pneumatic automobile
CN2483152Y (en) Multi-purpose self-tapping drill
CN101745803A (en) Multi-head all-screwing type mechanical wrench
CN202169552U (en) Quick socket wrench
CN203141396U (en) Electric wrench
CN203426918U (en) Spanner
CN204800593U (en) Electric tool of ability fitting attachments
CN202088144U (en) Device used for screwing or unscrewing nut of pipeline connector
CN202137387U (en) Reverser for quickly mounting and dismounting nuts in small space
CN2685008Y (en) Socket wrench
CN210589001U (en) Spanner is used in little space
CN216607904U (en) Wheel hub diskless locking system of tire changer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131030